CN104265279B - Logging-while-drilling curve prediction method under fault condition - Google Patents

Logging-while-drilling curve prediction method under fault condition Download PDF

Info

Publication number
CN104265279B
CN104265279B CN201410367695.7A CN201410367695A CN104265279B CN 104265279 B CN104265279 B CN 104265279B CN 201410367695 A CN201410367695 A CN 201410367695A CN 104265279 B CN104265279 B CN 104265279B
Authority
CN
China
Prior art keywords
curve
well
logging
point
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410367695.7A
Other languages
Chinese (zh)
Other versions
CN104265279A (en
Inventor
胡振平
姜艳玲
吉人
吴胜
吴宝玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Chuanqing Drilling Engineering Co Ltd filed Critical CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN201410367695.7A priority Critical patent/CN104265279B/en
Publication of CN104265279A publication Critical patent/CN104265279A/en
Application granted granted Critical
Publication of CN104265279B publication Critical patent/CN104265279B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/02Determining slope or direction
    • E21B47/022Determining slope or direction of the borehole, e.g. using geomagnetism
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

The invention discloses a logging while drilling curve prediction method under fault conditions, which comprises the following steps: and on the basis of reference well information beside a logging-while-drilling operation well, combining a track along with drilling and a stratum model, calculating a logging prediction curve along a well track, comparing the logging prediction curve with an actual drilling curve, judging whether the established stratum model is correct or not, and correcting the stratum model. The invention not only can utilize the small layer comparison result of the reference well, but also can accurately express various faults, and can predict the curve along the well track under the control of the fault and the stratum position, thereby improving the accuracy of the predicted curve.

