CN104268733A - Lean logistics system based on spectaculars - Google Patents

Lean logistics system based on spectaculars Download PDF

Info

Publication number
CN104268733A
CN104268733A CN201410532375.2A CN201410532375A CN104268733A CN 104268733 A CN104268733 A CN 104268733A CN 201410532375 A CN201410532375 A CN 201410532375A CN 104268733 A CN104268733 A CN 104268733A
Authority
CN
China
Prior art keywords
demand
billboard
expect
data
order
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410532375.2A
Other languages
Chinese (zh)
Other versions
CN104268733B (en
Inventor
孙赫勇
王涛
彭清畅
高川
柳少华
孙华
曹炳欣
姜毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Qingdao Sifang Co Ltd
Original Assignee
CSR Qingdao Sifang Locomotive and Rolling Stock Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSR Qingdao Sifang Locomotive and Rolling Stock Co Ltd filed Critical CSR Qingdao Sifang Locomotive and Rolling Stock Co Ltd
Priority to CN201410532375.2A priority Critical patent/CN104268733B/en
Publication of CN104268733A publication Critical patent/CN104268733A/en
Application granted granted Critical
Publication of CN104268733B publication Critical patent/CN104268733B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management

Abstract

The invention provides a lean logistics system based on the spectaculars. According to the system, generation of the material demand spectaculars is achieved through materials in a production order or three-day schedule by means of the parallel processing technique according to working procedure and team information, 20-30 tasks are defined according to the data size to be calculated, a name is assigned to each task, task names are allocated to all the order procedures in a circulating mode according to the defined task number, and only data corresponding to the name of the task operating currently are used during working; meanwhile, to utilize server resources to the maximum, weight allocation is conducted according to the work center, and the weight and work center data size is in direct proportion to the total number; during spectaculars detail generation, due to the large data size, data insertion and calculation of the spectaculars are both conducted through background jobs, and in this way, time difference exists compared with actual business, and it also means that discrepant data exist. According to the system, operation identification is added to the data of the material demand spectaculars to be generated.

Description

A kind of lean logistics system based on billboard
Technical field
The invention belongs to motor-car manufacturing technology field, particularly a kind of in motor-car manufacture process based on the lean logistics system of billboard.
Background technology
Two large foundations of material allocation are exactly MRP and billboard.
MRP refers to subordinate according to each level article of product structure and quantitative relation, with each article for plan object, with the period of completion for time reference back scheduling, by time in advance length distinguish each material and to assign plans the sequencing of time, it is plan management of materials and quipment pattern in a kind of industrial manufacturing enterprise, MRP can help people that MPS is converted to CRP, generate load report, then according to load report analysis result and feedback adjusting MPS, but it should be noted that in the process of feedback adjusting, artificial participation is a lot, also do not have now MRP system can overload in self-poise ability need or underload situation, in addition, whether the beat of each operation activity in production of production scene is in step with is the key of production control, if adopt MRP system to manage, just there will be, by MRP system, respectively production ordering is assigned to each operation, each operation to go into operation production separately according to its instruction, the demand of the later process that preceding working procedure goes out according to system-computed carries out activity in production, not necessarily match with the actual demand of later process, this is because, the plan time zone of MRP is normally in units of week or sky, and the enterprise of in fact many enterprises especially production line balance mode, process time of each operation is with minute even Miao Zuo unit.The chronomere of system, with actual inconsistent, just easily causes the mistiming between the demand of system and actual demand, thus easily cause production scene overstock the confusion with activity in production at goods.
Billboard mode derives from TPS (Toyota Production System Toyota's production system), billboard mode is the realization rate under JIT production planning mode, be exactly punctual dispensing for Enterprise Logistic System, logistics tally-man can according to material billboard, determine the concrete time of feeding, deliver goods place and deliver goods material, the dispensing of material is carried out according to the concrete detail of billboard, according to the experience of Toyota Motor company, merely adopt the rationalization of the impossible round Realization production run of kanban system.
Therefore, MRP and kanban system have his own strong points, and respectively have shortage again, if a kind of manufacturing management system as enterprise is only selected in both by enterprise, inevitably run into respective defect.
Summary of the invention
In order to overcome MRP and kanban system shortcoming separately, the invention provides the lean logistics system based on billboard, namely no matter be network, maintenance order and production order, no matter when creating or change, all directly upgrade the material requirement table of lean logistics banner system, be convenient to system craft or backstage calculates billboard data automatically, achieve lean logistics kanban system, thus improve the flow process of logistics distribution, emphasis solves the disparities between supply and demand manufacturing on-the-spot material, to produce order-driven market logistics, the requirement command that the production of preceding working procedure and materials procurement are transmitted in strict accordance with later process carries out, make the flow process of whole logistics distribution that MRP " pushing away " is become " drawing " of kanban system.
The technical solution adopted for the present invention to solve the technical problems is, a kind of lean logistics based on billboard realizes method, system, comprising: basic information management, order management, process management, will expect demand management, wherein
Basic information management: comprise work centre, product structure BOM that material information, described order will be produced shows;
Order management: comprise product information, product quantity, target date;
Described BOM table comprises: the quantity of material, described material;
Described operation, comprising: the material produced/purchase, relevant work centre, production/procurement cycle;
Expect demand management: show for the BOM according to described order product, and the material related in described BOM and the described material operation of being correlated with adopt parallel processing technique to generate need the situation of certain material in certain time;
Stock control: for recording the real time data of material in warehouse, and according to the described material requirement period planning will expected in demand management, generate outbound list by needing the material of outbound.
Describedly will expect that demand management also comprises: task management, described task management, comprising: job title, and described task management is used for the quantity according to all process steps in described BOM table, and each operation shown for described BOM distributes a described operation;
Preferred described operation is 20-30, and described task management is used for, and all process steps in described BOM table is divided into 20-30 part, and every part is distributed an operation;
Work centre also comprises weight, described weight, refers to that material that described work centre uses accounts for the number percent of total material; Described task management be also included in into described BOM distribute operation time, in the operation in the BOM that every part of described operation is corresponding, the quantity that the data belonging to described work centre account for all process steps of described operation is, the weight of described work centre;
Preferably, described work centre comprises: general assembly material, bogie are arranged and car body design;
Preferably, the weight of described general assembly material is 50% to 60%, when distributing operation for described general assembly material, has the described BOM data of 50% to 60% to belong to described general assembly material in each operation; The weight that described bogie is arranged is 10% to 20%, when arranging distribution operation for described bogie, has the described BOM data of 10% to 20% to belong to described bogie and arrange in each operation; The weight of described car body design is 20% to 30%, when distributing operation for described car body design, has the described BOM data of 20% to 30% to belong to described car body design in each operation.
Describedly will expect that demand management also comprises computing and indicates, described computing indicates, for mark during described BOM shows need to generate described in expect the data of demand;
Preferably, the computing of each node of the relevant BOM table of newly-built order is designated sky;
Preferably, the initial value that described computing indicates is " X ", and the execution end value that described computing indicates is " Z ".
Also comprise log management, described log management comprises log sheet, for store generate described in expect that demand is made mistakes time data; When expecting that demand is made mistakes described in generating, the misdata in log sheet, stored in described log sheet, when generation will expect demand next time, generates and will expect demand by described misdata again, and will expect described in generating that the daily record data of demand is deleted;
