CN104268699A - Method for automatic inspection of bill of material (BOM) - Google Patents
Method for automatic inspection of bill of material (BOM) Download PDFInfo
- Publication number
- CN104268699A CN104268699A CN201410510301.9A CN201410510301A CN104268699A CN 104268699 A CN104268699 A CN 104268699A CN 201410510301 A CN201410510301 A CN 201410510301A CN 104268699 A CN104268699 A CN 104268699A
- Authority
- CN
- China
- Prior art keywords
- bom
- abnormal
- attribute
- self
- development
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement or balancing against orders
- G06Q10/0875—Itemisation or classification of parts, supplies or services, e.g. bill of materials
Abstract
The invention provides a method for automatic inspection of a bill of material (BOM). The method includes the steps that a material identity identification number ID is set, the material ID corresponds to material information, the material ID and the material information are stored in a material database, and the material information comprises material attributes; the material attributes are found according to the material ID, and whether an abnormal material exists in the BOM is judged; if no abnormal material exists, whether an alternative material used for the material in the BOM exists is judged; if the alternative material exists, a BOM containing the material and the corresponding alternative material is generated. The BOM can be quickly and automatically inspected in the method, a great amount of labor time needed for inspecting the BOM is saved, omission and errors caused by human factors can be avoided, and the quality of the BOM is guaranteed.
Description
Technical field
The present invention relates to technical field of data processing, particularly relate to the method for a kind of self-verifying Bill of Material (BOM) (BOM, Bill of Material).
Background technology
At present, in single board design processing, BOM is ageing and design that is accuracy is more and more important.Especially in the R & D design of large server, in order to avoid BOM goes wrong, reduce cost unnecessary after going into operation, BOM designer generally can verify each material in BOM, is improved the output quality of BOM by each material of examination.But, whether being all preferred feed by manually coming on the whole BOM of examination, whether having the school of the alternative material of coupling to examine work quite loaded down with trivial details, and easily omission is gone on business.
Along with the development of technology, single board design becomes increasingly complex, and turn of the market is fast, and BOM quality requirements is more and more higher, therefore, find a kind of fast and the scheme of self-verifying BOM becomes very important.
Summary of the invention
In order to solve the problems of the technologies described above, the invention provides a kind of method of self-verifying Bill of Material (BOM), can fast and self-verifying BOM.
In order to reach the object of the invention, the invention provides a kind of method of self-verifying Bill of Material (BOM), comprise: arrange material identify label number ID and material ID and material information are carried out correspondence, and be deposited in material data storehouse by material ID and material information, wherein material information comprises material attribute; Search material attribute according to material ID, judge whether there is abnormal material in BOM; If there is no abnormal material, judges whether the material in BOM has alternative material; Substitute material if had, generate the BOM comprising material and corresponding alternative material.
Further, material information, comprising: the technical parameter of material, commercial attributes and material attribute, wherein, the technical parameter of material comprises the specifications of material, environmental certification book, process the curve of resistance to temperature value key diagram, specifications illustrate material variety, material operation, dimensions, proof voltage, resistance to electric current, output voltage, output current value etc.; Whether the commercial attributes of material comprises the trade name of material, manufacturer's item number, be normally supply material or project stopping production EOL material in market; Material attribute representation is normal material or abnormal material.
Further, arranging material ID, comprising: by material code system, is that material arranges different material ID according to coding rule.
Further, searching material attribute, comprising according to material ID: material attribute labeling material data storehouse being had material ID is normal material, if material goes wrong, is abnormal material by the material attribute labeling gone wrong; Use BOM comparison instrument, according to material ID, the material in BOM is compared with the material in material data storehouse one by one, obtain the material attribute that this material ID is corresponding.
Further, the method also comprises: if there is abnormal material in BOM, the abnormal material in highlighted display BOM, and this abnormal material is replaced with normal material.
Further, the method also comprises: if need the difference obtaining different development BOM, then determine the development residing for current BOM, current BOM and other development BOM is compared, wherein, development comprises design verification EVT, design verification testing period DVT and the short run process verification test PVT at product development initial stage.
Compared with prior art, the present invention includes: arrange material identify label number ID and material ID and material information are carried out correspondence, and be deposited in material data storehouse by material ID and material information, wherein material information comprises material attribute; Search material attribute according to material ID, judge whether there is abnormal material in BOM; If there is no abnormal material, judges whether the material in BOM has alternative material; Substitute material if had, generate the BOM comprising material and corresponding alternative material.The present invention fast and self-verifying BOM, can decrease a large amount of manual time checked needed for BOM, and can avoid the omission because human factor causes and mistake, ensure that the quality of BOM.
Accompanying drawing explanation
Fig. 1 is the schematic flow sheet of the method for self-verifying Bill of Material (BOM) of the present invention.
Fig. 2 is the interface schematic diagram that the method for self-verifying Bill of Material (BOM) of the present invention uses in client.
Fig. 3 is another interface schematic diagram that the method for self-verifying Bill of Material (BOM) of the present invention uses in client.
Embodiment
Below in conjunction with accompanying drawing, the present invention is described in further detail.By these exemplifying embodiments of enough detailed description, those skilled in the art are made to put into practice the present invention.Without departing from the spirit and scope in the present invention, can to implement to make logic, realize and other change.
Fig. 1 is the schematic flow sheet of the method for self-verifying Bill of Material (BOM) of the present invention, as shown in Figure 1, specifically can comprise:
Step 11, arranges material identify label number (ID, Identity), and material ID and material information are carried out correspondence, and is deposited in material data storehouse by material ID and material information, and wherein, material information comprises material attribute.
In this step, material information comprises the technical parameter of material, commercial attributes and material attribute, wherein, the technical parameter of material comprises the specifications of material, environmental certification book, processes the curve of resistance to temperature value key diagram etc., and specifications illustrate material variety, material operation, dimensions, proof voltage, resistance to electric current, output voltage, output current value etc.; Whether the commercial attributes of material comprises the trade name of material, manufacturer's item number, be that normally supply material or project of market stops production (EOL, End-of-life) material; Material attribute is normal material or abnormal material in order to represent.
Arranging material ID, comprising: by material code system, is that material arranges different material ID according to coding rule.Particularly, in material code system, can adopt 14 coding rules, each coding has specific implication, and give different vendor, different vendor's item number is using unique number as the identification card number of material.After gathering the material needed, determining whether virgin material by the technical parameter of material and commercial attributes, if virgin material, is that this virgin material arranges unique material ID according to coding rule.
Step 12, searches material attribute according to material ID, judges whether there is abnormal material in BOM, if there is no, enters step 13; If existed, enter step 15.
In this step, material data storehouse has the material attribute of material ID to be all labeled as " Y ", namely this material is normal material, if but due to market stop production or supply of material friendship phase etc. go wrong after or to record examination failure rate in production system high, can be " N " by the material attribute flags of these materials, namely this material be abnormal material.
BOM comparison instrument can be used, according to material ID, the material in BOM is compared with the material in material data storehouse one by one, obtain the material attribute that this material ID is corresponding, judge in BOM, whether to there is the material that material attribute is " N ".
Step 13, judges whether the material in BOM has alternative material, if existed, enters step 14, if there is no, checked BOM.
In this step, the material in material data storehouse is all the material that in such material, performance is good and conventional usually, in order to reduce cost, avoids lacking material risk, can be that the material in material data storehouse prepares to substitute material.
With material completely the same or do not affect board size function coupling material can as standard substitute material, these are accurate substitute material through checking meet design requirement and by performance test after, substitute material for these are accurate and material ID is set, and material ID and alternative material information are deposited in alternative material database.
According to material ID, check the alternative material substituting and whether there is the material in BOM in material database.
Step 14, generates the BOM comprising material and corresponding alternative material.
Step 15, the abnormal material in display BOM, and this abnormal material is replaced with normal material.
In this step, if there is abnormal material in BOM, by this abnormal material high brightness display, and this abnormal material can be replaced with normal material.
Step 16, if need the difference obtaining different development BOM, then determines the development residing for current BOM, is compared by current BOM and other development BOM.
In this step, research and development have the design verification (EVT at product development initial stage, Engineering Verification Test), design verification testing period (DVT, Design Verification Test) and short run process verification test (PVT, Process Verification Test) three phases.
In the different phase of research and development, according to research and development demand, the material on BOM may change to some extent, so the three phases researched and developed, all needs to check BOM.If need the difference obtaining different development BOM, then determine the development residing for current BOM, current BOM and other development BOM is compared.
With concrete operations example, the present invention is further elaborated below.
In the method for self-verifying Bill of Material (BOM) of the present invention, can use the check system program of the abnormal material of a kind of automatic screening of VBA language design and the suitable alternative material of Auto-matching, this program interface can be as shown in Figure 2.Formula is put in the grand extendfile of EXCEL, perform this and grandly just can to search in BOM to have and there is no abnormal material, the alternative material whether mated by a key, and show corresponding modification information by high brightness window, as shown in Figure 3.
User uses check system program, carries out following steps:
1, unified amendment BOM filename, containing keyword " BOM " in filename, opens BOM file;
2, open material information database, open and substitute material information database, database opens not full-time prompting: " material A MP.AMp.Amp substitutes material information and do not open ";
3, by BOM check system, click " having deleted material to confirm " and check in BOM whether to exist and delete material, if there is the yellow mark place of the direct high brightness of abnormal material;
4, automatically can generate auxiliary material B OM inventory by design verification testing period (DVT, Design Verification Test) BOM disposal system.Auxiliary material B OM is exported to system re-pack, and checking substitutes material;
5, PVT BOM can be automatically updated into by short run process verification test (PVT, Process Verification Test) BOM disposal system, and be loaded in BOM by normally and not adding the material substituting material;
6, if need the difference knowing different development BOM, use BOM Compare System, automatically export the difference of BOM.
The present invention is by arranging material ID, material ID and material information are carried out correspondence, and material ID and material information are deposited in material data storehouse, follow-up can according to material ID, automatically search all materials in BOM, by the material attribute in material information, judge abnormal material, abnormal material is carried out highlighted display, thus conveniently abnormal material is changed to normal material; In addition, according to material ID, substituting material database by searching, the material substituting material can be found out, then automatically can export the BOM substituting material with coupling, avoid lacking material risk; All right, if need the difference knowing different development BOM, use BOM Compare System, automatically export the difference of BOM.The present invention fast and self-verifying BOM, can decrease a large amount of manual time checked needed for BOM, and can avoid the omission because human factor causes and mistake, ensure that the quality of BOM.
Be to be understood that, although this instructions is described according to embodiment, but not each embodiment only comprises an independently technical scheme, this narrating mode of instructions is only for clarity sake, those skilled in the art should by instructions integrally, technical scheme in each embodiment also through appropriately combined, can form other embodiments that it will be appreciated by those skilled in the art that.
A series of detailed description listed is above only illustrating for feasibility embodiment of the present invention; they are not for limiting the scope of the invention, all do not depart from equivalent implementations that skill of the present invention spirit does or change all should be included within protection scope of the present invention.
Claims (6)
1. a method for self-verifying Bill of Material (BOM), is characterized in that, comprising:
Arrange material identify label number ID and material ID and material information are carried out correspondence, and be deposited in material data storehouse by material ID and material information, wherein material information comprises material attribute;
Search material attribute according to material ID, judge whether there is abnormal material in BOM;
If there is no abnormal material, judges whether the material in BOM has alternative material;
Substitute material if had, generate the BOM comprising material and corresponding alternative material.
2. the method for self-verifying Bill of Material (BOM) according to claim 1, is characterized in that, described material information, comprise: the technical parameter of material, commercial attributes and material attribute, wherein, the technical parameter of material comprises the specifications of material, environmental certification book, processes the curve of resistance to temperature value key diagram, and specifications illustrate material variety, material operation, dimensions, proof voltage, resistance to electric current, output voltage, output current value etc.; Whether the commercial attributes of material comprises the trade name of material, manufacturer's item number, be normally supply material or project stopping production EOL material in market; Material attribute representation is normal material or abnormal material.
3. the method for self-verifying Bill of Material (BOM) according to claim 1 and 2, is characterized in that, describedly arranges material ID, and comprising: by material code system, is that material arranges different material ID according to coding rule.
4. the method for self-verifying Bill of Material (BOM) according to claim 1, is characterized in that, describedly searches material attribute according to material ID, comprising:
Material attribute labeling material data storehouse being had material ID is normal material, if material goes wrong, is abnormal material by the material attribute labeling gone wrong;
Use BOM comparison instrument, according to material ID, the material in BOM is compared with the material in material data storehouse one by one, obtain the material attribute that this material ID is corresponding.
5. the method for self-verifying Bill of Material (BOM) according to claim 1, it is characterized in that, the method also comprises: if there is abnormal material in BOM, the abnormal material in highlighted display BOM, and this abnormal material is replaced with normal material.
6. the method for self-verifying Bill of Material (BOM) according to claim 1, it is characterized in that, the method also comprises: if need the difference obtaining different development BOM, then determine the development residing for current BOM, is compared by current BOM and other development BOM;
Wherein, development comprises design verification EVT, design verification testing period DVT and the short run process verification test PVT at product development initial stage.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410510301.9A CN104268699A (en) | 2014-09-28 | 2014-09-28 | Method for automatic inspection of bill of material (BOM) |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410510301.9A CN104268699A (en) | 2014-09-28 | 2014-09-28 | Method for automatic inspection of bill of material (BOM) |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104268699A true CN104268699A (en) | 2015-01-07 |
Family
ID=52160219
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410510301.9A Pending CN104268699A (en) | 2014-09-28 | 2014-09-28 | Method for automatic inspection of bill of material (BOM) |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104268699A (en) |
Cited By (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105302781A (en) * | 2015-11-18 | 2016-02-03 | 合肥宝龙达光电技术有限公司 | Method for fast BOM comparison |
CN105868041A (en) * | 2016-04-01 | 2016-08-17 | 浪潮电子信息产业股份有限公司 | Easy-to-apply server configuration automatic testing method |
CN106355375A (en) * | 2016-09-18 | 2017-01-25 | 福州大学 | Automatic confirming method of materials |
CN106354576A (en) * | 2016-08-22 | 2017-01-25 | 上海华力微电子有限公司 | MES data verification method and system |
CN106920057A (en) * | 2017-03-01 | 2017-07-04 | 泰康保险集团股份有限公司 | Material management method and system |
CN107633353A (en) * | 2017-09-08 | 2018-01-26 | 南京国电南自电网自动化有限公司 | Material BOM tables based on EXCEL Table V BA close rule inspection method |
CN108388743A (en) * | 2018-03-06 | 2018-08-10 | 深圳市图敏智能视频股份有限公司 | A kind of bill of materials method for sorting |
CN108681851A (en) * | 2018-05-02 | 2018-10-19 | 山东求同网信息科技有限公司 | The double-template of enterprise's COM code builds up coding method and workout system |
CN108921484A (en) * | 2018-07-19 | 2018-11-30 | 中电九天智能科技有限公司 | The intelligent condition monitoring system of automated storage and retrieval system |
CN109754200A (en) * | 2017-11-07 | 2019-05-14 | 深圳前海硬之城信息技术有限公司 | Bill of material management method, apparatus and computer readable storage medium |
CN109902958A (en) * | 2019-02-28 | 2019-06-18 | 苏州浪潮智能科技有限公司 | A kind of method and system improving server module BOM restricted class versatility |
CN109902906A (en) * | 2017-12-09 | 2019-06-18 | 英业达科技有限公司 | The manufacturing process management system and method for production |
CN110097647A (en) * | 2019-05-20 | 2019-08-06 | 珠海格力电器股份有限公司 | Automatic Verification method, explosive view production method and graphics software |
CN110503341A (en) * | 2019-08-27 | 2019-11-26 | 云汉芯城(上海)互联网科技股份有限公司 | A kind of method of calibration based on BOM type selecting, device |
CN111199367A (en) * | 2018-11-19 | 2020-05-26 | 鸿富锦精密电子(成都)有限公司 | Material reject ratio monitoring device and method |
CN111209765A (en) * | 2018-11-21 | 2020-05-29 | Oppo(重庆)智能科技有限公司 | Method and device for identifying material bar code and terminal equipment |
CN112508470A (en) * | 2019-09-16 | 2021-03-16 | 比亚迪股份有限公司 | Method and device for changing bill of material, storage medium and electronic equipment |
CN112561391A (en) * | 2020-12-25 | 2021-03-26 | 珠海格力电器股份有限公司 | Material management method and device, storage medium and electronic device |
CN112632953A (en) * | 2020-12-22 | 2021-04-09 | 云汉芯城(上海)互联网科技股份有限公司 | Method for quickly and accurately detecting that multiple uploaded bill of materials belong to same product |
CN112732506A (en) * | 2021-01-15 | 2021-04-30 | 苏州浪潮智能科技有限公司 | Server cabinet network card testing method, system, terminal and storage medium |
CN112801621A (en) * | 2021-01-30 | 2021-05-14 | 深圳捷创电子科技有限公司 | BOM bill of material sorting and approving method, system and computer readable storage medium |
CN113032457A (en) * | 2021-03-19 | 2021-06-25 | 山东英信计算机技术有限公司 | Method and device for maintaining database information of bill of material |
CN113065814A (en) * | 2021-03-12 | 2021-07-02 | 云汉芯城(上海)互联网科技股份有限公司 | Quantification method of BOM system and computer readable storage medium |
CN113743763A (en) * | 2021-08-26 | 2021-12-03 | 青岛鼎信通讯股份有限公司 | Material blacklist management system applied to electric power product |
CN113779659A (en) * | 2021-09-27 | 2021-12-10 | 浙江大华技术股份有限公司 | Material configuration method and device of equipment, storage medium and electronic device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1734480A (en) * | 2004-08-14 | 2006-02-15 | 鸿富锦精密工业(深圳)有限公司 | Bill of Material (BOM) (BOM) diversity ratio is to system and method |
CN101008997A (en) * | 2006-01-25 | 2007-08-01 | 英业达股份有限公司 | Material logistics system and method |
CN101464873A (en) * | 2007-12-20 | 2009-06-24 | 英业达股份有限公司 | Material list establishing method and system |
CN101639907A (en) * | 2009-09-04 | 2010-02-03 | 英华达(上海)科技有限公司 | Automatic comparison system and operation method thereof |
CN102567864A (en) * | 2010-12-08 | 2012-07-11 | 金蝶软件(中国)有限公司 | Material substitution method and device in material requirement planning system |
-
2014
- 2014-09-28 CN CN201410510301.9A patent/CN104268699A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1734480A (en) * | 2004-08-14 | 2006-02-15 | 鸿富锦精密工业(深圳)有限公司 | Bill of Material (BOM) (BOM) diversity ratio is to system and method |
CN101008997A (en) * | 2006-01-25 | 2007-08-01 | 英业达股份有限公司 | Material logistics system and method |
CN101464873A (en) * | 2007-12-20 | 2009-06-24 | 英业达股份有限公司 | Material list establishing method and system |
CN101639907A (en) * | 2009-09-04 | 2010-02-03 | 英华达(上海)科技有限公司 | Automatic comparison system and operation method thereof |
CN102567864A (en) * | 2010-12-08 | 2012-07-11 | 金蝶软件(中国)有限公司 | Material substitution method and device in material requirement planning system |
Cited By (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105302781A (en) * | 2015-11-18 | 2016-02-03 | 合肥宝龙达光电技术有限公司 | Method for fast BOM comparison |
CN105868041A (en) * | 2016-04-01 | 2016-08-17 | 浪潮电子信息产业股份有限公司 | Easy-to-apply server configuration automatic testing method |
CN106354576A (en) * | 2016-08-22 | 2017-01-25 | 上海华力微电子有限公司 | MES data verification method and system |
CN106354576B (en) * | 2016-08-22 | 2019-06-07 | 上海华力微电子有限公司 | A kind of verification method and system of MES data |
CN106355375A (en) * | 2016-09-18 | 2017-01-25 | 福州大学 | Automatic confirming method of materials |
CN106355375B (en) * | 2016-09-18 | 2019-08-09 | 福州大学 | A kind of automatic materiel affirmation method |
CN106920057A (en) * | 2017-03-01 | 2017-07-04 | 泰康保险集团股份有限公司 | Material management method and system |
CN107633353A (en) * | 2017-09-08 | 2018-01-26 | 南京国电南自电网自动化有限公司 | Material BOM tables based on EXCEL Table V BA close rule inspection method |
CN109754200A (en) * | 2017-11-07 | 2019-05-14 | 深圳前海硬之城信息技术有限公司 | Bill of material management method, apparatus and computer readable storage medium |
CN109902906A (en) * | 2017-12-09 | 2019-06-18 | 英业达科技有限公司 | The manufacturing process management system and method for production |
CN108388743A (en) * | 2018-03-06 | 2018-08-10 | 深圳市图敏智能视频股份有限公司 | A kind of bill of materials method for sorting |
CN108681851A (en) * | 2018-05-02 | 2018-10-19 | 山东求同网信息科技有限公司 | The double-template of enterprise's COM code builds up coding method and workout system |
CN108921484B (en) * | 2018-07-19 | 2021-08-10 | 中电九天智能科技有限公司 | Intelligent state monitoring system of automatic warehousing system |
CN108921484A (en) * | 2018-07-19 | 2018-11-30 | 中电九天智能科技有限公司 | The intelligent condition monitoring system of automated storage and retrieval system |
CN111199367A (en) * | 2018-11-19 | 2020-05-26 | 鸿富锦精密电子(成都)有限公司 | Material reject ratio monitoring device and method |
CN111209765A (en) * | 2018-11-21 | 2020-05-29 | Oppo(重庆)智能科技有限公司 | Method and device for identifying material bar code and terminal equipment |
CN109902958A (en) * | 2019-02-28 | 2019-06-18 | 苏州浪潮智能科技有限公司 | A kind of method and system improving server module BOM restricted class versatility |
CN110097647A (en) * | 2019-05-20 | 2019-08-06 | 珠海格力电器股份有限公司 | Automatic Verification method, explosive view production method and graphics software |
CN110097647B (en) * | 2019-05-20 | 2020-11-24 | 珠海格力电器股份有限公司 | Automatic checking method, explosion diagram making method and drawing software |
CN110503341A (en) * | 2019-08-27 | 2019-11-26 | 云汉芯城(上海)互联网科技股份有限公司 | A kind of method of calibration based on BOM type selecting, device |
CN112508470A (en) * | 2019-09-16 | 2021-03-16 | 比亚迪股份有限公司 | Method and device for changing bill of material, storage medium and electronic equipment |
CN112632953A (en) * | 2020-12-22 | 2021-04-09 | 云汉芯城(上海)互联网科技股份有限公司 | Method for quickly and accurately detecting that multiple uploaded bill of materials belong to same product |
CN112561391A (en) * | 2020-12-25 | 2021-03-26 | 珠海格力电器股份有限公司 | Material management method and device, storage medium and electronic device |
CN112732506A (en) * | 2021-01-15 | 2021-04-30 | 苏州浪潮智能科技有限公司 | Server cabinet network card testing method, system, terminal and storage medium |
CN112801621A (en) * | 2021-01-30 | 2021-05-14 | 深圳捷创电子科技有限公司 | BOM bill of material sorting and approving method, system and computer readable storage medium |
CN113065814A (en) * | 2021-03-12 | 2021-07-02 | 云汉芯城(上海)互联网科技股份有限公司 | Quantification method of BOM system and computer readable storage medium |
CN113032457A (en) * | 2021-03-19 | 2021-06-25 | 山东英信计算机技术有限公司 | Method and device for maintaining database information of bill of material |
CN113743763A (en) * | 2021-08-26 | 2021-12-03 | 青岛鼎信通讯股份有限公司 | Material blacklist management system applied to electric power product |
CN113779659A (en) * | 2021-09-27 | 2021-12-10 | 浙江大华技术股份有限公司 | Material configuration method and device of equipment, storage medium and electronic device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104268699A (en) | Method for automatic inspection of bill of material (BOM) | |
CN108228917B (en) | Circuit schematic diagram inspection device and method | |
US10599129B2 (en) | Method for data normalization | |
JP2009259256A (en) | System and method for design, procurement and manufacturing collaboration | |
CN106355375B (en) | A kind of automatic materiel affirmation method | |
CN101794106A (en) | Quality control system, quality control apparatus, and quality control method | |
CN103955429B (en) | Determine the method and device of regression test scope | |
JP2014130547A (en) | File management program, file management device and file management method | |
KR20120072130A (en) | Apparatus and method for evaluating basic software configuration based on autosar meta file | |
CN105279089A (en) | Method and device for obtaining page element | |
CN105095074A (en) | Upgrade test method and device for configuration file | |
CN111221849A (en) | Satellite fault positioning method, device, terminal and computer readable medium | |
CN106021087B (en) | code detection method and device | |
CN103310033B (en) | Editing system and edit methods | |
CN111061733B (en) | Data processing method, device, electronic equipment and computer readable storage medium | |
US10942215B2 (en) | Integrated circuit authentication from a die material measurement | |
CN112069073A (en) | Test case management method, terminal and storage medium | |
JP6715705B2 (en) | Failure cause search system and failure cause search method | |
CN106155665A (en) | Accordance puts to the proof system and method | |
CN110162461B (en) | Data synchronization verification method and device and computer equipment | |
JPH05240745A (en) | Method for generating test specification | |
CN107196789B (en) | Method and device for checking base station parameters | |
CN101145216A (en) | Electronic component examination and maintenance system and method | |
CN110532315B (en) | Method and system for automatically generating reliability prediction report import file | |
CN106992873B (en) | Protection group processing method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150107 |
|
WD01 | Invention patent application deemed withdrawn after publication |