CN104198782A - Power output test bed - Google Patents

Power output test bed Download PDF

Info

Publication number
CN104198782A
CN104198782A CN201410465295.XA CN201410465295A CN104198782A CN 104198782 A CN104198782 A CN 104198782A CN 201410465295 A CN201410465295 A CN 201410465295A CN 104198782 A CN104198782 A CN 104198782A
Authority
CN
China
Prior art keywords
power supply
test board
loop
power
test bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410465295.XA
Other languages
Chinese (zh)
Inventor
束龙胜
张希
高峰
刘雪侠
吴小春
杨先忠
崔文梅
徐怀宾
张先才
马小群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Xinlong Electrical Co Ltd
Original Assignee
Anhui Xinlong Electrical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Xinlong Electrical Co Ltd filed Critical Anhui Xinlong Electrical Co Ltd
Priority to CN201410465295.XA priority Critical patent/CN104198782A/en
Publication of CN104198782A publication Critical patent/CN104198782A/en
Pending legal-status Critical Current

Links

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The invention relates to a power output test bed and belongs to the technical field of switch cabinet debugging. The test bed comprises a test bed body, an alarm unit, a wire inlet power loop and a power output loop. The wire inlet power loop is connected to the corresponding power output loop through different processing circuits. The test bed further comprises a wheel mechanism mounted at the bottom of the test bed. The power output loop comprises eight power loops ranking from the first level to the eighth level. Compared with the prior art, the power output test bed has the advantages that the technical problems such as multiple adjustment of the power supply and a test position of the switch cabinet and even the temporary power supply are solved; when the switch cabinet is tested, the multi-functional test bed provides various power supplies, and debugging site is in the good order; debugging efficiency of the staffs is improved, and the power supply is safe and reliable in use; the test bed can be simultaneously used by multiple people to debug the multiple switch cabinets.

Description

A kind of power supply output test board
Technical field
The present invention relates to switch cubicle debugging technique field, relate in particular to the dispatch from the factory test board of debugging of switch cubicle, relate in particular kind of many specifications power supply output test board.
Background technology
Our commissioning staff was dispatching from the factory to switch cubicle in debugging in the past, because components and parts in switch cubicle need power specification kind many, it is very inconvenient that commissioning staff hurries back and forth through be everlasting power taking source place and the contact of Test Switchboard cabinet place, and build power supply temporarily and cause debugging field apparatus many and random, will make so on-the-spot electricity consumption can not ensure that stability is dangerous again.
Summary of the invention
For correlative technology field document and above the deficiencies in the prior art, in a large amount of existing literature research and long-term on the basis of association area Development Practice, the present invention proposes " many specifications power supply output test board ", overcome and the technical barrier such as in prior art, " repeatedly adjusted; build power supply " at power supply place and Test Switchboard cabinet place even temporarily, realize " in the time of Test Switchboard cabinet; multi-functional test desk is responsible for providing various kind power supplys; debugging scene is become without any confusion; debugging staff can increase work efficiency, can be safe and reliable using power supply again.And a test board can, simultaneously for many people, be debugged many control box arrangements." beneficial effect.
For achieving the above object, the present invention is achieved by the following technical solutions: a kind of power supply output test board, this test board comprises test board body, alarm unit, incoming power loop, power supply output loop, and described incoming power loop is connected to corresponding power supply output loop by different disposal circuit.Described test board also comprises the wheel mechanism that is arranged on test board bottom.Described power supply output loop comprises eight electric power loops of the first specification to the eight specifications.Described the first specification power supply output loop is for analog power lacuna.The described second to the 6th specification power supply output loop is for converting Switching Power Supply to DC220V, DC110V and tri-kinds of supply units uses of DC24V by AC380V.Described the 7th specification power supply output loop is exported 4~20mA current signal by intelligent instrument.Described the 8th specification power supply output loop is for detection of the reading degree of accuracy of switch cubicle instrument.
The beneficial effect that the present invention possesses is: 1. cost performance is high: the general 3000 yuan of left and right of cost, can provide 8 kinds of different size switch cubicles to test required power supply.2. easy to use: volume is little, installing wheel on test board, test board can be moved freely, without the wiring of hurrying back and forth back and forth.3. high safety: whole electric appliance circuits is built in test board, electric interfaces safety, safe to use to operating personnel.4. out-put supply is reliable and stable: test board is monitored 8 kinds of specification out-put supply performances in real time by intelligent instrument, and out-put supply is stable and reliable for performance.
Brief description of the drawings
Fig. 1 is the test board outline dimensional drawing of the specific embodiment of the invention;
Fig. 2 is 8 kinds of specification power supply output design frame charts of the specific embodiment of the invention;
Fig. 3 is 8 kinds of specification power supply output test board electrical systematic drawings of the specific embodiment of the invention;
Fig. 4 is the incoming power major loop of the specific embodiment of the invention;
Fig. 5 is the first specification out-put supply loop of the specific embodiment of the invention;
Fig. 6 is the second to the 6th out-put supply loop of the specific embodiment of the invention;
Fig. 7 is the 8th specification out-put supply loop of the specific embodiment of the invention;
Embodiment
Contrast accompanying drawing below, by the description to embodiment, to the specific embodiment of the present invention as related control system, mutual annexation, and implementation method, be described in further detail, to help those skilled in the art to have more complete, accurate and deep understanding to inventive concept of the present invention, technical scheme.
A kind of power supply output test board, this test board comprises test board body, alarm unit, incoming power loop, power supply output loop, described incoming power loop is connected to corresponding power supply output loop by different disposal circuit.The high 1030mm of this power supply output test wide 500mm of director 735mm, adopt plane operations, highlight design as Fig. 1, meet normal human's height design, can stand on the plane drilling output specification that elects, on riser, check out-put supply specification by display device.Below operator's console left and right, 8 kinds of specification power supply output connection jacks are installed, are facilitated the specification power supply that in debug process, directly selection needs as required directly to insert and can use with plug, easy-to-connect, safety.
Test board also comprises the wheel mechanism that is arranged on test board bottom.Described power supply output loop comprises eight electric power loops of the first specification to the eight specifications.Described the first specification power supply output loop is for analog power lacuna.The described second to the 6th specification power supply output loop is for converting Switching Power Supply to DC220V, DC110V and tri-kinds of supply units uses of DC24V by AC380V.Described the 7th specification power supply output loop is exported 4~20mA current signal by intelligent instrument.Described the 8th specification power supply output loop is for detection of the reading degree of accuracy of switch cubicle instrument.
Many specifications power supply output test board mainly designs by incoming power loop, eight kinds of specification power supply output loop Liang great departments and forms.As shown in Figure 2 and Figure 3, the output of eight kinds of specification power supplys be respectively 1, AC380V; 2, DC220V; 3, DC110V; 4, DC24V; 5, AC220V; 6, AC110V; 7,4~20mA; 8,0~20A.Its course of work is: gather an AC380V power supply to incoming power major loop, and then be dispensed to eight feeder assemblies.Each control loop is responsible for 380VAC power supply to convert power supply corresponding to various loops to by button control, realizes the power supply that low-voltage intelligent switch cubicle is provided automatically to all size, and this circuit has the feature of the unified output of concentrated circuit simultaneously.
Incoming power major loop as shown in Figure 4, this test board incoming power loop, in the time that draw AC380V power supply and be connected to test board in the external world, test board panel will have pilot lamp instruction, when the adhesive of major loop contactor, the buzzer warning lamp of installing on test board, can send chimes of doom and warning light, to remind the existing electricity of staff's test board, when operation, should take care.
As shown in Figure 5, this loop Main Function is to provide AC380V and uses to switch cubicle incoming power in the first specification out-put supply loop.We are in the time of design; consider in the time of test power cabinet; we want analog power phase shortage; so we pass through to use two contactors at major loop; in control loop, add button; realize power phase shortage, detect default-phase protection function as inner in the intelligent element such as soft starter, frequency converter as object to reach.So we are in test convenient, safety when power cabinet.
Second and third, four, five, six, specification out-put supply loop as shown in Figure 6; on protective relaying device, power supply generally can use by using DC220V and DC110V; the power supply of some intelligent elements such as PLC, motor protector often can use DC24V; so we are in when design, by second and third, four feeder assemblies are respectively by using Switching Power Supply to convert AC380V to DC220V, DC110V and tri-kinds of power supplys of DC24V for device.
The 7th specification out-put supply loop is to export 4~20mA current signal by intelligent instrument, and this current signal is of wide application, and such as utilizing to 4~20mA current signal of frequency converter input, motor speed is regulated etc.
The 8th specification out-put supply loop as shown in Figure 7, this loop is mainly the degree of accuracy of the reading of detector switch cabinet instrument, we make adjustable 0~20A current signal of its output by isolating transformer, adjustable resistance in test carriage, by its signal loading to current transformer in switch cubicle, whether then we observe in switch cubicle the variation of instrument numerical value consistent with adjustable current signal, thereby judge accuracy of instrument.
Professional can also further recognize, the execution step of describing in conjunction with embodiment disclosed herein, can realize with electronic hardware, computer software or the combination of the two, these functions are carried out with hardware or software mode actually, depend on application-specific and the design constraint of technical scheme.Professional and technical personnel can realize described function with distinct methods to each specifically should being used for, but this realization should not thought and exceeds scope of the present invention.
The present invention is not limited to above-mentioned specific embodiment; do not departing under spirit of the present invention and real situation thereof; those of ordinary skill in the art can make according to the present invention various corresponding changes and distortion; these are tackled mutually the amendment that the present invention carries out or are equal to replacement, and it all should be encompassed in the middle of the scope of claim protection of the present invention.

Claims (7)

1. a power supply output test board, is characterized in that: this test board comprises test board body, alarm unit, incoming power loop, power supply output loop, and described incoming power loop is connected to corresponding power supply output loop by different disposal circuit.
2. test board according to claim 1, is characterized in that: described test board also comprises the wheel mechanism that is arranged on test board bottom.
3. test board according to claim 1, is characterized in that: described power supply output loop comprises eight electric power loops of the first specification to the eight specifications.
4. test board according to claim 3, is characterized in that: described the first specification power supply output loop is for analog power lacuna.
5. test board according to claim 3, is characterized in that: the described second to the 6th specification power supply output loop is for converting Switching Power Supply to DC220V, DC110V and tri-kinds of supply units uses of DC24V by AC380V.
6. test board according to claim 3, is characterized in that: described the 7th specification power supply output loop is exported 4~20mA current signal by intelligent instrument.
7. test board according to claim 3, is characterized in that: described the 8th specification power supply output loop is for detection of the reading degree of accuracy of switch cubicle instrument.
CN201410465295.XA 2014-09-13 2014-09-13 Power output test bed Pending CN104198782A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410465295.XA CN104198782A (en) 2014-09-13 2014-09-13 Power output test bed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410465295.XA CN104198782A (en) 2014-09-13 2014-09-13 Power output test bed

Publications (1)

Publication Number Publication Date
CN104198782A true CN104198782A (en) 2014-12-10

Family

ID=52084096

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410465295.XA Pending CN104198782A (en) 2014-09-13 2014-09-13 Power output test bed

Country Status (1)

Country Link
CN (1) CN104198782A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101762724A (en) * 2008-10-07 2010-06-30 李昕然 Test power supply
CN201576044U (en) * 2009-12-31 2010-09-08 重庆朗天通讯设备有限公司 Three-phase voltage regulation testbed
US20130049794A1 (en) * 2010-04-15 2013-02-28 Atc Logistics & Electronics, Inc. Extended systems and methods for testing power supplies
WO2013036656A1 (en) * 2011-09-06 2013-03-14 Cerus Industrial Corporation Integrated bypass apparatus, system, and/or method for variable-frequency drives
CN203101536U (en) * 2012-11-27 2013-07-31 安徽鑫龙自动化有限公司 Switch cabinet test table
CN203376363U (en) * 2013-07-31 2014-01-01 甘肃电器科学研究院 Power supply device for electrical appliance testing
CN203561511U (en) * 2013-09-25 2014-04-23 株洲南车时代电气股份有限公司 Device and system for locomotive test
CN204314349U (en) * 2014-09-13 2015-05-06 安徽鑫龙电器股份有限公司 A kind of power supply exports test board

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101762724A (en) * 2008-10-07 2010-06-30 李昕然 Test power supply
CN201576044U (en) * 2009-12-31 2010-09-08 重庆朗天通讯设备有限公司 Three-phase voltage regulation testbed
US20130049794A1 (en) * 2010-04-15 2013-02-28 Atc Logistics & Electronics, Inc. Extended systems and methods for testing power supplies
WO2013036656A1 (en) * 2011-09-06 2013-03-14 Cerus Industrial Corporation Integrated bypass apparatus, system, and/or method for variable-frequency drives
CN203101536U (en) * 2012-11-27 2013-07-31 安徽鑫龙自动化有限公司 Switch cabinet test table
CN203376363U (en) * 2013-07-31 2014-01-01 甘肃电器科学研究院 Power supply device for electrical appliance testing
CN203561511U (en) * 2013-09-25 2014-04-23 株洲南车时代电气股份有限公司 Device and system for locomotive test
CN204314349U (en) * 2014-09-13 2015-05-06 安徽鑫龙电器股份有限公司 A kind of power supply exports test board

Similar Documents

Publication Publication Date Title
CN103760441B (en) A kind of Multifunctional adjustment table of distribution box
CN205038281U (en) Direct current system monitoring devices is scurried into in interchange
CN201935973U (en) Integrative test device of electric test of transformer
CN202837423U (en) Wireless GPRS wind power power grid electric energy quality detection device based on DSP and ARM
CN202533787U (en) New type mine power supply monitoring system
CN203759152U (en) Multifunctional adjustment table of distribution box
CN102565562A (en) Comprehensive testing device for electrical test of transformer
CN206922507U (en) A kind of intelligent integrated switch board
CN203224748U (en) Environment monitoring data collector used for transformer station
CN204314349U (en) A kind of power supply exports test board
CN203101536U (en) Switch cabinet test table
CN203135304U (en) A state synthetic dynamic display device of a medium-voltage switch cabinet
CN104198782A (en) Power output test bed
CN206147065U (en) Motor test system
CN104316114A (en) Intensive type touch screen intelligent power meter
CN205608096U (en) Automatic nuclear phase appearance of public observing and controlling screen secondary voltage of transformer substation
CN207992351U (en) Coil class equipment electric testing device
CN204633477U (en) A kind of precision intelligence alternating current-direct current distributing monitoring system
CN208939860U (en) A kind of composite structure of Generator Set starting cabinet
CN105373044A (en) Generator set control cabinet
CN204376207U (en) A kind of novel microcomputer protecting device towards small-sized cabinet
CN103247938B (en) Intelligent city electricity generation converter cabinet
CN215681922U (en) Switch board control circuit and switch board
CN204129112U (en) A kind of Intelligent current voltage instrument
CN204515086U (en) The auto-action proving installation of automatic change over

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20141210

RJ01 Rejection of invention patent application after publication