CN104212186B - Butylbenzene glue modified pitch caulking material and preparation method thereof - Google Patents

Butylbenzene glue modified pitch caulking material and preparation method thereof Download PDF

Info

Publication number
CN104212186B
CN104212186B CN201310219859.7A CN201310219859A CN104212186B CN 104212186 B CN104212186 B CN 104212186B CN 201310219859 A CN201310219859 A CN 201310219859A CN 104212186 B CN104212186 B CN 104212186B
Authority
CN
China
Prior art keywords
butylbenzene glue
asphalt
butylbenzene
caulking material
modified pitch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310219859.7A
Other languages
Chinese (zh)
Other versions
CN104212186A (en
Inventor
赵泽鹏
李祖仲
雷娟
周豪
韩明哲
华伦松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201310219859.7A priority Critical patent/CN104212186B/en
Publication of CN104212186A publication Critical patent/CN104212186A/en
Application granted granted Critical
Publication of CN104212186B publication Critical patent/CN104212186B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Compositions Of Macromolecular Compounds (AREA)
  • Adhesives Or Adhesive Processes (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention relates to a kind of modified pitch caulking material of butylbenzene glue and preparation method thereof;The modified pitch caulking material by weight 100% meter is made up of following raw material:Butylbenzene glue 5~8%, terpene resin 3~5%, sulphur powder 0.5~1.5%, asphalt surplus;Its preparation method, comprises the following steps:Weigh raw material in proportion first, stirring-type reaction kettle is preheated to 120~140 DEG C, input pitch is simultaneously warming up to 150 DEG C, successively incorporation butylbenzene glue, terpene resin stir 15min, add sulphur powder stirring 5min, finally it is cooled in 130 DEG C of constant temperature 30min, output barreled is that calking finished product is made;The caulking material stable chemical nature, in molten state with interface infiltration, high adsorption capacity, resistance to flaking is good after solidification, be particularly suitable for cement-concrete road joint fill meet, asphalt pavement crack maintenance and floorings expansion joint use.

Description

Butylbenzene glue modified pitch caulking material and preparation method thereof
Technical field
The present invention relates to highway pavement field of material preparation, more particularly to a kind of modified pitch filleting based on butylbenzene glue Material composition and preparation method thereof.
Background technology
China has turned into cement concrete pavement in the world and has possessed the most country of mileage.Ended for the end of the year 2012, China is high Standard highway cement concrete pavement is close to 220,000 km, the Km of urban concrete road surface 90,000, highway and urban cement concrete Road surface total kilometrage is still increased with the speed of about 8000~10000km or so every year at present up to 300,000 more than km.
The need for due to cement concrete pavement structure design and surface feature, Cement Concrete Pavement Slab is every a spacing From(4~5m)Necessary joint-cutting, then fills and meets.Meanwhile, as highway extends to hills, mountain area, building, servicing bridges it is more next More, floorings expansion joint need to fill or change in time.In addition, bituminous paving top layer crack needs substantial amounts of filling to meet material Conserved, cause Moisture Damage to prevent that road table water from entering even basic unit inside surface layer.According to according to a preliminary estimate, annual highway pavement is embedding Seam, filling meet material more than 5000 tons, and material generally asphalt-based material is met in filling, generally also mix styrene-butadiene-benzene second The outer-penetrating agents such as alkene block copolymer, rubber powder.According to occupation mode, project situation, operation, one are generally carried out using two ways It is to rely on filling to meet machine progress heat filling to meet to plant, and cementation of fissures cost is higher;It is another to be formed into after ribbon finished product, raked joint, slightly it is heated into Product, which are attached to, to be sewed on.
At present, influenceed by factors such as traffic loading, climatic environment and interface contact conditions, although incorporation thermoplasticity rubber Glue class is material modified, and high-temperature behavior increases, and the increase of calking viscosity, mobility and permeability are deteriorated, existing filleting or Gap-grouting material using effect is unsatisfactory, is mainly shown as that low temperature deformation ability is poor, not strong with Adhesion Interface cementing power, easily Cracking is peeled off, and has had a strong impact on calking practical effect.
The content of the invention
It is an object of the invention to provide a kind of butylbenzene glue modified pitch caulking material and preparation method thereof.Using oil Pitch, according to territory of use, seam situation from No. 70, No. 90 or No. 110 pitches;It is low that the appropriate butylbenzene glue of incorporation improves its Warm cracking resistance;The appropriate terpene resin of incorporation, strengthens the adhesion of cementation interface;The appropriate stable cross-linked material sulphur powder of incorporation (Monoclinic sulphur), improve the stability and high-temperature stability of the material modified thermmal storage.The caulking material stable chemical nature, molten With interface infiltration, high adsorption capacity when melting state, resistance to flaking is good after solidification, is particularly suitable for cement-concrete road joint filling Meet, asphalt pavement crack maintenance and floorings expansion joint are used.
A kind of butylbenzene glue modified pitch caulking material of the present invention, by weight 100% meter is made up of following raw material: Butylbenzene glue 5~8%, terpene resin 3~5%, sulphur powder 0.5~1.5%, asphalt surplus.
Above-mentioned butylbenzene glue modified pitch caulking material composition and preparation method thereof, it is characterised in that comprise the following steps: Weigh raw material in proportion first, heating stirring inputs pitch and be warming up to 150 DEG C, so to 120~140 DEG C in a kettle. Incorporation butylbenzene glue, terpene resin stirring 15min, add sulphur powder stirring 5min, are finally cooled in 130 DEG C of constant temperature afterwards 30min, output barreled is that calking finished product is made.
The butylbenzene glue modified pitch caulking material of the present invention, can comprehensively improve the high-temperature stability of calking, low temperature and resist Fragility and adhesiveness.In the present invention, using asphalt as main raw material(s), asphalt is some extremely complex macromolecules Hydrocarbon and these hydrocarbons the mixture that is constituted of nonmetallic derivative.Under common petroleum pitch normal temperature For black solid, integrate viscous-bullet-plasticity, with good deformation nature, there is certain stick after hot melt with interface Property.Density is 1.0g/cm3, softening point be 46 DEG C, with the rising of heating-up temperature, from solid-state to viscous state, until 150 DEG C with On, become complete liquid.Less than 0 DEG C low temperature flexibility shows slightly not enough, more than 40 DEG C of extreme weather temperature(Road surface up to 60 DEG C with On)High-temperature stability has much room for improvement.But generally speaking, asphalt chemical stability is good, waterproof, corrosion resistant are that calking is preferred Base material.
Butylbenzene glue is that styrene and divinylic monomer are acted on through initiator, occurs anionic solution polymerization reaction, is formed It is thick liquid under many block macromolecular polymer of styrene-butadiene-styrene, normal temperature, density is 0.63~0.98g/ cm3.The glue can obviously improve the low temperature flexibility and ductility of pitch, reduce asphalt viscosity, also, with bitumen compatibility compared with It is good.
Terpene resin is some thermoplastic block copolymers, and mean molecule quantity is between 650~2600, density:0.9~ 1.0g/cm3, softening point:It is 80~140 DEG C, water insoluble, do not crystallize, chance light and heat nondiscolouring, acidproof, alkaline-resisting, good weatherability, It is nontoxic.With high adhesion force, inoxidizability and excellent heat endurance, with bitumen compatibility it is good the advantages of.Particularly in solvent In type SBR rubber sticker, with cohesive force and good tack is maintained, especially Efficient Adhesive Promotion is bright in terms of quick adhesion It is aobvious.
The sulphur powder that the present invention is used is monoclinic sulfur, the ring molecule formed by 8 S atoms, and relative molecular weight is about 256, density is 1.96g/cm3, 119.0 DEG C of fusing point.In pitch molten mass environment, butylbenzene glue macromolecular by monosulfidic bond or Polysulfide bond connection generation network structure, is also participated in hydro carbons in pitch is high molecular so that light component is assembled to be turned to heavy constituent Move, multiphase coexistence body interface energy is reduced, so as to improve the hot storage stability of reactive blending pitch colloidal solution.
The butylbenzene glue modified pitch caulking material of the present invention, is pitch and butylbenzene glue, terpenes tree the characteristics of prominent Preferably, molten state can substantially form homogeneous colloid, mobility, pumping concrete castability enhancing to lipid phase capacitive.With other hot melts Calking is compared, high temperature viscosity reduction, is unlikely to block pouring machine pumping line, meanwhile, as caulking material viscosity declines, stream The ability that body penetrates into interface is improved, the adhesive attraction of enhancing caulking material and interface.Also, butylbenzene glue modified pitch is embedding Stitch material preparation process flow simple, convenient transportation can construct using ordinary hot pouring machine.
According to territory of use's weather conditions and operating mode, by changing asphalt-based material, butylbenzene glue of the invention is modified drip Blue or green caulking material can form series of products, can be widely applied to the cement-concrete road joint cementation of fissures, bituminous paving different type Crack cementation of fissures maintenance and the filling of floorings expansion joint, with good market application foreground and promotional value, will be produced huge Economic results in society.Material of the present invention can be obtained by following manner:
Butadiene-styrene rubber liquid preparing process:
Butylbenzene glue is many block macromolecular polymer of styrene-butadiene-styrene of polymerisation in solution, is under normal temperature Thick liquid, density is 0.63~0.98g/cm3.Preparation method is:Solvent is added into reactor first(C5~C10)And adjust Agent is saved, control special equipment temperature is at 40~80 DEG C, and pressure adds 10~50 parts of benzene second into reactor in 0.05~0.5MPa 90~50 parts of butadiene are added in alkene and proper catalyst, 5~20 minutes backward reactors, 80~120 DEG C, 1~20 are warming up to Coupling agent is added in minute backward reactor, after stirring 5~20 minutes, butylbenzene glue is made in desolvation.The glue can be obvious Improve the low temperature flexibility and ductility of pitch, reduce asphalt viscosity, it is preferable with bitumen compatibility.
The market purchasing information of the terpene resin of table 1., sulphur powder
Embodiment
The butylbenzene glue modified pitch caulking material preparation method of the present invention, comprises the following steps:Weigh in proportion first Raw material, 120~140 DEG C are preheated to by stirring-type reaction kettle, and input pitch is simultaneously warming up to 150 DEG C, successively mix butylbenzene glue, Terpene resin stirs 15min, adds sulphur powder stirring 5min, is finally cooled in 130 DEG C of constant temperature 30min, output barreled is system Into calking finished product.
For convenience of description with contrast, embodiments below be calking flowed out from reactor sampling test its technology Performance.
According to the difference of territory of use's weather conditions, 1~embodiment of embodiment 3 uses 70# asphalt, is suitable for summer heat Area;4~embodiment of embodiment 6 uses 90# oil, is suitable for Xia Liangqu, winter-warm syndrome area;7~embodiment of embodiment 9 uses 110# stones Oil asphalt, is suitable for winter cold-zone, cold area.
Embodiment 1:
70# asphalt 90%, butylbenzene glue 6%, terpene resin 3.0%, sulphur powder 1.0%.
Embodiment 2:
70# asphalt 88%, butylbenzene glue 7%, terpene resin 3.5%, sulphur powder 1.5%.
Embodiment 3:
70# asphalt 86%%, butylbenzene glue 8%, terpene resin 5.0%, sulphur powder 1.0%.
Embodiment 4:
90# asphalt 90%, butylbenzene glue 6%, terpene resin 3.0%, sulphur powder 1.0%.
Embodiment 5:
90# asphalt 88%, butylbenzene glue 7%, terpene resin 3.5%, sulphur powder 1.5%.
Embodiment 6:
90# asphalt 86%%, butylbenzene glue 8%, terpene resin 5.0%, sulphur powder 1.0%.
Embodiment 7:
110# asphalt 90%, butylbenzene glue 6%, terpene resin 3.0%, sulphur powder 1.0%.
Embodiment 8:
110# asphalt 88%, butylbenzene glue 7%, terpene resin 3.5%, sulphur powder 1.5%.
Embodiment 9:
110# asphalt 86%%, butylbenzene glue 8%, terpene resin 5.0%, sulphur powder 1.0%.
9 kinds of butylbenzene glue modified pitch caulking materials, foundation are prepared by the proportion relation of 1~embodiment of embodiment 9《Highway Engineering pitch and Asphalt Mixture Experiment code》(JTG E20-2011), each sample technical performance is tested, result of the test is shown in Table 2.
The butylbenzene glue modified pitch calking technical performance of table 2

Claims (3)

1. a kind of modified pitch caulking material of butylbenzene glue, it is characterised in that by weight 100% meter is made up of following raw material: Butylbenzene glue 5~8%, terpene resin 3~5%, sulphur powder 0.5~1.5%, asphalt surplus;The asphalt selects 70 Number, No. 90 or No. 110 asphalt, be black solid under normal temperature, density is 1.0g/cm3, softening point is 46 DEG C, with heating The rising of temperature, from solid-state to viscous state, until more than 150 DEG C, become complete liquid;The butylbenzene glue is styrene and fourth Diene monomers react by anionic solution polymerization, form many block macromolecular polymer of styrene-butadiene-styrene, It is thick liquid under normal temperature, density is 0.63~0.98g/cm3;The terpene resin is some thermoplastic block copolymers, is put down Average molecular weight is between 650~2600, density:0.9~1.0g/cm3, softening point:It is 80~140 DEG C, water insoluble, acidproof, Alkaline-resisting, good weatherability, it is nontoxic.
2. the modified pitch caulking material of butylbenzene glue according to claim 1, it is characterised in that:The sulphur powder is monocline Brilliant sulphur, relative molecular weight is 256, and density is 1.96g/cm3, 119.0 DEG C of fusing point.
3. a kind of preparation method of the modified pitch caulking material of the butylbenzene glue described in claim 1, it is characterised in that:Including Following steps:Weigh raw material in proportion first, stirring-type reaction kettle is preheated to 120~140 DEG C, input pitch and be warming up to 150 DEG C, butylbenzene glue, terpene resin stirring 15min are then mixed, sulphur powder stirring 5min is added, is finally cooled at 130 DEG C Constant temperature 30min, output barreled is that calking finished product is made.
CN201310219859.7A 2013-06-05 2013-06-05 Butylbenzene glue modified pitch caulking material and preparation method thereof Active CN104212186B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310219859.7A CN104212186B (en) 2013-06-05 2013-06-05 Butylbenzene glue modified pitch caulking material and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310219859.7A CN104212186B (en) 2013-06-05 2013-06-05 Butylbenzene glue modified pitch caulking material and preparation method thereof

Publications (2)

Publication Number Publication Date
CN104212186A CN104212186A (en) 2014-12-17
CN104212186B true CN104212186B (en) 2017-07-14

Family

ID=52094110

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310219859.7A Active CN104212186B (en) 2013-06-05 2013-06-05 Butylbenzene glue modified pitch caulking material and preparation method thereof

Country Status (1)

Country Link
CN (1) CN104212186B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107325570A (en) * 2017-08-23 2017-11-07 南京林业大学 The preparation method of SBS modified pitch base cement pavement calkings
CN113897173B (en) * 2021-10-27 2024-06-14 中国石油化工股份有限公司 Normal-temperature molding Cheng Qianfeng adhesive and preparation method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1597827A (en) * 2004-08-17 2005-03-23 鞍山森远化学工业有限公司 Sealing glue for fissured of road
CN101074351A (en) * 2006-05-19 2007-11-21 中国石油化工股份有限公司 Hot-melt asphalt adhesive and its production
CN101629405A (en) * 2009-07-24 2010-01-20 武汉理工大学 Waterproof bond stress absorbing bridge deck pavement material preparation method
CN102766338A (en) * 2012-07-25 2012-11-07 甘肃交通规划勘察设计院有限责任公司 Wide temperature range modified asphalt for roads and preparation method thereof

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103044931B (en) * 2011-10-17 2016-01-20 中国石油化工股份有限公司 A kind of filleting packing material and preparation method thereof being easy to construct
CN102433008A (en) * 2011-11-03 2012-05-02 黑龙江长和化工股份有限公司 Fissure cementation glue for pavement, and preparation method for fissure cementation glue

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1597827A (en) * 2004-08-17 2005-03-23 鞍山森远化学工业有限公司 Sealing glue for fissured of road
CN101074351A (en) * 2006-05-19 2007-11-21 中国石油化工股份有限公司 Hot-melt asphalt adhesive and its production
CN101629405A (en) * 2009-07-24 2010-01-20 武汉理工大学 Waterproof bond stress absorbing bridge deck pavement material preparation method
CN102766338A (en) * 2012-07-25 2012-11-07 甘肃交通规划勘察设计院有限责任公司 Wide temperature range modified asphalt for roads and preparation method thereof

Also Published As

Publication number Publication date
CN104212186A (en) 2014-12-17

Similar Documents

Publication Publication Date Title
CN101074321B (en) Road-surface asphalt modified additive at normal temperature and its production
CN101475748B (en) High strength cold state asphalt fissure cementation water-proof glue and preparation thereof
CN101085871B (en) Asphalt modified by epoxy resin and rubber powder
CN101475351B (en) Cold mixing high polymer modified asphalt concrete and preparing method thereof
CN100503731C (en) Emulsified asphalt modified by epoxy resin
CN101921545B (en) Asphalt waterproof paint for building and preparation method thereof
CN1208393C (en) Polymer emulsified and re-cross-linked asphalt colloid mixture and its preparing process
CN104710804A (en) SBS (styrene butadiene styrene) modified asphalt and preparation method thereof
CN105236831A (en) Aged-asphalt regeneration agent, regenerated asphalt mixture and preparation method of two
CN105439498A (en) Composite modified asphalt concrete with electrical conductivity and preparation method of composite modified asphalt concrete
CN108165036A (en) A kind of modified asphalt composite of low temperature performance excellent and preparation method thereof
CN113072913B (en) Graphene oxide toughened thermosetting SBS (styrene butadiene styrene) modified asphalt binder and application thereof
CN108410185A (en) A kind of high-viscosity asphalt and preparation method thereof
CN109385106A (en) Low viscous high performance modified bitumen of one kind and preparation method thereof
CN107474567A (en) A kind of high adhered modification pitch and preparation method thereof
CN108178934A (en) A kind of room temperature can mix type modified pitch cementitious matter and preparation method thereof
CN104212186B (en) Butylbenzene glue modified pitch caulking material and preparation method thereof
CN104046044B (en) A kind of energy-conservation pavement crack repair material and its preparation method
CN101386498A (en) Method for preparing gelatine powder dual-composite modified asphalt
CN109971187A (en) A kind of cold repairing additive material and its preparation method and application
CN105733281A (en) Heating type modified asphalt high-molecular polymer crack pouring adhesive and method for preparing same
CN104845391A (en) Preparing method and application of high-weatherability asphalt cementing material
CN107987537A (en) A kind of permeable laying of roadway environment-protecting color cementitious matter and preparation method thereof
CN111500078A (en) Oily cold patch asphalt and preparation process thereof
CN104694058A (en) Preparation method of hot melt petroleum resin binder

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant