CN104228876B - Long-range note axle pre-reset system and method - Google Patents

Long-range note axle pre-reset system and method Download PDF

Info

Publication number
CN104228876B
CN104228876B CN201410457797.8A CN201410457797A CN104228876B CN 104228876 B CN104228876 B CN 104228876B CN 201410457797 A CN201410457797 A CN 201410457797A CN 104228876 B CN104228876 B CN 104228876B
Authority
CN
China
Prior art keywords
reset
long
pmi
relay
order
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410457797.8A
Other languages
Chinese (zh)
Other versions
CN104228876A (en
Inventor
刘延春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai electric traffic automation system Co., Ltd.
Original Assignee
Thales SAIC Transport System Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Thales SAIC Transport System Ltd filed Critical Thales SAIC Transport System Ltd
Priority to CN201410457797.8A priority Critical patent/CN104228876B/en
Publication of CN104228876A publication Critical patent/CN104228876A/en
Application granted granted Critical
Publication of CN104228876B publication Critical patent/CN104228876B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of long-range note axle pre-reset system, comprise: export the ATS server of long-range meter shaft pre-reset order, power supply, ACE, the PLC controlling described ACE execution pre-reset according to the order of described long-range meter shaft pre-reset, relay group and PMI, wherein, each relay coil in described relay group connects described PMI respectively, and each open contact is serially connected between described power supply and described PLC successively; Described PMI receives the order of described long-range meter shaft pre-reset, drives each relay in described relay group to keep high-order to connect described power supply and described PLC, and back production; Described ATS server, according to the back production signal of described PMI, is learnt that in described relay group, each relay all keeps high-end trim, is sent the order of described long-range meter shaft pre-reset to described PLC.The present invention utilizes PMI to replace the enable PLC of watch keeper's action, safe and reliable, avoids the risk that manual operation brings.

Description

Long-range note axle pre-reset system and method
Technical field
The present invention relates to train supervision field, particularly relate to a kind of system and the method thereof of recovering disturbed meter shaft section ACB (AxleCounterBlock) state.
Background technology
At present, axis-counting device and PMI (PostedeManoeuvreInformatis é (ComputerBasedInterlockingsystem), computer interlock subsystem) communicated by the discrete I/O port of ACE (AxleCounterEvaluator, meter shaft evaluator).Axis-counting device calculates the quantity of a direction through the train axle of certain position, each axis-counting device once passes through quantity and the direction of the axletree of its position every 200 milliseconds to ACE report, then ACE calculates ACB (AxleCounterBlock according to the counting of all axis-counting devices relevant to this section, meter shaft section) take situation, by report the test to PMI.
In ACE, all have four kinds of states to each ACB: vacant, take, disturbed and pre-reset.If following condition meets, ACB is regarded as disturbed:
1) ACE suspends; 2) ACE is restarted; 3) communication between check point magnetic head and ACE is disturbed; 4) communication between ACE is disturbed, and this section is the public section of two or all ACE; 5) section is idle, and receives the false alarm of check point; 6) the wheel shaft count value of section is negative; 7) two count values of ACB check point are inconsistent, or detect that the residue in section takes turns the number of axle lower than a threshold value, are identified the wheel number of axle (default value is 1, but can configure) being less than train.
ACB disturbed state shows section fault, will be considered as taking for disturbed ACB, PMI.In order to remove fault, need to follow following formality:
Send pre-reset order to disturbed ACB by ACE, the wheel counting apparatus of this section is all reset.
When following security procedure, artificial mode train or " simulating wheel " two wheel counting apparatus by this ACB can be driven.Before not completing this process, ACB is still in disturbed state.
If the axletree quantity of turnover ACB is again consistent, then disturbed state is eliminated.If quantity is still inconsistent, then ACB still keeps disturbed state, needs another time " pre-reset " to order.
In existing system, there is the mode of two kinds of realizations " pre-reset ".One is that control center member on duty is from ATS (AutomaticTrainSupervision, train supervises subsystem automatically) send the order of a long-range meter shaft pre-reset to PLC (ProgrammableController, Programmable Logic Controller), the button pressed in control cabin by local watch keeper connects power supply and sends pre-reset order with enable PLC, PLC control ACE to disturbed ACB.As shown in Figure 1 and Figure 2.Another mode is that local watch keeper uses the key switch on parallel input/output board to send pre-reset order to disturbed ACB.Because ACE rack is placed on canyon, this mode just requires that service personnel all will go canyon to operate at every turn, and inconvenience is also dangerous.
Therefore, in current operation, the first pre-reset mode is more conventional.Want the meter shaft section that pre-reset one is disturbed, need to press the button enable PLC by local watch keeper after ATS subsystem command PLC and power.But it should be noted that PLC is not secure subsystem, and this mode all needs watch keeper's action when each meter shaft pre-reset.When there being train occupation in an ACB, pre-reset is carried out in maloperation can be risky.
Summary of the invention
The object of the present invention is to provide a kind of long-range note axle pre-reset system and method, utilize PMI to replace the enable PLC of watch keeper's action, safe and reliable, avoid the risk that manual operation brings.
The technical scheme realizing above-mentioned purpose is:
The long-range note axle pre-reset system of one of the present invention, comprising: export the ATS server of long-range meter shaft pre-reset order, power supply, ACE, the PLC controlling described ACE execution pre-reset according to the order of described long-range meter shaft pre-reset, relay group and PMI, wherein,
Each relay coil in described relay group connects described PMI respectively, and each open contact is serially connected between described power supply and described PLC successively;
The output state of each relay in relay group described in described PMI back production, sends to described ATS server; Described ATS server receives the pre-reset instruction that operator sends, or when ATS server judges the equal trouble free of each relay according to back production information and is all in low-end trim, exports the order of described long-range meter shaft pre-reset to described PMI;
Described PMI receives the order of described long-range meter shaft pre-reset, drives each relay in described relay group to keep high-order to connect described power supply and described PLC, and back production;
Described ATS server, according to the back production signal of described PMI, is learnt that in described relay group, each relay all keeps high-end trim, is sent the order of described long-range meter shaft pre-reset to described PLC.
In above-mentioned long-range note axle pre-reset system, described relay group comprises two relays.
In above-mentioned long-range note axle pre-reset system, described relay fault refers to: output state and back production inconsistent, and this inconsistent state continue more than 200 milliseconds.
The long-range note axle pre-reset method of the present invention two, comprising:
The output state of each relay in relay group described in described PMI back production, sends to described ATS server; Described ATS server receives the pre-reset instruction that operator sends, or when ATS server judges the equal trouble free of each relay according to back production information and is all in low-end trim, exports the order of described long-range meter shaft pre-reset to described PMI;
Described ATS server sends the order of long-range meter shaft pre-reset to described PMI;
The order of described PMI output enable, to drive in described relay group each relay to keep high-end trim, and back production information is also returned to described ATS server by the status information of each relay of back production;
After described ATS server is all positioned at high-end trim according to each relay of back production validation of information, send the order of long-range note axle pre-reset to described PLC;
Described PLC controls described ACE and performs pre-reset.
In the long-range note axle pre-reset method stated, the order of described transmission long-range meter shaft pre-reset, comprising:
Described ATS server sends initial pre-reset order to described PMI, and described PMI returns and acknowledges receipt of instruction;
Described ATS server sends and confirms that pre-reset order is to described PMI.
In the long-range note axle pre-reset method stated, the order of described PMI output enable, drives each relay in described relay group to keep high-end trim 7 seconds.
In the long-range note axle pre-reset method stated, described PLC controls to the output 3 seconds of described ACE.
The invention has the beneficial effects as follows: the invention solves current each ACB disturbed need cleaning, need local watch keeper manually to press a button to operator's compartment, because of manual operation reduction functional reliability risk.Issuing security command by utilizing ATS replaces watch keeper's action to carry out enable PLC to interlock safety subsystem PMI, thus realizes long-range note axle pre-reset.
Accompanying drawing explanation
Fig. 1 is traditional structure diagram realizing the system of long-range note axle pre-reset;
Fig. 2 is traditional concrete structure figure realizing the system of long-range note axle pre-reset;
Fig. 3 is the constructional drawing of long-range note axle pre-reset system of the present invention;
Fig. 4 is the state machine diagram of long-range note axle pre-reset system of the present invention;
Fig. 5 is the diagram of circuit of long-range note axle pre-reset method of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described.
Refer to Fig. 3, long-range note axle pre-reset system of the present invention, comprises ATS server, PLC, ACE, PMI and relay group, wherein:
ATS server via Ethernet connects PMI and PLC respectively; PLC connects ACE; Each relay coil in relay group connects PMI respectively, and each open contact is serially connected between power supply and PLC successively.
ATS server is for exporting the order of long-range meter shaft pre-reset; PMI receives the order of long-range meter shaft pre-reset, drives each relay in relay group to keep high-order to switch on power and PLC, and back production;
ATS server, according to the back production signal of PMI, after knowing that in relay group, each relay all keeps high-end trim, sends the order of long-range meter shaft pre-reset to PLC;
PLC performs pre-reset according to long-range meter shaft pre-reset order control ACE.
In the present embodiment, define two relays in relay group, these two relays are identical.Be from security standpoint with two identical relays, the state of expression is more accurate, controls more stable.As seen from Figure 3, the function of these two relays is identical with PLC enable button.PMI controls the output state of these two relays, and back production.(export with back production state inconsistent, and this inconsistent state continues more than 200 milliseconds) when any one relay et out of order, PMI can send one and report to the police to ATS server.According to the state of two relays, PMI sends the status report of back production to ATS server.
When following any situation occurs, PMI can not accept the long-range meter shaft pre-reset order of ATS server:
Any one fault in two relays;
Any one back production state in two relays is high-order.
When following condition all meets, PMI can accept the long-range meter shaft pre-reset order of ATS server:
All et out of order is not had in two relays;
Back production state in two relays is all low level.
Can control center member on duty or ATS server self send the order of a long-range meter shaft pre-reset to PMI from ATS server according to the condition adjudgement of PMI report, if PMI report state is not for accepting, then ATS server command can be left in the basket.
Can represent that the internal logic of this function of PMI designs by utilization state machine figure:
As shown in Figure 4, from logic the design: in 0 state when PMI just starts, without input and output, built-in variable is not had to change yet.After startup, logic state is 1,4,6,8, and PMI can change internal logic states again according to trackside time of day afterwards.
By following steps, state transition is described:
1, if after startup, PMI detects two relays all do not have fault, and two relay status are all low level, then state 8 can jump to 9, namely PMI can accept the initial pre-reset order of ATS, logic state is 1, 4, 6, 9, after now accepting the initial pre-reset order of ATS, state 1 can jump to 2, countdown in 10 seconds is (if state 9 jumps to 8 in countdown, then interrupt countdown in 10 seconds and state 2 is jumped to 1) terminate after state 2 automatically can jump to 3, in 20 seconds afterwards, ATS sends and confirms pre-reset order, state 3 redirect can get back to 1 (extraordinary circumstances 1: if do not receive ATS in countdown in 20 seconds to confirm pre-reset order, after 20 seconds, countdown is invalid, the order of meter shaft pre-reset is also invalid, state jumps to 1 by 3, extraordinary circumstances 2: if state 9 jumps to 8 when also not receiving ATS confirmation pre-reset order in countdown in 20 seconds, then interrupt countdown in 20 seconds, the order of meter shaft pre-reset is invalid, state jumps to 1 by 3), once complete long-range meter shaft pre-reset order is sent completely, state 4 can jump to 5, PMI and drive two output relays to high-order.And due to the arbitrary relay of designing requirement for PMI time high-order can not accept the initial pre-reset order of ATS, then state 9 can jump to 8, and logic state is 1,5,6,8.At PMI output relay to after high-order countdown in 7 seconds terminates, state 5 can jump to 4 automatically, and state 8 also can jump to 9 again, prepares to accept the order of the long-range meter shaft pre-reset of ATS next time.Now logic state returns 1,4,6,9.
2, PMI detects one of them relay fault, then state can jump to 7 by 6, and according to design, have fault that PMI will be caused not accept the order of ATS pre-reset, then state 9 can jump to 8, and logic state is 1,4,7,8.If now ATS sends initial pre-reset order to PMI, 2 can not be jumped to from 1 because PMI now can not accept ATS order.
3, PMI detects relay failure recovery, and two relay status are all low level, then state can get back to 6 by 7 redirects, and state 8 can jump to 9, and logic state is 1,4,6,9, if now ATS sends the order of long-range meter shaft pre-reset, and can refer step 1.
Refer to Fig. 5, the long-range note axle pre-reset method based on above-mentioned long-range note axle pre-reset system of the present invention, comprises the following steps:
ATS server receives the pre-reset instruction that operator sends, or, ATS server is according to the output state of two of PMI back production relays, when judging two equal troubles free of relay and be all in low-end trim, export the order of long-range meter shaft pre-reset to PMI, this long-range meter shaft pre-reset order is a security command needing secondary-confirmation.First ATS server can send the order of an initial remote meter shaft pre-reset, and PMI can be reported to ATS server (return and acknowledge receipt of instruction) after receiving 10 seconds.ATS server sent again and once confirms the order of long-range meter shaft pre-reset in 20 seconds, such PMI just really can accept this order, drive two output relays and guard relay high-end trim 7 seconds, after countdown in 7 seconds terminates, two output relays are set to low-end trim by PMI immediately.The definition of 7 seconds considers: the communication time delay of ATS and PLC 2 seconds+PLC export the surplus of 3 seconds+2 seconds.
The order of PMI output enable, drive two relays to keep high-end trim, back production information is also returned to ATS server by the status information that back production is two;
After ATS server is all positioned at high-end trim according to back production validation of information two relays, send the order of long-range note axle pre-reset to PLC; The output of PLC control ACE 3 seconds, the wheel counting apparatus of disturbed section all resets by enough ACE.After train or simulating wheel this disturbed ACB swept also recover, ATS server shows this ACB state normal.
To sum up, the present invention is independently, does not affect other interlocks, and can the demand different according to each client of every bar line configure from interlocking table.For PMI software, in interlocking table " ACB_RPEPRESET_RELAYS " this when being classified as sky, just do not realize this function, as long as and in interlocking table, define the name of these two output relays, just can realize this function.Thus realize replacing manual operation button to carry out enable PLC by PMI.And ACE rack and interface not any change, service personnel still can use key switch to realize meter shaft pre-reset.
In Fig. 3, DCS represents dcs; CPU represents central process unit.
Above embodiment is used for illustrative purposes only, but not limitation of the present invention, person skilled in the relevant technique, without departing from the spirit and scope of the present invention, various conversion or modification can also be made, therefore all equivalent technical schemes also should belong to category of the present invention, should be limited by each claim.

Claims (7)

1. a long-range note axle pre-reset system, comprising: export the ATS server of long-range meter shaft pre-reset order, power supply, ACE and control according to the order of described long-range meter shaft pre-reset the PLC that described ACE performs pre-reset;
It is characterized in that, also comprise: relay group and PMI, wherein,
Each relay coil in described relay group connects described PMI respectively, and each open contact is serially connected between described power supply and described PLC successively;
The output state of each relay in relay group described in described PMI back production, sends to described ATS server; Described ATS server receives the pre-reset instruction that operator sends, or when ATS server judges the equal trouble free of each relay according to back production information and is all in low-end trim, exports the order of described long-range meter shaft pre-reset to described PMI;
Described PMI receives the order of described long-range meter shaft pre-reset, drives each relay in described relay group to keep high-order to connect described power supply and described PLC, and back production;
Described ATS server, according to the back production signal of described PMI, is learnt that in described relay group, each relay all keeps high-end trim, is sent the order of described long-range meter shaft pre-reset to described PLC.
2. long-range note axle pre-reset system according to claim 1, it is characterized in that, described relay group comprises two relays.
3. long-range note axle pre-reset system according to claim 1, it is characterized in that, described relay fault refers to: output state and back production inconsistent, and this inconsistent state continue more than 200 milliseconds.
4., based on a long-range note axle pre-reset method for note axle pre-reset system long-range described in claim 1 or 2, it is characterized in that, comprising:
The output state of each relay in relay group described in described PMI back production, sends to described ATS server; Described ATS server receives the pre-reset instruction that operator sends, or when ATS server judges the equal trouble free of each relay according to back production information and is all in low-end trim, exports the order of described long-range meter shaft pre-reset to described PMI;
Described ATS server sends the order of long-range meter shaft pre-reset to described PMI;
The order of described PMI output enable, to drive in described relay group each relay to keep high-end trim, and back production information is also returned to described ATS server by the status information of each relay of back production;
After described ATS server is all positioned at high-end trim according to each relay of back production validation of information, send the order of long-range note axle pre-reset to described PLC;
Described PLC controls described ACE and performs pre-reset.
5. long-range note axle pre-reset method according to claim 4, it is characterized in that, the order of described transmission long-range meter shaft pre-reset, comprising:
Described ATS server sends initial pre-reset order to described PMI, and described PMI returns and acknowledges receipt of instruction;
Described ATS server sends and confirms that pre-reset order is to described PMI.
6. long-range note axle pre-reset method according to claim 4, is characterized in that, the order of described PMI output enable, drives each relay in described relay group to keep high-end trim 7 seconds.
7. long-range note axle pre-reset method according to claim 4, is characterized in that, described PLC controls to the output 3 seconds of described ACE.
CN201410457797.8A 2014-09-10 2014-09-10 Long-range note axle pre-reset system and method Active CN104228876B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410457797.8A CN104228876B (en) 2014-09-10 2014-09-10 Long-range note axle pre-reset system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410457797.8A CN104228876B (en) 2014-09-10 2014-09-10 Long-range note axle pre-reset system and method

Publications (2)

Publication Number Publication Date
CN104228876A CN104228876A (en) 2014-12-24
CN104228876B true CN104228876B (en) 2016-03-16

Family

ID=52218009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410457797.8A Active CN104228876B (en) 2014-09-10 2014-09-10 Long-range note axle pre-reset system and method

Country Status (1)

Country Link
CN (1) CN104228876B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107953899B (en) * 2017-12-21 2024-02-23 通号(西安)轨道交通工业集团有限公司北京分公司 Electronic interface device for axle counting
CN108183942B (en) * 2017-12-21 2021-01-22 通号(北京)轨道工业集团有限公司 Test system of axle counting electronic interface device
CN111452832B (en) * 2019-01-18 2022-02-08 比亚迪股份有限公司 Train axle-drawing management method and management system
CN111717237B (en) * 2020-05-26 2022-09-20 卡斯柯信号有限公司 Tramcar axle counting remote reset design method based on safety password
CN111824208A (en) * 2020-07-27 2020-10-27 卡斯柯信号有限公司 Optimization method for axle counting zero resetting operation

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201268315Y (en) * 2008-06-27 2009-07-08 北京康吉森交通技术有限公司 Axle counter track circuit
CN203306050U (en) * 2013-05-29 2013-11-27 上海自仪泰雷兹交通自动化系统有限公司 Safety control box

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB0123058D0 (en) * 2001-09-25 2001-11-14 Westinghouse Brake & Signal Train detection
WO2014059487A1 (en) * 2012-10-18 2014-04-24 Siemens Ltd. Supplementary warning system for level crossing activated by train

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201268315Y (en) * 2008-06-27 2009-07-08 北京康吉森交通技术有限公司 Axle counter track circuit
CN203306050U (en) * 2013-05-29 2013-11-27 上海自仪泰雷兹交通自动化系统有限公司 Safety control box

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
移动闭塞系统计轴远程预复位功能的安全分析;王历珘;《城市轨道交通》;20111231;78-80 *

Also Published As

Publication number Publication date
CN104228876A (en) 2014-12-24

Similar Documents

Publication Publication Date Title
CN104228876B (en) Long-range note axle pre-reset system and method
CN102055633B (en) Satellite-borne double-CAN (Controller Area Network) bus node failure self-restoration system
CN103019218B (en) Railway signal device utilizing dual-CPU (central processing unit) redundancy and control method of railway signal device
EP3708415A2 (en) Battery management system
CN107054414A (en) Remote reboot control method and device for Urban Rail Transit Signal equipment
CN109616378A (en) A kind of emergency stop control device, robot and its emergency stop control method
CN108725521B (en) Hot standby redundancy management system and method for main and standby control centers of rail transit
CN103352837A (en) Stand-by pump automatically-starting control logic device with two pumps mutually serving as stand-by pumps
CN110837062A (en) Power failure and network failure detection reporting system
CN203877672U (en) Redundancy control device of underground explosion-proof elevator
CN101291201A (en) Heart beat information transmission system and method
CN102294293A (en) Starting control method, system and equipment of coal pulverizer
CN105573869B (en) System controller fault tolerant control method based on I2C bus
CN105652191B (en) A kind of safety return circuit condition monitoring system
CN112793621A (en) Computer interlocking turnout multi-machine control system and method
CN105528324A (en) System and method for artificial intervention type 1553B bus seamless switching
CN203133573U (en) Remote intelligent monitoring system of computer room
CN113602327B (en) Remote restarting device and system
CN105858430B (en) A kind of soft stop vehicle control and soft stop control method
CN207360345U (en) Vehicle-mounted ATP remote reboot circuit
CN112787360B (en) High-reliability charging pile
CN112721639B (en) Relay control method and device
CN204271746U (en) Automatic switching device of standby power supply
CN202975754U (en) A power control system of multiple controllers and engineering machinery equipment
CN201573679U (en) Control substation for PIC singlechip overhead manned equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 201206 Shanghai City, Pudong New Area Jinhai Road No. 1000 Building No. 28

Patentee after: Shanghai electric traffic automation system Co., Ltd.

Address before: 201206 Shanghai City, Pudong New Area Jinhai Road No. 1000 Building No. 28

Patentee before: Shanghai is from instrument Tai Leizi traffic automation System Co., Ltd