CN104250833A - Novel positive electrode assembly workshop loading-unloading station process configuration - Google Patents
Novel positive electrode assembly workshop loading-unloading station process configuration Download PDFInfo
- Publication number
- CN104250833A CN104250833A CN201310267002.2A CN201310267002A CN104250833A CN 104250833 A CN104250833 A CN 104250833A CN 201310267002 A CN201310267002 A CN 201310267002A CN 104250833 A CN104250833 A CN 104250833A
- Authority
- CN
- China
- Prior art keywords
- process configuration
- track
- unloading station
- positive electrode
- electrode assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The present invention discloses a novel positive electrode assembly workshop loading-unloading station process configuration, which comprises a suspension conveyor (1) and a movement lifting loading-unloading table (2), and is characterized in that the suspension conveyor (1) is suspended on a track (3), and the movement lifting loading-unloading table (2) is arranged below the track (3). With the novel positive electrode assembly workshop loading-unloading station process configuration, the production efficiency is easily improved, the amount of equipment maintenance can be reduced, and the production cost can be reduced.
Description
Technical field
The present invention relates to the configuration of a kind of anode assembling workshop depot novel process efficiently, belong to Aluminium Electrolysis technical field.
Background technology
Anode assembling is the indispensable Production Flow Chart of electrolysis of aluminum enterprise, along with Aluminium Electrolysis enterprise maximization, more adopt the continuous assembly line of automatization, overhead chain conveyer is nucleus equipment wherein, charcoal block assembly (residual/new pole) dress on suspension conveying line, unload be production process must through link, the dress of charcoal block assembly, the mode of unloading determines its operation scheme on the conveyor line, namely laterally or longitudinally run, existing domestic assembly line is the horizontal operation scheme of charcoal block assembly, this is owing to being difficult to realize many group charcoal blocks simultaneously from suspension conveying line longitudinally handling in existing Equipments Setting situation.
Anode assembling each ground workstation requires that charcoal block assembly longitudinally enters station mostly, current common treatment process is: on overhead chain conveyer track and dolly, arrange turning device, charcoal block assembly is made to enter floor treatment station front by laterally transferring longitudinal operation to, after completing manufacturing procedure, make it by longitudinally transferring horizontal operation to by turning device again, due to reasons such as device fabrication quality and service wears, often there is blocking or turn to situation not in place in turning device, assembling production system operational efficiency is caused to reduce, and the overhead chain conveyer travelling speed of this mode of operation comparatively slow (≤12m/min), be difficult to meet the composing room's capacity requirements day by day improved.
Summary of the invention
The technical problem to be solved in the present invention is: provide that a kind of production efficiency is high, reliable, convenient operating maintenance, thoroughly can solve many group charcoal blocks and be difficult to longitudinal handling, after laterally loading and unloading, workpiece needs the Process configuration frequently turning to the difficult problems such as caused blocking and understeer on assigned line, to overcome the deficiency that existing production technique exists.
Technical scheme of the present invention is: a kind of anode assembling workshop depot novel process configures, and comprise overhead chain conveyer and moving lifting platform, overhead chain conveyer hangs on track, arranges moving lifting platform below track.
Track is provided with unloading station and load station.
Unloading station and load station install stopper respectively.
Track is U-shaped, and You Duotiao branch.
The present invention is conducive to enhancing productivity, and also has the advantage that can reduce maintenance of equipment amount, reduce production cost simultaneously.
Accompanying drawing explanation
Fig. 1 is schematic diagram of the present invention;
Fig. 2 is load station schematic diagram;
Fig. 3 is unloading station schematic diagram.
Embodiment
The depot novel process configuration of a kind of anode assembling workshop, comprise overhead chain conveyer 1 and moving lifting platform 2, overhead chain conveyer 1 hangs on track 3, moving lifting platform 2 is set below track 3, track 3 is provided with unloading station 4 and load station 5, unloading station 4 and load station 5 install stopper 6 respectively, and track 3 is U-shaped, and You Duotiao branch.
As shown in drawings, in the present invention, overhead chain conveyer Duo Tiao branch track 3 and ground moving loading platform 2 are specific equipment, need manufacture and design as the case may be, overhead chain conveyer Duo Tiao branch track 3 is configured at above ground moving loading platform 2, each branch track space is identical with the width between centers that anode scrap is put in pallet, the overhead chain conveyer 1 that assigned line longitudinally runs, after entering loading place, the each bar parallel orbit 3 making separate unit overhead chain conveyer 1 enter overhead chain conveyer respectively by shunting track switch runs, and adjustable point stops at station stopper 6 place on each bar parallel orbit 3 side by side, be beneficial to ground platform to handling while many group charcoal blocks, after handling procedure completes, overhead chain conveyer 1 ECDC runner trouble on each bar parallel orbit is got back on same orbit, longitudinally enter each production treatment zone, workshop.
Claims (4)
1. an anode assembling workshop depot novel process configuration, comprise overhead chain conveyer (1) and moving lifting platform (2), it is characterized in that: overhead chain conveyer (1) hangs on track (3), track (3) below arranges moving lifting platform (2).
