CN104237693A - Three-phase circuit simulation system capable of checking accuracy of arc suppression coil compensation device - Google Patents

Three-phase circuit simulation system capable of checking accuracy of arc suppression coil compensation device Download PDF

Info

Publication number
CN104237693A
CN104237693A CN201410490574.1A CN201410490574A CN104237693A CN 104237693 A CN104237693 A CN 104237693A CN 201410490574 A CN201410490574 A CN 201410490574A CN 104237693 A CN104237693 A CN 104237693A
Authority
CN
China
Prior art keywords
arc suppression
suppression coil
simulation system
phase circuit
capacitor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410490574.1A
Other languages
Chinese (zh)
Inventor
徐健
干耀生
梁仕伟
刘兴鹏
王恺
唐河勋
徐春晖
钱丽明
田靖臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Baodi Power Supply Co of State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Baodi Power Supply Co of State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Baodi Power Supply Co of State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410490574.1A priority Critical patent/CN104237693A/en
Publication of CN104237693A publication Critical patent/CN104237693A/en
Pending legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention relates to a three-phase circuit simulation system capable of checking accuracy of an arc suppression coil compensation device. The three-phase circuit simulation system is characterized by being composed of an unbalanced voltage analog source, a bus, an arc suppression coil, a switch for simulating switching of a system outgoing cubicle, a system bus-to-ground capacitor, a first outgoing line-to-ground first capacitor and a second outgoing line-to-ground second capacitor. The unbalanced voltage analog source, the bus, the arc suppression coil, the switch, the capacitor, the first capacitor and the second capacitor are in series connection. The three-phase circuit simulation system capable of checking the accuracy of the arc suppression coil compensation device is scientific and reasonable in structural design, has the advantages of being capable of providing reliable data for system compensating currents, and ensuring reliable compensation of an arc suppression system and safe running of a power grid, and has the high innovativeness.

Description

A kind of three-phase circuit simulation system verifying arc suppression coil compensation device accuracy
Technical field
The invention belongs to power domain, particularly a kind of three-phase circuit simulation system verifying arc suppression coil compensation device accuracy.
Background technology
The effect of arc suppression coil compensation device is when after electrical network generation singlephase earth fault, capacitance current is flow through in trouble spot, arc suppression coil provides inductive current to compensate, current in the fault point is made to be down to below 10A, restrike after being conducive to preventing arc light zero passage, reach the object of arc extinguishing, reduce the probability that amplitude superpotential occurs, Accident prevention expands further.When arc suppression coil correct tuning time, not only effectively can reduce and produce the probability of arc grounding over-voltage, can also the spoke value of effective over-voltage suppression, also reduce the voltage etc. of trouble spot heat damage effect and grounded screen to greatest extent simultaneously.
Along with the development of electrical network, major part transformer station has all installed automatic compensating device of arc suppression coil and has come into operation, but to the running status of this automatic compensating device of arc suppression coil, the accuracy of measuring system capacitive current, compensating coefficient, the operation information provided except producer, calculate except data, lack and effectively verify means.If the information that producer provides is wrong, system balance capacitance current just can not provide reliable data, thus causes arc-extinguishing system compensation to occur mistake, affects the security of operation of electrical network.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, provide a kind of and can provide reliable data for system balance electric current, ensure the three-phase circuit simulation system of the dependable compensation of arc-extinguishing system and the verification arc suppression coil compensation device accuracy of safe operation of electric network.
The present invention solves its technical matters and takes following technical scheme to realize:
A kind of three-phase circuit simulation system verifying arc suppression coil compensation device accuracy, it is characterized in that: by switch when unbalance voltage dummy source, bus, arc suppression coil, simulation system outgoing line cabinet switching, system busbar, to electric capacity greatly, the first outlet, to the first electric capacity of the earth and the second outlet, the second electric capacity to the earth is formed, and described unbalance voltage dummy source, bus, arc suppression coil, switch, electric capacity, the first electric capacity and the second electric capacity are series relationship each other.
Advantage of the present invention and good effect are:
1, the three-phase circuit simulation system of this verification arc suppression coil compensation device accuracy, by system unbalance voltage dummy source, over the ground artificial capacitor, the setting of simulating the switch etc. due to load and outlet change, artificial neutral point can be provided for system, simulation system non-equilibrium state, provide the displacement voltage of test, between property point and ground, improve the system ground capacitance under simulation system running environment in systems in which.Thus the information of the automatic compensating device of arc suppression coil that producer provides is verified, improve the accuracy that it compensates, ensure the security of operation of electrical network.
2, scientific structure design of the present invention is reasonable, having and can provide reliable data, ensure the dependable compensation of arc-extinguishing system and the advantage of safe operation of electric network for system balance electric current, is a kind of three-phase circuit simulation system with the verification arc suppression coil compensation device accuracy of higher innovation.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of simulation system compensated distribution network of the present invention.
Description of reference numerals:
U-unbalance voltage dummy source, ASCA-bus through arc suppression coil system earth, Cf-system busbar to the earth electric capacity, C01-first outlet to the earth the first electric capacity, C02-second outlet to the earth the second electric capacity, K-switch simulation system outgoing line cabinet switching time switch.
Specific implementation method
Below in conjunction with accompanying drawing, by specific embodiment, the invention will be further described.Following examples are descriptive, are not determinate, can not limit protection scope of the present invention with this.
A kind of three-phase circuit simulation system verifying arc suppression coil compensation device accuracy, its innovation is: by K switch when unbalance voltage dummy source U, bus, arc suppression coil, simulation system outgoing line cabinet switching, system busbar, to electric capacity f greatly, the first outlet, to the first electric capacity of the earth and the second outlet, the second electric capacity to the earth is formed, and described unbalance voltage dummy source U, bus, arc suppression coil, K switch, electric capacity f, the first electric capacity and the second electric capacity are series relationship each other.
The present invention is by system unbalance voltage dummy source, over the ground artificial capacitor, the setting of simulating the switch etc. due to load and outlet change, artificial neutral point can be provided for system, simulation system non-equilibrium state, provide the displacement voltage of test, between property point and ground, improve the system ground capacitance under simulation system running environment in systems in which.Thus the information of the automatic compensating device of arc suppression coil that producer provides is verified, improve the accuracy that it compensates, ensure the security of operation of electrical network.
Although disclose embodiments of the invention and accompanying drawing for the purpose of illustration, but it will be appreciated by those skilled in the art that: in the spirit and scope not departing from the present invention and claims, various replacement, change and amendment are all possible, therefore, scope of the present invention is not limited to the content disclosed in embodiment and accompanying drawing.

Claims (1)

1. one kind verifies the three-phase circuit simulation system of arc suppression coil compensation device accuracy, it is characterized in that: by switch when unbalance voltage dummy source, bus, arc suppression coil, simulation system outgoing line cabinet switching, system busbar, to electric capacity greatly, the first outlet, to the first electric capacity of the earth and the second outlet, the second electric capacity to the earth is formed, and described unbalance voltage dummy source, bus, arc suppression coil, switch, electric capacity, the first electric capacity and the second electric capacity are series relationship each other.
CN201410490574.1A 2014-09-23 2014-09-23 Three-phase circuit simulation system capable of checking accuracy of arc suppression coil compensation device Pending CN104237693A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410490574.1A CN104237693A (en) 2014-09-23 2014-09-23 Three-phase circuit simulation system capable of checking accuracy of arc suppression coil compensation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410490574.1A CN104237693A (en) 2014-09-23 2014-09-23 Three-phase circuit simulation system capable of checking accuracy of arc suppression coil compensation device

Publications (1)

Publication Number Publication Date
CN104237693A true CN104237693A (en) 2014-12-24

Family

ID=52226166

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410490574.1A Pending CN104237693A (en) 2014-09-23 2014-09-23 Three-phase circuit simulation system capable of checking accuracy of arc suppression coil compensation device

Country Status (1)

Country Link
CN (1) CN104237693A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107664728A (en) * 2017-10-13 2018-02-06 国家电网公司 Network system earthing compensation device diagnostic platform
CN107831378A (en) * 2017-09-13 2018-03-23 梅素真 A kind of device and method for examining arc suppression coil compensation effect

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107831378A (en) * 2017-09-13 2018-03-23 梅素真 A kind of device and method for examining arc suppression coil compensation effect
CN107831378B (en) * 2017-09-13 2020-06-30 梅素真 Device and method for detecting compensation effect of arc suppression coil
CN107664728A (en) * 2017-10-13 2018-02-06 国家电网公司 Network system earthing compensation device diagnostic platform

Similar Documents

Publication Publication Date Title
Jacobson Examples of ferroresonance in a high voltage power system
Riechert et al. Ultra high‐voltage gas‐insulated switchgear–a technology milestone
CN104217634B (en) Distribution true-value simulation test method
McDermit et al. Medium voltage switching transient induced potential transformer failures; prediction, measurement and practical solutions
CN102946094B (en) The braking measure system of selection of a kind of transformer station very fast transient overvoltage
CN103645410B (en) The dynamic simulator system of small current neutral grounding system and method in a kind of electrical network
CN103558527A (en) Voltage withstand test analogue simulation method for ultra-high-voltage GIS standard lightning impulse voltage
CN105785157A (en) Double main transformer longitudinal differential protection loop closing testing method
Chen et al. Faulted terminal open circuit voltage controller for arc suppression in distribution network
CN104237693A (en) Three-phase circuit simulation system capable of checking accuracy of arc suppression coil compensation device
Tao et al. Switching transients caused by vacuum circuit breakers in collection grids of offshore wind farms
CN104237678A (en) Arc suppression coil control device verification system
CN105823969A (en) Apparatus for simulating partial discharge detects of transformer
CN103559358B (en) Super-pressure GIS oscillation mode lightning impulse voltage pressure test simulation methods
CN205720535U (en) A kind of partial discharge of transformer defects simulation device
Topolánek et al. Practical experience of using additional earthing of the faulty phase during a ground fault
Kolechitskaya et al. Ferroresonant phenomena on 6-to 10-kV substation buses
CN104237694A (en) Single-phase circuit simulation system capable of checking accuracy of arc suppression coil compensation device
Li et al. Influence of ultra‐high‐voltage hybrid reactive power compensation on the interrupting characteristics of CB at out‐of‐phase faults
Yi‐qiong et al. Design and research of UHV AC substation
Niayesh Failure modes of synthetic test circuits used to evaluate the current interruption capability of high‐voltage circuit breakers
Chi et al. Comparison and analysis on Very Fast Transient Overvoltage based on 550kV GIS and 800kV GIS
CN203870201U (en) Gis equipment test device
CN103941165A (en) GIS equipment testing device and method
Kouba et al. The analysis of efficiency of shunt resistor during a single-phase earth fault using the two-port network theory

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 300010 Tianjin city Hebei District Wujing Road No. 39

Applicant after: State Grid Corporation of China

Applicant after: STATE GRID TIANJIN BAODI POWER SUPPLY CO., LTD.

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Grid Corporation of China

Applicant before: STATE GRID TIANJIN BAODI POWER SUPPLY CO., LTD.

WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20141224