CN105785157A - Double main transformer longitudinal differential protection loop closing testing method - Google Patents

Double main transformer longitudinal differential protection loop closing testing method Download PDF

Info

Publication number
CN105785157A
CN105785157A CN201410850329.7A CN201410850329A CN105785157A CN 105785157 A CN105785157 A CN 105785157A CN 201410850329 A CN201410850329 A CN 201410850329A CN 105785157 A CN105785157 A CN 105785157A
Authority
CN
China
Prior art keywords
transformer
differential protection
phase
current
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410850329.7A
Other languages
Chinese (zh)
Other versions
CN105785157B (en
Inventor
李雪峰
刘民业
韩晓松
刘星
陈民泰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201410850329.7A priority Critical patent/CN105785157B/en
Publication of CN105785157A publication Critical patent/CN105785157A/en
Application granted granted Critical
Publication of CN105785157B publication Critical patent/CN105785157B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a double main transformer longitudinal differential protection loop closing testing method. The method includes the following steps: a first step of determining that requirements for loop closing is satisfied; a second step of double main transformers conducting power transmission and phase checking; a third step of loop closing and adjusting shifts of transformers; a fourth step of testing a longitudinal differential protection system; a fifth step of finishing the test; if each item of data and parameter meet requirements for the longitudinal differential protection of the transformers, after testing data are recorded, gradually recovering the shifts of the transformer to an initial state, and finally disconnecting a bus tie circuit breaker, and recovering a differential protection trip-out pressure plate. According to the invention, the method guarantees that phase sequences of the two transformers in the newly built transformer substation are correct, and that first and secondary wiring and polarities of the longitudinal differential protection are correct, increases reliability and stability of main transform differential protection, simplifies testing procedures, and increases testing efficiency.

Description

Double; two main transformer longitudinal differential protection cyclization method of testings
Technical field
The present invention relates to a kind of double; two main transformer longitudinal differential protection cyclization method of testing.
Background technology
The double; two main transformer double-bus of the commonly used on-load voltage regulation of Chang Nei electric substation of large size industrial enterprise, and can the change distribution design of parallel running, main transformer arranges the relay protection measure such as longitudinal differential protection, standby current protection.For ensureing transformer and distribution power station after operation, excising fault rapidly and accurately, the test of the longitudinal differential protection of main transformer and debugging are one of most important work.
Method of testing general now is: after once connecting with secondary line and checking and terminate, and carries out intelligence and combines the differential protection test protected and have verified that the accuracy of definite value and protection, and the method can only be tested secondary circuit and primary circuit cannot be verified.
Using high-current generation device to produce the sufficiently large primary current correctness by transformer test differential lines, the method operation inconvenience, need step measurement, and can not measure the phase angle situation of first and second three-phase current, reliability is not high.
Further method is: use three-phase 380V low-tension supply to pass into main transformer high-pressure side, current transformer at main transformer low-pressure side bus is subsequently formed short circuit, by short circuit current and current transformer detect differential system once, the wiring of secondary and polarity whether correct.
Also all kinds of corrupt practices creep in when practical application for the method for testing of use low-tension supply manufacture short circuit current, and such as the material such as cable, switch, shorting stub need to meet the capacity requirement of short circuit current, it is possible to cannot smooth operation.Additionally, the current transformer of main transformer low-pressure side bus is generally arranged in power distribution cabinet, technology upgrading along with distribution high-voltage board, the inner space of power distribution cabinet is closely, want on the bus after this transformer, connect satisfactory short-circuit line extremely difficult, even needing to disassemble cabinet inner part (bus, transformer), such operation is not only wasted time and energy, and also has potential safety hazard.
Summary of the invention
It is contemplated that overcome the defect of prior art; a kind of double; two main transformer longitudinal differential protection cyclization method of testing is provided; ensure that the phase sequence of two main transformers of newly-built transformer station is correct; once and secondary connection is correct, polarity correct to ensure longitudinal differential protection, improves the reliability and stability of transform er differential protection;Simplify testing procedure, improve testing efficiency.
In order to solve above-mentioned technical problem, the present invention is achieved in that
1, a kind of double; two main transformer longitudinal differential protection cyclization method of testing, it is characterised in that it comprises the steps:
Step one: confirm to meet cyclization requirement
1) two cyclization main transformer models, capacity, connection group, gear number, transformation ratio etc. must be consistent, and short-circuit impedance differs less than 10%;
2) two main transformer primary voltages should be basically identical, and voltage difference is less than 10%, and two incoming powers should belong to same system;
3) higher level's stabilization of power grids meets the requirements prescribed;
4) the necessary phase place of two sections of buses of higher level's electrical network is identical, and voltage difference, carrier phase shift are less than 5%;
Step 2: double; two main transformers are by electricity and nuclear phase
1) all power supplying and distributing equipment pass the tests of transformer station, connect first and second loop, and transformer station is qualified by inspection, and higher level energy sector is agreed to by starting tissue after electricity application by electricity work;
2) perform the test of main transformer Switching impulse, cable charging, busbar charging etc. by electricity work, notice that two transformators should on same gear;
3) two sections of buses are by after electricity, need to carry out primary circuit nuclear phase at mother position in storehouse, it is ensured that two sections of bus wire phase sequences are consistent;And the voltage transformer secondary side for two sections of buses is also carried out phase sequence confirmation, consistent to ensure two sections of bus-bar potential transformer secondary phase sequences;
4) check the magnitude of voltage on two sections of buses by the voltage transformer of two sections of high-voltage boards of step down side, it is ensured that two transformators under identical gear low-pressure side voltage difference less than 5%;
Step 3: cyclization also adjusts transformer gear
1) ensureing that two main transformers are all located at same operation range N, exit main transformer differential protection trip pressing plate and retain fast differential over current protection, operation mother cabinet breaker closes a floodgate, and makes two sections of buses and parallel operation of transformers;
2) now two sections of busbar voltage differences are less than 5%, and on system line, circulation is less than 20A;Differential protection relay checks data the record such as the electric current of two transformators, difference stream, phase angle;Using six phase differential protection testers that transformator the superior and the subordinate Current Transformer Secondary side electric current carries out sampling test, the data such as Current Transformer Secondary side electric current, phase angle difference are recorded;
3) the first transformer main change gear is risen to N+1 by N, observe and record Alloy White Iron voltage and phase angles data;
4) as electric current is too little, it is impossible to judge, the second transformer main change gear is down to N-1 by N, observes and record Alloy White Iron voltage and phase angles data;
5) be repeated in above-mentioned 3), 4) make electric current gradually rise, when the current sampling data of protective relay exceedes differential starting current 1.5 times stop adjust gear position operation;
Step 4: longitudinal differential protection system test
1) check sampling and the warning message of the balanced relay of two main transformers, make vector diagram according to the amplitude of six road electric currents of upper and lower two groups of current transformers sampling, phase angle, and record the data such as difference stream, stalling current;
2) use six phase differential protection testers that transformator the superior and the subordinate Current Transformer Secondary side electric current carries out sampling test; sampling location can at the current input terminal of balanced relay backboard two-way current transformer; the vector diagram of six road electric currents of sampling can be directly displayed on instrument screen, and the data such as current amplitude, phase angle, difference stream all clearly show;
3) contrast above-mentioned 1) and 2) vector diagram, current amplitude, phase angle, the difference data such as stream; two numbers evidences should be consistent; meet this longitudinal differential protection system features; and difference stream is less than 0.01A; as abnormal conditions occur: difference stream more than 0.01A, three-phase imbalance, the superior and the subordinate's homophase phase angle difference more than 10%, differential protection action etc.; after must recording data, system recovery has a power failure to original state;Analyze measurement result, complete test by continuing above step after system correction;
Step 5: terminate test
As each item data, parameter meet the requirement of this transformer longitudinal linked differential protection, after record test data, progressively transformer gear is recovered to original state, finally by bus disjunction, recover differential protection trip pressing plate.
