CN104259360B - Heating technique before the forging of Cr9SiMn bearing steel - Google Patents

Heating technique before the forging of Cr9SiMn bearing steel Download PDF

Info

Publication number
CN104259360B
CN104259360B CN201410364234.4A CN201410364234A CN104259360B CN 104259360 B CN104259360 B CN 104259360B CN 201410364234 A CN201410364234 A CN 201410364234A CN 104259360 B CN104259360 B CN 104259360B
Authority
CN
China
Prior art keywords
cr9simn
steel
forging
vibrator
bearing steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410364234.4A
Other languages
Chinese (zh)
Other versions
CN104259360A (en
Inventor
罗晓芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhangjiagang general Limited by Share Ltd
Original Assignee
ZHANGJIAGANG CITY GUANGDA MACHINERY FORGING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHANGJIAGANG CITY GUANGDA MACHINERY FORGING CO Ltd filed Critical ZHANGJIAGANG CITY GUANGDA MACHINERY FORGING CO Ltd
Priority to CN201410364234.4A priority Critical patent/CN104259360B/en
Publication of CN104259360A publication Critical patent/CN104259360A/en
Application granted granted Critical
Publication of CN104259360B publication Critical patent/CN104259360B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forging (AREA)

Abstract

The invention discloses heating technique before a kind of Cr9SiMn bearing steel forging, comprise the following steps: first putting on the dividing plate of intermediate frequency furnace by Cr9SiMn bearing steel steel ingot, the dividing plate back side is fixed with vibrator;Open vibrator, be transferred to peak frequency;Then it is heated to 170 180 DEG C with the speed of 50 60 DEG C/h, is incubated 23 hours;It is heated to 770 790 DEG C with the speed of 60 80 DEG C/h, after being incubated 36 hours, closes vibrator;Steel ingot is heated to 1,200 1220 DEG C with the speed of 100 120 DEG C/h, after being incubated 28 hours, heating terminates, rapidly enter the forging stage, the present invention by zone heating, control temperature retention time, the method for programming rate, be possible to prevent the internal burning of steel ingot, temperature distributing disproportionation is even and the phenomenons such as coarse-grain occurs, internal stress and the fragility of steel ingot is eliminated by heating and vibrator vibrations, avoid, during forging, crack performance occurring, it is ensured that product quality.

Description

Heating technique before the forging of Cr9SiMn bearing steel
Technical field
The processing method that the invention belongs to forging, is specifically related to heating technique before the forging of Cr9SiMn bearing steel.
Background technology
Cr9SiMn bearing steel is a kind of special steel of processing bearing, there is high comprcssive strength and fatigue limit, high rigidity, high-wearing feature and certain toughness, quenching degree is good, sulfur and phosphorus are controlled the tightest, it it is a kind of high-duty cast steel, also mould steel can be done, need steel ingot is heated before the forging of Cr9SiMn bearing steel, then carry out forging and heat treatment and polish, in heating process, owing to heating technique is unreasonable, cause the internal burning of steel ingot, internal stress is high, temperature distributing disproportionation is even and the phenomenons such as coarse-grain occurs, make during follow-up forging, the phenomenons such as be full of cracks often occur, have a strong impact on and forge quality.
Summary of the invention
For solving the problems referred to above, the invention discloses heating technique before a kind of Cr9SiMn bearing steel forging, be possible to prevent the internal burning of steel ingot, temperature distributing disproportionation even and the phenomenons such as coarse-grain, the internal stress of reduction steel ingot and fragility occur, in order to avoid during forging, crack performance occurring.
For reaching above-mentioned purpose, technical scheme is as follows:
Heating technique before a kind of Cr9SiMn bearing steel forging, it is characterised in that: comprise the following steps:
(1) putting on the dividing plate of intermediate frequency furnace by Cr9SiMn bearing steel steel ingot, the dividing plate back side is fixed with vibrator;
(2) open vibrator, be transferred to peak frequency;
(3) Cr9SiMn bearing steel steel ingot is heated to 170-180 DEG C with the speed of 50-60 DEG C/h, is incubated 2-3 hour;
(4) Cr9SiMn bearing steel steel ingot is heated to 770-790 DEG C with the speed of 60-80 DEG C/h, is incubated 3-6 hour;
(5) vibrator is closed;
(6) with the speed of 100-120 DEG C/h, Cr9SiMn bearing steel steel ingot being heated to 1200-1220 DEG C, after being incubated 2-8 hour, heating terminates, and rapidly enters the forging stage.
The invention has the beneficial effects as follows:
Heating technique before a kind of Cr9SiMn bearing steel forging of the present invention, by zone heating, control temperature retention time, the method for programming rate, be possible to prevent the internal burning of steel ingot, temperature distributing disproportionation is even and the phenomenons such as coarse-grain occurs, steel ingot described in step (3) is heated slowly to 170-180 DEG C, it is incubated 2-3 hour, it it is the internal stress being reduced steel ingot by heating, vibrator is used in heating process, it is internal stress and the fragility being eliminated steel ingot by mechanical means, double insurance is avoided during forging, crack performance there is, it is ensured that product quality.
Detailed description of the invention
Embodiment 1
The round steel that Cr9SiMn bearing steel is diameter 80cm described in the present embodiment.
Heating technique before a kind of Cr9SiMn bearing steel forging, comprises the following steps:
(1) putting on the dividing plate of intermediate frequency furnace by Cr9SiMn bearing steel steel ingot, the dividing plate back side is fixed with vibrator;
(2) open vibrator, be transferred to peak frequency;
(3) Cr9SiMn bearing steel steel ingot is heated to 180 DEG C with the speed of 50 DEG C/h, is incubated 2 hours;
(4) Cr9SiMn bearing steel steel ingot is heated to 780 DEG C with the speed of 70 DEG C/h, is incubated 4 hours;
(5) vibrator is closed;
(6) with the speed of 115 DEG C/h, Cr9SiMn bearing steel steel ingot being heated to 1210 DEG C, after being incubated 6 hours, heating terminates, and rapidly enters the forging stage.
Embodiment 2
The square steel that Cr9SiMn bearing steel is 100x100 described in the present embodiment.
Heating technique before a kind of Cr9SiMn bearing steel forging, comprises the following steps:
(1) putting on the dividing plate of intermediate frequency furnace by Cr9SiMn bearing steel steel ingot, the dividing plate back side is fixed with vibrator;
(2) open vibrator, be transferred to peak frequency;
(3) Cr9SiMn bearing steel steel ingot is heated to 175 DEG C with the speed of 60 DEG C/h, is incubated 3 hours;
(4) Cr9SiMn bearing steel steel ingot is heated to 780 DEG C with the speed of 80 DEG C/h, is incubated 6 hours;
(5) vibrator is closed;
(6) with the speed of 115 DEG C/h, Cr9SiMn bearing steel steel ingot being heated to 1220 DEG C, after being incubated 8 hours, heating terminates, and rapidly enters the forging stage.
Embodiment 3
The band steel that Cr9SiMn bearing steel is 80x50 described in the present embodiment.
Heating technique before a kind of Cr9SiMn bearing steel forging, comprises the following steps:
(1) putting on the dividing plate of intermediate frequency furnace by Cr9SiMn bearing steel steel ingot, the dividing plate back side is fixed with vibrator;
(2) open vibrator, be transferred to peak frequency;
(3) Cr9SiMn bearing steel steel ingot is heated to 180 DEG C with the speed of 50 DEG C/h, is incubated 2.5 hours;
(4) Cr9SiMn bearing steel steel ingot is heated to 775 DEG C with the speed of 60 DEG C/h, is incubated 5 hours;
(5) vibrator is closed;
(6) with the speed of 120 DEG C/h, Cr9SiMn bearing steel steel ingot being heated to 1220 DEG C, after being incubated 5 hours, heating terminates, and rapidly enters the forging stage.
Heating technique before Cr9SiMn bearing steel of the present invention forging, by zone heating, control temperature retention time, the method for programming rate, be possible to prevent the internal burning of steel ingot, temperature distributing disproportionation is even and the phenomenons such as coarse-grain occurs, internal stress and the fragility of steel ingot is eliminated by heating and vibrator vibrations, avoid during forging, crack performance there is, it is ensured that product quality.

Claims (1)

1. heating technique before a Cr9SiMn bearing steel forging, it is characterised in that: comprise the following steps:
(1) putting on the dividing plate of intermediate frequency furnace by Cr9SiMn bearing steel steel ingot, the dividing plate back side is fixed with vibrator;
(2) open vibrator, be transferred to peak frequency;
(3) Cr9SiMn bearing steel steel ingot is heated to 170-180 DEG C with the speed of 50-60 DEG C/h, is incubated 2-3 hour;
(4) Cr9SiMn bearing steel steel ingot is heated to 770-790 DEG C with the speed of 60-80 DEG C/h, is incubated 3-6 hour;
(5) vibrator is closed;
(6) with the speed of 100-120 DEG C/h, Cr9SiMn bearing steel steel ingot being heated to 1200-1220 DEG C, after being incubated 2-8 hour, heating terminates, and rapidly enters the forging stage.
CN201410364234.4A 2014-07-29 2014-07-29 Heating technique before the forging of Cr9SiMn bearing steel Active CN104259360B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410364234.4A CN104259360B (en) 2014-07-29 2014-07-29 Heating technique before the forging of Cr9SiMn bearing steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410364234.4A CN104259360B (en) 2014-07-29 2014-07-29 Heating technique before the forging of Cr9SiMn bearing steel

Publications (2)

Publication Number Publication Date
CN104259360A CN104259360A (en) 2015-01-07
CN104259360B true CN104259360B (en) 2016-09-07

Family

ID=52151005

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410364234.4A Active CN104259360B (en) 2014-07-29 2014-07-29 Heating technique before the forging of Cr9SiMn bearing steel

Country Status (1)

Country Link
CN (1) CN104259360B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108193039A (en) * 2018-02-11 2018-06-22 湖南耐特材料科技有限公司 A kind of annealing device for being used for plank and bar

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56489B2 (en) * 1974-05-07 1981-01-08
JPS606235A (en) * 1983-06-24 1985-01-12 Nippon Steel Corp Hot forging method of mechanical parts
CN1727502A (en) * 2004-07-29 2006-02-01 山东泰山钢铁有限公司 Crl2MoV steel forging method
CN101912935B (en) * 2010-08-20 2011-10-19 张家港市广大机械锻造有限公司 Heating method for forging based on P20+Ni die steel
CN102441628A (en) * 2010-10-11 2012-05-09 上海腾辉锻造有限公司 Forging heating method for forge piece sealing ring
CN101979678B (en) * 2010-11-01 2013-03-13 北京航空航天大学 Method for homogenizing residual stress through vibration positioning
CN102352474B (en) * 2011-10-31 2013-02-13 哈尔滨中飞新技术股份有限公司 Forging and heat treatment method of 2A50 aluminium alloy die forging

Also Published As

Publication number Publication date
CN104259360A (en) 2015-01-07

Similar Documents

Publication Publication Date Title
CN104745780A (en) Production method for forging and thermally treating Cr12MoV steel
CN103602798A (en) Method for heat treatment on high-hardness semi-steel roller
CN105714042A (en) Steel casting heat treatment technology
CN108356189A (en) The cogging forging method of 2507 super-duplex stainless steel strands
CN105648175A (en) Heat treatment method capable of increasing first pass yield of 0Cr17Ni4Cu4Nb stainless steel material and application thereof
CN103805764B (en) A kind of hot rolling technology method of refinement height manganese austenite crystalline grain of steel
CN104259360B (en) Heating technique before the forging of Cr9SiMn bearing steel
CN105648177A (en) Tool steel heat treatment process
CN102634646B (en) Special temperature-control cooling thermal treatment technology
CN104439986A (en) Method for continuously producing large long shaft type forged pieces through casting-forging heat
CN105695699A (en) Micro-deformation vacuum heat treatment process for 40CrNi steel gear
CN105369022A (en) Method for carrying out grain refinement on 2Cr12NiMo1W1V forge piece in production process
CN102424904B (en) Method for manufacturing motorcycle gears from 20CrMo carburizing steel
CN105695701A (en) 40Cr quenching and tempering technology
CN101912935B (en) Heating method for forging based on P20+Ni die steel
CN105935738B (en) A kind of forging technology of ledeburite steel shaft
CN105986275A (en) Method for producing wheel gear by 20CrMnTi carburizing steel
CN103820608A (en) 35CrMnSi steel and heat treatment method for eliminating second-class temper brittleness and improving toughness of 35CrMnSi steel
CN103740899A (en) Forged piece quenching method by utilizing waste heat
CN105986080A (en) Heat treatment technology of 38CrMnAl steel
CN103817277B (en) The boiler-steam dome manufacture method of 13MnNiMo5-4 cylinder forgings
CN104164543A (en) Quenching method for hot work die steel
CN103557234A (en) Manufacturing method for bearing ball
CN103320581B (en) High-hardenability quenched and tempered steel heat treatment method
CN105755232A (en) Heat treatment process of high-chromium cast iron

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 215614 Anqing Village, Fenghuang Town, Zhangjiagang City, Suzhou City, Jiangsu Province

Patentee after: Zhangjiagang general Limited by Share Ltd

Address before: 215614 Anqing Village, Fenghuang Town, Zhangjiagang City, Suzhou City, Jiangsu Province

Patentee before: Zhangjiagang City Guangda Machinery Forging Co., Ltd.

CP01 Change in the name or title of a patent holder