CN104234043B - 一种灌注桩施工方法 - Google Patents
一种灌注桩施工方法 Download PDFInfo
- Publication number
- CN104234043B CN104234043B CN201410466734.9A CN201410466734A CN104234043B CN 104234043 B CN104234043 B CN 104234043B CN 201410466734 A CN201410466734 A CN 201410466734A CN 104234043 B CN104234043 B CN 104234043B
- Authority
- CN
- China
- Prior art keywords
- conduit
- concrete
- sound detecting
- detecting pipe
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本发明提供一种灌注桩施工方法,包括:埋设钢护筒,钻进成桩孔;放置固定有声测管的钢筋笼和导管;其中,所述施工方法还包括:通过声测管对桩孔清孔,同时通过导管对桩孔灌注混凝土,同时完成清孔和灌注混凝土;混凝土初凝后,在所述声测管内检查成桩质量。本发明所述施工方法同时完成清孔和灌注混凝土,能够有效的减少施工时间,并且灌注的混凝土将孔底的浆气混合物和沉渣顶出,能够彻底清孔,不影响成桩质量;本发明无需渣浆排出管、风管通道和泥浆池,大大节省了施工成本。
Description
技术领域
本发明涉及建筑领域,具体说,涉及一种灌注桩施工方法。
背景技术
灌注桩是房屋、公路、桥梁、码头等建筑中普遍采用的基础结构,现有灌注桩的施工方法的示意图如图1所示,首先埋设钢护筒10,接着在钢护筒10的内部采用钻机、高压射水等方式向下掘进,以形成桩孔100;桩孔形成后,在桩孔内放入钢筋笼110,在钢筋笼内部固定有测量成桩质量的声测管120,其中,为了防止混凝土的灌入,声测管120的底部焊接有钢板,另外,在钢筋笼110内部还设置有清孔和灌注混凝土用的导管130,导管上端连接有渣浆排出管(未示出),导管内部设置有风管通道140;利用气举反循环清理灌注桩孔孔底的沉渣,具体地,将压缩机的压缩空气通过风管通道140送入导管130内同时沿桩孔100的内壁不断地注入泥浆,高压气与泥浆混合,形成浆气混合物,在导管130底部形成负压,气体和泥浆不断补充,在导管130内浆气混合物不断向上流动,使孔底沉渣漂浮起来,通过与导管130相连的渣浆排出管排出到桩孔一侧的泥浆池(未示出);清孔以后,抽出渣浆排出管和风管通道140,通过导管130对桩孔100灌注混凝土,混凝土灌注过程中,不断地向上抽出导管,混凝土灌注完成,拔出钢护筒;混凝土初凝之后,通过声测管120检查成桩质量。上述钻孔灌注桩的施工方法主要有以下几个缺点:
第一,导管内设置的风管通道密封性要求高、造价高。
第二,导管内抽出风管通道时,粘贴在通道内壁的较大或者较重的沉渣会落回孔底,不能彻底清孔。
第三,由于风管通道位于导管内,且清孔在导管内进行,只能清孔完成后才能灌注混凝土,延长了施工时间。
发明内容
本发明是为了解决现有技术中存在的上述技术问题而做出,其目的在于提供一种能够彻底清孔并且施工时间短、施工成本低的灌注桩施工方法。
本发明所述灌注桩施工方法包括:包括:埋设钢护筒,钻进成桩孔;放置固定有声测管的钢筋笼和导管;其中,所述施工方法还包括:通过声测管对桩孔清孔,同时通过导管对桩孔灌注混凝土,同时完成清孔和灌注混凝土;混凝土初凝后,在所述声测管内检查成桩质量。
所述的施工方法,其中,所述声测管的底部设置有单向阀。
所述的施工方法,其中,所述采用在声测管内对桩孔清孔时在导管内对桩孔灌注混凝土,同时完成清孔和灌注混凝土的步骤包括:将压缩机的高压胶管分别插入到声测管内,在声测管内通入压缩空气;形成浆气混合物,其不断上升,使孔底沉渣漂浮起来,然后开始在导管内灌注混凝土;当混凝土层高度超过声测管的底部以后,停止压缩机,继续灌注混凝土,不断向上拔出导管完成混凝土的灌注,然后拔出钢护筒。
本发明所述施工方法同时完成清孔和灌注混凝土,能够有效的减少施工时间,并且灌注的混凝土将孔底的浆气混合物和沉渣顶出,能够彻底清孔,不影响成桩质量;本发明无须渣浆排出管、风管通道和泥浆池,大大节省了施工成本。
附图说明
通过参考以下结合附图的说明及权利要求书的内容,本发明的其它目的及结果将更加明白及易于理解。在附图中:
图1示出了现有技术灌注桩施工方法的示意图;
图2是本发明灌注桩施工方法的流程图;
图3是本发明灌注桩施工方法的示意图;
图4是本发明清孔和灌注混凝土过程中桩孔内分层液面的示意图。
在所有附图中相同的标号指示相似或相应的特征或功能。
具体实施方式
下面将参照附图来对本发明的各个实施例进行详细描述。
图2是本发明钻孔灌注桩施工方法的流程图;图3是本发明钻孔灌注桩施工方法的示意图,结合图2和图3说明本发明灌注桩施工方法,所述灌注桩施工方法包括以下几个步骤:
首先,在步骤S200中,埋设钢护筒20,接着在钢护筒20的内部采用钻机、高压射水等方式向下掘进,以形成桩孔200。优选地,钢护筒20的顶端具有向外翻的边沿,防止从桩孔中漫出的泥浆腐蚀钢护筒外侧的泥土,造成桩孔松动。
桩孔200形成后,桩孔存在影响成桩质量的泥浆和沉渣,所以需要清孔,然后,在步骤S210中,进行清孔和灌注混凝土之前的准备,具体地,在桩孔内放入钢筋笼210,在钢筋笼210内侧固定(例如焊接)有用于清孔和测量成桩质量的声测管220,声测管220的底部安装有单向阀221,另外,在钢筋笼210内部还设置有灌注混凝土用的导管230,其中,声测管220的数量根据桩孔孔径和清孔时间要求确定,桩孔孔径越大或者清孔时间要求越短,所需声测管的数量越多。
准备好清孔和灌注混凝土之后,在步骤S220中,通过声测管220内对桩孔清孔同时通过导管230内对桩孔灌注混凝土,同时完成清孔和灌注混凝土,具体地,将压缩机300的高压胶管310分别插入到声测管220内,在声测管内通入压缩空气,随着高压气与泥浆混合,形成浆气混合物,其不断上升,使孔底沉渣漂浮起来,由于声测管底部设置有单向阀,所以浆气混合物不能进入声测管,孔底沉渣漂浮起来以后,例如打开压缩机5-10分钟后,开始在导管内灌注混凝土,混凝土比重较大,所以在桩孔内形成如图4所示的分层液面,孔底为混凝土层,混凝土层上面为浆气混合物层,浆气混合物层上漂浮着沉渣。当混凝土层高度超过声测管的底部以后,例如开始灌注混凝土0.5-2分钟后,停止压缩机,间隔一定时间向上提取导管一次,例如间隔6-10分钟向上提起导管一次,然后重复上述过程,直到混凝土灌注完成,然后拔出钢护筒,其中,在混凝土灌注过程中,由于混凝土比重较大,灌注后的混凝土不断将浆气混合物和沉渣顶出,灌注混凝土完成,灌注桩也彻底清孔,由于本发明是利用灌注的混凝土将浆气混合物和沉渣顶出,所以不需要象气举反循环那样补充泥浆形成泥浆循环,节约泥浆用量,减少环境污染。
清孔和灌注混凝土完成后,在步骤S230中,混凝土初凝后,通过声测管检查成桩质量。
在上述灌注桩的施工方法中,通入所有声测管内的压缩空气的总空气量量Q,单位为m3/min,根据以下公式计算
Q=47.1*K1*K2*(D2-d2)*V
其中:K1为孔深损耗系数,一般取1;K2为孔内涌水时,风量增加系数,其值与用水量有关,中等和小水量时候,K2=1.5;D为钻孔直径,单位m;d为钻杆外径,单位m;V为环状间隙气流上返速度,单位m/min。
本发明所述灌注桩施工方法具有以下几个优点:灌注混凝土和清孔同时完成节约了施工时间;灌注混凝土过程中,当混凝土层高度超过声测管时,即停止压缩机,相对于现有技术中所有浆气混合物和沉渣排出后才停止压缩机,节省了压缩空气的用量;停止压缩机后,较大较重的沉渣和将其混合物位于混凝土层上面,不会落下,对桩基质量造成影响;不需要渣浆排出管、风管通道和泥浆池,大大节省了施工成本;本发明不需要补充泥浆,节约泥浆用量且排出方便。
在本发明的另一个实施例中,桩孔形成后,除了包含S210的内容外,导管的底部用塞子塞住或者安装单向阀,防止桩孔内的泥浆和沉渣的混合物进入导管内,将沉渣黏在导管内壁上;然后将压缩机300的高压胶管310分别插入到声测管220内,在声测管定通入压缩空气,同时在导管内注满水;随着高压气与泥浆混合,形成浆气混合物,其不断上升,使孔底沉渣漂浮起来,由于声测管底部设置有单向阀并且导管底部塞住,所以浆气混合物不能进入声测管和导管内,孔底沉渣漂浮起来以后,开始在导管内灌注混凝土,混凝土比重较大,使导管内的水冲开塞子或者单向阀排出与浆气混合物混合,开始对桩底灌注混凝土,在桩孔底部形成混凝土层;当混凝土层高度超过声测管的底部以后,停止压缩机,不断向上提起导管完成整个桩孔混凝土的灌注,拔出钢护筒,其中,导管内的水降低了桩孔内泥浆的比重,利于浆气混合物和沉渣的排出。
尽管前面公开的内容示出了本发明的示例性实施例,但是应当注意,在不背离权利要求限定的本发明的范围的前提下,可以进行多种改变和修改。根据这里描述的发明实施例的方法权利要求的功能、步骤和/或动作不需以任何特定顺序执行。此外,尽管本发明的元素可以以个体形式描述或要求,但是也可以设想多个,除非明确限制为单数。
Claims (5)
1.一种灌注桩施工方法,包括:
埋设钢护筒,钻进成桩孔;
放置固定有声测管的钢筋笼和导管,其中,所述声测管的底部设置有单向阀;
通过声测管对桩孔清孔,同时通过导管对桩孔灌注混凝土,同时完成清孔和灌注混凝土,其包括:将压缩机的高压胶管分别插入到声测管内,在声测管内通入压缩空气;形成浆气混合物,其不断上升,使孔底沉渣漂浮起来,然后开始在导管内灌注混凝土;当混凝土层高度超过声测管的底部以后,停止压缩机,继续灌注混凝土,不断向上拔出导管完成混凝土的灌注,然后拔出钢护筒;
混凝土初凝后,在所述声测管内检查成桩质量。
2.根据权利要求1所述的施工方法,其中,所述在声测管内通入压缩空气的总空气量为:
Q=47.1*K1*K2*(D2-d2)*V
其中:Q为所有声测管的通入的压缩空气的总空气量,单位m3/min;K1为孔深损耗系数,一般取1;K2为孔内涌水时,风量增加系数,其值与用水量有关,中等和小水量时候,K2=1.5;D为钻孔直径,单位m;d为钻杆外径,单位m;V为环状间隙气流上返速度,单位m/min。
3.根据权利要求1所述的施工方法,放置固定有声测管的钢筋笼和导管,其中,所述导管的底部塞有塞子或者安装有单向阀。
4.根据权利要求3所述的施工方法,其中,所述施工方法还包括:
将压缩机的高压胶管分别插入到声测管内,在声测管定通入压缩空气,同时在导管内注满水;
形成浆气混合物,其不断上升,使孔底沉渣漂浮起来,然后开始在导管内灌注混凝土;
导管内的水冲开导管底部的塞子,开始对桩孔底部灌注混凝土,在桩孔底部形成混凝土层,当混凝土层高度超过声测管的底部以后,停止压缩机,继续灌注混凝土,不断向上拔出导管完成整个桩孔的混凝土的灌注,然后拔出钢护筒。
5.根据权利要求1所述的施工方法,其中,所述钢护筒的顶端具有向外翻的边沿。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410466734.9A CN104234043B (zh) | 2014-09-12 | 2014-09-12 | 一种灌注桩施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410466734.9A CN104234043B (zh) | 2014-09-12 | 2014-09-12 | 一种灌注桩施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104234043A CN104234043A (zh) | 2014-12-24 |
CN104234043B true CN104234043B (zh) | 2016-08-24 |
Family
ID=52222877
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410466734.9A Active CN104234043B (zh) | 2014-09-12 | 2014-09-12 | 一种灌注桩施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104234043B (zh) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104747088B (zh) * | 2015-03-31 | 2017-03-08 | 浙江禹建建设集团有限公司 | 一种钻孔灌注桩单腰多叶筒式钻头及成孔施工方法 |
CN106120877B (zh) * | 2016-06-21 | 2018-08-21 | 中铁十八局集团第五工程有限公司 | 一种用于确保钻孔灌注桩中超声波正常检测的预处理方法 |
CN106284314B (zh) * | 2016-08-31 | 2018-07-03 | 中冶建工集团有限公司 | 喀斯特地貌旋挖成孔灌注桩施工方法 |
CN108978737A (zh) * | 2018-07-04 | 2018-12-11 | 中国二十冶集团有限公司 | 一种用于灌注桩声测管注浆的施工方法 |
CN111424668B (zh) * | 2020-05-09 | 2024-09-27 | 安徽省建设工程测试研究院有限责任公司 | 一种钻孔灌注桩无沉渣施工装置 |
CN112942359A (zh) * | 2021-01-26 | 2021-06-11 | 上海兴庚基础工程有限公司 | 一种基坑围护施工工艺 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101487250A (zh) * | 2009-02-26 | 2009-07-22 | 中冶京唐建设有限公司 | 灌注桩混凝土真空脱水施工方法 |
CN201368861Y (zh) * | 2008-11-10 | 2009-12-23 | 中冶京唐建设有限公司 | 一种复合微孔多功能声测管 |
JP2011137318A (ja) * | 2009-12-28 | 2011-07-14 | Daiho Constr Co Ltd | 場所打ち杭築造方法及びその装置 |
CN102535529A (zh) * | 2011-12-08 | 2012-07-04 | 中铁五局(集团)有限公司 | 自平衡法桩基承载力试验装置施工方法 |
CN102635129A (zh) * | 2012-04-11 | 2012-08-15 | 中冶交通工程技术有限公司 | 一种用于检测预埋在灌注桩地下的钢筋笼的方法 |
JP2013147933A (ja) * | 2013-05-08 | 2013-08-01 | Ohbayashi Corp | 山留め壁の構築方法、場所打ち杭の構築方法、山留め壁、場所打ち杭 |
CN103696417A (zh) * | 2013-12-20 | 2014-04-02 | 中国一冶集团有限公司 | 一种钻孔灌注桩底部二次清孔装置及方法 |
-
2014
- 2014-09-12 CN CN201410466734.9A patent/CN104234043B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201368861Y (zh) * | 2008-11-10 | 2009-12-23 | 中冶京唐建设有限公司 | 一种复合微孔多功能声测管 |
CN101487250A (zh) * | 2009-02-26 | 2009-07-22 | 中冶京唐建设有限公司 | 灌注桩混凝土真空脱水施工方法 |
JP2011137318A (ja) * | 2009-12-28 | 2011-07-14 | Daiho Constr Co Ltd | 場所打ち杭築造方法及びその装置 |
CN102535529A (zh) * | 2011-12-08 | 2012-07-04 | 中铁五局(集团)有限公司 | 自平衡法桩基承载力试验装置施工方法 |
CN102635129A (zh) * | 2012-04-11 | 2012-08-15 | 中冶交通工程技术有限公司 | 一种用于检测预埋在灌注桩地下的钢筋笼的方法 |
JP2013147933A (ja) * | 2013-05-08 | 2013-08-01 | Ohbayashi Corp | 山留め壁の構築方法、場所打ち杭の構築方法、山留め壁、場所打ち杭 |
CN103696417A (zh) * | 2013-12-20 | 2014-04-02 | 中国一冶集团有限公司 | 一种钻孔灌注桩底部二次清孔装置及方法 |
Non-Patent Citations (1)
Title |
---|
《 2.5m钻孔灌注桩桩底高压注浆补强施工》;郑广明;《广东公路交通》;19990330(第3期);第35-36页 * |
Also Published As
Publication number | Publication date |
---|---|
CN104234043A (zh) | 2014-12-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104234043B (zh) | 一种灌注桩施工方法 | |
CN103410119B (zh) | 一种渗漏混凝土内部截水帷幕灌浆方法 | |
CN109853538B (zh) | 混凝土灌注桩桩基补强加固结构及其施工方法 | |
CN109519150B (zh) | 一种针对出水量较大的降水井封堵装置及方法 | |
CN110409433B (zh) | 利用带钢套筒的灌注桩进行地基处理的施工系统及方法 | |
CN111576423A (zh) | 一种桩基沉渣清理装置及方法 | |
CN106759360B (zh) | 一种清渣注浆装置及采用该装置的清渣注浆方法 | |
CN206368379U (zh) | 一种埋地式水池抗浮的稳定系统 | |
CN109138904B (zh) | 双封隔器分层注浆止水装置及其使用方法 | |
CN111608723B (zh) | 瓦斯抽采孔排水方法 | |
CN107869146A (zh) | 一种用反循环钻机施工降水井的方法 | |
CN205502044U (zh) | 一种应用于建筑物下砂性含水层的降水结构 | |
CN107218010B (zh) | 破损钻孔套管堵水桥塞及双桥塞式堵水方法 | |
CN203891785U (zh) | 水文水井管内投砾专用接头管总成 | |
CN105178966A (zh) | 矿山立井井筒的破壁注浆堵水工艺 | |
CN103603363B (zh) | 水泥搅拌注浆凸节桩基及成形方法 | |
CN202787289U (zh) | 管井封井降水装置 | |
JP6586503B6 (ja) | ファインバブル水置換工法、及びファインバブル水置換装置 | |
CN110939412B (zh) | 一种利用水平井实现超前注水与早期注水的开发方法 | |
CN104563887B (zh) | 组合式螺纹挤土成孔砂井钻头 | |
CN103711121B (zh) | 桩顶下置的原状取土压灌混凝土桩的施工方法 | |
CN103132536A (zh) | 一种地质化学灌浆前的排水技术 | |
CN206581271U (zh) | 隔水塞 | |
CN112031811A (zh) | 一种崖壁涌水注浆封堵系统及方法 | |
CN206486890U (zh) | 混凝土圆筒结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP03 | Change of name, title or address |
Address after: 100085, Beijing, Beijing economic and Technological Development Zone, Kangding street, No. 1, 2, six or seven, Daxing District Patentee after: MCC COMMUNICATION CONSTRUCTION GROUP CO., LTD. Address before: 100028, Beijing, Chaoyang District, No. 28, west of China Metallurgical Building, 18 and 19 Patentee before: MCC Communication Engineering Technology Co., Ltd. |