CN104213654A - Novel method for synchronously building walls, frame and floors of house - Google Patents

Novel method for synchronously building walls, frame and floors of house Download PDF

Info

Publication number
CN104213654A
CN104213654A CN201310219797.XA CN201310219797A CN104213654A CN 104213654 A CN104213654 A CN 104213654A CN 201310219797 A CN201310219797 A CN 201310219797A CN 104213654 A CN104213654 A CN 104213654A
Authority
CN
China
Prior art keywords
building
house
floor
wall
novel method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310219797.XA
Other languages
Chinese (zh)
Inventor
杨遂震
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310219797.XA priority Critical patent/CN104213654A/en
Publication of CN104213654A publication Critical patent/CN104213654A/en
Pending legal-status Critical Current

Links

Landscapes

  • Building Environments (AREA)

Abstract

The invention provides a novel method for synchronously building walls, a frame and floors of a house. Novel building materials of L-shaped matched wall bricks, H-shaped matched wall bricks and U-shaped matched wall bricks and a layered matched building mode are adopted, the heat and sound insulation waterproof floor slab building house is built, and the novel method used for building the walls and frame formworks of the walls is creatively generated. According to the novel method for floor slab building, floor slabs are scientifically built in a layered and matched mode, so that the heat and sound insulation and waterproof effects are achieved. When the novel method is used for building the house, building work hours are reduced by about 50%, resource and energy consumption is reduced by about 50%, and damage generated in various natural disasters such as an earthquake is reduced by over 50%.

Description

House wall, framework, floor synchronously build new method by laying bricks or stones
Existing framework house building method is all generally first vertical frame Structural form on building foundation, use steel bar concrete casting framework shaping again, inlay with wall brick afterwards and fill up masonry panel, majority is all general frame of first casting, after from bottom to top layered mosaics fill up, masonry panel, framework casting and building wall are implemented step by step.Or also there is minority first to build the scrappy monolithic body of wall of frameless position, the framework formwork of rear vertical frame rack position, then use steel bar concrete casting frame construction, to connect the scrappy monolithic body of wall in each portion.Above building method shortcoming is: framework casting and building wall step-by-step construction, and cause man-hour long, consumptive material is many, high energy consumption, and overall structure performance between framework and body of wall is poor, Anti-seismic and disaster resistant ability.
The for a change above building method fallen behind, the present invention's design is used special LHU shape instead and is coordinated wall brick and channel steel shape layering cooperation to build thermal insulation sound insulation waterproof floor slab by laying bricks or stones, implement disposable synchronous house to build by laying bricks or stones and framework cast molding, to improve house soundness and quake evaluation performance, (attached: in raise build work (1) LHU shape coordinate wall brick manual and in raise build work (2) channel steel shape layering and coordinate thermal insulation sound insulation waterproof floor slab manual) simultaneously for house property cause joint provide energy-saving time, the people's livelihood is lived in peace and is contributed.
New method synchronously built by laying bricks or stones by house wall, framework, floor:
1, on building foundation, preset the vertical steel concrete steel frame needing to arrange everywhere.
2, coordinate wall brick not only when wall brick but also when framework formwork surrounds vertical steel concrete steel frame masonry panel with the LHU shape of difformity and purposes, and reserved concrete column groove and in length and breadth beam casting groove simultaneously, to build casting general frame house by laying bricks or stones:
Two blocks of L shape wall bricks are put upside down and are fitted in a pair rectangle wall brick, carry out levels doubling masonry panel corner in length and breadth for surrounding the vertical steelframe of building elbow place by laying bricks or stones.
One piece of H-shaped wall brick transverse opening docking turning doubling building wall, follow-up polylith H-shaped wall brick lateral port mouth is connected, upper lower leaf doubling fissure of displacement building sequence masonry panel.
Two blocks of L shape wall bricks are put upside down and are fitted in a pair rectangle wall brick and one piece of square wall brick point levels fissure of displacement of horizontal U-shaped and coordinate and build door and window both sides upper and lower vertical edges seam body of wall by laying bricks or stones.
The square wall brick opening upwards of polylith U-shaped, the mouth building sequence that is connected in side is built beam groove in length and breadth by laying bricks or stones and is connected with column groove.
3, arrange beam channel-section steel muscle in length and breadth in the reserved beam groove in length and breadth after integral house builds appearance by laying bricks or stones, past column groove and in length and breadth beam groove casting concrete mortar simultaneously, with fixing formation general frame structural building main body.Need in the middle of above crossbeam to stay 2-4 centimetre wide dark effluent trough to lead to the outer outlet pipe of wall.
4, according to building construction quake evaluation firmness needs, column can be designed to overlook the various rectangle column such as right angle type, T-shaped or cross in length and breadth in advance, the rectangular dimension of various rectangle column, can increase with the need, until full body of wall slam is cast into whole blank wall body in length and breadth, the thickness up and down of vertical cross girder suitably can add on the basis of beam groove builds the U-shaped cooperation wall brick turning upside down alternate, and integral cast improves thickness, meets the anti-folding demand of beam body.
5, on crossbeam, first pave lower floor's floor that layering coordinates floor, notch is upwards closely paved successively, and seam cement mortar is closely knit fills up.After lower floor's floor is paved, floor joint must be connected with bolt is firm, come off with floor displacement during earthquake-proof, damage.Lower floor pave fastening after build upper strata floor again, notch is downward, and closely build by laying bricks or stones with the adjacent groove of lower fault Cao Kua lower floor two successively, seam mortar tamps, with preventing water leakage, before and after the floor of upper strata each inlay to pave with half range floor pave.
When the cooperation of levels floor is built by laying bricks or stones, 2-3 cm thick cement mortar must be laid between Zhe Qiang district, floor two levels, to ensure to build rear upper and lower channel-section steel frame by laying bricks or stones, must not contact with each other with base plate or panel, with space partition levels floor, prevent levels floor to be connected, guarantee that the sound of something astir of upper aspect must not be delivered to lower floor's floor, manifest soundproof effect.
6, after the room body of same floor height is built by laying bricks or stones, is cast, lays and be disposed, go round and begin again on reserved vertical pillars reinforcing bar Foundation of steel frame again, again wheel turns over and builds casting by laying bricks or stones and lay new last layer building, until the highest top layer in house, the floor of the highest top layer i.e. roof panels, for prevention snow and rain hail or the infringement of extraneous material, roofing can the two-layer thermal insulation sound insulating floor slab of lay-up, to reach object of living in peace.
7, for improving Building Energy Saving, the effects such as environmental protection, can annotate in the air and filling various lightweight thermal insulation sound-and-fire proof material in house surrounding body of wall concerning foreign affairs, outside reducing room as far as possible, the high and cold high noisy of high temperature is on the impact of indoor.
8, all door and windows can adopt the door and window of double face slab or double-layer glass spacer structure, in order to reinforcement thermal insulation soundproof effect.
Above synchronous masonry panel, casting framework, laying floor construction house tool is adopted to have the following advantages:
1, house wall is built by laying bricks or stones with framework casting and is paved sound insulating floor slab synchronous construction, the integral firmness in house can be strong, Anti-seismic and disaster resistant performance is good, because body of wall hollow rate reaches about 50%, the deadweight in house also reduces about 50%, the reaction force of same house to earthquake also reduces about 50%, thus can reduce loss more than 50% that various disaster causes until 100%.
2, because house wall is also framework formwork, building wall and framework formwork erection and lay prefabricated sound insulating floor slab etc. and synchronously develop simultaneously simultaneously and construct, abolished a large amount of on-the-spot carpenter's operations, saved a large amount of wood works, main house body construction period can save more than 50%.
3, because body of wall hollow rate reaches about 50%, and be all cement bonded sand petrochemical industry substantially, abolished carpenter's operation engineering that job site is a large amount of simultaneously, thus can save various building resource and consume more than 50%.
4, because various building logistics reduces in a large number, and abolish on-the-spot carpenter's operation engineering, implemented building energy conservation and add energy saving building, thus can save building total energy consumption about 50%.Figure of description illustrates:
Accompanying drawing is that after coordinating hollow wall brick masonry, bird lookes at flat shape and is similar to the hollow wall brick schematic diagram of cooperation of English capitalization LHU shape.
Fig. 1 is that L shape coordinates hollow wall brick, and two blocks of L shape wall bricks are put upside down cooperation and built into the square wall brick of a block length by laying bricks or stones, be used for corner, house place in length and breadth layering doubling build the shape corner at a right angle vertical plane the top of a wall vertical with door and window both sides seam by laying bricks or stones.
Fig. 2 is that H-shaped coordinates hollow wall brick, house wall area hollow wall broad in the middle is built in the building sequence that is connected of polylith H-shaped wall brick transverse opening by laying bricks or stones, body of wall two stop portion coordinates with the hollow wall brick of the square cooperation of a block length or one block of hollow wall brick of U-shaped builds into the top of a wall seam by laying bricks or stones, and this seam method is also seam method when building various rectangular frame column groove by laying bricks or stones.
Fig. 3 is that U-shaped coordinates hollow wall brick, polylith U-shaped wall brick opening upwards, side mouth be connected building sequence build by laying bricks or stones into house frame in length and breadth beam groove be connected with column groove, form integral house framework casting groove, integral house uses concrete casting general frame after having built by laying bricks or stones immediately, forms integral reinforced concrete frame house.

Claims (1)

1. adopting New Building Materials---LHU shape coordinates wall brick and layering to coordinate thermal insulation sound insulation waterproof floor slab building, and what innovation produced is house wall, again when house frame formwork; Floor layering overstates that two adjacent groove scientific matching are built by laying bricks or stones, and implements masonry panel, casting framework, lays floor synchronous construction new method.
CN201310219797.XA 2013-06-05 2013-06-05 Novel method for synchronously building walls, frame and floors of house Pending CN104213654A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310219797.XA CN104213654A (en) 2013-06-05 2013-06-05 Novel method for synchronously building walls, frame and floors of house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310219797.XA CN104213654A (en) 2013-06-05 2013-06-05 Novel method for synchronously building walls, frame and floors of house

Publications (1)

Publication Number Publication Date
CN104213654A true CN104213654A (en) 2014-12-17

Family

ID=52095536

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310219797.XA Pending CN104213654A (en) 2013-06-05 2013-06-05 Novel method for synchronously building walls, frame and floors of house

Country Status (1)

Country Link
CN (1) CN104213654A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113931344A (en) * 2021-10-26 2022-01-14 李鹏 Square brick and building method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU7152074A (en) * 1973-07-20 1976-01-22 Johnston G A Concrete tee block
CN1058068A (en) * 1991-06-20 1992-01-22 杨遂震 Combined hollow building block and production equipment
CN2320693Y (en) * 1997-08-21 1999-05-26 广西科学院应用物理研究所 Multi-functional ventilating and insulating hollow brick
EP1054115A1 (en) * 1999-05-21 2000-11-22 G P S Building block for making angled walls
CN1639430A (en) * 2002-03-01 2005-07-13 P·布拉热维奇 Building panel and construction method
CN2753822Y (en) * 2004-11-18 2006-01-25 何德江 Two-layer corrugated plate planel

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU7152074A (en) * 1973-07-20 1976-01-22 Johnston G A Concrete tee block
CN1058068A (en) * 1991-06-20 1992-01-22 杨遂震 Combined hollow building block and production equipment
CN2320693Y (en) * 1997-08-21 1999-05-26 广西科学院应用物理研究所 Multi-functional ventilating and insulating hollow brick
EP1054115A1 (en) * 1999-05-21 2000-11-22 G P S Building block for making angled walls
CN1639430A (en) * 2002-03-01 2005-07-13 P·布拉热维奇 Building panel and construction method
CN2753822Y (en) * 2004-11-18 2006-01-25 何德江 Two-layer corrugated plate planel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113931344A (en) * 2021-10-26 2022-01-14 李鹏 Square brick and building method thereof
CN113931344B (en) * 2021-10-26 2023-01-06 上海炽盛装饰工程有限公司 Square brick and building method thereof

Similar Documents

Publication Publication Date Title
CN202324323U (en) Outer wall plate
CN109057091B (en) Assembly type hollow outer wall suitable for steel structure and assembly method thereof
CN103015563B (en) Outer-block inner-masonry building structure system
CN202899319U (en) Waterproof panel point of side wall of existing building and roof of new-built building
CN104213654A (en) Novel method for synchronously building walls, frame and floors of house
CN211621943U (en) Prefabricated balcony of assembled steel construction bridge cut-off
CN204151917U (en) The double combined wall self-insulation system that a kind of insulation blocks is built by laying bricks or stones
CN204151985U (en) Sandwich wall Self-thermal-insulation System
CN111075011A (en) Prefabricated balcony of assembled steel construction bridge cut-off
CN201236416Y (en) Prefabricated component for denizen house and prefabricated component house
CN204151927U (en) Novel cast-in-place double combined wall self-insulation system
CN204151939U (en) Cast-in-place double combined wall self-insulation system
CN204151954U (en) The double combined wall self-insulation system that a kind of composite heat insulation block is built by laying bricks or stones
CN204152063U (en) The double group of block type wall self-insulation system that a kind of composite heat insulation block is built by laying bricks or stones
CN204151946U (en) Novel cast-in-place double assembled wall Self-thermal-insulation System
CN204151959U (en) Cast-in-place combined wall self-insulation system
CN204151977U (en) Cast-in-place double assembled wall Self-thermal-insulation System
CN204151982U (en) The double combined wall thermal insulating system that a kind of composite heat insulation block is built by laying bricks or stones
CN204151941U (en) The double group of block type wall thermal insulating system that a kind of composite heat insulation block is built by laying bricks or stones
CN204151986U (en) Outer wall heat insulating system
CN204151987U (en) Internal wall insulation system
CN204151965U (en) Cast-in-place double group of block type wall self-insulation system
CN204151958U (en) Novel cast-in-place combined wall self-insulation system
CN221399428U (en) Integrated system structure of heat-insulating structure of frame structure building
RU129953U1 (en) STONE FRAME WITH DIAPHRAGM WALL ELEMENTS

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20141217