CN104196230B - Fast installation formwork and connection structure - Google Patents
Fast installation formwork and connection structure Download PDFInfo
- Publication number
- CN104196230B CN104196230B CN201410454303.0A CN201410454303A CN104196230B CN 104196230 B CN104196230 B CN 104196230B CN 201410454303 A CN201410454303 A CN 201410454303A CN 104196230 B CN104196230 B CN 104196230B
- Authority
- CN
- China
- Prior art keywords
- template
- fast installation
- pulling eye
- formwork
- reinforcing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Moulds, Cores, Or Mandrels (AREA)
Abstract
The invention discloses a fast installation formwork and a connection structure, and belongs to the field of installation formworks. The fast installation formwork and the connection structure are light, convenient to install, high in structural strength and suitable for emergency work or large-size concrete pouring projects. The structural strength of the formwork is improved by arranging main reinforcing ribs on the back of the formwork. Corresponding counter pull holes are formed in the formwork, and the installation strength and the stability of the formwork are improved through connection between the formwork and a reinforcing rod. Under the condition of meeting the use requirements for the formwork in the emergency work or the large-size concrete pouring projects, the mass of the formwork is lowered, and the formwork is more convenient to carry and install. When made of plastic, the formwork has more outstanding advantages and becomes lighter and more convenient to carry and install. The formwork is more convenient to produce and low in cost and does not rust easily.
Description
Technical field
The present invention relates to installation form field, more particularly, to one kind can be used for emergency repair engineering or large volume mixed mud
Pour Fast Installation template and the attachment structure in engineering.
Background technology
Pour in engineering in emergency repair engineering or large volume mixed mud at present, such as dash is increased for concrete dam
Engineering, road rehabilitation works, dam mixed mud pour engineering etc., remove the dangerous condition or carry out construction in order to quick, safe and effective
Operation is it will usually using building the waterwall of phase factor to Fast Installation template, mixed mud pours barricade or other interim ties
Structure.Because these use environments there are certain requirements to template strength, therefore traditional Fast Installation template generally adopts steel form,
Its shortcoming mainly includes quality weight, transport and in-convenience in use, assembled complicated, not easy to store, easy-to-rust deformation etc..
Additionally, it is contemplated that had in the interim build process disposing house up till now using light-duty Fast Installation mould
Plate, this template has convenient transportation, can be mass, low cost, the advantages of easy for installation, most importantly so that facing
When house speed of building obtain rapid raising.However, its use of Fast Installation template built due to one off houses
Environment is not high to the intensity requirement of template, therefore the structures shape of template it directly cannot be applied to emergency repair engineering or
Person's large volume mixed mud pours in engineering.In addition, one off houses build in attachment structure between each template nor directly
Apply to emergency repair engineering or large volume mixed mud is poured in engineering it is necessary to be tied using a kind of higher connection of bonding strength
Structure.
The inventor of this patent will be used for emergency repair engineering or large volume mixed mud pours in engineering in prior art
Steel form take into consideration with the light weight form that one off houses is built, design one kind and have above two template Common advantages concurrently
Light-duty can be used for emergency repair engineering or large volume mixed mud pours Fast Installation template in engineering.
Content of the invention
Present invention solves the technical problem that be provide a kind of light-duty, easy for installation, structural strength high be applied to emergent
Emergency work or large volume mixed mud pour Fast Installation template and the attachment structure of engineering.
The technical solution adopted for the present invention to solve the technical problems is: Fast Installation template, including smooth panel and
Main reinforcement positioned at shiny surface backboard portion;It is additionally included in the pulling eye of setting in template, described pulling eye is along template thickness side
To running through template;Main reinforcement includes the cross reinforcing along template length direction and the vertical reinforcement along template width direction
Muscle;Described cross reinforcing and vertical strengthening ribs mutually cross, and the surrounding edge in template surrounds circumferential reinforcement;Described
Pulling eye is located at the intersection of cross reinforcing and vertical strengthening ribs.
It is further: described Fast Installation template is plastics.
It is further: described main reinforcement includes two cage bar bars parallel to each other and is located between two cage bar bars
And a plurality of auxiliary rib that two cage bar bars are connected.
It is further: the smooth panel around pulling eye has been embedded in stiffener.
It is further: the outside of pulling eye is provided with ring stiffener, the hole wall of described pulling eye passes through radially to add
Strong muscle is connected with the ring stiffener in outside;Described ring stiffener is also connected with cross reinforcing and vertical strengthening ribs respectively;
Described ring stiffener is consistent with main reinforcement with the height of radial reinforced rib.
Be further: also include assistant reinforcement muscle, described assistant reinforcement muscle in the region that main reinforcement surrounds, and
And the height of assistant reinforcement muscle is less than main reinforcement.
It is further: the length of described template is 180cm, width is 60cm, thickness is 8cm.
It is further: described pulling eye has four, and four pulling eyes are dispensed along the center line in template length direction
On.
In addition, the attachment structure using above-mentioned Fast Installation template composition;Including polylith Fast Installation template, and every
It is provided with connecting hole on the circumferential reinforcement of block Fast Installation template surrounding;Polylith Fast Installation template is in length and/or width
Direction is mutually spliced, and is connected by connector;Also include reinforcing bar and reinforce bolt, described reinforcing bar is at least while located at two
The back of block Fast Installation template, the pulling eye that described reinforcing bolt passes through in Fast Installation template by Fast Installation template and adds
Gu bar connects.
It is further: described reinforcing bar is made up of two steel pipes, two steel pipes stagger and overlap, and two steel
Gap is left, described reinforcing bolt is snapped onto on steel pipe by the gap between two steel pipes between pipe.
The invention has the beneficial effects as follows: by arranging main reinforcement at template back, template self structure is strengthened with this
Intensity;And also by arranging, in template, the installation strength that pulling eye strengthens template, make model sheetinstallat more firm.Template
Can realize to drawing by pulling eye when mounted, the fixed form such as oblique pull.Can also be by the reinforcing in the setting of template back
Template is connected with reinforcing bar by reinforcing bolt, the bonding strength of polylith template so can be made to be greatly enhanced by bar.By
All can be improved in template self structure intensity and installation strength, therefore met for emergency repair engineering or substantially
Long-pending mixed mud can reduce the intensity of mould material in the case of pouring engineering, so can by template do thinner or permissible
Stainless steel material is replaced using the relatively low composite of density or plastics;So template quality is reduced, and can make
The carrying of template and easier for installation quick.Especially in the case of using plastics as mould material, the advantage of rising is even more
Substantially, not only template becomes light-dutyer, carries and easier for installation;Also make the production of template convenient, and not
Easily get rusty, with low cost.In addition, main reinforcement passes through using by two cage bar bars parallel to each other and positioned at two cage bar bars
Between, and the structure of a plurality of auxiliary rib composition that two cage bar bars are connected, the intensity of template so can be made to increase further
By force.Furthermore it is also possible to the smooth panel around pulling eye is embedded in stiffener, to improve the intensity of pulling eye itself;To drawing
Around hole, can also be using the fit structure of radial reinforced rib and ring stiffener so that the structural strength of pulling eye be higher.
Fast Installation template of the present invention, it plays light weight, and intensity is high, can meet emergency repair engineering or large volume mixed mud
Pour the requirement to template strength for the engineering, the carrying of template simultaneously and installation are very convenient, therefore can effectively save the set-up time.
Particularly with emergency repair situation, more valuable times can be won for rescue.
Brief description
Fig. 1 is the 3-D view of Fast Installation template of the present invention;
Fig. 2 is the 3-D view of another angle;
Fig. 3 is the front view of Fast Installation template;
Fig. 4 is the rearview of Fast Installation template;
Fig. 5 is the enlarged diagram of regional area q in Fig. 4;
Fig. 6 is the sectional view shown in a-a section in Fig. 4;
Fig. 7 is the sectional view shown in b-b section in Fig. 4;
Fig. 8 is the enlarged diagram of regional area p in Fig. 7;
Fig. 9 is the attachment structure schematic diagram when splicing along template length direction for the Fast Installation template;
Figure 10 is the front view of Fig. 9;
Figure 11 is the side view of Fig. 9;
Figure 12 is the rearview of Fig. 9;
Figure 13 is the sectional view in Figure 12 described in c-c section;
Figure 14 is the enlarged diagram of regional area i in Figure 13;
Figure 15 is as attachment structure schematic diagram during reinforcing bar using double steel pipe;
Figure 16 is the sectional view in the c-c section of Figure 15;
Figure 17 is the enlarged diagram of regional area n in Figure 16;
Figure 18 is to connect structural representation using two steel pipes staggering as the connection between steel pipe during reinforcing bar;
In figure is labeled as: smooth panel 1, main reinforcement 2, circumferential reinforcement 21, cross reinforcing 22, vertical strengthening ribs
23rd, ring stiffener 24, radial reinforced rib 25, cage bar bar 201, auxiliary rib 202, pulling eye 3, stiffener 4, assistant reinforcement muscle 5,
Connecting hole 6, connector 7, reinforcing bar 8, steel pipe 81, reinforcing bolt 9.
Specific embodiment
The present invention is further described with reference to the accompanying drawings and detailed description.Wherein with reference to shown in Fig. 1 it is stipulated that mould
Plate length direction, template width direction and template thickness direction.
As shown in Fig. 1 to Figure 17, Fast Installation template of the present invention, including smooth panel 1 and positioned at smooth
The main reinforcement 2 at panel 1 back;It is additionally included in the pulling eye 3 of setting in template, described pulling eye 3 is passed through along template thickness direction
Wear template;Main reinforcement 2 includes the cross reinforcing 22 along template length direction and the vertical strengthening ribs along template width direction
23;Described cross reinforcing 22 and vertical strengthening ribs 23 mutually cross, and the circumferential reinforcement in surrounding edge besieged city in template
21;Described pulling eye 3 is located at the intersection of cross reinforcing 22 and vertical strengthening ribs 23.
Fast Installation template of the present invention is strong by the structure strengthening template in the template back main reinforcement 2 of setting
Degree, simultaneously setting pulling eye 3 come to increase template the intensity of attachment structure and model sheetinstallat when stability.So can make
Obtain template and can select the lower material of relatively stainless intensity it is particularly possible to select the relatively lower light-duty material of density.
Permissible in the case that satisfaction pours engineering for emergency repair engineering or large volume mixed mud after finally making model sheetinstallat
Effectively reduce template quality.Because template quality is reduced, therefore carrying and installation for template would be much more convenient.
Concrete structure as main reinforcement 2 it may be preferred to include the structure of cross reinforcing 22 and vertical strengthening ribs 23,
And the structure of the circumferential reinforcement 21 of surrounding edge besieged city one circle in template.Cross reinforcing 22 and vertical strengthening ribs 23 can phases
Mutually cross or intersect, and specific quantity is also unrestricted.
So-called light-duty material, refers to the density material lower relative to stainless steel.As various plastics, composite wood can be selected
Material, elastomeric material etc..As long as it can meet the intensity requirement of phase factor after using Fast Installation template of the present invention, and makes
Obtain the relatively conventional steel mould of template quality effectively to be reduced.Certainly, such quality must not reduce and lost model sheetinstallat
Effective area afterwards is obtaining;Both must not be realized by reducing the size of template length and width.
In addition, Fast Installation template can preferably employ plastics making, light weight, shaping are had using the template after plastics
Simply, easy to manufacture, convenient in carrying, quick for installation the advantages of.Although using after plastic material, its strength of materials is not so good as steel plate
Mould, but by arranging, at the back of smooth panel 1, the structural strength that main reinforcement 2 strengthens template;Increase simultaneously and be provided with
Pulling eye 3, to strengthen the stability after the installation strength of template and model sheetinstallat by pulling eye 3.So so that template
Appoint after mounting and so meet emergency repair engineering or large volume mixed mud pours the use requirement to template in engineering.
The effect of pulling eye 3 is the installation strength strengthening template.And in order to increase pulling eye 3 structural strength of itself, will
Pulling eye 3 is arranged on the position that cross reinforcing 22 and vertical strengthening ribs 23 in main reinforcement 2 cross.As for pulling eye 3
Quantity and particular location, can be preferably provided with four pulling eyes 3 further, and four pulling eyes 3 are dispensed along template length side
To center line on;Certainly, such arrangement is it is desirable to there be a cross reinforcing 22 to be located just at along along template length direction
On heart line.
Further, the structure of main reinforcement 2 can preferably employ the cage bar bar 201 parallel to each other including two and be located at
Article two, between cage bar bar 201, and a plurality of auxiliary rib 202 that two cage bar bars 201 are connected;With reference to shown in Fig. 5.Such
So that the multiple recessed empty structure in divided place between two cage bar bars 201, it had both been provided that higher structural strength to structure,
The quality of template can be reduced simultaneously again.Certainly auxiliary rib 202 can relative cage bar bar 201 tilt distribution.
