CN104265007B - A kind of removable groups of building system and control method thereof - Google Patents

A kind of removable groups of building system and control method thereof Download PDF

Info

Publication number
CN104265007B
CN104265007B CN201410468757.3A CN201410468757A CN104265007B CN 104265007 B CN104265007 B CN 104265007B CN 201410468757 A CN201410468757 A CN 201410468757A CN 104265007 B CN104265007 B CN 104265007B
Authority
CN
China
Prior art keywords
subsystem
building
pallet
superstructure
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410468757.3A
Other languages
Chinese (zh)
Other versions
CN104265007A (en
Inventor
卢邦稳
刘长武
卢帮安
范翔宇
崔方南
黄娜
彭慧娇
葛俊伶
付娟
王启龙
余桃
田轲
黄常玲
高云瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan University
Original Assignee
Sichuan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan University filed Critical Sichuan University
Priority to CN201410468757.3A priority Critical patent/CN104265007B/en
Publication of CN104265007A publication Critical patent/CN104265007A/en
Application granted granted Critical
Publication of CN104265007B publication Critical patent/CN104265007B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/02Dwelling houses; Buildings for temporary habitation, e.g. summer houses
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/98Protection against other undesired influences or dangers against vibrations or shocks; against mechanical destruction, e.g. by air-raids
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/06Separating, lifting, removing of buildings; Making a new sub-structure

Abstract

The present invention relates to a kind of novel building group's system and control method.This system includes standardizing seven parts such as foundation subsystem, translation track subsystem, standardization pallet subsystem, superstructure subsystem, monitoring subsystem, power sub-system, Based Intelligent Control subsystem.Monitoring subsystem, power sub-system, Based Intelligent Control subsystem synergy under, realize standardizing pallet subsystem and being positioned at superstructure subsystem thereon changing self-position along translation track subsystem free shift, and realize the purpose of later stage change layout of building group with this.The control method of this system includes method of construction and the control method of operation stage in these groups of building system building stage.Can not shift and the unconvertible drawback of whole layout of building group by overcoming existing building to be fixed on the later stage on foundation, the present invention solves conflicting of in early days architectural composition and later stage actual demand, and repeating of producing for this is teared down and built and the problem such as the wasting of resources.