The invention has the beneficial effects as follows: this method of testing, without connecting cable on system line, access test power supply, installing and measure instrument, is disassembled, installed power supplying and distributing equipment.Save material, instrument puts into, and will not destroy power supplying and distributing equipment, and potential safety hazard is little;
Two kinds of collecting measurement data equipment that this method of testing uses: one, the differential protection relay that system carries, do not have secondary dismounting, dependable performance;Two, six phase differential protection tester, this equipment volume is little, current resolution 0.0001A, phase angular resolution 0.1 °, and certainty of measurement is high, need not change system original circuit during measurement.
This method of testing is easy and simple to handle; can be completed by electric process first in transformer station; and use formal supply line to complete test; avoid the potential safety hazard that unnecessary interim measurement circuit brings; disposable can completing the experimental projects such as transformator Switching impulse, nuclear phase, paired running, longitudinal differential protection test, work efficiency is obviously improved.
Accompanying drawing explanation
Below in conjunction with drawings and embodiments, the present invention is described in further detail:
Fig. 1 is double; two main transformer ring structures schematic diagrams.
Fig. 2 is the structural representation of six phase differential protection tester samplings.
Detailed description of the invention
As depicted in figs. 1 and 2: a kind of double; two main transformer longitudinal differential protection cyclization method of testings, step one is comprised the steps:: confirmation system meets cyclization requirement
1) two cyclization main transformer models, capacity, connection group, gear number, transformation ratio etc. must be consistent, and short-circuit impedance differs less than 10%;
2) two main transformer primary voltages should be basically identical, and voltage difference is less than 10%, and two incoming powers should belong to same system;
3) higher level's stabilization of power grids meets the requirements prescribed;
4) the necessary phase place of two sections of buses of higher level's electrical network is identical, and voltage difference, carrier phase shift are less than 5%;
Step 2: double; two main transformers are by electricity and nuclear phase
1) all power supplying and distributing equipment pass the tests of transformer station, first and second loop correctly connects after check and correction checks according to design drawing, and transformer station is qualified by inspection, and higher level energy sector is agreed to by starting tissue after electricity application by electricity work;
2) performed the test of main transformer Switching impulse, cable charging, busbar charging etc. by electricity work in strict accordance with transformer station by electricity scheme, notice that two transformators should on same gear;
3) two sections of buses are by after electricity, need to carry out primary circuit nuclear phase at mother position in storehouse, it is ensured that two sections of bus wire phase sequences are consistent.And the voltage transformer secondary side for two sections of buses is also carried out phase sequence confirmation, consistent to ensure two sections of bus-bar potential transformer secondary phase sequences;
4) check the magnitude of voltage on two sections of buses by the voltage transformer of two sections of high-voltage boards of step down side, it is ensured that two transformators under identical gear low-pressure side voltage difference less than 5%;
Step 3: cyclization also adjusts transformer gear
1) ensureing that two main transformers are all located at same operation range N, exit transform er differential protection trip pressing plate (protection act, but do not trip) and retain fast differential over current protection, operation mother cabinet breaker closes a floodgate, and makes two sections of buses and parallel operation of transformers;
2) now two sections of busbar voltage differences minimum (less than 5%), on system line, circulation is less than 20A(primary current).Differential protection relay checks data the record such as the electric current of two transformators, difference stream, phase angle.Using six phase differential protection testers that transformator the superior and the subordinate Current Transformer Secondary side electric current carries out sampling test, the data such as Current Transformer Secondary side electric current, phase angle difference are recorded;
3) the first transformator T1 main shift is risen to N+1 by N, observe and record Alloy White Iron voltage and phase angles data.
4) as electric current is too little, it is impossible to judge, the second transformator T2 main shift is down to N-1 by N, observes and record Alloy White Iron voltage and phase angles data.
5) be repeated in step 3), 4) make electric current gradually rise, when the current sampling data of protective relay exceedes differential starting current 1.5 times stop adjust gear position operation
Step 4: longitudinal differential protection system test
1) check sampling and the warning message of the balanced relay of two main transformers, make vector diagram according to the amplitude of six road electric currents of upper and lower two groups of current transformers sampling, phase angle, and record the data such as difference stream, stalling current;
2) use six phase differential protection testers 3 that transformator the superior and the subordinate Current Transformer Secondary side electric current carries out sampling test; sampling location is as shown in Figure 2; can at the current input terminal of balanced relay backboard two-way current transformer; the vector diagram of six road electric currents of sampling can be directly displayed on instrument screen, and the data such as current amplitude, phase angle, difference stream all clearly show;Number in the figure 4 is high-pressure side three-phase current sampled point, and number in the figure 5 is low-pressure side three-phase current sampled point.
3) contrast step 1) and 2) vector diagram, current amplitude, phase angle, differ from the data such as stream; two numbers evidences should be consistent; meet this longitudinal differential protection system features; and difference stream should be zero (less than 0.01A); as abnormal conditions occur: difference stream is more than 0.01A, three-phase imbalance, the superior and the subordinate's homophase phase angle difference nonconforming (error is more than 10%), differential protection action etc.; after must recording data, system recovery has a power failure to original state.Analyze measurement result, complete test by continuing above step after system correction.
Step 5: terminate test
As each item data, parameter meet the requirement of this transformer longitudinal linked differential protection, after record test data, progressively transformer gear is recovered to original state, finally by bus disjunction, recover differential protection trip pressing plate;
This method is based on the change distribution design of commonly used two same models of newly-built transformer station, the on-load voltage regulation type main transformer of same specification, the low-pressure side of two main transformers is respectively connected to two sections of high-voltage boards of transformer station through bus or cable, when ensureing to meet cyclization condition, two sections of buses of high-voltage board can connect mother cabinet breaker to realize parallel running, both cyclizations.
The gear of main transformer is adjusted by on-load voltage regulating device, two main transformer low-pressure sides there will be voltage difference, produces circulation, progressively adjust the gear of two main transformers on low-pressure side bus, make the circulation on bus incrementally increase, after current value meets test request, stop gear adjustment.
This test is by the double sampling value of transform er differential protection relay, warning message; and six measurement data of phase differential protection tester; comprehensive descision differential protective system once, secondary connection, polarity, phase angle difference, difference stream etc. whether correct, if can stable operation.

Claims (1)

1. a double; two main transformer longitudinal differential protection cyclization method of testing, it is characterised in that it comprises the steps:
Step one: confirm to meet cyclization requirement
1) two cyclization main transformer models, capacity, connection group, gear number, transformation ratio etc. must be consistent, and short-circuit impedance differs less than 10%;
2) two main transformer primary voltages should be basically identical, and voltage difference is less than 10%, and two incoming powers should belong to same system;
3) higher level's stabilization of power grids meets the requirements prescribed;
4) the necessary phase place of two sections of buses of higher level's electrical network is identical, and voltage difference, carrier phase shift are less than 5%;
Step 2: double; two main transformers are by electricity and nuclear phase
1) all power supplying and distributing equipment pass the tests of transformer station, connect first and second loop, and transformer station is qualified by inspection, and higher level energy sector is agreed to by starting tissue after electricity application by electricity work;
2) perform the test of main transformer Switching impulse, cable charging, busbar charging etc. by electricity work, notice that two transformators should on same gear;
3) two sections of buses are by after electricity, need to carry out primary circuit nuclear phase at mother position in storehouse, it is ensured that two sections of bus wire phase sequences are consistent;And the voltage transformer secondary side for two sections of buses is also carried out phase sequence confirmation, consistent to ensure two sections of bus-bar potential transformer secondary phase sequences;
4) check the magnitude of voltage on two sections of buses by the voltage transformer of two sections of high-voltage boards of step down side, it is ensured that two transformators under identical gear low-pressure side voltage difference less than 5%;
Step 3: cyclization also adjusts transformer gear
1) ensureing that two main transformers are all located at same operation range N, exit main transformer differential protection trip pressing plate and retain fast differential over current protection, operation mother cabinet breaker closes a floodgate, and makes two sections of buses and parallel operation of transformers;
2) now two sections of busbar voltage differences are less than 5%, and on system line, circulation is less than 20A;Differential protection relay checks data the record such as the electric current of two transformators, difference stream, phase angle;Using six phase differential protection testers that transformator the superior and the subordinate Current Transformer Secondary side electric current carries out sampling test, the data such as Current Transformer Secondary side electric current, phase angle difference are recorded;
3) the first transformer main change gear is risen to N+1 by N, observe and record Alloy White Iron voltage and phase angles data;
4) as electric current is too little, it is impossible to judge, the second transformer main change gear is down to N-1 by N, observes and record Alloy White Iron voltage and phase angles data;
5) be repeated in above-mentioned 3), 4) make electric current gradually rise, when the current sampling data of protective relay exceedes differential starting current 1.5 times stop adjust gear position operation;
Step 4: longitudinal differential protection system test
1) check sampling and the warning message of the balanced relay of two main transformers, make vector diagram according to the amplitude of six road electric currents of upper and lower two groups of current transformers sampling, phase angle, and record the data such as difference stream, stalling current;
2) use six phase differential protection testers that transformator the superior and the subordinate Current Transformer Secondary side electric current carries out sampling test; sampling location can at the current input terminal of balanced relay backboard two-way current transformer; the vector diagram of six road electric currents of sampling can be directly displayed on instrument screen, and the data such as current amplitude, phase angle, difference stream all clearly show;
3) contrast above-mentioned 1) and 2) vector diagram, current amplitude, phase angle, the difference data such as stream; two numbers evidences should be consistent; meet this longitudinal differential protection system features; and difference stream is less than 0.01A; as abnormal conditions occur: difference stream more than 0.01A, three-phase imbalance, the superior and the subordinate's homophase phase angle difference more than 10%, differential protection action etc.; after must recording data, system recovery has a power failure to original state;Analyze measurement result, complete test by continuing above step after system correction;
Step 5: terminate test
As each item data, parameter meet the requirement of this transformer longitudinal linked differential protection, after record test data, progressively transformer gear is recovered to original state, finally by bus disjunction, recover differential protection trip pressing plate.
CN201410850329.7A 2014-12-26 2014-12-26 Double main transformer longitudinal differential protection cyclization test methods Active CN105785157B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410850329.7A CN105785157B (en) 2014-12-26 2014-12-26 Double main transformer longitudinal differential protection cyclization test methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410850329.7A CN105785157B (en) 2014-12-26 2014-12-26 Double main transformer longitudinal differential protection cyclization test methods

Publications (2)

Publication Number Publication Date
CN105785157A true CN105785157A (en) 2016-07-20
CN105785157B CN105785157B (en) 2019-01-11

Family

ID=56389746

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410850329.7A Active CN105785157B (en) 2014-12-26 2014-12-26 Double main transformer longitudinal differential protection cyclization test methods

Country Status (1)

Country Link
CN (1) CN105785157B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107329016A (en) * 2017-07-20 2017-11-07 中国三冶集团有限公司 A kind of novel transformer group and current phase experimental bench and experimental method
CN108321800A (en) * 2018-02-09 2018-07-24 国网上海市电力公司 A kind of Alloy White Iron acquisition methods based on 10 kilovolts of busbar voltage vectors
CN110568249A (en) * 2019-10-18 2019-12-13 国网江苏省电力有限公司盐城供电分公司 parallel power transformer monitoring system based on circulating current detection and monitoring method thereof
CN111007439A (en) * 2019-12-24 2020-04-14 深圳供电局有限公司 Transformer substation bus protection secondary circuit commissioning on-load test method
CN111521887A (en) * 2020-05-07 2020-08-11 西安热工研究院有限公司 380V power supply-based high-voltage station service power supply nuclear phase system and method
CN111521888A (en) * 2020-05-07 2020-08-11 西安热工研究院有限公司 High-voltage station bus power supply phase checking system and method
CN113325236A (en) * 2021-07-02 2021-08-31 山东钢铁股份有限公司 Power transmission phase checking method for double-bus double-section wiring GIS cabinet power supply
CN113820630A (en) * 2021-08-13 2021-12-21 中石化南京工程有限公司 Differential belt load test method for gear shifting of 110kV transformer

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009247164A (en) * 2008-03-31 2009-10-22 Tokyo Electric Power Co Inc:The Transformer protective relay system
JP2013054017A (en) * 2011-09-05 2013-03-21 Taiwa Denki Kogyo Kk Insulation level monitoring device
CN103503262A (en) * 2010-12-31 2014-01-08 Abb技术有限公司 A method and an apparatus for supervision of current transformer in a differential protection system
CN103529321A (en) * 2013-10-10 2014-01-22 长园深瑞继保自动化有限公司 Current transformer saturation detecting method
CN103792448A (en) * 2014-01-22 2014-05-14 国家电网公司 Digitized protective device automatic test control system and control method thereof
CN104078934A (en) * 2014-07-15 2014-10-01 国家电网公司 Transformer differential current protection mis-operation preventing relay protection method
CN104133133A (en) * 2014-07-22 2014-11-05 国家电网公司 Standardized test system of relay protection test room

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009247164A (en) * 2008-03-31 2009-10-22 Tokyo Electric Power Co Inc:The Transformer protective relay system
CN103503262A (en) * 2010-12-31 2014-01-08 Abb技术有限公司 A method and an apparatus for supervision of current transformer in a differential protection system
JP2013054017A (en) * 2011-09-05 2013-03-21 Taiwa Denki Kogyo Kk Insulation level monitoring device
CN103529321A (en) * 2013-10-10 2014-01-22 长园深瑞继保自动化有限公司 Current transformer saturation detecting method
CN103792448A (en) * 2014-01-22 2014-05-14 国家电网公司 Digitized protective device automatic test control system and control method thereof
CN104078934A (en) * 2014-07-15 2014-10-01 国家电网公司 Transformer differential current protection mis-operation preventing relay protection method
CN104133133A (en) * 2014-07-22 2014-11-05 国家电网公司 Standardized test system of relay protection test room

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107329016A (en) * 2017-07-20 2017-11-07 中国三冶集团有限公司 A kind of novel transformer group and current phase experimental bench and experimental method
CN107329016B (en) * 2017-07-20 2023-09-08 中国三冶集团有限公司 Novel transformer group and current phase experiment table and experiment method
CN108321800B (en) * 2018-02-09 2020-11-24 国网上海市电力公司 Closed loop current obtaining method based on 10 kV bus voltage vector
CN108321800A (en) * 2018-02-09 2018-07-24 国网上海市电力公司 A kind of Alloy White Iron acquisition methods based on 10 kilovolts of busbar voltage vectors
CN110568249A (en) * 2019-10-18 2019-12-13 国网江苏省电力有限公司盐城供电分公司 parallel power transformer monitoring system based on circulating current detection and monitoring method thereof
CN111007439A (en) * 2019-12-24 2020-04-14 深圳供电局有限公司 Transformer substation bus protection secondary circuit commissioning on-load test method
CN111007439B (en) * 2019-12-24 2022-07-12 深圳供电局有限公司 Transformer substation bus protection secondary circuit commissioning on-load test method
CN111521888A (en) * 2020-05-07 2020-08-11 西安热工研究院有限公司 High-voltage station bus power supply phase checking system and method
CN111521887B (en) * 2020-05-07 2022-06-07 西安热工研究院有限公司 380V power supply-based high-voltage station service power supply nuclear phase system and method
CN111521888B (en) * 2020-05-07 2022-07-08 西安热工研究院有限公司 High-voltage station bus power supply phase checking system and method
CN111521887A (en) * 2020-05-07 2020-08-11 西安热工研究院有限公司 380V power supply-based high-voltage station service power supply nuclear phase system and method
CN113325236A (en) * 2021-07-02 2021-08-31 山东钢铁股份有限公司 Power transmission phase checking method for double-bus double-section wiring GIS cabinet power supply
CN113820630A (en) * 2021-08-13 2021-12-21 中石化南京工程有限公司 Differential belt load test method for gear shifting of 110kV transformer

Also Published As

Publication number Publication date
CN105785157B (en) 2019-01-11

Similar Documents

Publication Publication Date Title
CN105785157B (en) Double main transformer longitudinal differential protection cyclization test methods
CN104217634B (en) Distribution true-value simulation test method
CN106569075B (en) Main transformer and high-pressure side cable zero sequence differential protection polarity hookup and method
CN102540001B (en) Method of checking alternating current loop of a 500kV transformer substation through carrying out simulated through-type three-phase short circuit
EP2680017A1 (en) A method of early detection of feeder lines with a high-ohm ground fault in compensated power networks
CN101958530A (en) Main transformer differential protection CT polarity check method of pumped storage power station
CN101719663A (en) Grounding line selection method, grounding line selection device and application system based on active component of zero sequence current
CN103293446A (en) Small-current grounding fault line selection method based on arc suppression coil
CN203276027U (en) Digital dynamic closed-loop test system of electricity smooth and steady supply device
CN102565618A (en) Method for detecting zero-sequence voltage circuit of transformer substation
CN106908697A (en) A kind of synthetic power-frequency and the distribution network fault line selection method in transient reactive power direction
CN107831378B (en) Device and method for detecting compensation effect of arc suppression coil
CN106885959B (en) Test method for replacing short-circuit copper bar by grounding knife switch in power plant electric main start test
CN203084141U (en) Polarity test device for transformer bushing CT (Captive Test) and neutral point CT
Li et al. Research on Single-phase Grounding Fault Handling True Test of Primary and Secondary Integration Circuit Breaker
CN104950203A (en) Checking method for current protection circuit of transformer
CN206541018U (en) A kind of multipoint grounding seeking instrument of voltage transformer
CN103487677A (en) Portable automatic tuning tester
CN105319478A (en) Un-disassembly polarity and transformation ratio testing method for transformer bushing
CN110896214B (en) Phase selection method of active intervention type arc suppression device
CN109212360B (en) Relay protection vector determination test method based on synchronous triggering pressurization through-flow technology
Nan et al. A new method of measuring capacitance current in non-effective grounding power system
Li et al. The experimental technique and practical scheme of intelligent switch in power distribution IoT
CN206002645U (en) A kind of employing optical fiber is the PT secondary voltage signal isolation sampler of transmission medium
CN104253422B (en) A kind of distance protection overload property verification method based on real-timedigital simulation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant