CN104264882A - Floor slab structure allowing insulation receiving chamber provided inside - Google Patents

Floor slab structure allowing insulation receiving chamber provided inside Download PDF

Info

Publication number
CN104264882A
CN104264882A CN201410430506.6A CN201410430506A CN104264882A CN 104264882 A CN104264882 A CN 104264882A CN 201410430506 A CN201410430506 A CN 201410430506A CN 104264882 A CN104264882 A CN 104264882A
Authority
CN
China
Prior art keywords
clamping plate
floor
chamber
sides
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410430506.6A
Other languages
Chinese (zh)
Other versions
CN104264882B (en
Inventor
李泓胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Anjian Investment And Construction Co ltd
Anhui Water Resources Development Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410430506.6A priority Critical patent/CN104264882B/en
Publication of CN104264882A publication Critical patent/CN104264882A/en
Application granted granted Critical
Publication of CN104264882B publication Critical patent/CN104264882B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The invention relates to an insulation structure of a house, in particular to a floor slab structure allowing an insulation receiving chamber provided inside. The upper portion of each clamp plate (2) is clamped between two floor slabs (1); two sides of the lower end, exposed under the floor slabs (1), of each clamp plate (2) are provided with side projecting edges (9); a receiving chamber for an insulation plate (3) is formed between the tops of the corresponding side projecting edges (9) of every adjacent two clamp plates (2) and the lower face of the part, between the two clamp plates (2), of the corresponding floor slab (1). The insulation plate is disposed on the upper portions or lower portions of the clamp plates between every two floor slabs, so that the insulation plates and a building roof are integrated; thermal insulation of the building roof is achieved.

Description

A kind ofly can embed the floor slab structure in chamber by built-in heat insulation
[technical field]
The present invention relates to a kind of insulation construction of house, specifically the present invention relates to and a kind ofly can embed the floor slab structure in chamber by built-in heat insulation.
[background technology]
Known, floor is one of primary structure of building, the floor used at existing building or one-storey house roof is mostly polylith combination, then at floor upper side and bottom surfaces overing number mud layer, finally at upper side pitch paying or to cover Chopped Strand Mat or polyester felt be the waterproof roll leakproof that carcass is made; In order to reduce indoor temperature, the cement board supported by fragment of brick is added on the floor top that a lot of unit in charge of construction is making the anti-water surface, because cement board thickness is less, when people install the operation such as solar energy, antenna on floor, part cement board just can be trampled fragmentation, loses due heat-insulation and heat-preservation effect.
[summary of the invention]
In order to overcome the deficiency in background technology, the invention discloses and a kind ofly can embed the floor slab structure in chamber by built-in heat insulation, utilize the clamping plate top between two between floor or bottom to place warming plate, make warming plate and building roof form one, obtain the heat insulation and preservation effect on building roof.
In order to realize goal of the invention of the present invention, invention adopts following technical scheme:
A kind ofly can embed the floor slab structure in chamber by built-in heat insulation, comprise floor, clamping plate and warming plate, the top of clamping plate adds and is held between two between floor, the exposed both sides, clamping plate lower end in floor bottom are respectively equipped with side chimb, and the chimb top, side that clamping plate are corresponding between two and the described floor bottom surfaces between two between clamping plate form the embedding chamber of warming plate.
Described can embed the floor slab structure in chamber by built-in heat insulation, be respectively equipped with raised item in the both sides, bottom of each floor, the raised item that two floors are adjacent forms the clamping in the middle part of clamping plate.
Described can embed the floor slab structure in chamber by built-in heat insulation, on the top of each floor, two sides are respectively equipped with raised item in bottom, thickening face, side is respectively equipped with in the both sides, top of clamping plate, the thickening face, both sides of clamping plate is between the adjacent upper and lower raised item of floor between two, is formed the clamping in thickening face, side, both sides, clamping plate top by the raised item of two adjacent floor deck.
Described can embed the floor slab structure in chamber by built-in heat insulation, extension clamping plate are provided with on the top, thickening face, side of both sides, clamping plate top, the upper end in the thickening face, side of both sides, described clamping plate top forms two and tops bar, and the extension clamping plate on clamping plate top are between the raised item on top between adjacent floor deck between two.
Described can embed the floor slab structure in chamber by built-in heat insulation, be respectively equipped with side projection on the top, both sides of warming plate, the both sides projection of warming plate is in the chimb top, side of clamping plate between two, and the bottom surfaces of described warming plate is fair with the bottom surfaces of clamping plate.
Described can embed the floor slab structure in chamber by built-in heat insulation, described clamping plate are concrete material; Or ferrous material; Described warming plate is cystosepiment.
Can embed the floor slab structure in chamber by built-in heat insulation, comprise floor, clamping plate and warming plate, the bottom of clamping plate adds and is held between two between floor, forms the embedding chamber of warming plate between the exposed clamping plate between two on floor top and floor upper side.
Described can embed the floor slab structure in chamber by built-in heat insulation, be respectively equipped with raised item in the bottom of adjacent floor deck between two, form the support bottom clamping plate by described raised item.
Described can embed the floor slab structure in chamber by built-in heat insulation, the upper side of described warming plate and the upper surface of clamping plate are same level.
By above-mentioned disclosure, the invention has the beneficial effects as follows:
Of the present inventionly can embed the floor slab structure in chamber by built-in heat insulation, by the both sides at floor, raised item is set, utilize the raised item clamping clamping plate of floor both sides between two, as required warming plate is arranged on top or the bottom of two clamping plate during use, forms heat insulation and preservation effect by warming plate; Present invention achieves the thermal insulation object of building, what efficiently avoid that existing cement board mode easily occurs is trampled broken drawback.
[accompanying drawing explanation]
Fig. 1 is structural representation of the present invention;
Fig. 2 is another embodiment of the present invention structural representation;
Fig. 3 is warming plate perspective view of the present invention;
Fig. 4 is floor perspective view of the present invention;
Fig. 5 is clamping plate perspective view of the present invention;
In the drawings: 1, floor; 2, clamping plate; 3, warming plate; 4, side is protruding; 5, raised item; 6, side; 7, top bar; 8, thickening face, side; 9, side chimb.
[detailed description of the invention]
Below in conjunction with embodiment, the present invention is further detailed; The following examples are not for restriction of the present invention, only realize mode of the present invention as support, and any equivalent structure in technological frame disclosed in this invention is replaced, and is protection scope of the present invention;
1,3,4 or 5 structures provided by reference to the accompanying drawings, described can embed the floor slab structure in chamber by built-in heat insulation, and comprise floor 1, clamping plate 2 and warming plate 3, described clamping plate 2 are concrete material, or ferrous material, described warming plate 3 is cystosepiment, on the top of each floor 1, two sides, bottom 6 are respectively equipped with raised item 5, thickening face, side 8 is respectively equipped with in the both sides, top of clamping plate 2, extension clamping plate are provided with on the top, thickening face, side 8 of both sides, clamping plate 2 top, the thickening face, both sides 8 of clamping plate 2 is between the adjacent upper and lower raised item 5 of floor 1 between two, the upper end in the thickening face, side 8 of both sides, described clamping plate 2 top forms two and tops bar 7, the extension clamping plate on clamping plate 2 top are between the raised item 5 on top between adjacent floor deck 1 between two, the clamping in thickening face, side, both sides, clamping plate 2 top 8 is formed by the raised item 5 of two adjacent floor deck 1, the exposed both sides, clamping plate 2 lower end in floor 1 bottom are respectively equipped with side chimb 9, side chimb 9 top that clamping plate 2 are corresponding between two and described floor 1 bottom surfaces between two between clamping plate 2 form the embedding chamber of warming plate 3, be respectively equipped with side projection 4 on the top, both sides of warming plate 3, the both sides projection 4 of warming plate 3 is in side chimb 9 top of clamping plate 2 between two, and the bottom surfaces of described warming plate 3 and the bottom surfaces of clamping plate 2 maintain an equal level.
2 replacing structures provided by reference to the accompanying drawings, the present invention can embed the floor slab structure in chamber by built-in heat insulation, comprise floor 1, clamping plate 2 and warming plate 3, raised item 5 is respectively equipped with in the bottom of adjacent floor deck 1 between two, the bottom of clamping plate 2 adds and is held between two between floor 1, the support bottom clamping plate 2 is formed by described raised item 5, form the embedding chamber of warming plate 3 between the exposed clamping plate between two 2 on floor 1 top and floor 1 upper side, putting into and embedding warming plate 3 upper side in chamber and the upper surface of clamping plate 2 is same level.
Implement of the present inventionly to embed the floor slab structure in chamber by built-in heat insulation, when the floor 1 built is installed, after laying first piece of floor 1, between the two raised items 5 thickening face, side 8 of clamping plate 2 side being put into first piece of floor 1, then lay second piece of floor 1, by two raised items 5 of second piece of floor 1 clamp clamping plate 2 opposite side thickening face, side 8 " according to design, the top of clamping plate 2 is in floor 1 top; Or the bottom of clamping plate 2 is in floor 1 bottom "; lay whole floor 1 and clamping plate 2 by that analogy; if use the embodiment that provides of accompanying drawing 2 to arrange insulation on floor 1 top embed chamber; insulation uses the cement mortar of two centimeters of left and right thicknesses will comprise clamping plate 2 upper end after embedding and putting into warming plate 3 in chamber and warming plate 3 upper side is closed; etc. after cement mortar solidifies, then make the anti-water surface of routine; Also can lay cement board comprising in clamping plate 2 upper end and warming plate 3 upper side, then make the conventional anti-water surface; If use the embodiment that accompanying drawing 1 provides, the side projection 4 of warming plate 3 both sides is put into " before being placed in warming plate 3; first in warming plate 3, interval penetrates steel reinforcing " on the side chimb 9 of the clamping plate between two 2 of floor 1 bottom, warming plate 3 wherein near building wall is simply fixing by nail, the body of wall layer formed by cement mortar when plastering wall fixes the bottom of warming plate 3 by wall side, then clamping plate 2 and warming plate 3 bottom surfaces brush coating, bonding non-woven fabrics, powder cement is being comprised, the same normal process steps of residue operation.
Part not in the detailed description of the invention is prior art.

Claims (9)

1. one kind can embed the floor slab structure in chamber by built-in heat insulation, comprise floor (1), clamping plate (2) and warming plate (3), it is characterized in that: the top of clamping plate (2) adds and is held between two between floor (1), exposed clamping plate (2) both sides, lower end in floor (1) bottom are respectively equipped with side chimb (9), and side chimb (9) top that clamping plate (2) are corresponding between two and described floor (1) bottom surfaces between two between clamping plate (2) form the embedding chamber of warming plate (3).
2. according to claim 1ly can embed the floor slab structure in chamber by built-in heat insulation, it is characterized in that: be respectively equipped with raised item (5) in the both sides, bottom of each floor (1), the raised item (5) that two floors (1) are adjacent forms the clamping at clamping plate (2) middle part.
3. according to claim 1ly can embed the floor slab structure in chamber by built-in heat insulation, it is characterized in that: on the top, two sides, bottom (6) of each floor (1), be respectively equipped with raised item (5), thickening face, side (8) is respectively equipped with in the both sides, top of clamping plate (2), the thickening face, both sides (8) of clamping plate (2) is between the adjacent upper and lower raised item (5) of floor (1) between two, is formed the clamping of thickening face, side, clamping plate (2) both sides, top (8) by the raised item (5) of two adjacent floor deck (1).
4. according to claim 3ly can embed the floor slab structure in chamber by built-in heat insulation, it is characterized in that: be provided with extension clamping plate on thickening face, side (8) top of clamping plate (2) both sides, top, the upper end in the thickening face, side (8) of described clamping plate (2) both sides, top forms two and tops bar (7), and the extension clamping plate on clamping plate (2) top are between the raised item (5) on top between adjacent floor deck (1) between two.
5. according to claim 1ly can embed the floor slab structure in chamber by built-in heat insulation, it is characterized in that: be respectively equipped with side projection (4) on the top, both sides of warming plate (3), the both sides projection (4) of warming plate (3) is in side chimb (9) top of clamping plate (2) between two, and the bottom surfaces of described warming plate (3) and the bottom surfaces of clamping plate (2) maintain an equal level.
6. according to claim 1ly can embed the floor slab structure in chamber by built-in heat insulation, it is characterized in that: described clamping plate (2) are concrete material; Or ferrous material; Described warming plate (3) is cystosepiment.
7. one kind can embed the floor slab structure in chamber by built-in heat insulation, it is characterized in that: comprise floor (1), clamping plate (2) and warming plate (3), the bottom of clamping plate (2) adds and is held between two between floor (1), forms the embedding chamber of warming plate (3) between the exposed clamping plate between two (2) on floor (1) top and floor (1) upper side.
8. according to claim 7ly can embed the floor slab structure in chamber by built-in heat insulation, it is characterized in that: be respectively equipped with raised item (5) in the bottom of adjacent floor deck (1) between two, formed the support of clamping plate (2) bottom by described raised item (5).
9. according to claim 7ly can embed the floor slab structure in chamber by built-in heat insulation, it is characterized in that: the upper side of described warming plate (3) and the upper surface of clamping plate (2) are same level.
CN201410430506.6A 2014-08-23 2014-08-23 Floor slab structure allowing insulation receiving chamber provided inside Active CN104264882B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410430506.6A CN104264882B (en) 2014-08-23 2014-08-23 Floor slab structure allowing insulation receiving chamber provided inside

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410430506.6A CN104264882B (en) 2014-08-23 2014-08-23 Floor slab structure allowing insulation receiving chamber provided inside

Publications (2)

Publication Number Publication Date
CN104264882A true CN104264882A (en) 2015-01-07
CN104264882B CN104264882B (en) 2017-01-18

Family

ID=52156445

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410430506.6A Active CN104264882B (en) 2014-08-23 2014-08-23 Floor slab structure allowing insulation receiving chamber provided inside

Country Status (1)

Country Link
CN (1) CN104264882B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2254455Y (en) * 1996-10-03 1997-05-21 彭奇琨 Thin-wall, square-hole hollow construction board
JP2001081891A (en) * 1999-07-12 2001-03-27 Runesu Kenkyusho:Kk Sound insulation floor structure in building
CN2647963Y (en) * 2003-09-30 2004-10-13 潘旭鹏 Light type thermal preserving steel structure combined plate
CN102296736A (en) * 2011-09-01 2011-12-28 建研科技股份有限公司 Self-supporting heat-insulation hollow floor slab and construction method thereof
CN203701387U (en) * 2014-02-06 2014-07-09 李健鹏 Floor slab structure with embedded heat preservation cavities
CN204001329U (en) * 2014-08-23 2014-12-10 罗森林 A kind of floor slab structure that can built-in heat insulation embeds chamber

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2254455Y (en) * 1996-10-03 1997-05-21 彭奇琨 Thin-wall, square-hole hollow construction board
JP2001081891A (en) * 1999-07-12 2001-03-27 Runesu Kenkyusho:Kk Sound insulation floor structure in building
CN2647963Y (en) * 2003-09-30 2004-10-13 潘旭鹏 Light type thermal preserving steel structure combined plate
CN102296736A (en) * 2011-09-01 2011-12-28 建研科技股份有限公司 Self-supporting heat-insulation hollow floor slab and construction method thereof
CN203701387U (en) * 2014-02-06 2014-07-09 李健鹏 Floor slab structure with embedded heat preservation cavities
CN204001329U (en) * 2014-08-23 2014-12-10 罗森林 A kind of floor slab structure that can built-in heat insulation embeds chamber

Also Published As

Publication number Publication date
CN104264882B (en) 2017-01-18

Similar Documents

Publication Publication Date Title
WO2014123313A1 (en) Floor structure for preventing noise through floor of building
CN102011437A (en) Fireproof outer wall heat-insulating system and manufacturing method thereof
CN103669746B (en) The construction method of inverted roof heat-insulation system
CN211548402U (en) Rapid construction tile roof structure
CN204001329U (en) A kind of floor slab structure that can built-in heat insulation embeds chamber
KR20170032992A (en) Parapet structure for preventing thermal transfer and construction method thereof
CN109667334A (en) A kind of water storage pond type balcony construct
CN103628634A (en) Temperature-keeping, ventilating and energy-saving dry-method structure of slope roof and construction method thereof
CN207672761U (en) A kind of water proof structure of floor and steel plate wall intersection
CN104264882A (en) Floor slab structure allowing insulation receiving chamber provided inside
CN205476047U (en) A assembled EPS module with filling heat preservation composite wall panel for steel construction wall body
CN202483092U (en) Vapor-proof thermal insulation walkable roof
CN106121140A (en) Structure that cultural relic building roof heat insulation is waterproof and construction method thereof
CN204326384U (en) A kind of gauze wire cloth thin-coat plaster rice straw composite roof board
CN205857546U (en) The structure that cultural relic building roof heat insulation is waterproof
CN210482788U (en) Roof expansion joint structure
CN209907844U (en) Bathroom falls board area and does wet subregion stagnant water steel sheet device futilely
CN209308321U (en) A kind of decoration composite plate
CN207905166U (en) A kind of slideway type heat-preserving wall body structure
CN202644749U (en) External thermal insulation system composed of foam thermal insulation plate
CN206245606U (en) A kind of EPS composite heat-insulation roofs
CN206189690U (en) Roof boarding and room lid
CN107938987A (en) Heat accumulating type dry method floor heating fast spreading structure and method
CN205712517U (en) Anhydrous and have the water proof structure of junction, position, doorway between water
CN218149037U (en) Heat preservation wall face wall tile structure in bathroom

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Tao Chengxiang

Inventor after: Liu Qi

Inventor after: Tan Wenxiang

Inventor after: Mei Yunpeng

Inventor after: Chen Yudong

Inventor after: Liu Xingliang

Inventor after: He Zhengtao

Inventor after: Ma Wei

Inventor after: Wang Maozhong

Inventor after: Wang Qiumin

Inventor before: Li Hongsheng

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20161115

Address after: 233000 Anhui City, East China Sea Road, Cheung Shan Road South

Applicant after: Tao Chengxiang

Address before: 124010 Xinglongtai City, Panjin Province, the United States, the city of the United States, the 32 Villa Building No. 5, No.

Applicant before: Li Hongsheng

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170515

Address after: 233000 Anhui City, East China Sea Road, Cheung Shan Road South

Patentee after: Anhui Water Resources Development Co., Ltd.

Address before: 233000 Anhui City, East China Sea Road, Cheung Shan Road South

Patentee before: Tao Chengxiang

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Anhui Water Resources Development Co., Ltd.

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Anhui Water Resources Development Co., Ltd.

Document name: Notification of Passing Examination on Formalities

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190710

Address after: 233010 No. 5183 Donghai Avenue, Bengbu City, Anhui Province

Patentee after: Anhui Water Resources Development Co., Ltd.

Address before: 233000 South Side of Zhanggongshan Road, Donghai Avenue, Bengbu City, Anhui Province

Patentee before: Anhui Water Resources Development Co., Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210423

Address after: 233010 No. 5183 Donghai Avenue, Bengbu City, Anhui Province

Patentee after: Anhui Water Resources Development Co.,Ltd.

Patentee after: Shaanxi Anjian investment and Construction Co.,Ltd.

Address before: 233010 No. 5183 Donghai Avenue, Bengbu City, Anhui Province

Patentee before: Anhui Water Resources Development Co.,Ltd.