Description

Well logging curve prediction method under the conditions of tomography
Technical field
The present invention relates to a kind of well logging curve prediction method under the conditions of tomography, belongs to drilling prospection development technique neck Domain.
Background technology
In the exploration and development of Sichuan Basin stone carbon system reservoir, often bore and run into high-dip structure and tomography.At present with brill The method that curve prediction is carried out in well logging assumes that what is carried out in the case of vertical without tomography or tomography, for example, 2010 06 Phase《Oil drilling technology》A kind of disclosed log Forecasting Methodology based on support vector machine, by offset well set up support to Amount machine forecast model is predicted to current borehole logging tool curve, while introducing well logging of the Measurement While Drilling Data to current Jing Zuantouchu Curve carries out being updated with brill.
And tomography Jing is commonly present and not vertical under conditions down-hole, it is assumed that under the conditions of the curve prediction that carries out it is obvious Being actually needed for scene is can not meet, prior art is primarily present following shortcoming:1. stratigraphic horizon line does not have geological Significance;2. adopt Fault block is managed with demarcation line, demarcation line does not have geological Significance;3. the layer bit line between fault block is not set up mutual relation, When the layer position to a fault block operates, other fault blocks can not synchronously change;4. carry out during reversed fault curve to existing Prediction.
The content of the invention
It is an object of the invention to overcome the problems referred to above that prior art is present, there is provided well logging under the conditions of a kind of tomography Curve prediction method.The present invention can carry out accurate table not only using the detail correlation of reservoir bed result with reference to well to all kinds of tomographies Reach, the curve prediction along well track is carried out under the control of tomography and stratigraphic horizon, improve the precision of prediction curve.
For achieving the above object, the technical solution used in the present invention is as follows:
A kind of well logging curve prediction method under the conditions of tomography, it is characterised in that:With the ginseng by well logging operation well Based on examining well information, with reference to the track with drilling well and stratigraphic model, the logging prediction curve along well track is calculated, will be surveyed Well prediction curve and real brill curve comparison, judge whether set up stratigraphic model is correct, and stratigraphic model is modified.
Methods described specifically includes following steps:
A, to reference to well interval of interest, determining the layer position of representative curve(Depth);
B, it is determined that representative curve layer position in, calculate well track, calculate characteristic curve value and substratum Vertical depth;
C, by step b result of calculation import stratigraphic model, the relation of well track and stratigraphic model is set up, using chain Table manages stratigraphic model, and each fault block has a tomography and multiple bed boundarys;
D, according to the stratigraphic model relation set up, judge the fault block residing for the point on well track, then judge successively should The residing layer position of point;
Point in e, respectively calculation procedure d is represented respectively to the vertical dimension of two line segments in layer top and layer bottom with L1 and L2;
F, calculating well track current point are corresponding to reference to well vertical depth TVD;
G, the value that characteristic curve is then found according to the size of TVD;
H, each point to well track are predicted and obtain a continuous logging prediction curve;
I, logging prediction curve is bored into curve comparison with real, judge whether set up stratigraphic model is correct, to stratum mould Type is modified.
In step a, the well logging Qu Jinhang for selecting cross directional variations stable is finely divided, and takes natural gamma(GR), electricity Resistance rate(RT)Curve determines the layer position of representative curve as standard curve.
In step b, hole angle is input into(DEV)And direction of deflection(DAZ), using curvature method well track, meter are calculated Calculate with vertical depth as the characteristic curve value for indexing and the vertical depth of substratum.
In step f, if layer top correspondence is TVD1 with reference to the vertical depth of well, layer bottom correspondence refers to the vertical depth of well For TVD2, then well track current point is corresponding to the computing formula with reference to well vertical depth:
In step g, the value computing formula of characteristic curve is:
In above formula, V is the curve values of correspondence TVD, and T1 is the vertical depth of former point, and T2 is the vertical depth of latter point, V1 is the curve values of former point, and V2 is the curve values of latter point.
Using it is an advantage of the current invention that:
First, the present invention can be calculated along the prediction curve of well track in the case of complicated fault is present, by boring curve with real Relative analyses, can differentiate that stratigraphic model is whether correct, the amendment of stratigraphic model is and guided, so as to improve geologic steering drilling Reservoir Drilling ratio, improves drilling benefit.
2nd, the present invention can subtly mark off stratum variations in detail longitudinally and laterally because adopting the stratum detail correlation of reservoir bed; Using visual Modifying model, making the amendment of stratigraphic model becomes directly perceived and quick;Fault block management has been used, prediction curve has been made It is possibly realized in the presence of having reversed fault;The layer position management technique with STRATIGRAPHIC SIGNIFICANCE has been used, curve prediction has been made just In realization.
Description of the drawings
Fig. 1 is that the fault block residing for the point that the present invention is judged on well track judges successively that again the layer position residing for the point is illustrated Figure.
Specific embodiment
The technical problem to be solved:One is solved the problems, such as with reference to the detail stratigraphic division of well stratum;Two be well track with The relation of stratigraphic model;Three is well logging curve prediction problem under the conditions of tomography;Four are solved computational methods by calculating The problem that machine language is realized.Below it is specifically described.
A kind of well logging curve prediction method under the conditions of tomography, including:Believed with the reference well by well logging operation well Based on breath, with reference to the track with drilling well and stratigraphic model, the logging prediction curve along well track is calculated, by logging prediction Curve and real brill curve comparison, judge whether set up stratigraphic model is correct, and stratigraphic model is modified.
Methods described specifically includes following steps:
A, to carefully analyzing with reference to well interval of interest, the well logging Qu Jinhang for selecting cross directional variations more stable finely draws Point, take natural gamma(GR), resistivity(RT)Curve determines the layer position of representative curve as standard curve (Depth);Fine division can adopt prior art.
B, it is determined that representative curve layer position in, be input into hole angle(DEV)And direction of deflection(DAZ), application Curvature method calculates well track, calculates with vertical depth as the characteristic curve value for indexing and the vertical depth of substratum.
C, by step b result of calculation import stratigraphic model, the relation of well track and stratigraphic model is set up, using chain Table manages stratigraphic model, and each fault block has a tomography and multiple bed boundarys.
D, according to tomography, the stratigraphic model relation set up, first determine whether out the fault block residing for the point on well track, then according to The secondary layer position judged residing for the point, as shown in Figure 1.
Point in e, respectively calculation procedure d is represented respectively to the vertical dimension of two line segments in layer top and layer bottom with L1 and L2.
F, set layer top correspondence with reference to well vertical depth as TVD1, layer bottom correspondence with reference to well vertical depth be TVD2, then Well track current point is corresponding to reference to the computing formula of well vertical depth:
G, the value that characteristic curve can be then found according to the size of TVD, its computing formula is:
In above formula, V is the curve values of correspondence TVD, and T1 is the vertical depth of former point, and T2 is the vertical depth of latter point, V1 is the curve values of former point, and V2 is the curve values of latter point.
H, each point to well track are predicted and be just obtained a continuous logging prediction curve.
I, logging prediction curve is bored into curve comparison with real, so that it may judge whether set up stratigraphic model is correct, and then Stratigraphic model is modified.
To sum up, the present invention can be calculated along the prediction curve of well track in the case of complicated fault is present, by boring bent with real The relative analyses of line, can differentiate whether stratigraphic model is correct, and guides the amendment of stratigraphic model, be conducive to the brill for improving reservoir to meet Rate.The easy-to-use computer language of algorithm is realized.
The preferred embodiments of the present invention are these are only, the present invention is not limited to, for those skilled in the art For member, the technical solution adopted in the present invention can have various modifications and variations.It is all within the spirit and principles in the present invention, Any modification, equivalent substitution and improvements made etc., should be included within the scope of the present invention.The present invention is without detailed The technological means of elaboration, can adopt prior art means.

Claims (5)

1. a kind of well logging curve prediction method under the conditions of tomography, it is characterised in that:With the reference by well logging operation well Based on well information, with reference to the track with drilling well and stratigraphic model, the logging prediction curve along well track is calculated, will be logged well Prediction curve and real brill curve comparison, judge whether set up stratigraphic model is correct, and stratigraphic model is modified;
Methods described specifically includes following steps:
A, to reference to well interval of interest, determining the layer position of representative curve;
B, it is determined that representative curve layer position in, calculate well track, calculate the vertical of characteristic curve value and substratum Depth;
C, by step b result of calculation import stratigraphic model, the relation of well track and stratigraphic model is set up, using chained list pipe Reason stratigraphic model, each fault block has a tomography and multiple bed boundarys;
D, according to the relation of the well track and stratigraphic model set up, judge the fault block residing for the point on well track, then according to The secondary layer position judged residing for the point;
Point in e, respectively calculation procedure d is represented respectively to the vertical dimension of two line segments in layer top and layer bottom with L1 and L2;
F, calculating well track current point are corresponding to the vertical depth TVD with reference to well;
G, the value that characteristic curve is found according to the size of TVD;
H, each point to well track are predicted and obtain a continuous logging prediction curve;
I, logging prediction curve is bored into curve comparison with real, judge whether set up stratigraphic model is correct, and stratigraphic model is entered Row amendment.
2. well logging curve prediction method under the conditions of tomography according to claim 1, it is characterised in that:Step a In, the log for selecting cross directional variations stable is finely divided, and takes natural gamma GR, resistivity RT curve as standard Curve, determines the layer position of representative curve.
3. well logging curve prediction method under the conditions of tomography according to claim 1 and 2, it is characterised in that:The step In rapid b, hole angle DEV and direction of deflection DAZ is input into, using curvature method well track is calculated, calculated with vertical depth as index Characteristic curve value and substratum vertical depth.
4. well logging curve prediction method under the conditions of tomography according to claim 3, it is characterised in that:Step f In, if layer top correspondence is TVD1 with reference to the vertical depth of well, layer bottom correspondence is TVD2 with reference to the vertical depth of well, then well track Current point is corresponding to reference to the computing formula of well vertical depth:
5. well logging curve prediction method under the conditions of tomography according to claim 4, it is characterised in that:Step g In, the value computing formula of characteristic curve is:
In above formula, V is the curve values of correspondence TVD, and T1 is the vertical depth of former point, and T2 is the vertical depth of latter point, and V1 is The curve values of former point, V2 is the curve values of latter point.
CN201410367695.7A 2014-07-30 2014-07-30 Logging-while-drilling curve prediction method under fault condition Expired - Fee Related CN104265279B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410367695.7A CN104265279B (en) 2014-07-30 2014-07-30 Logging-while-drilling curve prediction method under fault condition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410367695.7A CN104265279B (en) 2014-07-30 2014-07-30 Logging-while-drilling curve prediction method under fault condition

Publications (2)

Publication Number Publication Date
CN104265279A CN104265279A (en) 2015-01-07
CN104265279B true CN104265279B (en) 2017-05-10

Family

ID=52156837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410367695.7A Expired - Fee Related CN104265279B (en) 2014-07-30 2014-07-30 Logging-while-drilling curve prediction method under fault condition

Country Status (1)

Country Link
CN (1) CN104265279B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625842A (en) * 2017-03-22 2018-10-09 中国石油化工股份有限公司 A kind of wellbore trace control method and system
CN107091081B (en) * 2017-06-02 2020-11-03 中国石油天然气股份有限公司 Method and system for early warning of drilling fault in drilling process
CN108547611B (en) * 2018-03-01 2022-02-11 杭州迅美科技有限公司 Method for rapidly simulating logging of electromagnetic wave resistivity while drilling in complex environment of horizontal well
CN110231660B (en) * 2019-05-15 2021-04-27 防灾科技学院 Method for determining dislocation quantity of blind active fault by using susceptibility logging method
CN112901070B (en) * 2019-12-03 2023-06-30 中国石油天然气股份有限公司 Method for tracking horizontal well while drilling and control method for controlling drilling direction of drill bit
CN113379907B (en) * 2020-03-10 2024-08-27 中国石油天然气股份有限公司 Method and device for constructing broken block geological model
CN113743175B (en) * 2020-10-21 2024-05-31 中国石油天然气集团有限公司 Stratum inclination analysis method and device, computer equipment and storage medium
CN114564800B (en) * 2022-02-25 2022-10-11 北京金阳普泰石油技术股份有限公司 Vertical thickness longitudinal fitting method and system for horizontal well logging curve

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2155918C (en) * 1994-08-15 2001-10-09 Roger Lynn Schultz Integrated well drilling and evaluation
WO2005071222A1 (en) * 2004-01-20 2005-08-04 Saudi Arabian Oil Company Real time earth model for collaborative geosteering
US7529624B2 (en) * 2007-02-21 2009-05-05 Geomechanics International, Inc. Method and apparatus for remote characterization of faults in the vicinity of boreholes
US8245795B2 (en) * 2009-12-08 2012-08-21 Schlumberger Technology Corporation Phase wellbore steering
CN103046868B (en) * 2012-12-28 2014-10-22 中国石油集团川庆钻探工程有限公司 Integrated geosteering method for horizontal well

Also Published As

Publication number Publication date
CN104265279A (en) 2015-01-07

Similar Documents

Publication Publication Date Title
CN104265279B (en) Logging-while-drilling curve prediction method under fault condition
US10024104B2 (en) Improving geosteering inversion using look-ahead look-around electromagnetic tool
US20210332690A1 (en) Method and system of combined support for a well drilling process
CN106894761B (en) Utilize the geosteering method of the geosteering model of time-domain seismic volume
NO20111054A1 (en) Chronostratigraphic and tectonic stratigraphic interpretation of seismic volumes
CN106940450B (en) Geosteering method for establishing model based on time-domain seismic volume
US20180348396A1 (en) Determining Permeability In Subsurface Anisotropic Formations
EP2668523A2 (en) Apparatus and method for predicting vertical stress fields
CN106154322A (en) Log curve correction method and apparatus
GB2575418A (en) System and methods for evaluating a formation using pixelated solutions of formation data
Izgec et al. Quantifying reservoir connectivity, in-place volumes, and drainage-area pressures during primary depletion
NO20101734A1 (en) Speed models for a single well and for a set of wells
Lesso Jr et al. The principles and procedures of geosteering
US6856910B2 (en) Method and apparatus for determining regional dip properties
Tankersley et al. Reservoir modeling to characterize dual porosity, tengiz field, republic of kazakhstan
CN104459800A (en) Sand body pinch-out prediction method and device
US11249218B2 (en) Horizontal reservoir description systems
US10222498B2 (en) System and method for joint inversion of bed boundaries and petrophysical properties from borehole logs
CN106522919A (en) Three-detector density logging surrounding rock correcting method and device
CN114429015B (en) Shale gas reservoir stratum model building method, electronic equipment and medium
WO2020096571A1 (en) Downhole signal compression and surface reconstruction
US10900329B2 (en) Model tuning using boundary flux sector surrogates
CN105484732B (en) Processing method for horizontal well drilling geosteering work progress well depth
CN108242069A (en) Oil reservoir section compilation method based on seismic profile deep relationship in time
DeVerse et al. Optimizing lateral well spacing by improving directional survey accuracy

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170510

Termination date: 20180730