Description

A kind of removable groups of building system and control method thereof
Technical field
The present invention relates to a kind of building system, particularly one to realize single building the later stage shifts one's position, entirety is built Build the groups of building system that layout also can change therewith.
Background technology
Now, the house that we are lived the most all is integrally fixed on foundation, cannot move after building up;And build The result building group's each building interior fixing causes groups of building can only have a kind of layout.In view of the life built typically with hundred Year calculates, and this unalterable construction pattern exists two big shortcomings.
1, different times user can not be met to building and the functional demand of peripheral facility
For production unit, groups of building general layout is required for being mutually matched with production activity.One groups of building initial Layout is for initial Function Service, and when its function changes, and layout no longer adapts to actual demand in one's early years Time, architectural composition naturally also to change therewith.As a example by factory, the construction pattern in construction stage combines technology at that time in early days Condition, production technology and design, but be as innovation or the change of production activity of technology, construction pattern is often difficult in early days Adapt to later stage actual demand.Another further aspect, for the life and work demand angle of people, different phase people and family are to inhabitation The functional demand of house and peripheral facility thereof is different.Such as, the when that child being babies at home, Yong Huhui Wish oneself to stay in the house closing on kindergarten;By the time child grows up, and user's meeting and then hope stay in the house closing on middle and primary schools; When middle child's independence spouses approaching old age again of getting home, user is more desirable to stay in the lives such as next-door neighbour market In the house in district.
But, for the building construction of project of vital and lasting importance, within the use cycle that it is very long, begin in the position of single building It is fixed on a place eventually, it is impossible to mobile with the idea of its owner, corresponding, monolithic architecture group's layout also cannot change Become.Present building requirements people deacclimatizes environment, deacclimatizes building, rather than allows environment deacclimatize people.As a result, as building user Be impatient at groups of building when can not meet function demand, can only select to move away from this building or tear open greatly build in large scale again build new Groups of building, this has resulted in the waste of resource.
2, people's aesthetic requirement to architectural environment can not be met
From the point of view of the people's aesthetic needs to environment, if building is fixing all the time, then its user can appreciate The scenery arrived also will be the most single, for years after will aestheticly tired, the satisfaction of institute's living environment also will be declined.Ratio As said, if building is fixing all the time, then always have the room being exposed to the north and forever can not see sunlight, even and if the window being exposed to the sun Family also simply could look at sunlight straight at noon, it is also difficult to sees Chaoyang and the setting sun of brilliance of beauty.And, the view before window It is that a kind of view forever, always allows its user from enjoying a kind of landscape to aestheticly tired afterwards for years;With a back of the body For the community bordered on the sea in mountain, the building user in sea, face plays first meeting and enjoys in facing sea that during the warmth of spring, all the flowers bloom, but of long duration it After, can be painful in piercingly cold sea wind;In this time, will want to change mountain scene behind into, hope wide stretches of virgin forest, listen The bird listening early morning cries.In turn, those houses faced the mountain also have similar worries.
In a word, building is all " project of vital and lasting importance ", at it within the century-old very long use cycle, if each building is forever Maintain static, construction pattern eternal one layer constant if, deacclimatize environment if going simply to ask for help, this will be one very The thing felt bad;And if do not adapt to, present method exactly torn open reconstruction or move away from both approaches.
Summary of the invention
The invention provides a kind of removable groups of building system.This system includes standardizing foundation subsystem, translation Orbit subsystem, standardization pallet subsystem, superstructure subsystem, monitoring subsystem, power sub-system, Based Intelligent Control subsystem Seven parts such as system.Monitoring subsystem, power sub-system, Based Intelligent Control subsystem synergy under, it is achieved standardization pallet Subsystem and be positioned at superstructure subsystem thereon and change self-position along translation track subsystem free shift, and with this Realize changing the purpose of monolithic architecture layout.
Wherein, standardization foundation subsystem refers to be distributed in the latticed foundation of standard of groups of building underground. Particularly, at the foundation that full wafer building yard subterranean networking is formatted, and foundation is standardized size everywhere, I.e. foundation bearing capacity is the most identical with settling amount, and maximum foundation bearing capacity is greater than maximum upper load, it is ensured that whole region Any one ground can support any superstructure and overall settlement of foundation is identical.Additionally, on foundation also Fixing device need to be set, after building translation completes, superstructure is fixed on above foundation.
Wherein, translation track subsystem refers to be laid on standardization foundation for building the track of translation.Tool In fact, translation track is laid on standardization foundation body, and it is located pallet and top-out;Translation track has High intensity, high-wearing feature and be easy to the features such as later maintenance.
Wherein, standardization pallet subsystem refers to be arranged on translation track for just building and carrying top-out Rectangular carrier.Particularly, above pallet square region between translation track, and pallet surrounding is seated in translation track On;Build on pallet or superstructure facility is installed;Pallet has to be easy to mobile and fixing, high intensity, erosion resistant and is easy to The features such as later maintenance, and need according to different technology and take corresponding material to select and structure design;For ease of the later stage Translation, pallet bottom can pre-install roller bearing, scroll wheel, and also or other are for building the facility of translation, it is also possible to reserved phase Close interface to install again when the later stage translates.Additionally, in translation motion, standardization pallet subsystem provides the function in " room " Pallet, it is provided that the feature that the pallet of the function in " room " and superstructure conveniently remove and install, this pallet preferably employs bolt The steel construction coupled or the structure of other readily accessible installations.
Wherein, superstructure subsystem refers to be arranged on standardization pallet and sets for the surface structures produced of living Execute.It should be noted that the superstructure mentioned by the present invention is preferably designed to adapt to the structure of later stage translation at the beginning of building; And, because the foundation bearing capacity of standardization foundation is the most identical with settling amount, and maximum foundation bearing capacity is greater than Big upper load, for foundation bearing capacity and then the reduction foundation cost of debasing the standard foundation, the absolute altitude of surface structures is not The most too high, its load is unsuitable excessive.
Wherein, monitoring subsystem refer to be arranged on foundation, track, pallet and superstructure for synchronizing prison Surveying loaded deformation and the device of translation motion parameter, these parameters reflect the running status of whole building system in real time, and are The analysis decision of intelligent controlling device and keeper provides foundation.
Wherein, power sub-system refers to provide the system of power into whole system translation.The power of this power sub-system is executed Add mode can be thrust type, tensile force type, push-and-pull convolution etc., preferably push-and-pull convolution.The translation side of this power sub-system Formula can be roller, slidingtype, wheel dynamic formula, preferably takes turns dynamic formula.The biggest stroke of power scheme thousand of this power sub-system Jin top, reaction support is preferably provided on standardization foundation subsystem.
Wherein, Based Intelligent Control subsystem refers to that the running status according to whole building system carries out intellectual analysis and controls certainly The system of plan.
Present invention also offers a kind of control method moving dynamic groups of building system.Groups of building system involved in the present invention Control method includes that the construction phase builds and the control method of operation stage.
Wherein, construction phase method of construction: at the beginning of building under the architectural composition of design, build standardization ground base successively Plinth subsystem, translation track subsystem, standardization pallet subsystem and superstructure subsystem, and monitoring subsystem is installed, moves Power subsystem, Based Intelligent Control subsystem;Wherein standardize foundation, translation track, standardization pallet, superstructure are preferably adopted By " parts are prefabricated, immediately tile " technology, it is simple to construction and later maintenance.Additionally, in standardization foundation subsystem, translation Orbit subsystem construction will be by full wafer building yard gridding after completing, in construction standardization pallet subsystem and superstructure Before subsystem, need at least one net region reserved not carry out superstructure planning, lay and be used for providing " room " function Pallet and relatively easy superstructure, in order to the later stage realizes the adjustment of architectural composition.
Wherein, control method operation stage: the operation stage of groups of building system involved in the present invention includes that architectural composition is adjusted Before whole, architectural composition adjust in, architectural composition adjust rear three kinds of states, and three kinds of states are repeated in occurring realizing building The continuous conversion of layout.Wherein, architectural composition is two kinds of different architectural compositions after adjusting with architectural composition before adjusting, when whole The when that architectural composition needing to adjust i.e. by gradually by the pallet on a net region and superstructure thereof to neighbouring " empty Position " net region translation and finally realize whole architectural composition convert.The first step, manufacture that wherein architectural composition adjusts are " empty Position ": carry out dismantling by the pallet being used for providing " room " function reserved and superstructure thereof thus form " room ";Then Second step, carry out translation transformation and adjust architectural composition: will " room " a certain pallet on the net region and superstructure thereof Move in " room ", and form new " room " on the pallet being translated and net region, superstructure place thereof;With this type of Pushing away, may occur in which and be similar to required construction pattern after translation several times, now construction pattern has occurred and that change, simply Pallet and the superstructure thereof at " room " place has been lacked compared to final required architectural composition.3rd step, installation " room " building set Execute translation: be readily disassembled pallet and the superstructure thereof of installation in new " room " upper installation, and form required building cloth Office's form, thus complete the conversion of construction pattern.
The present invention is desirable obtains following technique effect: 1, meet different times people to building and the functional needs of peripheral facility. Building system involved in the present invention is after translation, it is possible to achieve the conversion of layout of building group, different architectural compositions can expire Foot user is to building and the different needs of peripheral facility, thus meets different times user to building and the function of peripheral facility Demand.
2, people's aesthetic requirement to architectural environment is met.Building system involved in the present invention is after translation, it is possible to achieve The conversion of layout of building group, the landscape under different layouts also can change, and such user will enjoy diversified landscape, from And meet people's aesthetic requirement to architectural environment.
3, avoid repeating tearing down and building, energy-conserving and environment-protective.Building system involved in the present invention is by building and other ground installations Later stage translates, it is achieved the conversion of later stage of architectural composition, thus avoids conflicting, also of architectural composition and later stage actual demand in early days Avoid repeating of producing for this to tear down and build and the wasting of resources, the most greatly save social resources and create huge social benefit And economic benefit.
4, building has good shock resistance.Generally, existing building materials, as a example by concrete, have good resistance to compression energy Power, its shear resistance is the most relatively low, and generally fragile material.Therefore, building, can be huge under geological process Brittle break is there is under horizontal loads.Building system involved in the present invention is to adapt to putting down of later stage at the beginning of designing and constructing because of it Move to rotate and will do much improvement work, improve its shearing resistance shock resistance.On the other hand, because building is the tightest with foundation The one of close connection, but be preferably fixedly connected by hinged effect, this preferred mode of connection inherently has good resisting Shake effect;Under geological process, interval by having bigger buffering between building and foundation, this buffering interval will The a large amount of horizontally seismic energy of release, thus improve shock resistance.
5, improve user's happiness, create livable building system.Building system involved in the present invention is meeting user to residence Surrounding enviroment aesthetic requirement and building function demand after, improve the life comfort level of user and happiness, create Livable building system, promotes social harmony.
Accompanying drawing explanation
Fig. 1, building structure of the present invention and foundation schematic diagram.
Wherein, 1, standardization foundation, 2, translation track, 3, standardization pallet, 4, superstructure, dotted line is only used for Represent superstructure, relative position between pallet and superstructure thereof.
Fig. 2, translation principle of the present invention drill intention.
Wherein Fig. 2 (I) is not to be laid out the construction pattern before adjusting, building lattice when Fig. 2 (II) is to form " room " Office, Fig. 2 (III) is the architectural composition after translation, and Fig. 2 (IV) is the architectural composition after having translated;Wherein, middle A, B, C generation successively Table row number, a, b, c represent columns successively, can represent any one position in nine grids with line number and columns, first, second, third, Fourth, penta, oneself, heptan, pungent, nonyl represent and be arranged in the superstructure on ground, wherein third for being readily disassembled and undertake " room " merit The pallet of energy and superstructure thereof;Space at diagonal line hatches is " room ".
Detailed description of the invention
Will be explained in greater detail below now a kind of preferred embodiment, the example is explained below.Need explanation , the present invention is not limited solely to this illustrative embodiments.On the contrary, present invention also contemplates that and be included in appended right Require various alternative forms, remodeling, equivalents and other embodiments in the spirit and scope of the present invention limited.
According to the preferred embodiment of the present invention, as it is shown in figure 1, the building element of the present invention is the most successively: 1, Standardization foundation, 2, track, 3, standardization pallet, 4, superstructure;It should be noted that Fig. 1 is the present invention builds knot Structure and foundation schematic diagram, for illustrate the present invention building element composition, dotted line be only used for represent superstructure, pallet and Relative position between its superstructure.Fig. 2 is architectural composition shift theory schematic diagram of the present invention, describes this for convenience former Reason, is divided into the place, net region of the simplest nine grids form in this introduction.In Fig. 2, A, B, C represent row successively Counting, a, b, c represent columns successively, can represent any one position in nine grids with line number and columns, and such as Ac represents nine The grid of palace lattice top-left position, Bb represents the grid of nine grids middle position;First, second, third, fourth, penta, oneself, heptan, pungent, nonyl represents Be arranged in the pallet on ground and superstructure thereof, wherein third be readily disassembled and undertake " room " function pallet and on Layer building;Space at diagonal line hatches is " room ".
Wherein, as it is shown in figure 1, standardization foundation preferably employs cross strip footing to avoid differential settlement and to protect Card sufficient intensity, additionally, on the basis of arrange provide traction counter-force reaction frame.Track laying is used on standardization foundation In building translation, it is located this pallet and top-out, has high intensity, wearability concurrently and be easy to the features such as later maintenance.Mark Standardization pallet refers to be arranged on translation track for building and carry the square carrier of top-out.Particularly, torr Above dish square area between translation track, and pallet surrounding is seated on translation track;Build on pallet or Superstructure facility is installed;Pallet has the feature of bigger intensity and erosion resistant.Additionally, provide " room " merit in translation motion Pallet and the superstructure thereof of energy also have the feature conveniently removed and installed.
Wherein, superstructure refers to be arranged on standardization pallet for the surface structures facility produced of living.Need Illustrating, the superstructure mentioned by the present invention is just designed to adapt to the structure of later stage translation at the beginning of building;And, because The foundation bearing capacity of standardization foundation is the most identical with settling amount, and maximum foundation bearing capacity is greater than maximum top lotus Carrying, for foundation bearing capacity and then the reduction foundation cost of debasing the standard foundation, the absolute altitude of surface structures is unsuitable too high, its Load is unsuitable excessive.
According to the preferred embodiment of the present invention, the present invention under the architectural composition of design, builds mark at the beginning of building successively Standardization foundation, translation track, standardization pallet and superstructure, and monitoring device, power set, Based Intelligent Control dress are installed Put;Wherein standardize foundation, translation track, standardization pallet, superstructure preferably use " parts are prefabricated, immediately tile " skill Art, it is simple to construction and later maintenance.Additionally, at the beginning of building reserved at least one provide pallet of " room " function so that the later stage Realize translation.
Principle as shown in Figure 2, when whole architectural composition needs to adjust when, it is provided that the pallet of " room " function and on Layer building will be dismantled formation " room " temporarily, so the pallet on " room " periphery net region and superstructure thereof be translated To " room " place, and form new " room ", by that analogy, through repeatedly at former " room " the periphery net region being translated Ultimately form new architectural composition after circulation, the most again " room " eventually formed upper install easy-to-dismount pallet and on Layer building, thus the later stage internal translation of chunk, the exchange that complete groups of building system.Particularly, for not entering in Fig. 2 (I) Construction pattern before row distributing adjustment, wherein " third " of Ac position is pallet and the superstructure thereof being readily disassembled installation;Fig. 2 (II) In for architectural composition adjust the first step, manufacture " room ": carry out dismantling by " third " of Ac position thus form " room ";Then Two steps, the translation transformation adjustment architectural composition that carries out: successively by flat to the pallet on grid position, " room " side and superstructure thereof Move in " room ", and on the grid position being translated, form new " room ";By that analogy, can after translation several times Construction pattern shown in Fig. 2 (III) occur, now construction pattern has occurred and that change, and forms new " room " on Ca position.The Three steps, the pallet installing " room " place and superstructure thereof complete translation: form the upper installation " third " in new " room " on Ca position, Pallet and the superstructure thereof being readily disassembled installation is i.e. installed, forms architectural composition form shown in Fig. 2 (IV), thus complete to build Build the conversion of general layout.It should be added that, now " third " at " room " place, i.e. install be readily disassembled installation pallet and Superstructure, can be the pallet being readily disassembled installation and the superstructure thereof at " room " place being removed before, it is possible to To readjust superstructure form according to the architectural composition after conversion.
Furthermore, it is necessary to explanation, the principle without departing from the present invention and substantial variations can be made in embodiment of above, The scope of the present invention is limited in claims and equivalents thereof.

Claims (2)

1. a removable groups of building system, this system includes: standardization foundation subsystem, translation track subsystem, mark Standardization pallet subsystem, superstructure subsystem, monitoring subsystem, power sub-system, Based Intelligent Control subsystem;This system is at prison Survey under the synergy of subsystem, power sub-system, Based Intelligent Control subsystem, it is achieved standardization pallet subsystem and position are thereon Superstructure subsystem along translation track subsystem free shift change self-position, and with this realize change monolithic architecture The purpose of layout;Wherein, it is standard network trellis that standardization foundation subsystem is distributed in groups of building underground, and foundation is each Place is standardized size, and foundation bearing capacity is the most identical with settling amount, and maximum foundation bearing capacity is greater than maximum top lotus Carry;Additionally, arrange fixing device on foundation, after building translation completes, superstructure is fixed on foundation;
Wherein, translation track subsystem is laid on standardization foundation and for building translation, standardizes pallet subsystem System and superstructure subsystem thereof change position along translation track subsystem free shift, and realize monolithic architecture layout with this Change;
Wherein, standardization pallet subsystem is arranged in for building and carrying top-out on translation track, wherein, in building System translation motion provide the superstructure on the pallet of " room " function simple, readily accessible, in order to the later stage builds The adjustment of layout;
Wherein, superstructure subsystem is arranged on standardization pallet for the surface structures facility produced of living;Upper strata is built Build the structure being designed to adapt to later stage translation at the beginning of building;Foundation bearing capacity and then fall for debasing the standard foundation Low foundation cost, the absolute altitude of surface structures is unsuitable too high, and its load is unsuitable excessive;
Wherein, monitoring subsystem is arranged on standardization foundation subsystem, translation track subsystem, standardization pallet subsystem And on superstructure subsystem, monitor whole system operational factor;
Wherein, power sub-system provides building translation power for whole system;
Wherein, Based Intelligent Control subsystem carries out intellectual analysis and control decision according to the running status of whole building system.
2. a control method for removable groups of building system, including method of construction and the controlling party of operation stage of construction phase Method;Wherein, method of construction refers to, at the beginning of building under the architectural composition of design, builds standardization foundation, translation rail successively Road, standardization pallet and superstructure, and monitoring device, power set, intelligent controlling device are installed;Wherein, operation stage Control method include architectural composition adjust before, architectural composition adjust in, architectural composition adjust rear three kinds of states, architectural composition adjust Before and architectural composition adjust after be two kinds of different architectural compositions, when whole architectural composition need adjustment when will make a reservation for The pallet in " room " and superstructure dismounting produce " room ", then by gradually being built in pallet and the upper strata thereof of groups of building system That builds translates and finally realizes the conversion of whole architectural composition to neighbouring " room " net region, and three kinds of states are repeated in out Now to realize the continuous conversion of architectural composition;Wherein, during architectural composition adjusts, state includes three below step: manufacture " empty Position ", carry out translation transformation adjust architectural composition, install " room " Architectural Equipment complete translation;
Wherein, " manufacture " room " " refers to provide the pallet of " room " function and superstructure thereof to tear open being used for of reserving Unload thus form " room ";
Wherein, " carry out translation transformation adjust architectural composition " refers to: will " room " a certain pallet on net region and Superstructure moves in " room ", and forms new " sky on the pallet being translated and net region, superstructure place thereof Position ";By that analogy, may occur in which and be similar to required construction pattern after translation several times, now construction pattern has been sent out Changing, has simply lacked pallet and the superstructure thereof at " room " place compared to final required architectural composition;
Wherein, " installation " room " Architectural Equipment completes translation " refers to install in new " room " upper recovery be readily disassembled installation Pallet and superstructure thereof, and form required architectural composition form, thus complete the conversion of construction pattern.
CN201410468757.3A 2014-09-16 2014-09-16 A kind of removable groups of building system and control method thereof Expired - Fee Related CN104265007B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410468757.3A CN104265007B (en) 2014-09-16 2014-09-16 A kind of removable groups of building system and control method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410468757.3A CN104265007B (en) 2014-09-16 2014-09-16 A kind of removable groups of building system and control method thereof

Publications (2)

Publication Number Publication Date
CN104265007A CN104265007A (en) 2015-01-07
CN104265007B true CN104265007B (en) 2016-08-17

Family

ID=52156569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410468757.3A Expired - Fee Related CN104265007B (en) 2014-09-16 2014-09-16 A kind of removable groups of building system and control method thereof

Country Status (1)

Country Link
CN (1) CN104265007B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107217746A (en) * 2017-06-20 2017-09-29 马盼盼 Removable ring health care building structure and preparation method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4096675A (en) * 1976-08-25 1978-06-27 Next Generation Housing Corporation Of America Split-slab house construction
CN1089008A (en) * 1993-10-09 1994-07-06 阮蔚文 Method for moving house
CN1129765A (en) * 1995-07-27 1996-08-28 董显枢 New technology of moving buildings horizontally
CN1298996A (en) * 2000-08-10 2001-06-13 本溪华厦(集团)有限公司 Equipment and method for migrating whole building
CN1648810A (en) * 2005-02-22 2005-08-03 南京工业大学 Computer control system for building integrated translation process
CN2813778Y (en) * 2005-07-26 2006-09-06 李青哲 Monolithic building translational apparatus

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5353135A (en) * 1976-10-25 1978-05-15 Oki Kunitomo Automatic apparatus for moving building
CA2428174A1 (en) * 2003-01-23 2004-07-23 The Mattamy Corporation Transport and alignment device and process for manufactured houses

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4096675A (en) * 1976-08-25 1978-06-27 Next Generation Housing Corporation Of America Split-slab house construction
CN1089008A (en) * 1993-10-09 1994-07-06 阮蔚文 Method for moving house
CN1129765A (en) * 1995-07-27 1996-08-28 董显枢 New technology of moving buildings horizontally
CN1298996A (en) * 2000-08-10 2001-06-13 本溪华厦(集团)有限公司 Equipment and method for migrating whole building
CN1648810A (en) * 2005-02-22 2005-08-03 南京工业大学 Computer control system for building integrated translation process
CN2813778Y (en) * 2005-07-26 2006-09-06 李青哲 Monolithic building translational apparatus

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
挪威设计出可移动建筑群;未公开;《城市金融报》;20110212;第4版 *
挪威设计出可移动建筑群;未公开;《城市金融报》;城市金融报社;20110212;第4版 *

Also Published As

Publication number Publication date
CN104265007A (en) 2015-01-07

Similar Documents

Publication Publication Date Title
Yeang et al. The skyscraper, bioclimatically considered
Yeang et al. Eco skyscrapers I
De Luca et al. Base isolation issues in Italy: Integrated architectural and structural designs
CN1827936A (en) Method and apparatus for shock-insulating reconstruction of existing building
Rajpu et al. Neo-vernacular architecture: a paradigm shift
CN104265007B (en) A kind of removable groups of building system and control method thereof
Frankel et al. Neighbours: Negotiating space in a prehistoric village
Al-Kodmany Sustainable tall buildings: toward a comprehensive design approach
DE202017001473U1 (en) heat storage
Yaqub Open Source Architecture: Redefining Residential Architecture in Islamabad
Spasojević-Šantić et al. Earthship–A new habitat on Earth for quality life
Agha The role of intelligent systems in traditional courtyard houses in Baghdad, Iraq
BİÇER Comparison of a historical and a modern building according to ecological criteria
Ferguson et al. Contemporary Zuni architecture and society
CN209603541U (en) A kind of building configurations
Adhikari Incremental Housing: Design Approach for Kathmandu
Tunali Adobe Structures As Our Cultural Heritage and Their Features
Agha Intelligent Systems in Buildings: Traditional Courtyard Houses in Baghdad as a Case Study
Qian Hanging Gardens in Modern High-Rise Apartment Buildings.
Fierko et al. Energy Star
DiMaggio Extending Jefferson’s Vision
Mueller-Lust Crystal Clear
Cacciaguerra et al. New and Better Practices for City Regeneration
Esen Rooftop as a reciprocal transformation per diem
Ravneng Reimagine a Factory

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20200916