CN104251040A - 一种两阶段工作连梁及其施工方法 - Google Patents

一种两阶段工作连梁及其施工方法 Download PDF

Info

Publication number
CN104251040A
CN104251040A CN201310271003.4A CN201310271003A CN104251040A CN 104251040 A CN104251040 A CN 104251040A CN 201310271003 A CN201310271003 A CN 201310271003A CN 104251040 A CN104251040 A CN 104251040A
Authority
CN
China
Prior art keywords
coupling beam
steel
concrete
steel beam
web
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310271003.4A
Other languages
English (en)
Other versions
CN104251040B (zh
Inventor
聂建国
胡红松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsinghua University
Original Assignee
Tsinghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsinghua University filed Critical Tsinghua University
Priority to CN201310271003.4A priority Critical patent/CN104251040B/zh
Publication of CN104251040A publication Critical patent/CN104251040A/zh
Application granted granted Critical
Publication of CN104251040B publication Critical patent/CN104251040B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明涉及一种两阶段工作连梁及其施工方法,属于建筑结构技术领域。本发明包括核心钢梁、外包混凝土;所述核心钢梁为一钢结构,包括工字形钢梁、端板、锚固栓钉,工字形钢梁由上、下翼缘和腹板组成,端板固接于工字形钢梁两端;该连梁两端伸入混凝土剪力墙肢内并与其固接,伸入混凝土剪力墙肢内的上、下翼缘和腹板上焊接有锚固栓钉。本发明相比现有技术的钢连梁具有更大的正常使用刚度且钢梁腹板不易发生局部屈曲,在风荷载作用下更能满足舒适度要求;在地震荷载作用下,由于混凝土的约束,钢梁腹板不易发生局部屈曲,因此耗能能力更强,应用前景广阔。

