CN104213552B - 盐渍土地基中排水系统安装方法 - Google Patents

盐渍土地基中排水系统安装方法 Download PDF

Info

Publication number
CN104213552B
CN104213552B CN201410426940.7A CN201410426940A CN104213552B CN 104213552 B CN104213552 B CN 104213552B CN 201410426940 A CN201410426940 A CN 201410426940A CN 104213552 B CN104213552 B CN 104213552B
Authority
CN
China
Prior art keywords
anticorrosion band
band drain
anticorrosion
preformed pile
adjacent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410426940.7A
Other languages
English (en)
Other versions
CN104213552A (zh
Inventor
曾德明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhu Longhu Construction Engineering Co ltd
Original Assignee
Chengdu Laibao Petroleum Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Laibao Petroleum Equipment Co Ltd filed Critical Chengdu Laibao Petroleum Equipment Co Ltd
Priority to CN201410426940.7A priority Critical patent/CN104213552B/zh
Publication of CN104213552A publication Critical patent/CN104213552A/zh
Application granted granted Critical
Publication of CN104213552B publication Critical patent/CN104213552B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本发明公开的是盐渍土地基中排水系统安装方法。本发明主要由以下步骤组成:(1)在地基上挖掘出预制桩预埋坑,在预制桩预埋坑的坑壁一周自上向下垂直设置防腐蚀排水板,预制桩预埋坑的底部铺设一层水平设置的防腐蚀排水板,该垂直设置的防腐蚀排水板均匀排布在预制桩一周,垂直设置的防腐蚀排水板底端均与水平设置的防腐蚀排水板连接;(2)地基上预制桩预埋坑以外的其他区域设置一排以上垂直插入的防腐蚀排水板,且该防腐蚀排水板与引水槽连通;且相邻两排防腐蚀排水板交错分布;(3)该水平设置的防腐蚀排水板连接于引水槽中,进而将盐渍土地基中的盐水引出。本发明具有有效提高排水效率、有效减缓预制桩被腐蚀效率的等优点。

Description

盐渍土地基中排水系统安装方法
技术领域
本发明涉及一种排水系统的安装方法,具体涉及的是盐渍土地基中排水系统安装方法。
背景技术
盐渍土是盐土和碱土以及各种盐化、碱化土壤的总称。盐土是指土壤中可溶性盐含量达到对作物生长有显著危害的土类。盐分含量指标因不同盐分组成而异。碱土是指土壤中含有危害植物生长和改变土壤性质的多量交换性钠。盐渍土主要分布在内陆干旱、半干旱地区,滨海地区也有分布。
全世界盐渍土面积计约897.0万平方公里,约占世界陆地总面积的6.5%,占干旱区总面积的39%。中国盐渍土面积约有20多万平方公里,约占国土总面积的2.1%。随着我国广大西北地区的开发和建设,对盐渍土地基工程提出了更高的要求。
我国对盐渍土的分类方法是沿用前苏联的分类方法,按不同性质的盐含量进行分类:主要分为氯盐渍土、硫酸盐渍土和碳酸盐渍土。
由于盐渍土本身与一般土不同,甚至比冻土、膨胀土和湿陷性黄土更特殊和复杂。它除了具有溶陷性外,还具有盐胀性和腐蚀性,给工程带来许多危害,造成了巨大的经济损失。
发明内容
本发明的目的在于解决现有排水系统排水效果不好的问题,提供一种有效提高排水效率同时有效减缓预制桩被腐蚀效率的方法。
为解决上述缺点,本发明的技术方案如下:
盐渍土地基中排水系统安装方法,主要由以下步骤组成:
(1)在地基上挖掘出预制桩预埋坑,在预制桩预埋坑的坑壁一周自上向下垂直设置防腐蚀排水板,预制桩预埋坑的底部铺设一层水平设置的防腐蚀排水板,该垂直设置的防腐蚀排水板均匀排布在预制桩一周,垂直设置的防腐蚀排水板底端均与水平设置的防腐蚀排水板连接;
(2)地基上预制桩预埋坑以外的其他区域设置一排以上垂直插入的防腐蚀排水板,且该防腐蚀排水板与引水槽连通;且相邻两排防腐蚀排水板交错分布;
(3)该水平设置的防腐蚀排水板连接于引水槽中,进而将盐渍土地基中的盐水引出。
作为一种优选的设置方式,所述步骤(2)中当每排防腐蚀排水板中相邻两个防腐蚀排水板呈“一一”的形状排列时,该相邻两个防腐蚀排水板的距离为0.5m~1m,相邻两排防腐蚀排水板的间隔为2m~3m;当每排防腐蚀排水板中相邻两个防腐蚀排水板呈“二”字形排列时,每排中相邻两个防腐蚀排水板的距离为2m~3m,相邻两排防腐蚀排水板的间隔为0.5m~1m。
本发明通过多排交错设置的且垂直插入的防腐蚀排水板的设置,每排防腐蚀排水板平行设置,以及每排中相邻两个防腐蚀排水板之间的间隔设置为2m~3m,通过该设置能有效达到排水的效果,且排水效果显著。
通过在预制桩一周设置防腐蚀排水板,有效减少盐渍土中的盐水与预制桩相接触的量,进而达到减缓腐蚀效率的效果。
作为最优的设置方式,所述防腐蚀排水板环形排列在预制桩一周或/和放射形排列于预制桩一周。
为了能及时将排水板中的水分排出,提高排水板的效率,本发明还包括在引水槽上连接抽水泵,通过抽水泵将引水槽中盐水抽出。
本发明与现有技术相比,具有以下优点及有益效果:
1、利用本发明的排水管分布方式,可极大地增加排水效果,同时,还对预制桩起到一定的防护作用,降低预制桩的腐蚀效率;
2、本发明的适用于所有类型的盐渍土,操作方法简单,效果显著。
附图说明
图1为本发明中实施例1的防腐蚀排水板分布结构示意图。
图2为本发明中实施例2的防腐蚀排水板分布结构示意图。
图3为本发明中实施例3的防腐蚀排水板分布结构示意图。
其中,图中附图标记对应的零部件名称为:
1-防腐蚀排水板,2-预制桩。
具体实施方式
下面结合实施例和附图对本发明作进一步地详细说明,但本发明的实施方式不限于此。
实施例1
盐渍土地基中排水系统安装方法,主要由以下步骤组成:
(1)在预制桩一周自上向下垂直插入防腐蚀排水板;所述防腐蚀排水板环形排列在预制桩一周,如图1所示;预制桩预埋坑的底部铺设一层水平设置的防腐蚀排水板。
(2)地基上预制桩预埋坑以外的其他区域设置一排以上垂直插入的防腐蚀排水板,每排中相邻两个防腐蚀排水板间隔2m~3m平行设置,相邻两排防腐蚀排水板交错分布;垂直设置的防腐蚀排水板底端与水平设置的防腐蚀排水板连接;
(3)该水平设置的防腐蚀排水板连接于引水槽中,进而将盐渍土地基中的盐水引出,并通过抽水泵将引水槽中盐水抽出。
所述步骤(2)中当每排防腐蚀排水板中相邻两个防腐蚀排水板呈“一一”的形状排列时,该相邻两个防腐蚀排水板的距离为0.5m~1m,相邻两排防腐蚀排水板的间隔为2m~3m;当每排防腐蚀排水板中相邻两个防腐蚀排水板呈“二”字形排列时,每排中相邻两个防腐蚀排水板的距离为2m~3m,相邻两排防腐蚀排水板的间隔为0.5m~1m。
本实施例中优选为每排防腐蚀排水板中相邻两个防腐蚀排水板呈“二”字形排列的方式。
实施例2
本实施例与实施例1的区别在于:所述防腐蚀排水板放射形排列于预制桩一周,如图2所示。
实施例3
本实施例与实施例1的区别在于:所述盐渍土地基中一些防腐蚀排水板放射形排列于预制桩一周,一些防腐蚀排水板则环形排列在预制桩一周,如图3所示。
上述实施例仅为本发明的优选实施例,并非对本发明保护范围的限制,但凡采用本发明的设计原理,以及在此基础上进行非创造性劳动而作出的变化,均应属于本发明的保护范围之内。

Claims (4)

1.盐渍土地基中排水系统安装方法,其特征在于,主要由以下步骤组成:
(1)在地基上挖掘出预制桩预埋坑,在预制桩预埋坑的坑壁一周自上向下垂直设置防腐蚀排水板,预制桩预埋坑的底部铺设一层水平设置的防腐蚀排水板,该垂直设置的防腐蚀排水板均匀排布在预制桩一周,垂直设置的防腐蚀排水板底端均与水平设置的防腐蚀排水板连接;
(2)地基上预制桩预埋坑以外的其他区域设置一排以上垂直插入的防腐蚀排水板,且该防腐蚀排水板与引水槽连通;且相邻两排防腐蚀排水板交错分布;
(3)该水平设置的防腐蚀排水板连接于引水槽中,进而将盐渍土地基中的盐水引出。
2.根据权利要求1所述的盐渍土地基中排水系统安装方法,其特征在于,所述步骤(2)中当每排防腐蚀排水板中相邻两个防腐蚀排水板呈“一一”的形状排列时,该相邻两个防腐蚀排水板的距离为0.5m~1m,相邻两排防腐蚀排水板的间隔为2m~3m;当每排防腐蚀排水板中相邻两个防腐蚀排水板呈“二”字形排列时,每排中相邻两个防腐蚀排水板的距离为2m~3m,相邻两排防腐蚀排水板的间隔为0.5m~1m。
3.根据权利要求2所述的盐渍土地基中排水系统安装方法,其特征在于,所述防腐蚀排水板环形排列在预制桩一周或/和放射形排列于预制桩一周。
4.根据权利要求3所述的盐渍土地基中排水系统安装方法,其特征在于,还包括在引水槽上连接抽水泵,通过抽水泵将引水槽中盐水抽出。
CN201410426940.7A 2014-08-27 2014-08-27 盐渍土地基中排水系统安装方法 Expired - Fee Related CN104213552B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410426940.7A CN104213552B (zh) 2014-08-27 2014-08-27 盐渍土地基中排水系统安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410426940.7A CN104213552B (zh) 2014-08-27 2014-08-27 盐渍土地基中排水系统安装方法

Publications (2)

Publication Number Publication Date
CN104213552A CN104213552A (zh) 2014-12-17
CN104213552B true CN104213552B (zh) 2016-02-10

Family

ID=52095435

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410426940.7A Expired - Fee Related CN104213552B (zh) 2014-08-27 2014-08-27 盐渍土地基中排水系统安装方法

Country Status (1)

Country Link
CN (1) CN104213552B (zh)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535464A (zh) * 2012-03-02 2012-07-04 程松林 在厚层软土中打入预应力空心桩的施工方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2634071B2 (ja) * 1988-09-29 1997-07-23 株式会社クボタ 杭設置工法

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535464A (zh) * 2012-03-02 2012-07-04 程松林 在厚层软土中打入预应力空心桩的施工方法

Also Published As

Publication number Publication date
CN104213552A (zh) 2014-12-17

Similar Documents

Publication Publication Date Title
CN102612882B (zh) 一种沟埋植物秸秆改良沿海滩涂地的方法及其淋盐抑盐系统
CN108374097B (zh) 中国南方风化壳淋积型稀土矿浸出液截流工艺
CN102787236B (zh) 一种离子吸附型稀土原地浸矿母液回收工艺
CN104234667B (zh) 卤水沟渠及其系统和开挖方法
CN102862775B (zh) 一种矿井地下水的分布式存储方法
Wang et al. Groundwater regulation for coordinated mitigation of salinization and desertification in arid areas
CN102870523B (zh) 一种改良滨海盐土的地形处理方法
CN204498610U (zh) 盐碱地排盐系统
CN101906536A (zh) 具有副巷道的原地浸取引流收液工艺
CN203167652U (zh) 盐碱地绿化种植系统
CN105393667A (zh) 一种利用生态沟拦截森林地表径流的方法
CN202202311U (zh) 农田叠合式排降结构
CN209873816U (zh) 一种矿山坡面再生系统
CN102787606B (zh) 一种基坑开挖降水过程中对周围环境的保护方法
CN101836527A (zh) 盐碱地园林绿化水土改良设施
CN204435430U (zh) 一种适用于上游式尾矿库的反向排渗系统及上游式尾矿库
CN205934875U (zh) 一种水工隧洞接力式反坡排水布置结构
CN104213552B (zh) 盐渍土地基中排水系统安装方法
CN202500608U (zh) 一种井下集排水系统
CN201598619U (zh) 坝体排水结构
CN210406343U (zh) 一种用于高陡岩质边坡的绿化种植结构
CN113186897A (zh) 一种尾矿库集中式排渗装置及其排渗方法
CN103790223B (zh) 一种岩溶洼地排水系统
CN202587802U (zh) 盐碱地改良种植的土沟结构
CN204669835U (zh) 盐碱地改良系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20151202

Address after: Xindu District of Chengdu City, Sichuan province 610000 Lee Road No. 1 (the city 3G KIC Plaza Building 13 layer 10, 2)

Applicant after: CHENGDU LAIBAO PETROLEUM EQUIPMENT Co.,Ltd.

Address before: 610000 Chengdu City, Chenghua District Province, No. two North Ring Road, No. four, No. 1, with a layer of No. 2, No. 104

Applicant before: CHENGDU RONGDE CONSTRUCTION LABOR SERVICE Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Ren Yunfeng

Inventor before: Zeng Deming

COR Change of bibliographic data
TR01 Transfer of patent right

Effective date of registration: 20161101

Address after: 241000, Anhui City, Wuhu province Longhu District Street business city C-1

Patentee after: Wuhu Longhu Construction Engineering Co.,Ltd.

Address before: Xindu District of Chengdu City, Sichuan province 610000 Lee Road No. 1 (the city 3G KIC Plaza Building 13 layer 10, 2)

Patentee before: CHENGDU LAIBAO PETROLEUM EQUIPMENT Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160210

Termination date: 20210827