CN104217286A - A power transmission and transformation project design review data system - Google Patents
A power transmission and transformation project design review data system Download PDFInfo
- Publication number
- CN104217286A CN104217286A CN201410432603.9A CN201410432603A CN104217286A CN 104217286 A CN104217286 A CN 104217286A CN 201410432603 A CN201410432603 A CN 201410432603A CN 104217286 A CN104217286 A CN 104217286A
- Authority
- CN
- China
- Prior art keywords
- project
- audio
- design review
- engineering
- transmitting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Two-Way Televisions, Distribution Of Moving Picture Or The Like (AREA)
Abstract
The present invention discloses a power transmission and transformation project design review data system. The system has advantages of high safety performance, high efficiency, and convenient management, and includes: a scanner for scanning reviewed project documents to obtain a scanning copy, and storing the scanning copy in a cloud server, wherein the scanning copy of the project documents corresponds to project information encodings one by one, the project information encodings are stored in the cloud server, and the cloud server is divided into an audio/video storage module, an electronic review module, a project electronic file module and a project management module; a client end for users of different authorities to access system data, and upload and download data based on the authority thereof, wherein the client end is provided with a function of bar code scanning or two-dimensional code scanning, i.e., corresponding project information can be searched through scanning the bar code or the two-dimensional code; and a province power transmission and transformation project design review system, a city power transmission and transformation project design review system and a power transmission and transformation project design review system of State Grid Corporation of China.
Description
Technical field
The present invention relates to a kind of project of transmitting and converting electricity design review data system.
Background technology
Project of transmitting and converting electricity design review is used for the evaluation to Transmission Projects result, along with increasing of Transmission Projects, more and more higher to the requirement of estimating and examining system.Project of transmitting and converting electricity design review is on-the-spot meeting mode, the labour of traditional low, simple repetition of project of transmitting and converting electricity design review system works efficiency occupies the plenty of time, and along with the progress of science and technology, the development of network, network security more and more obtains the attention of people, in order to ensure that the estimating and examining system that the accuracy of review result is traditional ensures data virgin state by simply carrying out classification to user profile by arranging authority, but the risk that advanced level user still can not be stoped stolen.The equipment that on the other hand traditional evaluation meeting-place adopts is relatively backward does not do noise reduction process yet, result in whole conference process not fogging clear, acoustic noise is large.Finally traditional evaluation meeting-place can not meet the jumbo storage demand of high resolution audio and video data file, memory module is that the waste that unified storage causes storage space very easily produces redundant data.
Summary of the invention
In order to solve the problem, the present invention proposes a kind of project of transmitting and converting electricity design review data system, and it has that security is high, efficiency is high and data are easy to the advantage that manages.
In order to achieve the above object, the technical solution adopted in the present invention is:
A kind of project of transmitting and converting electricity design review data system, comprising:
Provinces and regions project of transmitting and converting electricity design review system: hold audio/video conference by internet and urban district, ground estimating and examining system, obtain engineering design review result data;
Scanner: the complete engineering project file of evaluation is carried out to scanning and obtains scanned copy, and scanned copy is stored in Cloud Server, the scanned copy of engineering project file and engineering information are encoded one_to_one corresponding, and by engineering information code storage in Cloud Server;
Described Cloud Server is divided into audio frequency and video memory module, electronic jury voting module, engineering electronic record module and project management module; Cloud Server is unified to access and authorize i.e. unified account management to store the user profile of all modules to audio frequency and video memory module, electronic jury voting module, engineering electronic record module and project management module; Audio frequency and video memory module realizes audiovisual presentation storage, retrieval, playback, backup and recovery, and managerial personnel can by the video recording of computer access Cloud Server inquiry playback video;
Client: for the user of different rights to the access of system data, and according to oneself authority data uploaded or download, described client is provided with bar code scan or Quick Response Code scan function, can directly inquire about corresponding engineering project information by scanning barcode or Quick Response Code;
Urban district, ground project of transmitting and converting electricity design review system: hold audio/video conference, by engineering project data upload to provinces and regions project of transmitting and converting electricity design review system by internet and provinces and regions project of transmitting and converting electricity design review system;
National grid project of transmitting and converting electricity design review system: be connected with provinces and regions project of transmitting and converting electricity design review system by internet, engineering project data are sent to national grid project of transmitting and converting electricity design review system by provinces and regions project of transmitting and converting electricity design review system, and engineering review data feedback are returned provinces and regions project of transmitting and converting electricity design review system.
Described Cloud Server is encryption Cloud Server.
Power transmission and transformation evaluation meeting-place, described provinces and regions comprises:
The main meeting room audio-visual system in provinces and regions: for hold evaluation engineering in plenary session or row noise meeting, the main meeting room audio-visual system in described provinces and regions is provided with high resolution audio and video harvester, high resolution audio and video display device and noise suppressor;
Specialized conference room, provinces and regions audio-visual system: evaluate use separately for evaluating each specialty in engineering, specialized conference room, described provinces and regions audio-visual system is provided with high resolution audio and video harvester, high resolution audio and video display device and noise suppressor;
Pulpit: for monitoring and the data processing of the main meeting room audio-visual system in provinces and regions and specialized conference room, provinces and regions audio-visual system.
The main meeting room audio-visual system in described provinces and regions, specialized conference room, provinces and regions audio-visual system, the communication between appraisal meeting field, urban district and national grid estimating and examining system all adopt national grid local network transport.
The user profile of described Cloud Server carries out strict grade classification, and different brackets has different authorities.
Described audio frequency and video memory module is for storing the audio, video data of main meeting room audio-visual system and specialized conference room audio-visual system.
Described electronic jury voting module for storing engineering design Project evaluation file, evaluation expert submits review comment to and authorization bill of approximate estimate.
Described engineering electronic record is for storing the archives of whole engineering project.
Described project management module is for storing evaluation plan, engineering project progress and task.
Beneficial effect of the present invention is
1, preliminary design review centralized management can be strengthened, improve preliminary design review efficiency, accelerate preliminary design review work implementation dynamics, accelerate engineering design evaluation progress and Engineering Standardization construction; Improve evaluation business process standardization, informationization, the application of result of strengthening Standardization Construction, effective control engineering cost management and control.
2, electronic record file layout is graphic form, fundamentally ensure that the unalterable feature of data, utilize bar code scan project information encode and be input to database simultaneously, the file in engineering archive and project information are encoded one_to_one corresponding, is convenient to inquiry and the access of client.
3, the audio and video acquisition devices in main meeting room audio-visual system and specialized conference room audio-visual system and display device are high definition device, noise suppressor is provided with in main meeting room audio-visual system and specialized conference room audio-visual system, ensure that the sharpness of the audio frequency and video of evaluation meeting and the accuracy of information, Cloud Server stores and realizes video image storage, retrieval, playback, backup and recovery, and managerial personnel can by the video recording of computer access storage server inquiry playback video.
4, owing to adopting national grid LAN (Local Area Network) to carry out data transmission, improve the security of data.
5, modular storage is carried out to Cloud Server and improve storage efficiency, make access more direct, manage more convenient; Cloud Server is encrypted to the security that further ensure that data.
Accompanying drawing explanation
Fig. 1 is system framework figure of the present invention.
Embodiment
A project of transmitting and converting electricity design review data system as shown in Figure 1, comprising:
Provinces and regions project of transmitting and converting electricity design review system: hold audio/video conference by internet and urban district, ground estimating and examining system, obtain engineering design review result data;
Scanner: the complete engineering project file of evaluation is carried out to scanning and obtains scanned copy, and scanned copy is stored in Cloud Server, the scanned copy of engineering project file and engineering information are encoded one_to_one corresponding, and by engineering information code storage in Cloud Server;
Cloud Server is divided into audio frequency and video memory module, electronic jury voting module, engineering electronic record module and project management module; Cloud Server is unified to access and authorize i.e. unified account management to store the user profile of all modules to audio frequency and video memory module, electronic jury voting module, engineering electronic record module and project management module; Audio frequency and video memory module realizes audiovisual presentation storage, retrieval, playback, backup and recovery, and managerial personnel can by the video recording of computer access Cloud Server inquiry playback video;
Client: for the user of different rights to the access of system data, and according to oneself authority data uploaded or download, described client is provided with bar code scan or Quick Response Code scan function, can directly inquire about corresponding engineering project information by scanning barcode or Quick Response Code;
Urban district, ground project of transmitting and converting electricity design review system: hold audio/video conference, by engineering project data upload to provinces and regions project of transmitting and converting electricity design review system by internet and provinces and regions project of transmitting and converting electricity design review system;
National grid project of transmitting and converting electricity design review system: be connected with provinces and regions project of transmitting and converting electricity design review system by internet, engineering project data are sent to national grid project of transmitting and converting electricity design review system by provinces and regions project of transmitting and converting electricity design review system, and engineering review data feedback are returned provinces and regions project of transmitting and converting electricity design review system.
Cloud Server is encryption Cloud Server.
Power transmission and transformation evaluation meeting-place, provinces and regions comprises:
The main meeting room audio-visual system in provinces and regions: for hold evaluation engineering in plenary session or row noise meeting, the main meeting room audio-visual system in described provinces and regions is provided with high resolution audio and video harvester, high resolution audio and video display device and noise suppressor;
Specialized conference room, provinces and regions audio-visual system: evaluate use separately for evaluating each specialty in engineering, specialized conference room, provinces and regions audio-visual system is provided with high resolution audio and video harvester, high resolution audio and video display device and noise suppressor;
Pulpit: for monitoring and the data processing of the main meeting room audio-visual system in provinces and regions and specialized conference room, provinces and regions audio-visual system.
The main meeting room audio-visual system in provinces and regions, specialized conference room, provinces and regions audio-visual system, the communication between appraisal meeting field, urban district and national grid estimating and examining system all adopt national grid local network transport.
The user profile of Cloud Server carries out strict grade classification, and different brackets has different authorities.
Audio frequency and video memory module is for storing the audio, video data of main meeting room audio-visual system and specialized conference room audio-visual system.
Electronic jury voting module for storing engineering design Project evaluation file, evaluation expert submits review comment to and authorization bill of approximate estimate.
Engineering electronic record is for storing the archives of whole engineering project.
Project management module is for storing evaluation plan, engineering project progress and task.
The conference model of provinces and regions power transmission and transformation estimating and examining system:
1, point-to-point meeting, namely non-interference between each meeting room: specialized conference room, provinces and regions is urban district specialized conference room or national grid general headquarters specialized conference room over the ground; The main meeting room in provinces and regions is the main meeting room of the main meeting room in urban district or national grid general headquarters over the ground.
2, multipoint conference, when point-to-point Meeting Held, any one evaluation meeting room can join in other " point-to-point " meetings at any time, can hold multipoint conference: any third party's evaluation meeting room can be joined in other " point-to-point " meetings held by software asks.
3, broadcast conference, in order to the resource that uses manpower and material resources sparingly, increase the actual effect of work efficiency, company of general headquarters can hold overall meeting with subsidiary/member companies.This conferencing can arrange main meeting-place, can hold overall meeting by video conferencing system with broadcast mode.When carrying out all broadcast Great Council, the main meeting room at province evaluation center is set to main meeting-place, the meeting room of other evaluation substations is sub-venue, conference organisations, job placement etc. are carried out to each sub-venue in main meeting-place, when there being sub-venue to need working report or conference speech, have main meeting-place specified speech, working report or the conference speech of that sub-venue are listened in all meeting-place.
4, temporary meeting, there is thing need with the opposing party or in many ways discuss and exchange between meeting-place temporarily, when not needing to create meeting by conference management personnel, the terminal namely by meeting room is directly called or invites an other side to set up two sides or video conference in many ways.Send invitation one side or a called side must be in idle condition, the meeting set up is only temporary meeting.
What adopt due to meeting room audio-visual system is high definition harvester and high definition display device, data traffic is large, need mass storage, Cloud Server can well address this problem, save local storage space, client conducts interviews to whole system and also facilitates much on the other hand simultaneously.In order to make access more direct, managing and more convenient Module Division storage having been carried out to Cloud Server, simultaneously in order to the security of data, ensureing the safety of whole network system, encryption has been carried out to Cloud Server.The user profile of Cloud Server to whole system is unified to store, the unified access of each module and mandate in effective solution evaluation platform, and the control of authority of districts and cities' different user needs, avoid access disparate modules repeat logon and repeatedly input username and password, unified account management stores the user profile of all modules, each module is to the associative operation of user all by once having logged in, and namely unified storage, distribution are authorized.
Audio frequency and video memory module, for storing the audio, video data of video and audio system, realizes video image storage, retrieval, playback, backup and recovery, and managerial personnel can by the video recording of computer access Cloud Server inquiry playback video.
Electronic jury voting module: evaluation expert has access and amendment authority, for storing engineering design Project evaluation file and review result, comprises the information such as review comment and Budgetary Estimates book.
Although Cloud Server has carried out strict grade classification to user profile, still do not stop now due to advanced level user's information stolen time the loss of data that causes.The real effectiveness of the whole evaluation platform of the safety in order to whole data review result, the present invention has introduced scanner, engineering project file after evaluation carries out scanning the file that obtains picture format and is stored in engineering electronic record module, this fundamentally solves lawless person and wants distorting whole Project evaluation result, engineering project file after evaluation carries out Quick Response Code or barcode encoding according to engineering project information coding before the scan, engineering project after evaluation is by obtaining scanned copy after scanning, engineering project scanned copy, engineering project information coding and Quick Response Code belong to relation one to one, after user's accessing system of client, can be inquired about file by scanning barcode or Quick Response Code, make whole access process more quick and easy.
Project management module is for storing evaluation plan, project information progress and distributing the task of each user, and normal client can conduct interviews to it according to the access rights of oneself and pay close attention to correlation engineering information.
By reference to the accompanying drawings the specific embodiment of the present invention is described although above-mentioned; but not limiting the scope of the invention; one of ordinary skill in the art should be understood that; on the basis of technical scheme of the present invention, those skilled in the art do not need to pay various amendment or distortion that creative work can make still within protection scope of the present invention.
Claims (9)
1. a project of transmitting and converting electricity design review data system, is characterized in that, comprising:
Provinces and regions project of transmitting and converting electricity design review system: hold audio/video conference by internet and urban district, ground estimating and examining system, obtain engineering design review result data;
Scanner: the complete engineering project file of evaluation is carried out to scanning and obtains scanned copy, and scanned copy is stored in Cloud Server, the scanned copy of engineering project file and engineering information are encoded one_to_one corresponding, and by engineering information code storage in Cloud Server;
Described Cloud Server is divided into audio frequency and video memory module, electronic jury voting module, engineering electronic record module and project management module; Cloud Server is unified to access and authorize i.e. unified account management to store the user profile of all modules to audio frequency and video memory module, electronic jury voting module, engineering electronic record module and project management module; Audio frequency and video memory module realizes audiovisual presentation storage, retrieval, playback, backup and recovery, and managerial personnel can by the video recording of computer access Cloud Server inquiry playback video;
Client: for the user of different rights to the access of system data, and according to oneself authority data uploaded or download, described client is provided with bar code scan or Quick Response Code scan function, can directly inquire about corresponding engineering project information by scanning barcode or Quick Response Code;
Urban district, ground project of transmitting and converting electricity design review system: hold audio/video conference, by engineering project data upload to provinces and regions project of transmitting and converting electricity design review system by internet and provinces and regions project of transmitting and converting electricity design review system;
National grid project of transmitting and converting electricity design review system: be connected with provinces and regions project of transmitting and converting electricity design review system by internet, engineering project data are sent to national grid project of transmitting and converting electricity design review system by provinces and regions project of transmitting and converting electricity design review system, and engineering review data feedback are returned provinces and regions project of transmitting and converting electricity design review system.
2. a kind of project of transmitting and converting electricity design review data system as claimed in claim 1, is characterized in that, described Cloud Server is encryption Cloud Server.
3. a kind of project of transmitting and converting electricity design review data system as claimed in claim 1 or 2, is characterized in that, described provinces and regions power transmission and transformation evaluation meeting-place comprises:
The main meeting room audio-visual system in provinces and regions: for hold evaluation engineering in plenary session or row noise meeting, the main meeting room audio-visual system in described provinces and regions is provided with high resolution audio and video harvester, high resolution audio and video display device and noise suppressor;
Specialized conference room, provinces and regions audio-visual system: evaluate use separately for evaluating each specialty in engineering, specialized conference room, described provinces and regions audio-visual system is provided with high resolution audio and video harvester, high resolution audio and video display device and noise suppressor;
Pulpit: for monitoring and the data processing of the main meeting room audio-visual system in provinces and regions and specialized conference room, provinces and regions audio-visual system.
4. a kind of project of transmitting and converting electricity design review data system as claimed in claim 3, it is characterized in that, the main meeting room audio-visual system in described provinces and regions, specialized conference room, provinces and regions audio-visual system, the communication between appraisal meeting field, urban district and national grid estimating and examining system all adopt national grid local network transport.
5. a kind of project of transmitting and converting electricity design review data system as claimed in claim 1 or 2, it is characterized in that, the user profile of described Cloud Server carries out strict grade classification, and different brackets has different authorities.
6. a kind of project of transmitting and converting electricity design review data system as claimed in claim 1 or 2, is characterized in that, described audio frequency and video memory module is for storing the audio, video data of main meeting room audio-visual system and specialized conference room audio-visual system.
7. a kind of project of transmitting and converting electricity design review data system as claimed in claim 1 or 2, is characterized in that, described electronic jury voting module for storing engineering design Project evaluation file, evaluation expert submits review comment to and authorization bill of approximate estimate.
8. a kind of project of transmitting and converting electricity design review data system as claimed in claim 1 or 2, it is characterized in that, described engineering electronic record is for storing the archives of whole engineering project.
9. a kind of project of transmitting and converting electricity design review data system as claimed in claim 1 or 2, is characterized in that, described project management module is for storing evaluation plan, engineering project progress and task.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410432603.9A CN104217286A (en) | 2014-08-28 | 2014-08-28 | A power transmission and transformation project design review data system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410432603.9A CN104217286A (en) | 2014-08-28 | 2014-08-28 | A power transmission and transformation project design review data system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104217286A true CN104217286A (en) | 2014-12-17 |
Family
ID=52098745
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410432603.9A Pending CN104217286A (en) | 2014-08-28 | 2014-08-28 | A power transmission and transformation project design review data system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104217286A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105260875A (en) * | 2015-09-16 | 2016-01-20 | 国网山东省电力公司经济技术研究院 | Electric power engineering project evaluation system |
CN105933362A (en) * | 2016-07-13 | 2016-09-07 | 北京恒华伟业科技股份有限公司 | Project progress monitoring method, device, and system |
CN108229620A (en) * | 2018-02-02 | 2018-06-29 | 翟松岩 | A kind of palm for prison supervision inspection leads to, system and APP |
CN108388997A (en) * | 2018-03-09 | 2018-08-10 | 四川安信科创科技有限公司 | Task record selective examination system and method based on Quick Response Code |
CN112000663A (en) * | 2020-07-21 | 2020-11-27 | 国家电网有限公司 | Data fusion system for electric power customer archive information |
CN113283858A (en) * | 2021-05-07 | 2021-08-20 | 范佳媛 | Cross-chain detection method for engineering service system fusing private chain and alliance chain |
CN113792436A (en) * | 2021-09-17 | 2021-12-14 | 国网福建省电力有限公司 | Power transmission and transformation project design review system and method based on GIM model |
-
2014
- 2014-08-28 CN CN201410432603.9A patent/CN104217286A/en active Pending
Non-Patent Citations (1)
Title |
---|
洪莺俤: "福建输变电工程设计评审系统的设计与实现", 《中国优秀硕士学位论文全文数据库(信息科技辑)》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105260875A (en) * | 2015-09-16 | 2016-01-20 | 国网山东省电力公司经济技术研究院 | Electric power engineering project evaluation system |
CN105933362A (en) * | 2016-07-13 | 2016-09-07 | 北京恒华伟业科技股份有限公司 | Project progress monitoring method, device, and system |
CN108229620A (en) * | 2018-02-02 | 2018-06-29 | 翟松岩 | A kind of palm for prison supervision inspection leads to, system and APP |
CN108388997A (en) * | 2018-03-09 | 2018-08-10 | 四川安信科创科技有限公司 | Task record selective examination system and method based on Quick Response Code |
CN112000663A (en) * | 2020-07-21 | 2020-11-27 | 国家电网有限公司 | Data fusion system for electric power customer archive information |
CN113283858A (en) * | 2021-05-07 | 2021-08-20 | 范佳媛 | Cross-chain detection method for engineering service system fusing private chain and alliance chain |
CN113283858B (en) * | 2021-05-07 | 2023-08-08 | 范佳媛 | Cross-link inspection method of engineering business system fusing private link and alliance link |
CN113792436A (en) * | 2021-09-17 | 2021-12-14 | 国网福建省电力有限公司 | Power transmission and transformation project design review system and method based on GIM model |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104217286A (en) | A power transmission and transformation project design review data system | |
CN101427257B (en) | Tracking and editing a resource in a real-time collaborative session | |
CN106572000A (en) | WeChat official account platform-based construction site quality and safety management method | |
CN101977184B (en) | Multi-identity selection landing device and service system | |
CN205408020U (en) | Teleconferencing system | |
CN110503406A (en) | Face electric distribution box inspection method for managing and monitoring and system | |
CN103826079A (en) | Data management platform | |
CN105469323A (en) | Handheld terminal for checking power supply service and method of checking power supply service | |
CN111970113A (en) | Enterprise WeChat processing management big data platform framework | |
CN104636849B (en) | Civil aircraft data management system | |
CN111311165A (en) | Labor information management method and labor information alliance chain system | |
CN109743297B (en) | Patrol and office management service system and working method thereof | |
CN112465450A (en) | Remote video investigation system based on small program | |
CN103971258A (en) | Electronic questionnaire investigation service system and investigation method using same | |
CN111401861B (en) | Office automation OA intelligent office management system | |
CN110782218A (en) | Rail transit design contact method, system, device and storage medium | |
US20220383262A1 (en) | Method and system for providing portable curriculum vitae | |
CN105488738A (en) | Method for performing power supply service check based on complaint information and hand-held terminal | |
CN111031132A (en) | Industrial Internet system architecture based on standard communication protocol and implementation method thereof | |
Hao | Research on strategic human resource management of enterprises based on cloud computing | |
CN110852578A (en) | Mobile operation system for maintenance management | |
Chen et al. | Combining the features of ICT and citizen relationship management to enhance the governmental administration: An I-kenting system as a practice | |
CN104581012A (en) | Method for checking course and training on internet | |
Yao | Path Analysis of Using Big Data to Innovate Archives Management Model and Improve Service Ability | |
TWI635400B (en) | Cloud-based management method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20141217 |