CN104237629A - 电能表 - Google Patents

电能表 Download PDF

Info

Publication number
CN104237629A
CN104237629A CN201310238751.2A CN201310238751A CN104237629A CN 104237629 A CN104237629 A CN 104237629A CN 201310238751 A CN201310238751 A CN 201310238751A CN 104237629 A CN104237629 A CN 104237629A
Authority
CN
China
Prior art keywords
power module
electric energy
energy meter
power
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310238751.2A
Other languages
English (en)
Inventor
严明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Industrial Park New Hongbo Communication Technology Co Ltd
Original Assignee
Suzhou Industrial Park New Hongbo Communication Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Industrial Park New Hongbo Communication Technology Co Ltd filed Critical Suzhou Industrial Park New Hongbo Communication Technology Co Ltd
Priority to CN201310238751.2A priority Critical patent/CN104237629A/zh
Publication of CN104237629A publication Critical patent/CN104237629A/zh
Pending legal-status Critical Current

Links

Abstract

本发明揭示了一种电能表,其中,所述电能表包括:电能计量模块,电源模块,所述电源模块包括电源模块A和电源模块B,所述电源模块A和电源模块B均可插拔。与现有技术相比,本发明采用双电源模块给电能表供电,若有任一电源模块损坏,另一电源模块会自动承接100%的用电负荷,此时只需拔出损坏电源模块,更换新的电源模块,增强了电能表的工作稳定性。

Description

电能表
技术领域
本发明属于电能计量装置制造领域,尤其涉及一种电能表。
背景技术
传统的电能表在现场作业时都是一个计量设备用一个电能表,但是在IDC数据机房的集中监控里,往往一个列头柜就有几十个回路需要监测,这时若采用传统的电能表进行监测就会遇到电能表安装位置的选取和布线的问题,在有限的空间里很难实现单路电表的安装,施工布线也就更困难。另外,因要确保数据中心设备能够正常工作,故数据中心的电源多采用双电源设计,一路为主,一路为备用,两路电源需同时给设备供电,一路电源故障或者断电不会导致数据服务器的不工作,传统的电表都是单电源设计,无法满足此运用场景,交流双电源输入在进行电能的计量时必须保证监测回路的电流与该回路的监测电压相位一致才能准确计量电能数据,因此该监测设备也必须满足双电源供电设计才能够准确计量监测回路的用电设备;数据中心的监测设备要求比一般环境下的计量产品稳定性和维护性上要求更高,很多公司的产品都是采用一体化设计,若有一个监测回路出现故障,则会导致整机更换,在更换过程中还会导致数据的丢失,这对后期维护带来了极大的不变。
因此,有必要提出一种新的电能表来解决上述问题。
发明内容
本发明的目的在于提供一种解决上述技术问题的夹紧工件装置。
其中,该电能表,包括:电能计量模块,电源模块,所述电源模块包括电源模块A和电源模块B,所述电源模块A和电源模块B均可插拔。
作为本发明的进一步改进,所述电源模块A和电源模块B可同时通电工作,并能自动平均分配电流供电。
作为本发明的进一步改进,当所述电源模块A或所述电源模块B断电时,所述电源模块B或所述电源模块A会自动承接全部的用电负荷。
作为本发明的进一步改进,所述电源模块A和电源模块B均可带电插拔。
作为本发明的进一步改进,所述电能计量模块是指电压采集卡,所述电压采集卡可带电插拔。
与现有技术相比,本发明采用双电源模块给电能表供电,若有任一电源模块损坏,另一电源模块会自动承接100%的用电负荷,此时只需拔出损坏电源模块,更换新的电源模块,增强了电能表的工作稳定性。 
附图说明
图1是本发明一实施方式中电能表工作示意图。
具体实施方式
以下将结合附图所示的具体实施方式对本发明进行详细描述。但这些实施方式并不限制本发明,本领域的普通技术人员根据这些实施方式所做出的结构、方法、或功能上的变换均包含在本发明的保护范围内。
在本发明一实施方式中,所述电能表,用来监测设备负载的电压,包括:电能计量模块,电源模块,其中,电源模块包括电源模块A和电源模块B, 电源模块A和电源模块B相互独立,电源模块A为主电源供电,电源模块B为备用电源供电,2个供电模块可同时通电工作,自主均流给设备负载提供电源,每个电源模块都各自承担50%的用电负荷,若电源模块A或所述电源模块B断电时,电源模块B或所述电源模块A会自动承接100%的用电负荷,确保电能表的正常运行。
具体地,参图1所示,电源模块A电性连接电压采集卡1、2、3、4,电源模块A给电压采集卡1、2、3、4的电压采样提供电源,电源模块B电性连接电压采集卡5、6、7、8,电源模块B给电压采集卡5、6、7、8的电压采集提供电源,此时数据中心列头柜中双电源供电的交流设备就能实现电能的准确计量。如果电源模块A损坏或断电时,电源模块B就同时给电压采集卡1、2、3、4、5、6、7、8供电,反之,如果电源模块B损坏或断电时,电源模块A就同时给电压采集卡1、2、3、4、5、6、7、8供电,但这种只有电源模块A或电源模块B单独供电的模式只是个暂时过渡,还是需要尽快的更换损坏或断电的电源模块。值得一提的是,电源模块A和电源模块B均采用可插拔设计,并且支持带电插拔,若有任一电源模块损坏,只需拔出损坏的电源模块,更换新的电源模块就可以,电压采集卡1、2、3、4、5、6、7、8也采用可插拔设计,并且支持带电插拔,若有任一电压采集卡损坏,只需拔出损坏的电压采集卡,更换新的电压采集卡即可,对后期设备维护带来便利,同时也增加了设备的可靠性,双路电源的设计实现了数据中心机架设备在不同电源情况下的准确计量,实时能够区别设备在不同电源情况下的用电情况及相关电参量。
应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施方式中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。
上文所列出的一系列的详细说明仅仅是针对本发明的可行性实施方式的具体说明,它们并非用以限制本发明的保护范围,凡未脱离本发明技艺精神所作的等效实施方式或变更均应包含在本发明的保护范围之内。