2. a kind of anode assembling workshop of one according to claim 1 depot novel process configuration, is characterized in that: track (3) is provided with unloading station (4) and load station (5).
3. a kind of anode assembling workshop of one according to claim 2 depot novel process configuration, is characterized in that: unloading station (4) and load station (5) install stopper (6) respectively.
4. a kind of anode assembling workshop of one according to claim 2 depot novel process configuration, is characterized in that: track (3) is U-shaped, and You Duotiao branch.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310267002.2A CN104250833A (en) | 2013-06-29 | 2013-06-29 | Novel positive electrode assembly workshop loading-unloading station process configuration |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310267002.2A CN104250833A (en) | 2013-06-29 | 2013-06-29 | Novel positive electrode assembly workshop loading-unloading station process configuration |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104250833A true CN104250833A (en) | 2014-12-31 |
Family
ID=52186071
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310267002.2A Pending CN104250833A (en) | 2013-06-29 | 2013-06-29 | Novel positive electrode assembly workshop loading-unloading station process configuration |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104250833A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB989709A (en) * | 1963-03-25 | 1965-04-22 | Jean Abegglen | Improvements in or relating to roller-type conveyors |
US3334723A (en) * | 1966-09-27 | 1967-08-08 | Cutler Hammer Inc | Transfer conveyor units and control systems therefor |
DE2150984B2 (en) * | 1971-10-13 | 1975-07-03 | Fromme, Hans-Georg, Dipl.-Ing., 7000 Stuttgart | Device for the horizontal guidance of pallets in transport roller conveyors |
JP2007223686A (en) * | 2006-02-21 | 2007-09-06 | Oki Data Corp | Medium storage device, and image forming device |
CN201250287Y (en) * | 2008-09-22 | 2009-06-03 | 贵州航天乌江机电设备有限责任公司 | Anode block loading and unloading station |
-
2013
- 2013-06-29 CN CN201310267002.2A patent/CN104250833A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB989709A (en) * | 1963-03-25 | 1965-04-22 | Jean Abegglen | Improvements in or relating to roller-type conveyors |
US3334723A (en) * | 1966-09-27 | 1967-08-08 | Cutler Hammer Inc | Transfer conveyor units and control systems therefor |
DE2150984B2 (en) * | 1971-10-13 | 1975-07-03 | Fromme, Hans-Georg, Dipl.-Ing., 7000 Stuttgart | Device for the horizontal guidance of pallets in transport roller conveyors |
JP2007223686A (en) * | 2006-02-21 | 2007-09-06 | Oki Data Corp | Medium storage device, and image forming device |
CN201250287Y (en) * | 2008-09-22 | 2009-06-03 | 贵州航天乌江机电设备有限责任公司 | Anode block loading and unloading station |
Non-Patent Citations (1)
Title |
---|
邱枫: "阳极组装车间工作站工艺探析", 《中国有色冶金》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203765298U (en) | Elevator door processing assembly line | |
CN205652760U (en) | Automatic change automobile body transfer chain | |
CN106458443A (en) | Overhead storage system and method for storing loads in overhead space | |
CN103057906A (en) | Hanging chain hanger with elevating device | |
CN204507899U (en) | A kind of from becoming rail intelligence shuttle autostore logistics system | |
CN102092557B (en) | Convenient-to-operate common conveying device for vehicle doors and trunk lids | |
CN104250833A (en) | Novel positive electrode assembly workshop loading-unloading station process configuration | |
CN204057228U (en) | Medium frequency equipment automatic loading/unloading load transfer device | |
CN209113041U (en) | A kind of wiring board automatic conveyor line | |
CN201670639U (en) | Full-automatic reciprocating type vertical conveyor | |
CN106064727A (en) | The transporter of raw steel | |
CN103818693A (en) | Electric-wire conveying device | |
CN203473517U (en) | Transportation rack for column type composite insulator product | |
CN204847037U (en) | Adjustable mounting bracket of wiping line | |
CN204473689U (en) | A kind of waterproof building material processing stage apparatus | |
CN106315116B (en) | A kind of method of aluminium anode carbon block conveying | |
CN204975973U (en) | Automatic assembly manufacturing line of notebook | |
CN204912562U (en) | Generous jar of turn -ups seals a jar manufacture equipment | |
CN204056775U (en) | A kind of rack preventing glass from toppling over | |
CN204400475U (en) | A kind of device avoiding travelling crane slide wire current collector mutually to collide | |
CN203007331U (en) | Production line with two symmetric vertical quenching furnaces in aluminum alloy extrusion workshop | |
CN205366792U (en) | Unload coal and store up semi -underground of coal integration and unload storage coal measures all | |
CN209871517U (en) | Complete set of production line side warehouse-out equipment | |
CN202379412U (en) | Mobile navigation assembly line for processing curtain wall | |
CN203866203U (en) | Combined substrate rack |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20141231 |