CN104265323A - 软弱大变形流变性岩体大断面隧道缓冲让压支护结构 - Google Patents

软弱大变形流变性岩体大断面隧道缓冲让压支护结构 Download PDF

Info

Publication number
CN104265323A
CN104265323A CN201410354346.1A CN201410354346A CN104265323A CN 104265323 A CN104265323 A CN 104265323A CN 201410354346 A CN201410354346 A CN 201410354346A CN 104265323 A CN104265323 A CN 104265323A
Authority
CN
China
Prior art keywords
rock mass
weak
section tunnel
points
eps layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410354346.1A
Other languages
English (en)
Inventor
阳军生
杨安民
肖小文
高世军
王立川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
Original Assignee
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University filed Critical Central South University
Priority to CN201410354346.1A priority Critical patent/CN104265323A/zh
Publication of CN104265323A publication Critical patent/CN104265323A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

本发明公开了一种软弱大变形流变性岩体大断面隧道缓冲让压支护结构,在隧道的初支(1)上全环铺设有EPS层(2),采用钢筋锚钉(5)将所述的EPS层(2)固定在所述的初支(1)上,在所述的EPS层(2)上铺设有防水板(3),在所述的防水板(3)施作有二衬(4)。本发明易于实施,由于EPS具有超轻型、可压缩和泊松比近于0的特性,能吸收一定的围岩流变变形,且不产生附加的切向应力,可最大限度地减少作用于二衬结构上的围岩压力,从而保证软弱大变形流变岩体大断面隧道,在及时施作二衬条件下衬砌结构的安全。同时,防水板与EPS层接触,可最大限度避免防水板的破坏。

Description

软弱大变形流变性岩体大断面隧道缓冲让压支护结构
技术领域
本发明涉及一种隧道支护结构,具体涉及一种软弱大变形流变性岩体大断面隧道缓冲让压支护结构。
背景技术
对于软弱围岩大断面隧道,需允许围岩发生一定变形,然后进行支护;若采用传统的支护理论,充分发挥围岩的承载作用,围岩变形将难以有效控制。目前针对此类隧道,主要采取加强初支,尽快施作仰拱和二衬的方法,以保证隧道施工安全。然而对于存在流变性的软弱大变形岩体,在二衬施作完毕后,过大的围岩流变压力常导致衬砌结构开裂破坏。为此,有必要研发一种适用于软弱大变形流变性岩体大断面隧道的缓冲让压支护结构,以保证二衬及时施作条件下,衬砌结构的安全。
发明内容
本发明所要解决的技术问题是提供一种能保证二衬及时施作条件下衬砌结构的安全且施工工艺简单、技术经济可行的软弱大变形流变性岩体大断面隧道缓冲让压支护结构。
为了解决上述技术问题,本发明提供的软弱大变形流变性岩体大断面隧道缓冲让压支护结构,其特征是:在隧道的初支1上全环铺设有EPS层2,采用钢筋锚钉5将所述的EPS层2固定在所述的初支1上,在所述的EPS层2上铺设有防水板3,在所述的防水板3施作有二衬4。
所述的EPS层2的材料密度为12kg/m3~15kg/m3
所述的EPS层2的厚度为6cm~10cm。
所述的钢筋锚钉5布置密度为拱部3点/m2~4点/m2,边墙2点/m2~3点/m2
采用上述技术方案的软弱大变形流变性岩体大断面隧道缓冲让压支护结构,其作用原理为:EPS(中文名是可发性聚苯乙烯)材料具有超轻型、可压缩和泊松比近于0的特性,能够吸收一定量的围岩流变变形,且不产生附加的切向应力,可最大限度减少作用于二衬结构上的围岩压力,从而保证软弱大变形流变性围岩大断面隧道,在及时施作二衬条件下的衬砌结构安全。
采用本发明的效用:本发明既允许围岩在施作衬砌后产生一定量的流变变形,又让围岩变形量在可控范围内,并减少作用于二衬结构上的围岩压力。因而在二衬及时施作条件下,可保证衬砌结构的安全。同时,防水板与EPS层接触,可最大限度避免防水板的破坏。
综上所述,本发明是一种能保证二衬及时施作条件下衬砌结构的安全且施工工艺简单、技术经济可行的软弱大变形流变性岩体大断面隧道缓冲让压支护结构。
附图说明
图1是本发明的结构示意图。
图2是本发明的结构剖面示意图。
附图中:1-初支,2-EPS层,3-防水板,4-二衬,5-钢筋锚钉。
具体实施方式
下面结合附图对本发明作进一步详细说明。
参见图1和图2,在隧道的初支1上全环铺设有EPS层2,采用钢筋锚钉5将EPS层2固定在初支1上,EPS层2的厚度为6cm~10cm,EPS层2的材料密度为12kg/m3~15kg/m3,在EPS层2上铺设有防水板3,在防水板3上施作有二衬4。
参见图1和图2,本发明的施工步骤是:
a、清理初支1的表面:在隧道开挖并初支1后,清理初支1的表面。清除初支1的表面尖锐物,并保证初支1的平整度符合D/L≤1/6(D为初支表面两相邻凸面凹进去的深度;L为初支表面相邻两凹面的距离);
b、铺设EPS层2:沿隧道的初支1全环铺设EPS层2,厚度控制为6cm~10cm,用钢筋锚钉5进行固定,钢筋锚钉5布置密度为拱部3点/m2~4点/m2,边墙2点/m2~3点/m2
c、铺设防水板3及施作仰拱和二衬4:在EPS层2上铺设防水板3,然后施作仰拱和二衬4。