Claims (5)

1.一种电能表,包括:电能计量模块,电源模块,其特征在于,所述电源模块包括电源模块A和电源模块B,所述电源模块A和电源模块B均可插拔。
2.根据权利要求1所述的电能表,其特征在于,所述电源模块A和电源模块B可同时通电工作,并能自动平均分配电流供电。
3.根据权利要求1所述的电能表,其特征在于,当所述电源模块A或所述电源模块B断电时,所述电源模块B或所述电源模块A会自动承接全部的用电负荷。
4.根据权利要求1所述的电能表,其特征在于,所述电源模块A和电源模块B均可带电插拔。
5.根据权利要求1所述的电能表,其特征在于,所述电能计量模块是指电压采集卡,所述电压采集卡可带电插拔。
CN201310238751.2A 2013-06-17 2013-06-17 电能表 Pending CN104237629A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310238751.2A CN104237629A (zh) 2013-06-17 2013-06-17 电能表

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310238751.2A CN104237629A (zh) 2013-06-17 2013-06-17 电能表

Publications (1)

Publication Number Publication Date
CN104237629A true CN104237629A (zh) 2014-12-24

Family

ID=52226106

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310238751.2A Pending CN104237629A (zh) 2013-06-17 2013-06-17 电能表

Country Status (1)

Country Link
CN (1) CN104237629A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109360395A (zh) * 2018-08-24 2019-02-19 深圳市信锐网科技术有限公司 一种数据采集设备

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201177643Y (zh) * 2008-03-19 2009-01-07 长沙威胜电子有限公司 数字化变电站电能表
CN201464511U (zh) * 2009-07-02 2010-05-12 北京市电力公司 电能量采集终端
CN201974474U (zh) * 2011-03-01 2011-09-14 深圳市森晖电子有限公司 一种国网三相智能电能表
CN102230946A (zh) * 2011-04-02 2011-11-02 广东天乐通信设备有限公司 一种多功能智能电力监测仪表
CN202057784U (zh) * 2011-04-29 2011-11-30 广州市格宁电气有限公司 一种电能表的在线检定与数字化在线监测系统
CN202084993U (zh) * 2011-05-17 2011-12-21 中国电力科学研究院 一种标准型智能配变终端
CN102520224A (zh) * 2011-11-30 2012-06-27 四川省电力公司内江电业局 一种模块化电能量智能采集终端

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201177643Y (zh) * 2008-03-19 2009-01-07 长沙威胜电子有限公司 数字化变电站电能表
CN201464511U (zh) * 2009-07-02 2010-05-12 北京市电力公司 电能量采集终端
CN201974474U (zh) * 2011-03-01 2011-09-14 深圳市森晖电子有限公司 一种国网三相智能电能表
CN102230946A (zh) * 2011-04-02 2011-11-02 广东天乐通信设备有限公司 一种多功能智能电力监测仪表
CN202057784U (zh) * 2011-04-29 2011-11-30 广州市格宁电气有限公司 一种电能表的在线检定与数字化在线监测系统
CN202084993U (zh) * 2011-05-17 2011-12-21 中国电力科学研究院 一种标准型智能配变终端
CN102520224A (zh) * 2011-11-30 2012-06-27 四川省电力公司内江电业局 一种模块化电能量智能采集终端

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109360395A (zh) * 2018-08-24 2019-02-19 深圳市信锐网科技术有限公司 一种数据采集设备

Similar Documents

Publication Publication Date Title
RU2014141500A (ru) Способ управления профилем нагрузки электрической сети низкого или среднего напряжения и связанная с ним система управления
CN104836336A (zh) 基于主从监控的智能配电箱
CN206712547U (zh) 低压配电监测装置及系统
CN203674797U (zh) 站用电微网主接线系统
CN102955487A (zh) 电源装置
CN104237629A (zh) 电能表
CN204205325U (zh) 一种高压直流电源
CN106354609A (zh) 一种服务器主板电流实时监控设计方法
CN203967831U (zh) 一种智能多回路列头柜
CN105071337A (zh) 自反馈智能漏电保护控制装置及其控制方法
CN205176131U (zh) 一种用电信息采集系统模组化终端的处理显示模块
CN203722327U (zh) 一种高压直流供电装置用桥接结构
CN102496872A (zh) 智能土建配电站
Banerjee et al. Three phase Parameter data logging and fault detection using GSM Technology
CN113805002A (zh) 电力电子直流变压器的检测装置、方法、设备及存储介质
CN202797954U (zh) 带有防雷保护功能的电源管理单元
CN205263633U (zh) 一种厂级负荷优化控制装置
CN103308787A (zh) 供电监测系统和方法
CN106527613B (zh) 一种通用服务器和税控核心板的连接方法及通用服务器
CN202837363U (zh) 直流电表板卡模块
CN203691053U (zh) 一种高危用电用户应急供电连接结构
CN203278870U (zh) 采用网线和无线两种数据连接的矿灯充电柜的通讯系统
CN103728492B (zh) 多电压多电流回路交流电表
CN204103580U (zh) 带通信接口的水电站自动化系统多路直流供电装置
CN104022565A (zh) 一种配电装置和方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20141224