CN104198808A - 电能计量中丢帧误码延时误差计算的方法、装置及系统 - Google Patents
电能计量中丢帧误码延时误差计算的方法、装置及系统 Download PDFInfo
- Publication number
- CN104198808A CN104198808A CN201410447050.4A CN201410447050A CN104198808A CN 104198808 A CN104198808 A CN 104198808A CN 201410447050 A CN201410447050 A CN 201410447050A CN 104198808 A CN104198808 A CN 104198808A
- Authority
- CN
- China
- Prior art keywords
- data
- error
- electric energy
- electric
- electric weight
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410447050.4A CN104198808B (zh) | 2014-09-03 | 2014-09-03 | 电能计量中丢帧误码延时误差计算的方法、装置及系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410447050.4A CN104198808B (zh) | 2014-09-03 | 2014-09-03 | 电能计量中丢帧误码延时误差计算的方法、装置及系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104198808A true CN104198808A (zh) | 2014-12-10 |
CN104198808B CN104198808B (zh) | 2017-01-18 |
Family
ID=52084122
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410447050.4A Active CN104198808B (zh) | 2014-09-03 | 2014-09-03 | 电能计量中丢帧误码延时误差计算的方法、装置及系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104198808B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105487040A (zh) * | 2015-12-22 | 2016-04-13 | 云南电网有限责任公司电力科学研究院 | 一种标准电能表及其数据处理方法 |
CN105717476A (zh) * | 2016-01-28 | 2016-06-29 | 云南电网有限责任公司电力科学研究院 | 一种数字式电能表的测试方法及系统 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102819004A (zh) * | 2012-08-31 | 2012-12-12 | 江苏省电力公司电力科学研究院 | 智能变电站数字化电能计量系统性能综合检测与分析平台 |
CN103279650A (zh) * | 2013-05-10 | 2013-09-04 | 国家电网公司 | 兼容数据延迟抖动或丢失的采样值同步插值算法 |
CN203233425U (zh) * | 2013-04-12 | 2013-10-09 | 国家电网公司 | 智能变电站数字量输入电能表校验报文控制装置 |
CN103424733A (zh) * | 2013-08-12 | 2013-12-04 | 江苏林洋电子股份有限公司 | 一种数字量输入电能信息采样数据丢失的修正方法 |
GB2504899A (en) * | 2011-04-22 | 2014-02-12 | Sichuan Elec Power Res Inst | Field integral detecting system of three-phase electric energy measuring system of electric distribution network |
CN103792508A (zh) * | 2014-01-27 | 2014-05-14 | 国家电网公司 | 数字化计量装置的误差测试系统及测试方法 |
-
2014
- 2014-09-03 CN CN201410447050.4A patent/CN104198808B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2504899A (en) * | 2011-04-22 | 2014-02-12 | Sichuan Elec Power Res Inst | Field integral detecting system of three-phase electric energy measuring system of electric distribution network |
CN102819004A (zh) * | 2012-08-31 | 2012-12-12 | 江苏省电力公司电力科学研究院 | 智能变电站数字化电能计量系统性能综合检测与分析平台 |
CN203233425U (zh) * | 2013-04-12 | 2013-10-09 | 国家电网公司 | 智能变电站数字量输入电能表校验报文控制装置 |
CN103279650A (zh) * | 2013-05-10 | 2013-09-04 | 国家电网公司 | 兼容数据延迟抖动或丢失的采样值同步插值算法 |
CN103424733A (zh) * | 2013-08-12 | 2013-12-04 | 江苏林洋电子股份有限公司 | 一种数字量输入电能信息采样数据丢失的修正方法 |
CN103792508A (zh) * | 2014-01-27 | 2014-05-14 | 国家电网公司 | 数字化计量装置的误差测试系统及测试方法 |
Non-Patent Citations (3)
Title |
---|
ZARKO DJEKIC,ET AL.: "Compatibility and interoperability evaluation of all-digital protection systems based on IEC 61850-9-2 communication standard", 《POWER AND ENERGY SOCIETY GENERAL MEETING》 * |
宋艳杰等: "数字化电能计量中丢帧误码延时分析与事件告警判断研究", 《电测与仪表》 * |
李毅等: "智能变电站数字接口电能表基本误差测量方法研究", 《电测与仪表》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105487040A (zh) * | 2015-12-22 | 2016-04-13 | 云南电网有限责任公司电力科学研究院 | 一种标准电能表及其数据处理方法 |
CN105487040B (zh) * | 2015-12-22 | 2018-05-15 | 云南电网有限责任公司电力科学研究院 | 一种标准电能表及其数据处理方法 |
CN105717476A (zh) * | 2016-01-28 | 2016-06-29 | 云南电网有限责任公司电力科学研究院 | 一种数字式电能表的测试方法及系统 |
CN105717476B (zh) * | 2016-01-28 | 2018-03-30 | 云南电网有限责任公司电力科学研究院 | 一种数字式电能表的测试方法及系统 |
Also Published As
Publication number | Publication date |
---|---|
CN104198808B (zh) | 2017-01-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10228409B2 (en) | Fault location using traveling waves | |
US20190187202A1 (en) | Traveling wave fault location with dispersion compensation in electric power delivery systems | |
US8990036B1 (en) | Power line parameter adjustment and fault location using traveling waves | |
US11204377B2 (en) | Estimation of a waveform period | |
Korkali et al. | Traveling-wave-based fault-location technique for transmission grids via wide-area synchronized voltage measurements | |
US20150081236A1 (en) | Traveling wave validation using estimated fault location | |
WO2019196425A1 (zh) | 网络报文时延测量的可信度评估方法、装置及存储介质 | |
US10312041B2 (en) | Frequency measurement for electric power delivery system | |
CN109494694B (zh) | 线路差动保护的数据同步方法、装置、设备和介质 | |
Zhan et al. | Universal grid analyzer design and development | |
CN104076321A (zh) | 一种数字式电能表在线监测与评估系统及方法 | |
EP3710842B1 (en) | Traveling wave based fault location using unsynchronized measurements for transmission lines | |
CN104202139A (zh) | 用于实现采样值序号同步的方法、装置和系统 | |
CN113406436A (zh) | 基于5g通信的交直流输电线路行波故障测距方法及系统 | |
CN104198808A (zh) | 电能计量中丢帧误码延时误差计算的方法、装置及系统 | |
CN102081134A (zh) | 一种电力系统扰动源定位方法 | |
CN105261202B (zh) | 基于b样条插值小波突变点检测的传输延时测量方法 | |
CN106932746B (zh) | 一种电子式电流互感器性能试验系统及方法 | |
CN105471572A (zh) | 一种基于goose报文的时间同步测量方法 | |
US11146273B2 (en) | Electronic device and electronic product | |
US20230077975A1 (en) | Time synchronization between ieds of different substations | |
Yin et al. | Low cost, flexible, and distribution level universal grid analyser platform: designs and implementations | |
CN201887543U (zh) | 采样值时间标定装置 | |
CN112904083A (zh) | 一种基于宽频测量的功率平衡校验方法及装置 | |
EP3610546B1 (en) | Floating neutral detection and localization system and methods |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Shen Jianliang Inventor after: Xiao Tao Inventor after: Yao Li Inventor after: Zou Chengwu Inventor after: Peng Hui Inventor after: Zhang Kai Inventor before: Li Shaoteng Inventor before: Xiao Tao Inventor before: Yao Li Inventor before: Zou Chengwu Inventor before: Peng Hui Inventor before: Zhang Kai |
|
CB03 | Change of inventor or designer information | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100031 No. 86 West Chang'an Avenue, Beijing, Xicheng District Patentee after: STATE GRID CORPORATION OF CHINA Patentee after: STATE GRID ZHEJIANG ELECTRIC POWER COMPANY LIMITED ELECTRIC POWER Research Institute Address before: 100031 No. 86 West Chang'an Avenue, Beijing, Xicheng District Patentee before: State Grid Corporation of China Patentee before: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID ZHEJIANG ELECTRIC POWER Co. |
|
CP01 | Change in the name or title of a patent holder | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220316 Address after: 100031 No. 86 West Chang'an Avenue, Beijing, Xicheng District Patentee after: STATE GRID CORPORATION OF CHINA Patentee after: Marketing service center of State Grid Zhejiang Electric Power Co.,Ltd. Address before: 100031 No. 86 West Chang'an Avenue, Beijing, Xicheng District Patentee before: STATE GRID CORPORATION OF CHINA Patentee before: STATE GRID ZHEJIANG ELECTRIC POWER COMPANY LIMITED ELECTRIC POWER Research Institute |
|
TR01 | Transfer of patent right |