CN104268732B - More operation area ship intelligent dispatching methods based on digital navigation channel - Google Patents

More operation area ship intelligent dispatching methods based on digital navigation channel Download PDF

Info

Publication number
CN104268732B
CN104268732B CN201410519842.8A CN201410519842A CN104268732B CN 104268732 B CN104268732 B CN 104268732B CN 201410519842 A CN201410519842 A CN 201410519842A CN 104268732 B CN104268732 B CN 104268732B
Authority
CN
China
Prior art keywords
ship
operation area
batch
presetting
area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410519842.8A
Other languages
Chinese (zh)
Other versions
CN104268732A (en
Inventor
李兵
张希俊
廖丽霞
潘洪涛
朱小霞
尹小文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
In Three Data Technology Ltd By Share Ltd
Original Assignee
In Three Data Technology Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by In Three Data Technology Ltd By Share Ltd filed Critical In Three Data Technology Ltd By Share Ltd
Priority to CN201410519842.8A priority Critical patent/CN104268732B/en
Publication of CN104268732A publication Critical patent/CN104268732A/en
Application granted granted Critical
Publication of CN104268732B publication Critical patent/CN104268732B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/40Business processes related to the transportation industry

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Traffic Control Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of more operation area ship intelligent dispatching methods based on digital navigation channel, for the ship anchor point of ship lock upstream, in the way of scheduling is planned as a whole in the ship classification registration of harbour or region to stop, Ship Registration is carried out by the operation area that simulation is established in downstream logging station, then the ship for operation area being corresponded to according to upstream stops situation, the quantity information of ship can be stopped by calculating, then by the way that the batch of logging station is presetting and the scheduling of sluice gate, finally realize ship dispatch function.The present invention is by way of dispatching priority rule and workspace registration management are combined, utilize remote presetting and sluice gate the actual schedule of registration for adjusting station, reach scientific and reasonable scheduling ship, ensure that each harbour has ship entrance, for the actual conditions in navigation channel where ship lock, using rational scheduling mode, shorten ship waiting time for lockage, improve ship lock Navigation capacity, it is ensured that ship gateway operation safety and navigation channel are unimpeded.

Description

More operation area ship intelligent dispatching methods based on digital navigation channel
Technical field
The present invention relates to a kind of more operation area ship intelligent dispatching methods based on digital navigation channel.
Background technology
China is vast in territory, with a varied topography, and river is widely distributed.Different areas, shipping transport capacity waterborne is each to be shown not Together.Some ship lock construction are narrower in upper river while shipping lane of a large amount of ships in river course bank stevedoring goods be present On, during ship lock is dispatched, often do not account for the actual conditions of Upstream Navigation Waterway dredging, and then blindness and unordered tune Ship is spent, causes the blocking in navigation channel, ship dispatch efficiency is low.
The content of the invention
The present invention provides a kind of more operation area ship intelligent dispatching methods based on digital navigation channel, passes through dispatching priority rule The mode being combined with workspace registration management reaches scientific and reasonable scheduling ship, ensures that each harbour has ship entrance.
In order to solve the above technical problems, the present invention adopts the following technical scheme that:
A kind of more operation area ship intelligent dispatching methods based on digital navigation channel, comprise the following steps:
(1) boat people registers:System obtains upstream boat people's card number information by way of Card Reader, and the ship is transferred from database The transit information of oceangoing ship, the transit information of each lockage is registered, obtain the operation where boat people's selection upstream loading or unloading harbour Area numbers, and sends to downstream and far adjust station the transit information of registration and the operation area obtained numbering in the lump;
(2) it is remote to adjust station presetting:Station is far adjusted first in registered ship in downstream, for needing priority scheduling and handling Ship is individually sorted out, remaining ship according to the workspace number class that selects during registration, positioned at same operation area ship according to The sequencing of enrollment time is shown;Then the ship for operation area being corresponded to according to upstream stops situation, and calculating to stop By the quantity information of ship, presetting batch is generated;
The generation method of the presetting batch is:Assuming that the maximum scheduling ships quantity of each batch of systemic presupposition is M, some When batch is presetting, now early-stage work area one is labeled as W1, operation area two is labeled as W2, the like operation area N be Wn, Corresponding upstream operations area WiDockable ships quantity is Si, then the ship of the pre- timing upstream operations area schedulable of a batch is total Number isA final presetting batch ship dispatch add up to ships quantity be
(3) lake gate management:Upstream sluice gate is according to the Ship Types and registration of a presetting batch or next presetting batch The sequencing selection ship of time is scheduled, and the ship overall length of selection need to be less than lock chamber length, according to the total length of lock chamber, Lockage lock is generated, finally realizes the dispatch deal of ship.
Further, to operation area numbering, operation area title, the maximum stop ship in operation area after the completion of the scheduling of each batch Number and current work area stop ship number and safeguarded, wherein operation area numbering is responsible for setting operation area selection relative importance value Put.
Further, in step (1), in the case of operation area selection mistake, there is provided the treatment mechanism of operation area is changed, Under occasion of the treatment mechanism including non-lockage of the modification operation area and under the occasion of lockage;
Find that mistake occurs in the operation area of selection under the occasion of non-lockage, by exchanging operation area in step (2), Operation area modification outside for timeliness, it is desirable to provide authorization function, the change for operation area, system provide change daily record, note Record tracking;
Boat people changes operation area under the occasion of lockage, and upstream operations area judges the operation area letter provided during the Ship Registration Whether breath is consistent with the operation area of reality, if finding, information is inconsistent, does not allow the ship to enter operation area.
From above technical scheme, the present invention passes through the regular side being combined with workspace registration management of dispatching priority Formula, using remote presetting and sluice gate the actual schedule of registration for adjusting station, reach scientific and reasonable scheduling ship, ensure each harbour There is ship entrance, for the actual conditions in navigation channel where ship lock, using rational scheduling mode, shorten ship waiting time for lockage, carry High ship lock Navigation capacity, it is ensured that ship gateway operation safety and navigation channel are unimpeded.
Brief description of the drawings
Fig. 1 is the flow chart of more ship intelligent dispatching methods in operation area of the invention based on digital navigation channel.
Embodiment
Ship dispatch method of the present invention is related to remote presetting and sluice gate the actual schedule of registration for adjusting station.
Far adjusted in downstream when the Ship Registration of station, it is necessary to be registered according to upstream operations region class, according to enrollment time Sequencing is ranked up, and provides the mark of promoting or transferring for special Ship Types, such as the dangerous material such as oil carrier ship, ensureing should The preferential lockage of type ship.Operation area refers to the ship loading and unloading goods region of one or more harbour compositions, and each operation area is stopped Ship information with leaving, carries out maintenance of information when lake gate management.
When the presetting batch of station arrangement ship is far adjusted in downstream, according to the real-time dynamic information in upstream operations area, including Operation area maximum can stop ship quantity, stop ship quantity, allow to stop the information such as ship quantity, with reference to approach channel energy The composite factors such as the ship transport power and ship lock ship lockage time that enough carry, it is presetting that a presetting batch sets rational ship Quantity, form digital navigation channel.
When ship lock lake gate management, according to the Ship Types and registration of a presetting batch or next presetting batch The sequencing selection ship of time is scheduled, and the factor that scheduling needs to consider mainly includes the length and width of lock chamber, scheduling ship Overall length, dispatch the Breadth Maximum etc. of ship.The ship information that each operation area is stopped and left, enters when lake gate management Row information is safeguarded.
The top-priority ship dispatch pattern of multi-work space based on digital navigation channel is the unimpeded of navigation channel, next to that ship Lockage efficiency.Therefore scheduling method of the present invention is applied to the ship lock that navigation channel is narrow, navigation power is small.
As shown in figure 1, more ship intelligent dispatching methods in operation area of the invention based on digital navigation channel comprise the following steps:
(1) boat people registers:System obtains upstream boat people's card number information by way of Card Reader, and the ship is transferred from database The transit information of oceangoing ship, the transit information of each lockage is registered, obtain the operation where boat people's selection upstream loading or unloading harbour Area numbers, and sends to downstream and far adjust station the transit information of registration and the operation area obtained numbering in the lump;
(2) it is remote to adjust station presetting:Station is far adjusted first in registered ship in downstream, for needing priority scheduling and handling Ship is individually sorted out, remaining ship according to the workspace number class that selects during registration, positioned at same operation area ship according to The sequencing of enrollment time is shown;Then the ship for operation area being corresponded to according to upstream stops situation, and calculating to stop By the quantity information of ship, presetting batch is generated;
The generation method of the presetting batch is:Assuming that the maximum scheduling ships quantity of each batch of systemic presupposition is M, some When batch is presetting, now early-stage work area one is labeled as W1, operation area two is labeled as W2, the like operation area N be Wn, Corresponding upstream operations area WiDockable ships quantity is Si, then the ship of the pre- timing upstream operations area schedulable of a batch is total Number isA final presetting batch ship dispatch add up to ships quantity be
(3) lake gate management:Upstream sluice gate is according to the Ship Types and registration of a presetting batch or next presetting batch The sequencing selection ship of time is scheduled, and the ship overall length of selection need to be less than lock chamber length, according to the total length of lock chamber, Lockage lock is generated, finally realizes the dispatch deal of ship.
The ship of the current presetting batch of upstream sluice gate selection, if the ship of the batch lockage, selects next batch Ship in secondary, the factor that scheduling needs to consider mainly include the length and width of lock chamber, dispatch the overall length of ship, dispatch the maximum of ship Width, it is unified to arrange ship lockage after ship is paid the fees in lock head, generate a lock, ship lockage successively.
Ship number is stopped to operation area numbering, operation area title, operation area maximum after the completion of the scheduling of each batch and worked as Preceding operation area is stopped ship number and safeguarded, wherein operation area numbering is responsible for being configured operation area selection relative importance value.
In step (1), in the case of operation area selection mistake, there is provided change the treatment mechanism of operation area, the modification Under occasion of the treatment mechanism of operation area including non-lockage and under the occasion of lockage;
Boat people has found that mistake occurs in the operation area of selection under the occasion of non-lockage, by way of exchanging operation area, I.e. when registration, the selection information of operation area is directly changed.In view of the seriousness of operation area management, boat people's malice is prevented Select operation area, for crossed the operation area in certain timeliness modification, it is desirable to provide authorization function, from boat people to Shiplock management at Leader applies for operation area change.Change for operation area, system provide change daily record, accomplish recording, tracking.
Boat people changes operation area under the occasion of lockage, i.e., not according to the operation area selected when registering to upstream operations.Then Need to provide the extra process that upstream operations area manages, the administrative staff in each upstream operations area provide when examining the ship to register Operation area information whether with reality operation area it is consistent, if find information it is inconsistent, do not allow the ship to enter operation area, It is considered as operation against rules.
It is the physical simulation scene description of the present invention below:
Certain ship lock is unobstructed to ensure navigation channel, increases ship turnaround speed, consults through same Local maritime, determine to step on entrance of Changjiang River The ship of note is divided into 12 operation areas and reported for work registration, is one or several harbours corresponding to each operation area, then in basis The demand of each harbour, scientific and reasonable scheduling ship, ensure that each harbour has ship entrance daily.
Estuary area far adjusts station division operation area registration to gather information such as following table:
Entrance of Changjiang River dispatching method such as following table:
1st, operation plan is formulated daily:
Operation area Operation plan Promoting or transferring ship
Three distributary operation areas 20
Xianghe River operation area 5 102nd, Ling Jiang 01 (oil carrier)
Happy bridge Fuding harbour 2
Happy bridge dragon marginal quay 6
It is total 90
2nd, station arrangement dispatching method is far adjusted in downstream:
First batch scheduling ship is total 20:Three distributary operation areas:The ship of sequence number 1- sequence numbers 4 totally four
Xianghe River operation area:The ship of sequence number 1,102 Ling Jiang 01 (oil carrier) totally two
Happy bridge Fuding harbour:The ship of sequence number 1 totally one
Happy bridge dragon marginal quay:Sequence number 1, the ship of sequence number 2 totally two
Second lot scheduling ship is total 15:Three distributary operation areas:The ship of sequence number 5- sequence numbers 10 totally six
(operation class phone wants ship) Xianghe River operation area:The ship of sequence number 2, the ship of sequence number 3 totally two
Happy bridge Fuding harbour:Sequence number 2 totally one
Happy bridge dragon marginal quay:Sequence number 3, sequence number 4, the ship of sequence number 5 totally three
N batches dispatch ship, until adjusting full 90 end.
Embodiment described above is only that the preferred embodiment of the present invention is described, not to the model of the present invention Enclose and be defined, on the premise of design spirit of the present invention is not departed from, technical side of the those of ordinary skill in the art to the present invention The various modifications and improvement that case is made, it all should fall into the protection domain of claims of the present invention determination.