Claims (5)

1.一种软弱大变形流变性岩体大断面隧道缓冲让压支护结构,其特征是:在隧道的初支(1)上全环铺设有EPS层(2),采用钢筋锚钉(5)将所述的EPS层(2)固定在所述的初支(1)上,在所述的EPS层(2)上铺设有防水板(3),在所述的防水板(3)施作有二衬(4)。
2.根据权利要求1所述的软弱大变形流变性岩体大断面隧道缓冲让压支护结构,其特征是:所述的EPS层(2)的材料密度为12kg/m3~15kg/m3
3.根据权利要求1或2所述的软弱大变形流变性岩体大断面隧道缓冲让压支护结构,其特征是:所述的EPS层(2)的厚度为6cm~10cm。
4.根据权利要求1或2所述的软弱大变形流变性岩体大断面隧道缓冲让压支护结构,其特征是:所述的钢筋锚钉(5)布置密度为拱部3点/m2~4点/m2,边墙2点/m2~3点/m2
5.根据权利要求3所述的软弱大变形流变性岩体大断面隧道缓冲让压支护结构,其特征是:所述的钢筋锚钉(5)布置密度为拱部3点/m2~4点/m2,边墙2点/m2~3点/m2
CN201410354346.1A 2014-07-24 2014-07-24 软弱大变形流变性岩体大断面隧道缓冲让压支护结构 Pending CN104265323A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410354346.1A CN104265323A (zh) 2014-07-24 2014-07-24 软弱大变形流变性岩体大断面隧道缓冲让压支护结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410354346.1A CN104265323A (zh) 2014-07-24 2014-07-24 软弱大变形流变性岩体大断面隧道缓冲让压支护结构

Publications (1)

Publication Number Publication Date
CN104265323A true CN104265323A (zh) 2015-01-07

Family

ID=52156881

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410354346.1A Pending CN104265323A (zh) 2014-07-24 2014-07-24 软弱大变形流变性岩体大断面隧道缓冲让压支护结构

Country Status (1)

Country Link
CN (1) CN104265323A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106499405A (zh) * 2016-11-02 2017-03-15 中国电建集团成都勘测设计研究院有限公司 隧洞衬砌结构

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010024667A (ja) * 2008-07-17 2010-02-04 Kfc Ltd トンネル防水構造およびその施工方法
CN102080550A (zh) * 2011-01-30 2011-06-01 同济大学 大断面岩石隧道双层初期支护系统设计方法
CN202140098U (zh) * 2011-07-22 2012-02-08 中铁十一局集团有限公司 基于变形可控释放的软岩大变形隧道支护结构
CN202645584U (zh) * 2012-06-15 2013-01-02 中铁第四勘察设计院集团有限公司 复合式隧道衬砌结构
CN202707084U (zh) * 2012-04-12 2013-01-30 中铁港航局集团有限公司 一种隧道防水结构
CN202851009U (zh) * 2012-10-15 2013-04-03 中铁二十一局集团有限公司 隧道缓冲多层防排水结构

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010024667A (ja) * 2008-07-17 2010-02-04 Kfc Ltd トンネル防水構造およびその施工方法
CN102080550A (zh) * 2011-01-30 2011-06-01 同济大学 大断面岩石隧道双层初期支护系统设计方法
CN202140098U (zh) * 2011-07-22 2012-02-08 中铁十一局集团有限公司 基于变形可控释放的软岩大变形隧道支护结构
CN202707084U (zh) * 2012-04-12 2013-01-30 中铁港航局集团有限公司 一种隧道防水结构
CN202645584U (zh) * 2012-06-15 2013-01-02 中铁第四勘察设计院集团有限公司 复合式隧道衬砌结构
CN202851009U (zh) * 2012-10-15 2013-04-03 中铁二十一局集团有限公司 隧道缓冲多层防排水结构

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
岳国均等: "软岩巷道支护技术的应用", 《现代矿业》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106499405A (zh) * 2016-11-02 2017-03-15 中国电建集团成都勘测设计研究院有限公司 隧洞衬砌结构
CN106499405B (zh) * 2016-11-02 2019-02-19 中国电建集团成都勘测设计研究院有限公司 隧洞衬砌结构

Similar Documents

Publication Publication Date Title
Guo et al. Numerical simulation of overburden and surface movements for Wongawilli strip pillar mining
AU2015377025B2 (en) Thick coal seam large seam height gob-side retained passageway method
Su et al. Study on gob-side entry retaining in fully-mechanized longwall with top-coal caving and its application
Qian et al. Quantitative analysis of rockburst for surrounding rocks and zonal disintegration mechanism in deep tunnels
CN202544925U (zh) 一种一孔两用的隧洞排水孔结构
CN106640126B (zh) 一种极高地应力软岩隧道拱墙衬砌开裂破坏的处理方法
Sun et al. Deformation control of asymmetric floor heave in a deep rock roadway: A case study
CN103590834A (zh) 非对称挤压型变形隧道的开挖支护方法
Wang et al. Floor heave characteristics and control technology of the roadway driven in deep inclined-strata
CN204703922U (zh) 一种处理隧道初期支护侵限的施工配套设备
Li et al. Principle and practice of coupling support of double yielding shell of soft rock roadway under high stress
CN106545019A (zh) 用于级差式地下结构施工的换撑体系及施工方法
CN203835404U (zh) 一种既有隧道拱部衬砌严重开裂无净空加固体系
CN104265323A (zh) 软弱大变形流变性岩体大断面隧道缓冲让压支护结构
CN103291328B (zh) 一种膨胀岩巷道底板治理方法
CN103806919A (zh) 用于膨胀性土层隧道初期的钢格栅钢拱架联合支护
CN204212180U (zh) 一种用于地下室降水井封堵的钢筋笼
Jin et al. Roadway layout for recycling residual coal pillar in room-and-pillar mining of thick coal seam
CN103334769A (zh) 用于加固超前工作面空巷的十字砌块墙体支护方法
MENG et al. Additional stress of shaft linings in thick alluvium constructed by freezing process
Zhang et al. The surrounding rock of deep borehole pressure relief and let the pressure bolt coupling analysis
Yan et al. Research on test of reducing deformation of soft rock tunnel with high stress level by pilot heading
Zhenghe et al. Stress control of deep cutting along roadway over roof rock
ZHOU et al. Experimental study on feature parameters of fluid-solid coupling model ofunderground reservoir in shallow depth seam
Wang et al. Discussion on the application of yielding support technology for large deformation of soft-rock tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150107

RJ01 Rejection of invention patent application after publication