Description

一种两阶段工作连梁及其施工方法
技术领域
本发明涉及一种两阶段工作连梁,属于建筑结构技术领域。
背景技术
在高层建筑中,剪力墙结构是主要的抗侧力结构。在正常使用状态下,剪力墙结构必须具有足够大的刚度来抵抗风等水平荷载,使建筑发生较小的水平侧移,从而保证建筑的舒适度要求。因此,连接剪力墙肢的连梁必须具有足够大的正常使用刚度,保证剪力墙肢能够协同工作,充分发挥抗侧能力。而在地震等极端荷载作用下,又要求连梁尽早屈服,使剪力墙结构的刚度减小,从而降低作用在结构上的地震力。连梁在屈服后也是重要的耗能构件,用于耗散地震能量,保证剪力墙肢等竖向构件不发生重大破坏而使结构倒塌。
钢连梁在不发生梁端弯曲破坏的情况下,具有较好的剪切屈服耗能能力,因此能够满足地震荷载作用下结构对连梁高延性、高耗能的要求。但由于钢连梁的组成板件较薄,相比两侧的钢筋混凝土剪力墙肢刚度偏弱,因此很难使钢筋混凝土剪力墙肢具有较强的协同工作能力。如果为了提高结构刚度而增加钢梁组成板件的厚度,会造成钢材的浪费,不够经济合理。
发明内容
本发明的目的在于针对现有技术中存在的不足,提出一种两阶段工作连梁及其施工方法。它具有较大的正常使用刚度,而接近屈服时刚度又能迅速减小,且屈服后的耗能能力强。
本发明的技术方案如下:
一种两阶段工作连梁,其特征在于,该连梁包括核心钢梁、外包混凝土9;所述核心钢梁为一钢结构,包括工字形钢梁、端板、锚固栓钉,工字形钢梁由上、下翼缘和腹板组成,端板固接于工字形钢梁两端;该连梁两端伸入混凝土剪力墙肢内并与其固接,伸入混凝土剪力墙肢内的上、下翼缘和腹板上焊接有锚固栓钉。所述的工字形钢梁表面包裹弹性材料或焊接螺纹钢筋。所述的弹性材料为橡胶、塑料泡沫或塑料布。
本发明的一种两阶段工作连梁的施工方法,其特征在于,该方法包括以下步骤:
加工完成连梁的钢结构部分,在工字形钢梁的相应位置焊接锚固栓钉,就位;施工钢筋混凝土剪力墙肢的纵筋、箍筋,将中断的箍筋端部焊接在对应的钢梁腹板上;支模,浇筑连梁的外包混凝土和钢筋混凝土剪力墙肢的混凝土。所述的工字形钢梁上包裹弹性材料或焊接螺纹钢筋。所述的连梁伸入钢筋混凝土剪力墙肢内部的长度可为工字形钢梁高度的1~2倍。本发明相对于现有技术具有以下优点及突出效果:
相比传统的钢连梁,本发明具有更大的正常使用刚度,在风荷载作用下更能满足舒适度要求;在地震荷载作用下,由于混凝土的约束,钢梁腹板不易发生局部屈曲,因此耗能能力更强。
本发明可应用于多、高层建筑的剪力墙结构体系中。
附图说明
图1为本发明连梁与墙肢的连接构造主视图;
图2为本发明工字形钢梁与混凝土界面的不同处理方法;
图3为图1的B-B剖面图;
图4为本发明连梁的钢结构示意图;
图5为图4的C-C剖面图。
图中:1-翼缘;2-腹板;3-弹性材料;4-螺纹钢筋;5-锚固栓钉;6-端板;7-钢筋混凝土剪力墙肢纵筋;8-钢筋混凝土剪力墙肢箍筋;9-外包混凝土;
具体实施方法
以下结合附图,对本发明的具体实施方法作进一步描述。
本发明的一种两阶段工作连梁,该连梁包括核心钢梁和外包混凝土9,如图1所示。核心钢梁为一钢结构,包括工字形钢梁、端板6、锚固栓钉5,工字形钢梁由上、下翼缘1和腹板2组成,在工字形钢梁两端分别焊接有端板6,用于提高连梁在剪力墙肢内部的锚固。如图4、图5所示。连梁的两端伸入钢筋混凝土剪力墙肢内,伸入中断了相应位置的钢筋混凝土墙肢箍筋8;中断的箍筋8端部须焊接在对应的工字形钢梁腹板2上。伸入剪力墙肢内部的工字形钢梁的上、下翼缘1和腹板2上焊接有锚固栓钉5,用于传递钢梁与墙肢混凝土之间的界面剪力。连梁伸入钢筋混凝土剪力墙肢内部的长度可为工字形钢梁高度的1~2倍,如图3所示。
工字形钢梁界面处理方案可以是自然界面、钢梁表面包裹弹性材料或钢梁表面焊接螺纹钢筋三种。弹性材料可以采用橡胶、塑料泡沫或塑料布。如图2所示。
采用自然界面的连梁,当荷载较小时,混凝土与钢梁之间通过界面粘结力共同工作,刚度较大;当荷载达到某一值后,界面粘结破坏,连梁刚度迅速降低;荷载继续增大,混凝土退出受力,但混凝土能为钢梁提供约束作用,延缓钢梁腹板发生局部屈曲。采用钢梁表面包裹弹性材料的界面处理方案,可降低钢梁和外包混凝土之间的界面粘结力,使刚度提前退化。采用钢梁表面焊接螺纹钢筋的界面处理方案,可增强钢梁与混凝土之间的界面粘结力,延缓刚度退化。
本发明的两阶段工作连梁的施工方法,该方法包括以下步骤:
加工完成连梁的钢结构部分,将伸入剪力墙肢内部的工字形钢梁的上、下翼缘1和腹板2上焊接锚固栓钉5,用于传递钢梁与墙肢混凝土之间的界面剪力;还可在工字形钢梁上包裹弹性材料或焊接螺纹钢筋。就位连梁钢结构部分;施工钢筋混凝土剪力墙肢的纵筋7、箍筋8,将中断的箍筋8端部焊接在对应的钢梁腹板2上;连梁伸入钢筋混凝土剪力墙肢内部的长度可为工字形钢梁高度的1~2倍;支模,浇筑连梁的外包混凝土和剪力墙肢的混凝土。

Claims (6)

1.一种两阶段工作连梁,其特征在于,该连梁包括核心钢梁、外包混凝土;所述核心钢梁为一钢结构,包括工字形钢梁、端板、锚固栓钉,工字形钢梁由上、下翼缘和腹板组成,端板固接于工字形钢梁两端;该连梁两端伸入混凝土剪力墙肢内并与其固接,伸入混凝土剪力墙肢内的上、下翼缘和腹板上焊接有锚固栓钉。
2.根据权利要求1所述的两阶段工作连梁,其特征在于,所述的工字形钢梁表面包裹弹性材料或焊接螺纹钢筋。
3.根据权利要求2所述的两阶段工作连梁,其特征在于,所述的弹性材料为橡胶、塑料泡沫或塑料布。
4.根据权利要求1-3中任一项所述的两阶段工作连梁的施工方法,其特征在于,该方法包括以下步骤:
加工完成连梁的钢结构部分,在工字形钢梁的相应位置焊接锚固栓钉,就位;施工钢筋混凝土剪力墙肢的纵筋、箍筋,将中断的箍筋端部焊接在对应的钢梁腹板上;支模,浇筑连梁的外包混凝土和钢筋混凝土剪力墙肢的混凝土。
5.根据权利要求4所述的施工方法,其特征在于,所述的工字形钢梁上包裹弹性材料或焊接螺纹钢筋。
6.根据权利要求4或5所述的施工方法,其特征在于,所述的连梁伸入钢筋混凝土剪力墙肢内部的长度为工字形钢梁高度的1~2倍。
CN201310271003.4A 2013-06-29 2013-06-29 一种两阶段工作连梁及其施工方法 Active CN104251040B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310271003.4A CN104251040B (zh) 2013-06-29 2013-06-29 一种两阶段工作连梁及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310271003.4A CN104251040B (zh) 2013-06-29 2013-06-29 一种两阶段工作连梁及其施工方法

Publications (2)

Publication Number Publication Date
CN104251040A true CN104251040A (zh) 2014-12-31
CN104251040B CN104251040B (zh) 2017-03-29

Family

ID=52186271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310271003.4A Active CN104251040B (zh) 2013-06-29 2013-06-29 一种两阶段工作连梁及其施工方法

Country Status (1)

Country Link
CN (1) CN104251040B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436975A (zh) * 2016-10-26 2017-02-22 曲周县和盛新型建筑材料有限公司 一种内置钢梁剪力墙
CN107237250A (zh) * 2017-07-24 2017-10-10 中交二航局南方工程有限公司 拱桥柔性铰装置以及拱桥
CN108343175A (zh) * 2018-04-26 2018-07-31 华南理工大学建筑设计研究院 一种钢管高强混凝土剪力墙连梁纵筋锚固装置

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11117422A (ja) * 1997-10-15 1999-04-27 Sekisui Chem Co Ltd 鉄骨被覆用耐火積層体及び耐火被覆鉄骨構造体
JP2003090082A (ja) * 2001-09-18 2003-03-28 Shimizu Corp 境界梁ダンパー
CN101225688A (zh) * 2008-01-24 2008-07-23 同济大学 波纹腹板h型钢组合梁
CN201713963U (zh) * 2010-06-04 2011-01-19 同济大学 一种可更换连系梁
CN201924479U (zh) * 2010-12-02 2011-08-10 西安建筑科技大学 低屈服点钢连梁剪力墙结构
CN102425267A (zh) * 2011-08-26 2012-04-25 中国建筑东北设计研究院有限公司 设置栓钉的开洞钢板混凝土剪力墙连梁
CN202483027U (zh) * 2012-03-23 2012-10-10 重庆大学 一种端板螺栓钢连梁联肢剪力墙

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11117422A (ja) * 1997-10-15 1999-04-27 Sekisui Chem Co Ltd 鉄骨被覆用耐火積層体及び耐火被覆鉄骨構造体
JP2003090082A (ja) * 2001-09-18 2003-03-28 Shimizu Corp 境界梁ダンパー
CN101225688A (zh) * 2008-01-24 2008-07-23 同济大学 波纹腹板h型钢组合梁
CN201713963U (zh) * 2010-06-04 2011-01-19 同济大学 一种可更换连系梁
CN201924479U (zh) * 2010-12-02 2011-08-10 西安建筑科技大学 低屈服点钢连梁剪力墙结构
CN102425267A (zh) * 2011-08-26 2012-04-25 中国建筑东北设计研究院有限公司 设置栓钉的开洞钢板混凝土剪力墙连梁
CN202483027U (zh) * 2012-03-23 2012-10-10 重庆大学 一种端板螺栓钢连梁联肢剪力墙

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436975A (zh) * 2016-10-26 2017-02-22 曲周县和盛新型建筑材料有限公司 一种内置钢梁剪力墙
CN107237250A (zh) * 2017-07-24 2017-10-10 中交二航局南方工程有限公司 拱桥柔性铰装置以及拱桥
CN108343175A (zh) * 2018-04-26 2018-07-31 华南理工大学建筑设计研究院 一种钢管高强混凝土剪力墙连梁纵筋锚固装置
CN108343175B (zh) * 2018-04-26 2023-07-14 华南理工大学建筑设计研究院有限公司 一种钢管高强混凝土剪力墙连梁纵筋锚固装置

Also Published As

Publication number Publication date
CN104251040B (zh) 2017-03-29

Similar Documents

Publication Publication Date Title
CN102296724B (zh) 斜置双层折板钢板剪力墙
CN103696498B (zh) 一种震后易修复钢异形柱-中心支撑架
CN201924479U (zh) 低屈服点钢连梁剪力墙结构
CN104674941A (zh) 可恢复功能筒体结构体系
CN104563331B (zh) 一种可承重的自复位加劲波纹钢板阻尼墙
CN104251039A (zh) 一种钢骨混凝土-钢梁混合连梁及其施工方法
CN104805958B (zh) 应用于联肢剪力墙结构的双阶屈服耗能钢连梁
CN207484730U (zh) 一种波浪形防屈曲钢板抗震墙
CN102444224A (zh) 混凝土组合剪力墙
CN202108133U (zh) 一种双层折板钢板剪力墙结构
CN203808295U (zh) 一种钢管混凝土与双钢板外包混凝土组合剪力墙
CN208749195U (zh) 一种可更换的轴向拉压型软钢耗能阻尼器
CN107489212A (zh) 免承重力防剪切屈曲钢板剪力墙
CN202298983U (zh) 混凝土组合剪力墙
CN103711228B (zh) 一种组合槽纹框剪装配耗能结构体系
CN110792188A (zh) 双保险机制的可更换连梁
CN104251040A (zh) 一种两阶段工作连梁及其施工方法
CN201165713Y (zh) 钢板剪切型消能连接器
CN101550727B (zh) 一种柱与梁连接的结点
CN203603297U (zh) 一种框架柱的耗能抗震结构
CN105113642A (zh) 一种钢结构节点构件
CN105756229B (zh) 一种多层自防屈曲钢板剪力墙
CN214574860U (zh) 一种地震智分缝耗能减震型钢筋混凝土墙体
CN207268036U (zh) 一种免承重力仅受剪力的钢板剪力墙
CN204491826U (zh) 可恢复功能筒体结构体系

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant