CN104250833A - Novel positive electrode assembly workshop loading-unloading station process configuration - Google Patents

Novel positive electrode assembly workshop loading-unloading station process configuration Download PDF

Info

Publication number
CN104250833A
CN104250833A CN201310267002.2A CN201310267002A CN104250833A CN 104250833 A CN104250833 A CN 104250833A CN 201310267002 A CN201310267002 A CN 201310267002A CN 104250833 A CN104250833 A CN 104250833A
Authority
CN
China
Prior art keywords
process configuration
track
unloading station
positive electrode
electrode assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310267002.2A
Other languages
Chinese (zh)
Inventor
卢剑
陈才荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN201310267002.2A priority Critical patent/CN104250833A/en
Publication of CN104250833A publication Critical patent/CN104250833A/en
Pending legal-status Critical Current

Links

Abstract

The present invention discloses a novel positive electrode assembly workshop loading-unloading station process configuration, which comprises a suspension conveyor (1) and a movement lifting loading-unloading table (2), and is characterized in that the suspension conveyor (1) is suspended on a track (3), and the movement lifting loading-unloading table (2) is arranged below the track (3). With the novel positive electrode assembly workshop loading-unloading station process configuration, the production efficiency is easily improved, the amount of equipment maintenance can be reduced, and the production cost can be reduced.

Description

The depot novel process configuration of anode assembling workshop
Technical field
The present invention relates to the configuration of a kind of anode assembling workshop depot novel process efficiently, belong to Aluminium Electrolysis technical field.
Background technology
Anode assembling is the indispensable Production Flow Chart of electrolysis of aluminum enterprise, along with Aluminium Electrolysis enterprise maximization, more adopt the continuous assembly line of automatization, overhead chain conveyer is nucleus equipment wherein, charcoal block assembly (residual/new pole) dress on suspension conveying line, unload be production process must through link, the dress of charcoal block assembly, the mode of unloading determines its operation scheme on the conveyor line, namely laterally or longitudinally run, existing domestic assembly line is the horizontal operation scheme of charcoal block assembly, this is owing to being difficult to realize many group charcoal blocks simultaneously from suspension conveying line longitudinally handling in existing Equipments Setting situation.
Anode assembling each ground workstation requires that charcoal block assembly longitudinally enters station mostly, current common treatment process is: on overhead chain conveyer track and dolly, arrange turning device, charcoal block assembly is made to enter floor treatment station front by laterally transferring longitudinal operation to, after completing manufacturing procedure, make it by longitudinally transferring horizontal operation to by turning device again, due to reasons such as device fabrication quality and service wears, often there is blocking or turn to situation not in place in turning device, assembling production system operational efficiency is caused to reduce, and the overhead chain conveyer travelling speed of this mode of operation comparatively slow (≤12m/min), be difficult to meet the composing room's capacity requirements day by day improved.
Summary of the invention
The technical problem to be solved in the present invention is: provide that a kind of production efficiency is high, reliable, convenient operating maintenance, thoroughly can solve many group charcoal blocks and be difficult to longitudinal handling, after laterally loading and unloading, workpiece needs the Process configuration frequently turning to the difficult problems such as caused blocking and understeer on assigned line, to overcome the deficiency that existing production technique exists.
Technical scheme of the present invention is: a kind of anode assembling workshop depot novel process configures, and comprise overhead chain conveyer and moving lifting platform, overhead chain conveyer hangs on track, arranges moving lifting platform below track.
Track is provided with unloading station and load station.
Unloading station and load station install stopper respectively.
Track is U-shaped, and You Duotiao branch.
The present invention is conducive to enhancing productivity, and also has the advantage that can reduce maintenance of equipment amount, reduce production cost simultaneously.
Accompanying drawing explanation
Fig. 1 is schematic diagram of the present invention;
Fig. 2 is load station schematic diagram;
Fig. 3 is unloading station schematic diagram.
Embodiment
The depot novel process configuration of a kind of anode assembling workshop, comprise overhead chain conveyer 1 and moving lifting platform 2, overhead chain conveyer 1 hangs on track 3, moving lifting platform 2 is set below track 3, track 3 is provided with unloading station 4 and load station 5, unloading station 4 and load station 5 install stopper 6 respectively, and track 3 is U-shaped, and You Duotiao branch.
As shown in drawings, in the present invention, overhead chain conveyer Duo Tiao branch track 3 and ground moving loading platform 2 are specific equipment, need manufacture and design as the case may be, overhead chain conveyer Duo Tiao branch track 3 is configured at above ground moving loading platform 2, each branch track space is identical with the width between centers that anode scrap is put in pallet, the overhead chain conveyer 1 that assigned line longitudinally runs, after entering loading place, the each bar parallel orbit 3 making separate unit overhead chain conveyer 1 enter overhead chain conveyer respectively by shunting track switch runs, and adjustable point stops at station stopper 6 place on each bar parallel orbit 3 side by side, be beneficial to ground platform to handling while many group charcoal blocks, after handling procedure completes, overhead chain conveyer 1 ECDC runner trouble on each bar parallel orbit is got back on same orbit, longitudinally enter each production treatment zone, workshop.

Claims (4)

1. an anode assembling workshop depot novel process configuration, comprise overhead chain conveyer (1) and moving lifting platform (2), it is characterized in that: overhead chain conveyer (1) hangs on track (3), track (3) below arranges moving lifting platform (2).
2. a kind of anode assembling workshop of one according to claim 1 depot novel process configuration, is characterized in that: track (3) is provided with unloading station (4) and load station (5).
3. a kind of anode assembling workshop of one according to claim 2 depot novel process configuration, is characterized in that: unloading station (4) and load station (5) install stopper (6) respectively.
4. a kind of anode assembling workshop of one according to claim 2 depot novel process configuration, is characterized in that: track (3) is U-shaped, and You Duotiao branch.
CN201310267002.2A 2013-06-29 2013-06-29 Novel positive electrode assembly workshop loading-unloading station process configuration Pending CN104250833A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310267002.2A CN104250833A (en) 2013-06-29 2013-06-29 Novel positive electrode assembly workshop loading-unloading station process configuration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310267002.2A CN104250833A (en) 2013-06-29 2013-06-29 Novel positive electrode assembly workshop loading-unloading station process configuration

Publications (1)

Publication Number Publication Date
CN104250833A true CN104250833A (en) 2014-12-31

Family

ID=52186071

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310267002.2A Pending CN104250833A (en) 2013-06-29 2013-06-29 Novel positive electrode assembly workshop loading-unloading station process configuration

Country Status (1)

Country Link
CN (1) CN104250833A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB989709A (en) * 1963-03-25 1965-04-22 Jean Abegglen Improvements in or relating to roller-type conveyors
US3334723A (en) * 1966-09-27 1967-08-08 Cutler Hammer Inc Transfer conveyor units and control systems therefor
DE2150984B2 (en) * 1971-10-13 1975-07-03 Fromme, Hans-Georg, Dipl.-Ing., 7000 Stuttgart Device for the horizontal guidance of pallets in transport roller conveyors
JP2007223686A (en) * 2006-02-21 2007-09-06 Oki Data Corp Medium storage device, and image forming device
CN201250287Y (en) * 2008-09-22 2009-06-03 贵州航天乌江机电设备有限责任公司 Anode block loading and unloading station

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB989709A (en) * 1963-03-25 1965-04-22 Jean Abegglen Improvements in or relating to roller-type conveyors
US3334723A (en) * 1966-09-27 1967-08-08 Cutler Hammer Inc Transfer conveyor units and control systems therefor
DE2150984B2 (en) * 1971-10-13 1975-07-03 Fromme, Hans-Georg, Dipl.-Ing., 7000 Stuttgart Device for the horizontal guidance of pallets in transport roller conveyors
JP2007223686A (en) * 2006-02-21 2007-09-06 Oki Data Corp Medium storage device, and image forming device
CN201250287Y (en) * 2008-09-22 2009-06-03 贵州航天乌江机电设备有限责任公司 Anode block loading and unloading station

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
邱枫: "阳极组装车间工作站工艺探析", 《中国有色冶金》 *

Similar Documents

Publication Publication Date Title
CN203765298U (en) Elevator door processing assembly line
CN205652760U (en) Automatic change automobile body transfer chain
CN106458443A (en) Overhead storage system and method for storing loads in overhead space
CN103057906A (en) Hanging chain hanger with elevating device
CN204507899U (en) A kind of from becoming rail intelligence shuttle autostore logistics system
CN102092557B (en) Convenient-to-operate common conveying device for vehicle doors and trunk lids
CN104250833A (en) Novel positive electrode assembly workshop loading-unloading station process configuration
CN204057228U (en) Medium frequency equipment automatic loading/unloading load transfer device
CN209113041U (en) A kind of wiring board automatic conveyor line
CN201670639U (en) Full-automatic reciprocating type vertical conveyor
CN106064727A (en) The transporter of raw steel
CN103818693A (en) Electric-wire conveying device
CN203473517U (en) Transportation rack for column type composite insulator product
CN204847037U (en) Adjustable mounting bracket of wiping line
CN204473689U (en) A kind of waterproof building material processing stage apparatus
CN106315116B (en) A kind of method of aluminium anode carbon block conveying
CN204975973U (en) Automatic assembly manufacturing line of notebook
CN204912562U (en) Generous jar of turn -ups seals a jar manufacture equipment
CN204056775U (en) A kind of rack preventing glass from toppling over
CN204400475U (en) A kind of device avoiding travelling crane slide wire current collector mutually to collide
CN203007331U (en) Production line with two symmetric vertical quenching furnaces in aluminum alloy extrusion workshop
CN205366792U (en) Unload coal and store up semi -underground of coal integration and unload storage coal measures all
CN209871517U (en) Complete set of production line side warehouse-out equipment
CN202379412U (en) Mobile navigation assembly line for processing curtain wall
CN203866203U (en) Combined substrate rack

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20141231