Claims (2)

1. a kind of more operation area ship intelligent dispatching methods based on digital navigation channel, it is characterised in that comprise the following steps:
(1) boat people registers:System obtains upstream boat people's card number information by way of Card Reader, and the fortune of ship is transferred from database Defeated information, the transit information of each lockage is registered, obtains the operation area where boat people selects upstream loading or unloading harbour and number, The transit information of registration and the operation area obtained numbering are sent to downstream far adjust station in the lump;
(2) it is remote to adjust station presetting:Station is far adjusted first in registered ship in downstream, the ship for needing priority scheduling and handling Individually sort out, the workspace number class selected when remaining ship is according to registration, the ship positioned at same operation area is according to registration The sequencing of time is shown;Then the ship for operation area being corresponded to according to upstream stops situation, and ship can be stopped by calculating The quantity information of oceangoing ship, generate presetting batch;
The generation method of the presetting batch is:Assuming that the maximum scheduling ships quantity of each batch of systemic presupposition is M, some batch When presetting, now early-stage work area one is labeled as W1, operation area two is labeled as W2, the like operation area N be Wn, it is corresponding Upstream operations area WiDockable ships quantity is Si, then the ship sum of the pre- timing upstream operations area schedulable of a batch beA final presetting batch ship dispatch add up to ships quantity be
(3) lake gate management:Upstream sluice gate is according to the Ship Types and enrollment time of a presetting batch or next presetting batch Sequencing selection ship be scheduled, the ship overall length of selection need to be less than lock chamber length, according to the total length of lock chamber, generate Lockage lock, finally realize the dispatch deal of ship;
In step (1), in the case of operation area selection mistake, there is provided change the treatment mechanism of operation area, the modification operation Under occasion of the treatment mechanism in area including non-lockage and under the occasion of lockage;
Find that mistake occurs in the operation area of selection under the occasion of non-lockage, by exchanging operation area in step (2), for Operation area modification outside timeliness, it is desirable to provide authorization function, the change for operation area, system provide change daily record, and record chases after Track;
Boat people changes operation area under the occasion of lockage, and the operation area information that upstream operations area judges to provide during the Ship Registration is No consistent with actual operation area, if finding, information is inconsistent, does not allow the ship to enter operation area.
2. more ship intelligent dispatching methods in operation area according to claim 1 based on digital navigation channel, it is characterised in that Operation area numbering, operation area title, the maximum stop ship number in operation area and current work area are stopped after the completion of each batch scheduling Safeguarded by ship number, wherein operation area numbering is responsible for being configured operation area selection relative importance value.
CN201410519842.8A 2014-09-30 2014-09-30 More operation area ship intelligent dispatching methods based on digital navigation channel Active CN104268732B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410519842.8A CN104268732B (en) 2014-09-30 2014-09-30 More operation area ship intelligent dispatching methods based on digital navigation channel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410519842.8A CN104268732B (en) 2014-09-30 2014-09-30 More operation area ship intelligent dispatching methods based on digital navigation channel

Publications (2)

Publication Number Publication Date
CN104268732A CN104268732A (en) 2015-01-07
CN104268732B true CN104268732B (en) 2018-01-23

Family

ID=52160252

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410519842.8A Active CN104268732B (en) 2014-09-30 2014-09-30 More operation area ship intelligent dispatching methods based on digital navigation channel

Country Status (1)

Country Link
CN (1) CN104268732B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111540173B (en) * 2020-04-22 2021-07-27 上海振华重工电气有限公司 Drowning alarm system and method based on intelligent picture recognition
CN114219236B (en) * 2021-11-29 2022-10-04 长江三峡通航管理局 Cascaded hub navigation joint scheduling method
CN115375248B (en) * 2022-10-24 2023-01-24 济宁港航内河经济研究院有限公司 Inland river faces port logistics park management system
CN116109054B (en) * 2022-11-08 2024-04-26 长江三峡通航管理局 Ship passing classification and sorting method based on positioning driving

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102254082A (en) * 2011-04-22 2011-11-23 中科怡海高新技术发展江苏股份公司 Real-time intelligent vehicle and boat scheduling method
CN102708681A (en) * 2012-06-14 2012-10-03 吴新赞 Urban intelligent traffic and transportation system and running method thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102254082A (en) * 2011-04-22 2011-11-23 中科怡海高新技术发展江苏股份公司 Real-time intelligent vehicle and boat scheduling method
CN102708681A (en) * 2012-06-14 2012-10-03 吴新赞 Urban intelligent traffic and transportation system and running method thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
分组调度算法在船闸调度中的应用研究;黄忠国;《万方学位论文·交通信息工程及控制》;20060918;第7-21页 *
船闸管理系统中的多模式信息集成方法;周春辉 等;《武汉理工大学学报(交通科学与工程版)》;20131031;第37卷(第5期);第947-950,955页 *

Also Published As

Publication number Publication date
CN104268732A (en) 2015-01-07

Similar Documents

Publication Publication Date Title
CN104268732B (en) More operation area ship intelligent dispatching methods based on digital navigation channel
CN110110403B (en) Scheduling gear shifting method suitable for unidirectional continuous lockage ship
CN101585453A (en) Distribution Method for export container yard of container wharf
Wang et al. Analysis and design of typical automated container terminals layout considering carbon emissions
CN101986313A (en) Knowledge-based container quay berth and shore bridge dispatching method
Lee et al. Changing concentration ratios and geographical patterns of bulk ports: the case of the Korean west coast
CN103020723A (en) Control method for booking cargo concentration in container wharf
Zhang et al. An Intelligent scheduling system and hybrid optimization algorithm for ship locks of the Three Gorges Hub on the Yangtze River
CN117132184A (en) Shipping network optimization system and method considering low carbon cost
Jiang et al. A SWOT-AHP method for the selection of strategies of smart port development
Mathias et al. Analysis of a new container terminal using a simulation approach
Chen An empirical analysis of competitiveness of yangshan deep-water port: the application of intermodal transportation and automated container terminal
Patmore The British railway network in the Beeching era
CN101893854A (en) Multiple delivering sequence decision-making system for container terminal shipment
Fibrianto et al. A simulation study of a storage policy for a container terminal
Huiling et al. Research on Tugboat Multi-objective Optimal Scheduling Considering Time and Fuel Consumption
Tong Study on Development Countermeasure of Tianjin to Yingkou Waterless Port
Xingchi et al. Integrated Optimization of Berth Allocation and Quay Crane Assignment under Uncertainty
Li et al. A simulation-based method for analyzing energy demands in container terminals under different arrival interval of ships
Zhang Research on the route optimization of Huzhou port’s outbound container
Zaoudi et al. Empirical study on productivity indicators and the impact of the dwell time factor on the capacity of container ports
Li et al. A Scheduling Framework for Railway Container Terminals Based on Internet of Vehicles
Liu Synergetic Development of Port Logistics and Regional Economy in Jiangxi Province
Zhengyi Research on the Status Quo and Strategy of Logistics Industry Cluster Development in Jiangxi Province
Li The effect of latest shipping alliance on shipping industry

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: Daoxiang road Hefei City, Anhui province 230031 Shushan New Industrial Park No. 1

Applicant after: In the three data technology Limited by Share Ltd

Address before: Daoxiang road Hefei City, Anhui province 230031 Shushan New Industrial Park No. 1

Applicant before: Hefei Sanli Automation Engineering Co., Ltd.

COR Change of bibliographic data
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Li Bing

Inventor after: Zhang Xijun

Inventor after: Liao Lixia

Inventor after: Pan Hongtao

Inventor after: Zhu Xiaoxia

Inventor after: Yin Xiaowen

Inventor before: Li Bing

Inventor before: Wang Darong

Inventor before: Pan Hongtao

Inventor before: Wang Wencheng