Described log sheet comprises: order number, plan stream day, operation, material, quantity, plan are got the raw materials ready day, warehouse compartment, work centre, Log Types;
Preferably, when will expect demand billboard described in each generation, all the misdata in described log management is generated billboard data;
Preferably, described Log Types comprises: order change, three daily planning changes or operation change
Preferably, described log management also comprises show log information, deletes log information.
Described work centre also comprises logistics center, according to described, described logistics center will expect that demand generates described outbound list; Described material is sent to described feeding place from described goods yard according to described outbound list by described tally-man, and operation is sent in execution; Described operation of sending to is exactly will expect that the material information described in demand billboard is set to completion status by described, carries out delivery simultaneously and to transfer items registration;
Preferably, whether described material type comprises is recoil material, if described material is recoil material, described stock movement to described work centre, is remembered that logistics stockpile number reduces by described tally-man simultaneously; Then carry out described delivery if not recoil material to transfer items registration, the minimizing of note stock material.
The described lean logistics system based on billboard, is applied to motor-car manufacturing;
Preferably, described order comprises: order number, completion date, material, quantity, Order Type;
Preferably, described Order Type comprises: produce order, maintenance order and the production schedule on the three;
Preferably, described order also comprises: plan stream day, and the plan of described maintenance order is any one day after current date in three days stream day;
Preferably, described operation also comprises: operation title, material, quantity, deliver goods/production cycle, work centre, teams and groups;
Preferably, describedly to expect that demand is for comprising: order number, operation, material, quantity, plan are got the raw materials ready day;
Preferably, described to expect that demand generates after, multiplely to expect demand by get the raw materials ready day, described work centre, operation and/or teams and groups' display of described plan;
Preferably, the plan described in material demand to get the raw materials ready described day, be current date data one day after, generate described outbound list;
Preferably, described material comprises material type, warehouse compartment, goods yard, tally-man, procurement cycle;
Preferably, describedly to expect that demand is to expect demand billboard;
Preferably, described operation also comprises operation type, and described operation type is: buying or production;
Preferably, described operation also comprises: the lower stage material producing described material needs, and when described operation type is for buying, described lower stage material is empty;
Preferably, described operation and BOM show in material one_to_one corresponding.
For the step of the peer distribution operation of BOM table is as follows:
1) quantity of all nodes that described BOM shows is calculated;
2) by step 1) quantity of all nodes that calculates divided by the quantity of operation, obtain the number of nodes of the described BOM table distributed for each operation;
3) be current work by first operational definition;
4) from the root node of BOM table, be the title of all peer distribution current work in described BOM table, when being described peer distribution job title at every turn, be recorded as the number of nodes of the described BOM table that described operation distributes, when described quantity reaches step 2) in after each operation of definition allows the operation quantity of distributing, be current work by next operational definition; Repeated execution of steps 4) until all distribute job title for all nodes in described BOM table.
Step for the peer distribution operation of BOM table after the weight considering each work centre is as follows:
1) quantity that described BOM shows all nodes is calculated;
2) by step 1) quantity of all nodes that calculates divided by the quantity of operation, obtain the number of nodes of the described BOM table distributed for each operation;
3) according to described step 2) the described number of nodes of BOM table distributed for described each operation that calculates and the weight calculation of each work centre obtain: the BOM belonging to each work centre in each operation shows the quantity of node;
4) be current work by first operational definition;
5) first job center is defined as work at present center;
6) from affiliated BOM table, obtain a certain amount of data of not yet distributing operation in work at present in the heart, distribute to described current work; Described be a certain amount ofly: step 3) calculate, the BOM belonging to each work centre in each operation shows the quantity of node;
7) a rear work centre is defined as work at present center, and performs step 6), until the data at all working center are all assigned with current work in BOM table;
8) be work at present center by next operational definition, perform step 5) until perform last operation;
9) data for not yet distributing operation in remaining all BOM tables distribute last operation.
The invention has the beneficial effects as follows, based on the pattern of infotech, under the guidance of lean production Advanced Idea and technology, combine with MRP and logistics billboard theory, the infosystem being target with actual lean logistics dispensing, the application of native system, effectively improve logistics distribution flow process, solve emphatically the disparities between supply and demand problem manufacturing on-the-spot material, stock clerk joins station information according to the operation in logistics electronic system, station material, can inquire about the material requirement of production team at any time.Even if production subsidiary factory does not propose billboard, also stock information can be checked according to MPS and MRP, accomplish that material joins platform in advance in storehouse, the requirement command that the production of preceding working procedure and materials procurement work are strictly transmitted according to later process carries out.Also ensure that the material allocation time tapers to the shortest like this, and effectively decrease material storage overstock and the occupation of capital.
Design alteration is an important service in company's production and operating activities, when user's request change, supplier change, there are quality problems in product, and when there is deviation in production manufacture process, the requirement of design alteration all may be proposed, the well-regulated enterprise of design alteration, the support of enterprise information system can be relied on, organize all departments personnel complete design redirection activity quickly and efficiently.Comprehensive quality management is the key business of business administration work, and to control design alteration well be the core work of quality management.Main and the most difficult task of design alteration activity keeps the integrality of product data, consistance and trackability.Lean logistics banner system can ensure the amendment of a series of product data that design alteration causes and version evolving consistance, namely all can obtain the complete consistent product data describing product unique technical state at any time; The version relationship between data can be recorded, ensure the trackability of data.Lean logistics banner system reaches following effect:
1) design alteration related products data relationship is complicated, and the product data model setting up a complete support design alteration is basis.
2) the workflow drive system of robotization is provided, controls the carrying out of change procedure.Workflow defining tool pre-defines the standard operation flow process of all kinds of change, coordinated scheduling task, personnel, data under the control of workflow, completes the orderly change of product data.
3) the file structure pattern of design alteration is complicated and changeable, and system provides the user interface function of process complex data.
4) following functions is supported in design alteration: design alteration request slip, modified application, change file management; Flow definition and the examination & approval of design alteration control; The consistance integrity checking of product data and version upgrade control; The change inquiry of parts in design alteration; The Event Service that information process is integrated.
In motor-car manufacturing, monthly can produce up to ten thousand and produce order, namely the issuance of materials of hundreds of thousands procedure even up to a million is had, these materials are allowed to be dealt into corresponding production team in suitable time, place, guarantee the demand that company's lean is produced, the lean logistics system based on billboard have also been devised tally-man, goods yard, material function one to one; Namely after guaranteeing that billboard runs, each material, all can corresponding corresponding goods yard, unique tally-man; Make the granularity refinement of logistics management.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the lean logistics system based on billboard of the present invention is specifically described.
Fig. 1 is the structural representation of the lean logistics system that the present invention is based on billboard;
Fig. 2 is the structural representation of BOM table;
Fig. 3 is the structural representation of production subsidiary factory in the present invention;
Fig. 4 is lean billboard data flowchart of the present invention;
Fig. 5 is the network topological diagram that the present invention realizes.
Embodiment
Billboard is formed: electronic board is by come back and detailed (also i.e. project) form, and billboard new line is in units of order, comprises the demand number of gathering, process route, sequence, record type, work centre, production order number, production order status etc.; Because billboard is using operation as minimum dispensing unit, so detail is in units of operation, comprises the demand number of gathering, process route, platform position, demand material, factory, stock locations, recoil mark, will the specifying informations such as time be expected.Meet the requirement of lean production dispensing, in lean logistics banner system, by the demand number of gathering, the new line of billboard is connected with detail.
Work centre in the present invention comprises production subsidiary factory and logistics center.
One, billboard generates:
1, the production schedule of motor-car manufacture is mainly derived from produces order and maintenance order (being also maintenance work order), the complicacy manufacturing the production schedule in view of motor-car and the change that may exist, and inevitably impact is changed in engineering design, logistics center is to production subsidiary factory issuance of materials, do not take the active means of distribution arranged based on the stable production schedule, but take means of distribution as required, production subsidiary factory is needed to propose to expect demand based on the production schedule in three days, subsequent production subsidiary factory submits to demand personnel according to expecting demand inventory, with operation and/or teams and groups' node, will expect that the release of demand inventory is submitted to logistics center, and the transmission of these production orderings has all been come by billboard, here the production schedule deriving from maintenance work order directly generates billboard data, and the billboard deriving from maintenance order only has data.
Based in the lean logistics system of billboard, if there is multiple billboard, can writes in the table of backstage, be focused on by background job.
2, billboard generates, and backstage can be divided into automatically to run formulate manual with foreground
2.1 high for priority level, to need emergency treatment billboard, can adopt the manual input mode in foreground to submit billboard to.When formulating by hand on foreground, system can judge the quantity that user inputs, if the billboard quantity that will run of user's input can point out mistake more than 100 systems, this act as avoids people to be input error, improves the operational efficiency of system.
2.2 motor-cars in process of production, each is produced order and relates to material process up to ten thousand, large material is so doted on for quantity, system adopts the mechanism of parallel processing, method for splitting is defined on backstage, system determines according to operation the quantity generating billboard, such as: there are 23 operations on backstage, there are 10 work orders, each work order has 20 operations, operation can be calculated by system, i.e. how many billboard quantity, calculate according to the operation in work order, as each operation has 100 kinds of materials, namely each work order has 2000 billboard, by all order operation data, namely need the data calculating billboard quantity to carry out cycle labeling and become A, B, C, 23 name (wherein A such as D, B, C, D etc. are job name), during first job run, label taking note is the data of A, during second job run, label taking note is the data run of B, by that analogy, because every procedure will new and old calculating repeatedly, in ERP, it is fewer that table stores data, efficiency is higher, so adopt this mechanism, substantially increase the operational efficiency of billboard, substantially a large amount of data runs within tens minutes, can be made complete, the quantity that certain operation splits arranges according to the portfolio of reality, when the changing greatly of portfolio, can again adjust.Here, single central processing unit computing machine that can perform many instructions simultaneously or process multiple data item simultaneously can be adopted also can to adopt multiple processor system.
Simultaneously, need when mark to calculate weight, this weight is distinguished, as shown in Figure 3, because general assembly material accounts for about 60% of total ratio according to production subsidiary factory, so system is when background process, the operation of 60% can be distributed to general assembly, bogie is set to 15%, and car body design is 25%, server resource can be utilized to greatest extent like this, calculate the quantity of billboard with the fastest speed.Certainly the distribution of this accounting can adjust according to the business datum of reality, and such as, when marking during job name, if the data of the operation bogie subsidiary factory of A exceed 25% of total amount, system automatically can move on to next job name to the operation of bogie and remove mark.Like this, effectively data are assigned in 23 background jobs, and reasonably control the operation quantity of each operation subsidiary factory.It is rational for guaranteeing that the billboard data run out are distributed.
2.3 when operation generates billboard detail, because data volume is larger, the data of billboard are inserted and calculated is all that background job performs calculating, like this, the mistiming is there is with practical business, also mean and there is variance data, system has added a computing mark in the table of billboard detail to be generated, when running generation billboard and being detailed, system can first by this get, will generate the data of billboard computing mark be set to " X ", after system operations complete generation billboard detail, then computing mark is put sky again.Adopt this mechanism, the data effectively avoiding billboard are repeated to capture and are calculated, and the phenomenon generating billboard Data duplication occurs.Simultaneously, system is in order to improve the travelling speed of billboard, gibberish is avoided to run, during each run, data for production work order are read in again, and be also repeatedly again read in when reading operation data, guarantee that the data of each to get, calculating are all up-to-date, the most real-time data, ensure that the accuracy that billboard data calculate.
3, demand billboard to be expected
Demand inventory will be expected will expect that billboard form is submitted to according to operation and/or teams and groups' node in lean logistics system by production subsidiary factory, is discharged into logistics center.There is the following two kinds form:
1) discrete piece will expect demand inventory: user cannot revise quantity required, and the background job of discrete piece divides into groups to calculate by operation;
2) recoil material to expect demand inventory: user can revise quantity required, simultaneity factor also can analog computation suggestion quantity required.Here recoil material refers to the inconsistent material of the unit of materials and forwarding unit, such as paint and so on, the unit of issuance of materials is tank/bucket, but the unit produced when consuming is gram, the actual consumption quantity of usual this material was difficult to statistics before production completes, and therefore recoil material manages in the subsidiary factory storehouse of production subsidiary factory.Logistics billboard operationally, carry out gathering issuance of materials by the feature according to recoil material.
Two, the production schedule changes
Unavoidably there is the possibility of change in production order, three daily plannings, therefore can cause expecting that demand billboard produces to change, system can according to original material data, see if there is outbound record, original outbound number and demand number are compared simultaneously, if without outbound, carry out outbound by the quantity that needs of new material; If there is outbound record, namely cancelling stocks is carried out to raw material, new materiel warehouse-out, produce one and move back a neck.
Changing the time point occurred may be will before or after material demand in submission.After expecting that demand is submitted, also may be picked and join or made outbound list.
Processing mode is as follows:
The first situation: if concerned process steps node to expect that demand inventory is not submitted or submit to but do not picked join, then be automatically appended to and formerly will expect demand odd numbers (reserved number+record type+operation ID+ submits demand sequence number to);
The second situation: if concerned process steps node to expect that demand inventory is submitted and pick join (pick containing part and join), what then automatic generation was new will expect in demand odd numbers (reserved number+record type+operation ID+ submits demand sequence number+serial number to), now, submission will expect demand sequence number, + 1 to be expected on demand sequence number basis former, will expect that demand sequence number initial value is 1 here.
Three, to the material returned process will expected in demand billboard
Because produce the change of order, can produce material returned request, also developed because of practical business demand in system, logistics department initiatively carries out the function of the material returned and neck material to the material sent out; A neck function is moved back in system support one, namely the material returned of certain material is applied for, the neck material of the material of tackling mutually can be applied for simultaneously, also support the material returned of single material, production subsidiary factory needs propose report material returned request according to the Production requirement of reality and variation, and logistics tally-man confirms the material returned according to the issuance of materials situation of reality, as one moves back a neck, while the material returned, allot new material, guarantee production subsidiary factory, logistics delivery, receive unanimously.
Expect that the material returned in demand billboard has three kinds of states: the non-outbound of demand be expected, requirement section outbound be expected, the complete outbound of demand will be expected, contingent various material returned demand in practical business is calculated accurately, as following table in systems in which by different fields, different values:
Note: lean logistics system is by 6 fields of upper table, and three states process all material returned requests likely occurred, such as,
ZDSTS_ASS=0 is represented: the non-outbound of demand be expected;
ZDSTS_ISS=1 is represented: have material returned request, material returned request key value with to expect that demand is inconsistent.
Do not have this state for " (the nothing) " system in upper table, system also can not carry out the such setting of ZDSTS_ISS=2 or ZDSTS_CIS=2.
Four, mistake billboard adjustment function
When producing order, the preservation of maintenance order, the generation will expecting demand schedule can be triggered, but in the practical business that motor-car is produced, can because design alteration causes the change of producing operation teams and groups, material, platform position in order, so according to reality, the data of billboard will will expect that need state carries out changing or locking, billboard data can not be generated after locking, but generation daily record data, be recorded in log sheet, here, the type of daily record comprises: the change of production work order, three daily planning changes and MRP change etc.
System, when designing, take into account all situations of producing order variation, concrete detailed as follows:
Note:
1) order status is that " X " represents locked, and locked data can not generate billboard data, but are stored in log sheet, the process of products for further;
2) for order demand change type be: the state of " increase material " be " (single) ", expression only have a kind of state, system according to expecting that need state directly processes;
3) have two kinds in the state of " change of operation teams and groups ": " mode one " and " mode two ", system according to circumstances performs respectively,
Such as: for expecting that need state is: " do not submit to/or submitted to but cancelled ", " submitted to and do not cancelled ", the treating method of system is: directly change;
For expecting that state is " all or part of transfer items ": for what transferred items, system selection approach one, locks this operation, does not generate billboard data, but generate daily record data (subsequent treatment: first submit the material returned request application material returned to by Ling Liao department, then rechange); For what do not transfer items, system selection approach two, directly changes.
The wrong material billboard data that the artificial maintenance mistake identified, the locking of production order, material locking, Material Cost do not have the reasons such as maintenance, design alteration to cause are saved in log sheet by system meeting automatically, next time is when running, system can perform the generation of billboard automatically again to the data of mistake, until the data genaration billboard of this mistake, just can delete this record in error log record sheet, therefore need regularly to start wrong billboard adjustment function, information flow according to up-to-date production order adjusts wrong billboard, ensure that the promptness that billboard adjusts.
But, be not all misdata generating daily record, finally all can generate billboard data, such as: change recoil setting, change material type, change MRP group, these may cause data run mistake, strictly forbid in systems in which, when there is the log information of this kind of mistake, need artificially to check.In addition, expect the project that demand is closed, also can not produce material billboard again, these need manual deletion.
Five, billboard uses:
Due to, monthly can produce up to ten thousand and produce order, namely the issuance of materials of hundreds of thousands procedure even up to a million is had, these materials are allowed to be dealt into corresponding production team in suitable time, place, guarantee the demand that lean is produced, billboard logistics platform devises tally-man, goods yard, material function one to one; Namely after guaranteeing that billboard runs, each material, all can corresponding corresponding goods yard, unique tally-man, guarantee that responsibility is clear and definite, can review, when tally-man can see oneself needs, feeding place, send to operation, accomplish to provide and deliver as required; Make the granularity refinement of logistics management.System sets up the contrast relationship in material, tally-man, goods yard, guarantee each material have tally-man be responsible for, the corresponding shipment goods yard of each material.What tally-man every day can run logistics billboard according to project or material puies forward material program, billboard to be refreshed detail is generated logistics billboard, and billboard is printed, detailed according to the material printed, determine the concrete time of feeding, deliver goods place and deliver goods material, carry out production batching, issuance of materials.Here, deliver goods place is generally each production subsidiary factory, but based on the feature that motor-car is produced, partial material volume is comparatively large, therefore can deliver to the place issuance of materials that production subsidiary factory specifies.This place of specifying is middle database.So namely, ensure that on-the-spot orderly production, also ensure that logistics is prepared burden on time.
Owing to can embody the three daily planning data according to actual production to the billboard data of production subsidiary factory, therefore production subsidiary factory is according to the condition of production of oneself, within one day, assign the detail of the production material of latter three days in advance, system generates according to MRP, product structure information etc. will expect demand billboard, so to the material of production subsidiary factory, by production subsidiary factory according to expecting that request billboard prints outbound list, carry out production batching, issuance of materials process.The material of the subsidiary factory of production here refers to: the intermediate product that recoil material or production subsidiary factory oneself produce.Here intermediate product use to oneself subsidiary factory, also may give next point station-service as material.
Six, billboard flow process, as shown in Figure 4:
1, production subsidiary factory planner assigns the production schedule on the three for one day in advance according to production order and maintenance list, and the production schedule comprised the production material detail of three days on 3rd.
2, system can generate according to MRP, product structure information, stock material information etc. and will expect demand billboard, expect that demand billboard comprises: produce the information such as order, operation, material, quantity, warehouse compartment.
3, all subsidiary factories to expect that demand billboard data summarization gets up to generate lean logistics billboard.
4, after lean logistics billboard generates, according to demand numbering according to item number, teams and groups, operation, row, a packing automatically, generate each production subsidiary factory billboard, each production subsidiary factory billboard is that production subsidiary factory billboard comprises following information: produce the information such as order, operation, work centre, platform position, production team, material, quantity, warehouse compartment according to project, row, the material a generated detail.
What 5, logistics center tally-man provided according to lean logistics billboard and production subsidiary factory planner will expect that demand is carried out: logistics center distributes, pick and join, fill out that storehouse is single, delivery is transferred items and a series of process such as production subsidiary factory issuance of materials, and the content of process comprises: produce the information such as order, operation, material, quantity, warehouse compartment.
6, whether logistics center tally-man is that recoil material is further processed according to material type, if material is recoil material, by stock movement to production subsidiary factory, remembers that logistics stockpile number reduces simultaneously; Expect that then outbound is kept accounts if not recoil, note stock material reduces.
Seven, the hardware equipment information of billboard management system realization
Realize a kind of lean logistics billboard management system provided by the invention, need at least to operate on following equipment in design, exploitation, test and production system, just can reach reasonable effect.
The above is only preferred embodiment of the present invention, not any pro forma restriction is done to the present invention, although the present invention discloses as above with preferred embodiment, but and be not used to limit the present invention, any technician being familiar with this patent is not departing within the scope of technical solution of the present invention, make a little change when the technology contents of above-mentioned prompting can be utilized or be modified to the Equivalent embodiments of equivalent variations, in every case be the content not departing from technical solution of the present invention, according to any simple modification that technical spirit of the present invention is done above embodiment, equivalent variations and modification, all still belong in the scope of the present invention program.

Claims (7)

1. based on a lean logistics system for billboard, it is characterized in that, comprising: basic information management, order management, process management, will demand management be expected, wherein
Basic information management: comprise work centre, product structure BOM that material information, described order will be produced shows;
Order management: comprise product information, product quantity, target date;
Described BOM table comprises: the quantity of material, described material;
Described operation, comprising: the material produced/purchase, relevant work centre, production/procurement cycle;
Expect demand management: show for the BOM according to described order product, and the material related in described BOM and the described material operation of being correlated with adopt parallel processing technique to generate need the situation of certain material in certain time;
Stock control: for recording the real time data of material in warehouse, and according to the described material requirement period planning will expected in demand management, generate outbound list by needing the material of outbound.
2. a kind of lean logistics system based on billboard according to claim 1, it is characterized in that, also comprise: task management, described task management, comprise: job title, processor, described task management is used for the quantity according to all process steps in described BOM table, and each operation shown for described BOM distributes a described operation;
Preferred described operation is 20-30, and described task management is used for, and all process steps in described BOM table is divided into 20-30 part, and every part is distributed an operation.
3. a kind of lean logistics system based on billboard according to claim 2, it is characterized in that, described work centre also comprises weight, described weight, refers to that material that described work centre uses accounts for the number percent of total material; Described task management be also included in into described BOM distribute operation time, in the operation in the BOM that every part of described operation is corresponding, the quantity that the data belonging to described work centre account for all process steps of described operation is, the weight of described work centre;
Preferably, described work centre comprises: general assembly material, bogie are arranged and car body design;
Preferably, the weight of described general assembly material is 50% to 60%, when distributing operation for described general assembly material, has the described BOM data of 50% to 60% to belong to described general assembly material in each operation; The weight that described bogie is arranged is 10% to 20%, when arranging distribution operation for described bogie, has the described BOM data of 10% to 20% to belong to described bogie and arrange in each operation; The weight of described car body design is 20% to 30%, when distributing operation for described car body design, has the described BOM data of 20% to 30% to belong to described car body design in each operation.
4. any one according to claim 1-3, based on the lean logistics system of billboard, is characterized in that, describedly will expect that demand management also comprises computing and indicates, and described computing indicates, for mark during described BOM shows need to generate described in expect the data of demand;
Preferably, the computing of each node of the relevant BOM table of newly-built order is designated sky;
Preferably, the initial value that described computing indicates is " X ", and the execution end value that described computing indicates is " Z ".
5. any one according to claim 1-4 is based on the lean logistics system of billboard, and it is characterized in that, also comprise log management, described log management comprises log sheet, for store generate described in expect that demand is made mistakes time data; When expecting that demand is made mistakes described in generating, the misdata in log sheet, stored in described log sheet, when generation will expect demand next time, generates and will expect demand by described misdata again, and will expect described in generating that the daily record data of demand is deleted;
Described log sheet comprises: order number, plan stream day, operation, material, quantity, plan are got the raw materials ready day, warehouse compartment, work centre, Log Types;
Preferably, when will expect demand billboard described in each generation, all the misdata in described log management is generated billboard data;
Preferably, described Log Types comprises: order change, three daily planning changes or operation change
Preferably, described log management also comprises show log information, deletes log information.
6. a kind of lean logistics system based on billboard according to claim 1, it is characterized in that, described work centre also comprises logistics center, according to described, described logistics center will expect that demand generates described outbound list; Described material is sent to described feeding place from described goods yard according to described outbound list by described tally-man, and operation is sent in execution; Described operation of sending to is exactly will expect that the material information described in demand billboard is set to completion status by described, carries out delivery simultaneously and to transfer items registration;
Preferably, whether described material type comprises is recoil material, if described material is recoil material, described stock movement to described work centre, is remembered that logistics stockpile number reduces by described tally-man simultaneously; Then carry out described delivery if not recoil material to transfer items registration, the minimizing of note stock material.
7. according to power want any one described in 1-6 based on the lean logistics system of billboard, it is characterized in that, the described lean logistics system based on billboard, is applied to motor-car manufacturing;
Preferably, described order comprises: order number, completion date, material, quantity, Order Type;
Preferably, described Order Type comprises: produce order, maintenance order and the production schedule on the three;
Preferably, described order also comprises: plan stream day, and the plan of described maintenance order is any one day after current date in three days stream day;
Preferably, described operation also comprises: operation title, material, quantity, deliver goods/production cycle, work centre, teams and groups;
Preferably, describedly to expect that demand is for comprising: order number, operation, material, quantity, plan are got the raw materials ready day;
Preferably, described to expect that demand generates after, multiplely to expect demand by get the raw materials ready day, described work centre, operation and/or teams and groups' display of described plan;
Preferably, the plan described in material demand to get the raw materials ready described day, be current date data one day after, generate described outbound list;
Preferably, described material comprises material type, warehouse compartment, goods yard, tally-man, procurement cycle;
Preferably, describedly to expect that demand is to expect demand billboard;
Preferably, described operation also comprises operation type, and described operation type is: buying or production;
Preferably, described operation and BOM show in material one_to_one corresponding.
CN201410532375.2A 2014-10-11 2014-10-11 A kind of lean logistics system based on billboard Active CN104268733B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410532375.2A CN104268733B (en) 2014-10-11 2014-10-11 A kind of lean logistics system based on billboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410532375.2A CN104268733B (en) 2014-10-11 2014-10-11 A kind of lean logistics system based on billboard

Publications (2)

Publication Number Publication Date
CN104268733A true CN104268733A (en) 2015-01-07
CN104268733B CN104268733B (en) 2018-02-27

Family

ID=52160253

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410532375.2A Active CN104268733B (en) 2014-10-11 2014-10-11 A kind of lean logistics system based on billboard

Country Status (1)

Country Link
CN (1) CN104268733B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111080145A (en) * 2019-12-20 2020-04-28 南京同赢信息科技有限公司 Method and device for realizing delivery of production orders based on billboard pulling
CN112001587A (en) * 2020-07-16 2020-11-27 中车青岛四方机车车辆股份有限公司 Data extraction method and system
CN112758572A (en) * 2020-12-09 2021-05-07 中航星(西安)智能系统有限公司 Delivery center system and method thereof
CN115526491A (en) * 2022-09-28 2022-12-27 深圳市海葵信息技术有限公司 Data processing method, equipment and storage medium for material demand plan

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110032154B8 (en) * 2019-03-29 2021-01-19 中车青岛四方机车车辆股份有限公司 Production control method and system for small-batch products

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101546393A (en) * 2008-03-27 2009-09-30 北京卫星环境工程研究所 Billboard management system and method
CN102262757A (en) * 2011-08-11 2011-11-30 王圣亮 Advanced planning system (APS)/manufacturing execution system (MES) lean manufacturing management system
KR20130065841A (en) * 2011-12-02 2013-06-20 한양디지텍 주식회사 Management system and method based integrated system for inventory control

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101546393A (en) * 2008-03-27 2009-09-30 北京卫星环境工程研究所 Billboard management system and method
CN102262757A (en) * 2011-08-11 2011-11-30 王圣亮 Advanced planning system (APS)/manufacturing execution system (MES) lean manufacturing management system
KR20130065841A (en) * 2011-12-02 2013-06-20 한양디지텍 주식회사 Management system and method based integrated system for inventory control

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
杨文帮 等: "精益模式看板管理下物流配送系统的改善", 《铁路采购与供应》 *
钱芳 等: "面向机械产品装配过程的物料配送方法研究", 《机械工程师》 *
陶孙杰 等: "基于MRPII/JIT混合模式的中小型企业综合MIS系统的研究", 《机电一体化》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111080145A (en) * 2019-12-20 2020-04-28 南京同赢信息科技有限公司 Method and device for realizing delivery of production orders based on billboard pulling
CN112001587A (en) * 2020-07-16 2020-11-27 中车青岛四方机车车辆股份有限公司 Data extraction method and system
CN112758572A (en) * 2020-12-09 2021-05-07 中航星(西安)智能系统有限公司 Delivery center system and method thereof
CN115526491A (en) * 2022-09-28 2022-12-27 深圳市海葵信息技术有限公司 Data processing method, equipment and storage medium for material demand plan
CN115526491B (en) * 2022-09-28 2023-11-17 惠州市海葵信息技术有限公司 Data processing method, equipment and storage medium for material demand planning

Also Published As

Publication number Publication date
CN104268733B (en) 2018-02-27

Similar Documents

Publication Publication Date Title
CN104268733B (en) A kind of lean logistics system based on billboard
US8326706B2 (en) Providing logistics execution application as enterprise services
US10783466B2 (en) Integrated system for optimizing vehicle utilization
Wortman et al. A review of capacity planning techniques within standard software packages
CN105512747A (en) Intelligent optimized scheduling system for logistics
JP2010269867A (en) Transportation schedule planning support system and transportation schedule planning support method
CN104252671B (en) A kind of lean logistics implementation method based on billboard
US20230004929A1 (en) Load tracking computing platform and user interface
Kabadurmus et al. Design of pull production control systems using axiomatic design principles
US20220188767A1 (en) Coordination platform for warehouse operations
CN112330481A (en) Method for intelligently calculating delivery date in manufacturing industry
Iegorchenkov et al. Product-resource planning system
US11488100B2 (en) Load tracking computing platform and user interface
US20200057972A1 (en) System and method for management of project portfolios
Kumar et al. Integrated production distribution problem in a partial backorder and order refusal environment
Hongjun et al. Process improvement model and it’s application for manufacturing industry based on the BPM-ERP integrated framework
CN215526674U (en) Information processing device, handheld radio frequency terminal and electronic screen
US11436543B2 (en) Plan creation interfaces for warehouse operations
Riezebos Shop floor planning and control in team-based work processes
De Snoo et al. The interconnectivity of planning and shop floor: case description and relocation analysis
Torres et al. Development of synchronized logistics scenarios
CN113806684B (en) Material management method and system for power grid major repair technical improvement project
JP2000322483A (en) Method and device for managing plant
Wang et al. Modeling for Materials and Logistics Optimal System in JIT Flexible Manufacturing
Yağmur et al. Comparison of Integrated and Sequential Decisions on Production and Distribution Activities: New Mathematical Models

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: Jihongtan town Chengyang District Shandong city Qingdao province Jinhong road 266111 No. 88

Applicant after: CRRC QINGDAO SIFANG CO., LTD.

Address before: Jihongtan town Chengyang District Shandong city Qingdao province Jinhong road 266111 No. 88

Applicant before: CSR Qingdao Sifang Locomotive and Rolling Stock Co., Ltd.

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant