CN104260852B - A kind of half ship positionning straining beam - Google Patents

A kind of half ship positionning straining beam Download PDF

Info

Publication number
CN104260852B
CN104260852B CN201410463539.0A CN201410463539A CN104260852B CN 104260852 B CN104260852 B CN 104260852B CN 201410463539 A CN201410463539 A CN 201410463539A CN 104260852 B CN104260852 B CN 104260852B
Authority
CN
China
Prior art keywords
straining beam
end carriage
middle girder
ship
half ship
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410463539.0A
Other languages
Chinese (zh)
Other versions
CN104260852A (en
Inventor
陈振宇
黄卫丰
陆伟中
梅钱汇
王城钢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yangzi Xinfu Shipbuilding Co Ltd
Original Assignee
Jiangsu Yangzi Xinfu Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yangzi Xinfu Shipbuilding Co Ltd filed Critical Jiangsu Yangzi Xinfu Shipbuilding Co Ltd
Priority to CN201410463539.0A priority Critical patent/CN104260852B/en
Publication of CN104260852A publication Critical patent/CN104260852A/en
Application granted granted Critical
Publication of CN104260852B publication Critical patent/CN104260852B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to a kind of half ship positionning straining beam, the two ends of straining beam are movably hinged on two halves ship, it is characterized in that: described straining beam includes middle girder, end carriage, connection otic placode and bedplate, the both sides of middle girder connect end carriage respectively, and end carriage is movably hinged, with half ship direction of advance and/or vertical direction, the bedplate being arranged on half ships main deck through connecting otic placode for hinge axes.

Description

A kind of half ship positionning straining beam
Technical field
The present invention relates to a kind of shipbuilding device, a kind of half ship positionning straining beam.
Background technology
Current shipbuilding field, in dock, two halves ship is when undocking floating, location construction, general use to draw set steel and pull the connection carried out between two halves ship and fixing, the method welding equipment need to hang horse on ship hull plate, the equipment such as configuration steel is pulled, earth anchor and hoist engine, equipment needed thereby is many, and structure is complicated, install, working costs laborious, and two halves ship advanced in unison difficulty on the water surface, controlling positioning precision with station low, staff cannot pass through between half ship, poor for applicability.
Summary of the invention
Socket the deficiency of location for half ship steel cable in prior art, the invention provides a kind of simple in construction, install, easy to use, quick advanced in unison and high-precision same station location can be taken into account, there is the personnel's half ship positionning straining beam by row.
The technical solution used in the present invention is: a kind of half ship positionning straining beam, the two ends of straining beam are movably hinged on two halves ship, described straining beam includes middle girder, end carriage, connection otic placode and bedplate, the both sides of middle girder connect end carriage respectively, and end carriage is movably hinged, with half ship direction of advance and/or vertical direction, the bedplate being arranged on half ships main deck through connecting otic placode for hinge axes.
Further, described middle girder is provided with the escape way of band guardrail.
Further, it is communicated with escape way and the gap bridge of half ships main deck on described middle girder or on end carriage or on bottom block or on half ships main deck.
Further, described middle girder and end carriage are truss structure.
Further, described middle girder uses Flange joint with end carriage.
Yet further, described gap bridge is truss structure.
After using technique scheme, the invention has the beneficial effects as follows:
1, middle girder, end carriage and the gap bridge of truss structure, structure is firm, light weight, it is simple to assembling, use cost is low;Middle girder uses Flange joint with end carriage, can connect end carriage again after adjusting multiple middle girder Flange joint according to half ship spacing, to meet half ship spacing, and on middle girder, escape way can pass through staff, to meet flow of personnel demand between two halves ship, improve applicability;
2, the two ends connecting otic placode are movably hinged for hinge axes with half ship direction of advance and/or vertical direction with end carriage and bedplate respectively, with satisfied connection end displacement drift angle in direction of advance and/or vertical direction, effectively guaranteeing that middle girder is rigidly connected on the basis of two halves ship, can advance waterborne to two halves ship time before and after, upper lower deviation is adjusted, guarantee the advanced in unison of two halves ship and position with station, it is simple to follow-up shipbuilding.
Accompanying drawing explanation
Fig. 1 is present configuration schematic diagram;
Fig. 2 is the top view of Fig. 1.
In figure: half ship 1, main deck 2, middle girder 3, end carriage 4, flange 5, middle otic placode 6, bedplate 7, gap bridge 8, escape way 9.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described.
Fig. 1, shown in 2, a kind of half ship positionning straining beam includes middle girder 3 end carriage 4, flange 5, middle otic placode 6, bedplate 7 and passes a bridge 8.Two halves ship 1 is equipped with bedplate 7 on the relative main deck 2 of side plate, with vertical direction for hinge axes moveable hinge otic placode 6 one end in succession on bedplate 7, connect otic placode 6 other end and be movably hinged end carriage 4 with half ship direction of advance for hinge axes, connect the two ends of middle girder 3 through flange 5 between two end carriages 4, middle girder 3 is provided with the escape way 9 of band guardrail, being communicated with the gap bridge 8 of main deck 2 and escape way 9 on the main deck 2 of two halves ship 1, middle girder 3, end carriage 4 and gap bridge 8 are steel truss structure.

Claims (6)

1. one and half ship positionning straining beam, the two ends of straining beam are movably hinged on two halves ship, it is characterized in that: described straining beam includes middle girder, end carriage, connection otic placode and bedplate, the both sides of middle girder connect end carriage respectively, and end carriage is movably hinged, with half ship direction of advance and/or vertical direction, the bedplate being arranged on half ships main deck through connecting otic placode for hinge axes.
A kind of half ship positionning straining beam the most according to claim 1, is characterized in that: described middle girder is provided with the escape way of band guardrail.
A kind of half ship positionning straining beam the most according to claim 2, is characterized in that: be communicated with escape way and the gap bridge of half ships main deck on described middle girder or on end carriage or on bedplate or on half ships main deck.
A kind of half ship positionning straining beam the most according to claim 1 and 2, is characterized in that: described middle girder and end carriage are truss structure.
A kind of half ship positionning straining beam the most according to claim 1 and 2, is characterized in that: described middle girder uses Flange joint with end carriage.
A kind of half ship positionning straining beam the most according to claim 3, is characterized in that: described gap bridge is truss structure.
CN201410463539.0A 2014-09-12 2014-09-12 A kind of half ship positionning straining beam Active CN104260852B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410463539.0A CN104260852B (en) 2014-09-12 2014-09-12 A kind of half ship positionning straining beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410463539.0A CN104260852B (en) 2014-09-12 2014-09-12 A kind of half ship positionning straining beam

Publications (2)

Publication Number Publication Date
CN104260852A CN104260852A (en) 2015-01-07
CN104260852B true CN104260852B (en) 2016-09-07

Family

ID=52152487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410463539.0A Active CN104260852B (en) 2014-09-12 2014-09-12 A kind of half ship positionning straining beam

Country Status (1)

Country Link
CN (1) CN104260852B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110758672A (en) * 2018-07-26 2020-02-07 江苏扬子鑫福造船有限公司 Method for quickly and integrally shifting and falling two large semi-floating ships

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102328737A (en) * 2010-07-12 2012-01-25 南通尧盛钢结构有限公司 Sectional scaffold apparatus for hull
CN202642059U (en) * 2012-05-10 2013-01-02 沪东中华造船(集团)有限公司 Boat side suspension type mobile staging
CN203623947U (en) * 2013-10-30 2014-06-04 中国石油集团渤海石油装备制造有限公司 Support for construction of ship and ocean engineering structures
CN204078039U (en) * 2014-09-12 2015-01-07 江苏扬子鑫福造船有限公司 A kind of half ship positionning straining beam

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102328737A (en) * 2010-07-12 2012-01-25 南通尧盛钢结构有限公司 Sectional scaffold apparatus for hull
CN202642059U (en) * 2012-05-10 2013-01-02 沪东中华造船(集团)有限公司 Boat side suspension type mobile staging
CN203623947U (en) * 2013-10-30 2014-06-04 中国石油集团渤海石油装备制造有限公司 Support for construction of ship and ocean engineering structures
CN204078039U (en) * 2014-09-12 2015-01-07 江苏扬子鑫福造船有限公司 A kind of half ship positionning straining beam

Also Published As

Publication number Publication date
CN104260852A (en) 2015-01-07

Similar Documents

Publication Publication Date Title
CN103991511B (en) Platform conveying arrangement
PT2436593E (en) Ship and method for transporting and setting up offshore structures
CN102173367A (en) Stern hydraulic rudder installing walking trolley
CN106167077B (en) Can autonomous navigation ultra-large type offshore steel structure floating body and its manufacture method
CN203806117U (en) Ship launching device
CN102910255A (en) Berth combination method in ship construction
CN106741603A (en) The flow container fast and accurately localization method when liquefaction vessel is built
CN104260852B (en) A kind of half ship positionning straining beam
CN204078039U (en) A kind of half ship positionning straining beam
CN107472462A (en) A kind of boarding bridge and its building method
RU2017123064A (en) METHOD AND SYSTEM FOR CARRYING OUT LOADS OF FLUID IN THE OPEN SEA
CN102615492A (en) Hoisting butt joint method of tower-like containers
CN109665441B (en) Method for installing crane track of floating dock
ATE523422T1 (en) AERODYNAMIC WIND PROPULSION DEVICE WITH ACTIVE AND PASSIVE STEERING LINES AND METHOD FOR CONTROLLING SUCH DEVICE
CN204037857U (en) Floating Production oil storage emptying equipment alongside fender structure
CN1305731C (en) General section gather-up butt joint method for regional shipbuilding
CN205020298U (en) Adjustable anchor chain water flooding nozzle
NO20141466A1 (en) Pipe section for floating bridge
CN203843444U (en) High-pressure pipeline butting joint instrument
CN204548417U (en) A kind of wharf boarding ladder
CN203806109U (en) Flexible boarding platform
CN203296065U (en) Adjustable, detachable and reusable nose supporting guide device of immersed tunnel
CN206780232U (en) It is a kind of that the branch stake tool that can quickly adjust dismounting is carried for boat segmental
US10815736B2 (en) Underwater SCR lifting frame
CN204076054U (en) Flat-bulb steel and band steel docking structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant