CN104268726A - Method and system for generating electricity consumption scheme - Google Patents

Method and system for generating electricity consumption scheme Download PDF

Info

Publication number
CN104268726A
CN104268726A CN201410598586.6A CN201410598586A CN104268726A CN 104268726 A CN104268726 A CN 104268726A CN 201410598586 A CN201410598586 A CN 201410598586A CN 104268726 A CN104268726 A CN 104268726A
Authority
CN
China
Prior art keywords
user
cycle
statistical graph
electricity consumption
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410598586.6A
Other languages
Chinese (zh)
Inventor
刘理峰
杨世忠
徐超
陈向民
施金锐
俞伟勇
陈政
郎未未
高俊青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU KAIDA ELECTRIC POWER CONSTRUCTION Co Ltd
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
HANGZHOU KAIDA ELECTRIC POWER CONSTRUCTION Co Ltd
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU KAIDA ELECTRIC POWER CONSTRUCTION Co Ltd, Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical HANGZHOU KAIDA ELECTRIC POWER CONSTRUCTION Co Ltd
Priority to CN201410598586.6A priority Critical patent/CN104268726A/en
Publication of CN104268726A publication Critical patent/CN104268726A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a method and system for generating an electricity consumption scheme. The method comprises the following steps: by presetting statistical cycles, performing statistics on electricity consumption information of one user in one statistical cycle to obtain a first statistical graph; performing statistics on electricity consumption information of the user in the next cycle of the statistical cycle in the former year to obtain a second statistical graph; combining the first statistical graph with the second statistical graph to obtain the plan of the next cycle of the user. The scheme realizes the statistics of the electricity consumption information of the user in each cycle by the combination of the first statistical graph and the second statistical graph, and the cycle in which the electricity consumption of the user is high can be looked up conveniently. The user can specifically look up which time frame or which device consuming more electricity in the cycle with high electricity consumption in the graph form. The plan graph is sent to a power supply company, so that the power generation and supply company can obtain the plane graph of each user so as to realize planned power generation, and the problem of insufficient electric energy production or excessive electric energy production of the power generation and supply company is avoided.

Description

A kind of power program generates method and system
Technical field
The present invention relates to power supply control field, particularly relate to a kind of power program and generate method and system.
Background technology
At present, as long as the mode that electric company adopts usually is all user power utilization, just power, and user also can not with considering in electric process whether electricity consumption is more or relatively less, this just makes electric company power to the later stage to lack planning, and cause the generating of electric company to the later stage not planned further, easily cause the situation that generated energy is not enough or generated energy is too much.
Summary of the invention
In view of this, the invention provides a kind of power program and generate method and system, to solve the problem that prior art Zhong Fa electric company generated energy is not enough or generated energy is too much, its concrete scheme is as follows:
A kind of power program generation method, comprising:
Obtain the power information of user, described power information comprises: electricity consumption device, electricity consumption time and power consumption;
The power information of this user in a certain predetermined measurement period is added up, obtains the first statistical graph;
Obtain the power information of this user of next cycle of measurement period described in former years, add up, obtain the second statistical graph;
Described first statistical graph is combined with the second statistical graph, obtains the plan chart in next cycle of this user;
The plan chart in this next cycle of user is sent to electric company.
Further, described in obtain the plan chart in next cycle of this user after, also comprise:
The plan chart in this next cycle of user described is sent to user.
Further, described obtain the first statistical graph after, also comprise:
Obtain the plan chart in this this cycle of user;
Analyze plan chart and first statistical graph in described cycle, obtain analysis result.
Further, described in obtain analysis result after, also comprise:
Described analysis result is carried out record, and generation exceeds electricity consumption planning and statistics table.
Further, described analysis result comprises: this cycle sometime in section power consumption exceed the maximal value of the permissible error scope of the power consumption of this time period in the plan chart in this cycle.
Further, described analysis result comprises: this cycle sometime in section power consumption lower than the minimum value of the permissible error scope of the power consumption of this time period in the plan chart in this cycle.
A kind of power program generation system, comprise: acquiring unit, the first statistic unit be connected with described acquiring unit, the second statistic unit be connected with described first statistic unit, the processing unit be connected respectively with described first statistic unit and the second statistic unit, the transmitting element be connected with described processing unit, wherein:
Described acquiring unit is for obtaining the power information of user, and described power information comprises: electricity consumption device, electricity consumption time and power consumption;
Described first statistic unit is used for adding up the power information of this user in a certain predetermined measurement period, obtains the first statistical graph;
Described second statistic unit, for obtaining the power information of this user of next cycle of measurement period described in former years, is added up, is obtained the second statistical graph;
Described processing unit is used for described first statistical graph to be combined with the second statistical graph, obtains the plan chart in next cycle of this user;
Described transmitting element is used for the plan chart in this next cycle of user to be sent to electric company.
Further, described transmitting element is also for being sent to user by the plan chart in this next cycle of user described.
Further, the analytic unit be connected with described acquiring unit, wherein:
Described acquiring unit is for obtaining the plan chart in this this cycle of user;
Described analytic unit, for analyzing plan chart and first statistical graph in this cycle, obtains analysis result.
Further, also comprise: the storage unit be connected with described analytic unit,
Described storage unit is used for described analysis result to carry out record, and generation exceeds electricity consumption planning and statistics table.
As can be seen from technique scheme, power program disclosed in the present application generates method and system, by default measurement period, the power information of certain user in some measurement periods is added up, obtains the first statistical graph, and to former years this measurement period the power information of this user of next cycle add up, obtain the second statistical graph, first statistical graph is combined with the second statistical graph, obtains the plan chart in next cycle of this user, this plan chart is sent to electric company.This programme is by the combination to the first statistical graph and the second statistical graph, achieve the statistics to power information in user's each cycle, conveniently consult this user power utilization within which cycle more, and by diagrammatic form realize specifically consulting which in electricity consumption more cycle time period or which device electricity consumption more, and by plan chart is sent to electric company, make to send out the plan chart that electric company can obtain each user, thus the generating that realizes a plan, avoid and send out the problem that electric company's generated energy is not enough or generated energy is too much.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
The process flow diagram of Fig. 1 a kind of power program generation method disclosed in the embodiment of the present invention;
The process flow diagram of Fig. 2 a kind of power program generation method disclosed in the embodiment of the present invention;
The structural representation of Fig. 3 a kind of power program generation system disclosed in the embodiment of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
The invention discloses a kind of power program generation method, its process flow diagram as shown in Figure 1, comprising:
The power information of step S11, acquisition user;
Power information comprises: electricity consumption device, electricity consumption time and power consumption.
The power information of user in real, the power information of acquisition is the corresponding relation of electricity consumption device, electricity consumption time and power consumption, is specifically as follows: the electricity used at certain electricity consumption device of section sometime.
Step S12, the power information of this user in a certain predetermined measurement period to be added up, obtain the first statistical graph;
Preset a measurement period, once add up at interval of a measurement period, this measurement period can be one month or a season, is not specifically limited at this to this measurement period.
Every electricity being specially at a time or using during certain electricity consumption of section sometime in first statistical graph.
The power information of this user of next cycle of step S13, acquisition this measurement period in former years, adds up, obtains the second statistical graph;
The power information of acquisition the previous year or for many years same user of next cycle of this measurement period, obtains the second statistical graph.
Step S14, the first statistical graph to be combined with the second statistical graph, to obtain the plan chart in next cycle of this user;
First statistical graph is combined with the second statistical graph, can be specially: when some electricity consumption devices power consumption in the measurement period that the first statistical graph is corresponding is more, then on the basis of the second statistical graph, increase suitable power consumption; Also can average as the data of planning in chart for direct every addition that first statistical graph is corresponding with the second statistical graph.
Wherein, first statistical graph is combined with the second statistical graph, be specifically as follows: adopt neural net method, set up user power utilization model, model element comprises the electrical equipment information of user, as: equipment transition information, comprise number of devices, type, power, utilization factor etc., the user power utilization time can also be comprised, Changes in weather, for electricity consumption policy, as peak-trough electricity, ladder electric light, can also comprise: season and festivals or holidays etc. key element, count data sample, then neural network model is trained, finally predict with the neural network model trained.
Step S15, the plan chart in this next cycle of user is sent to electric company.
It is a measurement period for a season: the power information of some users of the statistics first quarter, generate the first statistical graph, the power information of acquisition the previous year or several years ago this user of the first quarter, generate the second statistical graph, first statistical graph is combined with the second statistical graph, obtain the plan chart of this user second quarter, this plan chart is sent to electric company, Shi Fa electric company generates electricity according to the plan chart of multiple user, avoids generated energy too much or the problem of the wasting of resources that causes of deficiency.
Power program generation method disclosed in the present embodiment, by default measurement period, the power information of certain user in some measurement periods is added up, obtain the first statistical graph, and to former years this measurement period the power information of this user of next cycle add up, obtain the second statistical graph, the first statistical graph be combined with the second statistical graph, obtain the plan chart in next cycle of this user, this plan chart is sent to electric company.This programme is by the combination to the first statistical graph and the second statistical graph, achieve the statistics to power information in user's each cycle, conveniently consult this user power utilization within which cycle more, and by diagrammatic form realize specifically consulting which in electricity consumption more cycle time period or which device electricity consumption more, and by plan chart is sent to electric company, make to send out the plan chart that electric company can obtain each user, thus the generating that realizes a plan, avoid and send out the problem that electric company's generated energy is not enough or generated energy is too much.
Preferably, power program generation method disclosed in the present embodiment, after step s 14, can also comprise:
The plan chart in this next cycle of user is sent to user, makes user understand the electricity consumption situation of himself in time, all right plan chart in edition with parallel text cycle and the actual electricity consumption situation in this cycle, check actual electricity consumption situation simultaneously.
Present embodiment discloses a kind of power program generation method, its process flow diagram as shown in Figure 2, comprising:
The power information of step S21, acquisition user;
Power information comprises: electricity consumption device, electricity consumption time and power consumption.
The power information of user in real, the power information of acquisition is the corresponding relation of electricity consumption device, electricity consumption time and power consumption, is specifically as follows: the electricity used at certain electricity consumption device of section sometime.
Step S22, the power information of this user in a certain predetermined measurement period to be added up, obtain the first statistical graph;
Preset a measurement period, once add up at interval of a measurement period, this measurement period can be one month or a season, is not specifically limited at this to this measurement period.
Every electricity being specially at a time or using during certain electricity consumption of section sometime in first statistical graph.
The power information of this user of next cycle of step S23, acquisition this measurement period in former years, adds up, obtains the second statistical graph;
Step S24, the first statistical graph to be combined with the second statistical graph, to obtain the plan chart in next cycle of this user;
Step S25, the plan chart in this next cycle of user is sent to electric company;
Step S26, obtain the plan chart in this this cycle of user;
Be a measurement period for a season: the power information of some users of the statistics first quarter, generates the first statistical graph, obtain the plan chart of the first quarter that this user obtained upper 1 year fourth quarter, i.e. the plan chart in this cycle.
Step S27, the plan chart analyzing this cycle and the first statistical graph, obtain analysis result.
First statistical graph is the actual electricity consumption situation in this this cycle of user, and the plan chart in this cycle that the plan chart in this cycle is this user to be obtained in a upper cycle, actual electricity consumption chart and planned supply and use of electric power chart are analyzed, obtains the difference of planned supply and use of electric power amount and actual power consumption.
Power consumption in plan chart has a permissible error scope, when this cycle actual power consumption exceeds the maximal value of the permissible error of the power consumption of this time period in plan chart in section sometime, analyze the concrete reason that it exceeds, if some device power consumptions are more within this time period, whether the power consumption then analyzing this device is relevant with weather, as: in summer, idle call electricity can be more, this would not impact the planned supply and use of electric power amount in next season, if TV, then need to consider that the power consumption of TV continues all more within this cycle or short-term is more, if it is more to continue power consumption, then can impact the planned supply and use of electric power amount in next season, if short-term, one day or two days more, then can not impact the planned supply and use of electric power amount in next season.
In like manner, when this cycle actual power consumption minimum value lower than the permissible error of the power consumption of this time period in plan chart in section sometime, the reason that Water demand power consumption is lower, so that as the reference of later stage generated energy.
Power program generation method disclosed in the present embodiment, by default measurement period, the power information of certain user in some measurement periods is added up, obtain the first statistical graph, and to former years this measurement period the power information of this user of next cycle add up, obtain the second statistical graph, the first statistical graph be combined with the second statistical graph, obtain the plan chart in next cycle of this user, this plan chart is sent to electric company.This programme is by the combination to the first statistical graph and the second statistical graph, achieve the statistics to power information in user's each cycle, conveniently consult this user power utilization within which cycle more, and by diagrammatic form realize specifically consulting which in electricity consumption more cycle time period or which device electricity consumption more, and by plan chart is sent to electric company, make to send out the plan chart that electric company can obtain each user, thus the generating that realizes a plan, avoid and send out the problem that electric company's generated energy is not enough or generated energy is too much.
Preferably, in power program generation method disclosed in the present embodiment, after step S27, can also comprise: analysis result is carried out record, generate and exceed electricity consumption planning and statistics table, so that consult, as a reference.
Present embodiment discloses a kind of power program generation system, its structural representation as shown in Figure 3, comprising:
Acquiring unit 31, the first statistic unit 32 be connected with acquiring unit 31, the second statistic unit 33 be connected with the first statistic unit 32, the processing unit 34 be connected respectively with the first statistic unit 32 and the second statistic unit 33, the transmitting element 35 be connected with processing unit 34.
Wherein: acquiring unit 31 is for obtaining the power information of user.
Power information comprises: electricity consumption device, electricity consumption time and power consumption.
The power information of user in real, the power information of acquisition is the corresponding relation of electricity consumption device, electricity consumption time and power consumption, is specifically as follows: the electricity used at certain electricity consumption device of section sometime.
First statistic unit 32, for adding up the power information of this user in a certain predetermined measurement period, obtains the first statistical graph.
Preset a measurement period, once add up at interval of a measurement period, this measurement period can be one month or a season, is not specifically limited at this to this measurement period.
Every electricity being specially at a time or using during certain electricity consumption of section sometime in first statistical graph.
Second statistic unit 33, for obtaining your information of support of this user of next cycle of this measurement period in former years, is added up, is obtained the second statistical graph.
The power information of acquisition the previous year or for many years same user of next cycle of this measurement period, obtains the second statistical graph.
Processing unit 34, for being combined with the second statistical graph by the first statistical graph, obtains the plan chart in next cycle of this user.
First statistical graph is combined with the second statistical graph, can be specially: when some electricity consumption devices power consumption in the measurement period that the first statistical graph is corresponding is more, then on the basis of the second statistical graph, increase suitable power consumption; Also can average as the data of planning in chart for direct every addition that first statistical graph is corresponding with the second statistical graph.
Transmitting element 35 is for being sent to electric company by the plan chart in this next cycle of user.
It is a measurement period for a season: the power information of some users of the statistics first quarter, generate the first statistical graph, the power information of acquisition the previous year or several years ago this user of the first quarter, generate the second statistical graph, first statistical graph is combined with the second statistical graph, obtain the plan chart of this user second quarter, this plan chart is sent to electric company, Shi Fa electric company generates electricity according to the plan chart of multiple user, avoids generated energy too much or the problem of the wasting of resources that causes of deficiency.
The plan chart in this next cycle of user is sent to user, makes user understand the electricity consumption situation of himself in time, all right plan chart in edition with parallel text cycle and the actual electricity consumption situation in this cycle, check actual electricity consumption situation simultaneously.
Power program generation system disclosed in the present embodiment, by default measurement period, the power information of certain user in some measurement periods is added up, obtain the first statistical graph, and to former years this measurement period the power information of this user of next cycle add up, obtain the second statistical graph, the first statistical graph be combined with the second statistical graph, obtain the plan chart in next cycle of this user, this plan chart is sent to electric company.This programme is by the combination to the first statistical graph and the second statistical graph, achieve the statistics to power information in user's each cycle, conveniently consult this user power utilization within which cycle more, and by diagrammatic form realize specifically consulting which in electricity consumption more cycle time period or which device electricity consumption more, and by plan chart is sent to electric company, make to send out the plan chart that electric company can obtain each user, thus the generating that realizes a plan, avoid and send out the problem that electric company's generated energy is not enough or generated energy is too much.
Preferably, in power program generation system disclosed in the present embodiment, can also comprise: the analytic unit be connected with acquiring unit 31, wherein:
Acquiring unit 31 is also for obtaining the plan chart in this this cycle of user, and analytic unit, for analyzing plan chart and first statistical graph in this cycle, obtains analysis result.
Be a measurement period for a season: the power information of some users of the statistics first quarter, generates the first statistical graph, obtain the plan chart of the first quarter that this user obtained upper 1 year fourth quarter, i.e. the plan chart in this cycle.
First statistical graph is the actual electricity consumption situation in this this cycle of user, and the plan chart in this cycle that the plan chart in this cycle is this user to be obtained in a upper cycle, actual electricity consumption chart and planned supply and use of electric power chart are analyzed, obtains the difference of planned supply and use of electric power amount and actual power consumption.
Power consumption in plan chart has a permissible error scope, when this cycle actual power consumption exceeds the maximal value of the permissible error of the power consumption of this time period in plan chart in section sometime, analyze the concrete reason that it exceeds, if some device power consumptions are more within this time period, whether the power consumption then analyzing this device is relevant with weather, as: in summer, idle call electricity can be more, this would not impact the planned supply and use of electric power amount in next season, if TV, then need to consider that the power consumption of TV continues all more within this cycle or short-term is more, if it is more to continue power consumption, then can impact the planned supply and use of electric power amount in next season, if short-term, one day or two days more, then can not impact the planned supply and use of electric power amount in next season.
In like manner, when this cycle actual power consumption minimum value lower than the permissible error of the power consumption of this time period in plan chart in section sometime, the reason that Water demand power consumption is lower, so that as the reference of later stage generated energy.
Further, in power program generation system disclosed in the present embodiment, can also comprise: the storage unit be connected with analytic unit, for analysis result is carried out record, and generation exceeds electricity consumption planning and statistics table.
In this instructions, each embodiment adopts the mode of going forward one by one to describe, and what each embodiment stressed is the difference with other embodiments, between each embodiment identical similar portion mutually see.For device disclosed in embodiment, because it corresponds to the method disclosed in Example, so description is fairly simple, relevant part illustrates see method part.
Professional can also recognize further, in conjunction with unit and the algorithm steps of each example of embodiment disclosed herein description, can realize with electronic hardware, computer software or the combination of the two, in order to the interchangeability of hardware and software is clearly described, generally describe composition and the step of each example in the above description according to function.These functions perform with hardware or software mode actually, depend on application-specific and the design constraint of technical scheme.Professional and technical personnel can use distinct methods to realize described function to each specifically should being used for, but this realization should not thought and exceeds scope of the present invention.
The software module that the method described in conjunction with embodiment disclosed herein or the step of algorithm can directly use hardware, processor to perform, or the combination of the two is implemented.Software module can be placed in the storage medium of other form any known in random access memory (RAM), internal memory, ROM (read-only memory) (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technical field.
To the above-mentioned explanation of the disclosed embodiments, professional and technical personnel in the field are realized or uses the present invention.To be apparent for those skilled in the art to the multiple amendment of these embodiments, General Principle as defined herein can without departing from the spirit or scope of the present invention, realize in other embodiments.Therefore, the present invention can not be restricted to these embodiments shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.

Claims (10)

1. a power program generation method, is characterized in that, comprising:
Obtain the power information of user, described power information comprises: electricity consumption device, electricity consumption time and power consumption;
The power information of this user in a certain predetermined measurement period is added up, obtains the first statistical graph;
Obtain the power information of this user of next cycle of measurement period described in former years, add up, obtain the second statistical graph;
Described first statistical graph is combined with the second statistical graph, obtains the plan chart in next cycle of this user;
The plan chart in this next cycle of user is sent to electric company.
2. method according to claim 1, is characterized in that, described in obtain the plan chart in next cycle of this user after, also comprise:
The plan chart in this next cycle of user described is sent to user.
3. method according to claim 1, is characterized in that, described obtain the first statistical graph after, also comprise:
Obtain the plan chart in this this cycle of user;
Analyze plan chart and first statistical graph in described cycle, obtain analysis result.
4. method according to claim 3, is characterized in that, described in obtain analysis result after, also comprise:
Described analysis result is carried out record, and generation exceeds electricity consumption planning and statistics table.
5. method according to claim 3, is characterized in that, described analysis result comprises: this cycle sometime in section power consumption exceed the maximal value of the permissible error scope of the power consumption of this time period in the plan chart in this cycle.
6. method according to claim 3, is characterized in that, described analysis result comprises: this cycle sometime in section power consumption lower than the minimum value of the permissible error scope of the power consumption of this time period in the plan chart in this cycle.
7. a power program generation system, it is characterized in that, comprise: acquiring unit, the first statistic unit be connected with described acquiring unit, the second statistic unit be connected with described first statistic unit, the processing unit be connected respectively with described first statistic unit and the second statistic unit, the transmitting element be connected with described processing unit, wherein:
Described acquiring unit is for obtaining the power information of user, and described power information comprises: electricity consumption device, electricity consumption time and power consumption;
Described first statistic unit is used for adding up the power information of this user in a certain predetermined measurement period, obtains the first statistical graph;
Described second statistic unit, for obtaining the power information of this user of next cycle of measurement period described in former years, is added up, is obtained the second statistical graph;
Described processing unit is used for described first statistical graph to be combined with the second statistical graph, obtains the plan chart in next cycle of this user;
Described transmitting element is used for the plan chart in this next cycle of user to be sent to electric company.
8. system according to claim 7, is characterized in that, described transmitting element is also for being sent to user by the plan chart in this next cycle of user described.
9. system according to claim 7, is characterized in that, the analytic unit be connected with described acquiring unit, wherein:
Described acquiring unit is for obtaining the plan chart in this this cycle of user;
Described analytic unit, for analyzing plan chart and first statistical graph in this cycle, obtains analysis result.
10. system according to claim 9, is characterized in that, also comprises: the storage unit be connected with described analytic unit,
Described storage unit is used for described analysis result to carry out record, and generation exceeds electricity consumption planning and statistics table.
CN201410598586.6A 2014-10-29 2014-10-29 Method and system for generating electricity consumption scheme Pending CN104268726A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410598586.6A CN104268726A (en) 2014-10-29 2014-10-29 Method and system for generating electricity consumption scheme

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410598586.6A CN104268726A (en) 2014-10-29 2014-10-29 Method and system for generating electricity consumption scheme

Publications (1)

Publication Number Publication Date
CN104268726A true CN104268726A (en) 2015-01-07

Family

ID=52160246

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410598586.6A Pending CN104268726A (en) 2014-10-29 2014-10-29 Method and system for generating electricity consumption scheme

Country Status (1)

Country Link
CN (1) CN104268726A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108169597A (en) * 2017-12-27 2018-06-15 卢志旭 A kind of method for assessing electrical equipment loss state
CN108462173A (en) * 2018-04-23 2018-08-28 黄宇松 A kind of electric energy control method, device and equipment based on user power utilization custom
CN109063926A (en) * 2018-08-24 2018-12-21 国网河北省电力有限公司沧州供电分公司 Plan generated energy determines method, system and terminal device in period
CN109697522A (en) * 2017-10-20 2019-04-30 北京京东尚科信息技术有限公司 A kind of method and apparatus of data prediction

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030189420A1 (en) * 2001-09-28 2003-10-09 Hiroyuki Hashimoto Method for assisting in planning of power supply schedule
CN103048967A (en) * 2012-05-09 2013-04-17 济南华汉电气科技有限公司 Building resource consumption monitoring and management system
CN103745280A (en) * 2014-01-26 2014-04-23 北京中电普华信息技术有限公司 Prediction method, device and processor for electricity consumption
CN103809550A (en) * 2012-11-15 2014-05-21 财团法人工业技术研究院 Cost-saving electric power energy management device and method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030189420A1 (en) * 2001-09-28 2003-10-09 Hiroyuki Hashimoto Method for assisting in planning of power supply schedule
CN103048967A (en) * 2012-05-09 2013-04-17 济南华汉电气科技有限公司 Building resource consumption monitoring and management system
CN103809550A (en) * 2012-11-15 2014-05-21 财团法人工业技术研究院 Cost-saving electric power energy management device and method
CN103745280A (en) * 2014-01-26 2014-04-23 北京中电普华信息技术有限公司 Prediction method, device and processor for electricity consumption

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109697522A (en) * 2017-10-20 2019-04-30 北京京东尚科信息技术有限公司 A kind of method and apparatus of data prediction
CN109697522B (en) * 2017-10-20 2021-07-09 北京京东尚科信息技术有限公司 Data prediction method and device
CN108169597A (en) * 2017-12-27 2018-06-15 卢志旭 A kind of method for assessing electrical equipment loss state
CN108169597B (en) * 2017-12-27 2020-08-14 华北电力大学 Method for evaluating loss state of electric equipment
CN108462173A (en) * 2018-04-23 2018-08-28 黄宇松 A kind of electric energy control method, device and equipment based on user power utilization custom
CN108462173B (en) * 2018-04-23 2021-09-28 北京京仪北方仪器仪表有限公司 Electric energy control method, device and equipment based on user electricity utilization habits
CN109063926A (en) * 2018-08-24 2018-12-21 国网河北省电力有限公司沧州供电分公司 Plan generated energy determines method, system and terminal device in period

Similar Documents

Publication Publication Date Title
CN110705763B (en) Ultra-short-term load prediction method and system including error correction
CN103885825B (en) Rate monotonic real-time scheduling method based on dynamic time piece
CN104268726A (en) Method and system for generating electricity consumption scheme
WO2007022279A3 (en) Dynamic total asset management system (tams) and method for managing building facility services
RU2013142696A (en) ACCESS TO POWER SUPPLY
US20130179207A1 (en) Method and Apparatus for High Performance Design of a Project
CN103036229B (en) Line loss analysis method based on power distribution automation platform
CN108449393A (en) Combustion gas data transmission method and Internet of things system
CN113487084A (en) Method and device for predicting service life of equipment, computer equipment and computer-readable storage medium
Le et al. Joint capacity planning and operational management for sustainable data centers and demand response
Islam et al. Exploiting spatio-temporal diversity for water saving in geo-distributed data centers
CN103177209A (en) Method and device for protecting server password
McDonald Ethereum emissions: A bottom-up estimate
EP2375631A3 (en) System and method for energy efficient ethernet enhanced information technology power management tools
CN107947971A (en) A kind of collocation method of information, device and server
Bhushan et al. System dynamics investigation of capacity building by humanitarian supply chain in disaster prone Eco-communities of India
Adnan et al. Workload shaping to mitigate variability in renewable power use by data centers
CN106600129A (en) Power grid planning method and system
Gu et al. Minimizing energy cost for green cloud data centers by using ESDs
CN105574656A (en) Enterprise investment value assessment system
CN204926169U (en) Electric wire netting yearly budget planning system
CN103309934B (en) Medium-low voltage distribution network data integration platform and method
CN104301421A (en) Cloud calculation real-time data synchronization method
Abts A perspective on the economic life span of COTS-based software systems: The COTS-LIMO model
Battaglia et al. Environmental territorial management: a new approach for industrial clusters

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150107