In addition, for the intensity improving pulling eye 3 further, and durable performance, can also light around pulling eye 3
Sliding surface plate 1 has been embedded in stiffener 4.The intensity of stiffener 4 needs higher than the template strength of plastic material naturally, such as adopts steel
The stiffener 4 of sheet material matter.Stiffener 4 can also adopt circular configuration using rectangular configuration, and it is distributed in each pulling eye 3
Inside the smooth panel 1 of surrounding, therefore can't see stiffener 4 from outside.Certainly, stiffener 4 needs arrange one
Circular hole is corresponding with pulling eye 3.
Furthermore, it is contemplated that pulling eye 3 is provided in cross reinforcing 22 and the intersection of vertical strengthening ribs 23, and to drawing
Hole 3 is generally circular, and therefore inner wall surface thereof is also circle;In order that pulling eye 3 can preferably with cross reinforcing 22 and vertically
Reinforcement 23 connects, and passes through to arrange ring stiffener 24 in the outside of pulling eye 3, and the hole wall of pulling eye 3 is passed through radially
Reinforcement 25 is connected with the ring stiffener 24 in outside;Again by ring stiffener 24 respectively with cross reinforcing 22 and vertical strengthen
Muscle 23 connects;Such structure, so that the intensity of pulling eye 3 is higher, also makes pulling eye 3 and cross reinforcing 22 simultaneously
Connection conversion relations and vertical strengthening ribs 23 between are more preferable.Certainly, the height one of ring stiffener 24 and radial reinforced rib 25
As consistent with main reinforcement 2.
Furthermore it is also possible to setting assistant reinforcement muscle 5, to further enhance formwork structure intensity.Assistant reinforcement muscle 5 can set
Put in cross reinforcing 22 and vertical strengthening ribs 23 area defined in main reinforcement 2.Assistant reinforcement muscle 5 can also adopt
The structure the same with main reinforcement 2, simply generally the height of assistant reinforcement muscle 5 or rib thickness are less than main reinforcement 2.
In addition, the specific size of Fast Installation template of the present invention, various sizes structure can be adopted in theory.?
In the case of plastic material, and consider convenient transport, install and structural strength in the case of it may be preferred to adopt
The structure of 180cm × 60cm × 8cm.180cm therein refers to template length, and 60cm refers to template width, and 8cm refers to template thickness, its
Middle template thickness 8cm includes the thickness of smooth panel 1 and the height of main reinforcement 2, with reference to as shown in Fig. 6.As for shiny surface
The thickness of plate 1, and the height of main reinforcement 2 generally according to actual conditions select, as can be further preferably adopted 1cm thickness
Smooth panel 1 and the main reinforcement 2 of 7cm height;In addition, assistant reinforcement muscle 5 also can choose the height of 1cm.Such size knot
So that the moderate dimensions of template, weight is also more conform with ordinary person and carries structure, therefore installs very convenient, quick;When
So, its concrete size can choose other sizes structure in the case of meeting convenient carrying, installing;But avoid adopting as far as possible
Big size, because oversized be likely to result in carrying inconvenience, installs relatively more difficult;It is also required to avoid using too small chi
Very little, installation rate so can be caused to decline.
Specific embodiment 1:
Shown in as shown in Figure 1 to Figure 4, Fast Installation template integrally selects the dimensional structure of 180cm × 60cm × 8cm, its material
Expect for plastics;Its back is provided with three cross reinforcings 22 and seven vertical strengthening ribs 23.Two of which cross reinforcing 22
With 23 groups of two vertical strengthening ribs circumferentially reinforcement 21;Four pulling eyes 3 are provided with template, and four pulling eyes 3
On the center line in template length direction;The closest side of the pulling eye 3 at its two ends is 5cm, and the two of centre to drawing
Template is integrally divided equally by hole 3;Pulling eye 3 is respectively positioned on cross reinforcing 22 and the intersection of vertical strengthening ribs 23, and, to drawing
It is provided with ring stiffener 24 and the structure of radial reinforced rib 25 around hole 3.Smooth panel 1 around pulling eye 3 is embedded in
There is the stainless steel stiffener 4 of circular configuration.And, the thickness of smooth panel 1 is 1cm, the height of main reinforcement 2 is 7cm, auxiliary
The height of reinforcement 5 is 1cm.The thickness of all main reinforcements and assistant reinforcement muscle is 0.5cm.In addition, also in template surrounding
Circumferential reinforcement 21 on be provided with the structure of multiple connecting holes 6, to facilitate the splicing between template.
In conjunction with the concrete size of template in above-described embodiment 1, it is about 1.5g/cm in the density assuming plastics3When, obtain
The quality of one piece of template is about in 20kg;Such quality is very moderate in actual carrying and installation exercise.
Using the attachment structure of above-mentioned Fast Installation template composition, will polylith Fast Installation template mutually splice, its spelling
The mode of connecing can be along template length direction and/or template width direction;The week in template surrounding is first passed through between polylith template
To on reinforcement 21, the connecting hole 6 of setting is realized tentatively connecting, and uses connector 7;The specific connected mode of connector 7 is permissible
Using bolt or other connected modes of the prior art;Certainly, for convenience, quickly install and connect, generally from fast
The connector 7 that speed is installed.After polylith template tentatively connects, reinforcing bar 8 is set again at the back of template, reinforcing bar 8 needs
At least while it is located at the back of two pieces of templates, and is provided with reinforcing bar 8 and reinforces the position that bolt 9 is connected, by reinforcing
Template can be realized being connected by bolt 9 with reinforcing bar 8;And because reinforcing bar 8 is located at the back of at least two pieces of templates simultaneously, therefore
Reinforcing bar 8 is actually the effect that polylith template played with reinforcement by connection, final improves the steady of model sheetinstallat intensity and installation
Qualitative.In addition, reinforcing bar 8 can be respectively provided with horizontal and/or vertical.Furthermore it is also possible to pass through drawstring one end and reinforcing
Bar 8 connects, and other end oblique pull is fixing on the ground, realizes the oblique pull of installation form is fixed.In addition, reinforcing bar 8 is prolonged if necessary
Long, weld the mode such as can to adopt flange to connect two reinforcing bars or directly.
In addition, reinforcing bar 8 can preferably employ two steel pipes 81 forming;And for convenience to the company between steel pipe 81
Connect, two steel pipes 81 stagger and overlap after certain distance again, and leave gap between two steel pipes, reinforce bolt 9 and lead to
Cross the gap between two steel pipes 81 to snap onto on steel pipe 81.Now may need to use the structures such as corresponding fastener.Specifically
As shown in Figure 15 to Figure 17.When the structure of the overlap joint that staggered using two steel pipes 81, reinforcing bar 8, when connecting, can be passed through
The steel pipe 81 staggering connects, and structure is so that the prolongation of reinforcing bar 8 is convenient as shown in Figure 18.In addition, turning in template
On the position at angle, using the steel pipe 81 also convenient connection of setting of staggering.
As above, in the template from 180cm × 60cm × 8cm size, can be two steel pipes of 500cm from length
As reinforcing bar 8, two steel pipes stagger and are stitched together after 100cm, and so spliced reinforcing bar 8 entire length is 600cm.
Along template length directional spreding at template back, it may be located at the back of three pieces of templates to this reinforcing bar bar 8, and simultaneously with three pieces
Template connects.After so connecting, the bonding strength between three pieces of templates will be enhanced.Certainly, spell if there are more templates
Connect, after above-mentioned three pieces of template splicings, elongatedness direction is further continued for splice template, now can also increase reinforcing bar 8, and increase
Plus reinforcing bar 8 and former reinforcing bar 8 between by the mutual snapping of steel pipe extending 100cm out that staggers, and pass through steel pipe
Special connection fastener is realized connecting.
To sum up, Fast Installation template of the present invention, its can using plastic material so that template have quality lighter,
Convenient transport, easy for installation the advantages of, meanwhile, by arranging the structure of corresponding reinforcement and pulling eye 3, template can be strengthened
Intensity pour the requirement to template strength in engineering so as to meet for emergency repair engineering or large volume mixed mud.
Claims (8)
1. Fast Installation template, the main reinforcement (2) including smooth panel (1) and positioned at smooth panel (1) back, its feature
It is: be additionally included in the pulling eye (3) of setting in template, described pulling eye (3) runs through template along template thickness direction;Main reinforcement
Muscle (2) includes the cross reinforcing (22) along template length direction and the vertical strengthening ribs (23) along template width direction;Described
Cross reinforcing (22) and vertical strengthening ribs (23) mutually cross, and the surrounding edge in template surrounds circumferential reinforcement
(21);Described pulling eye (3) is located at the intersection of cross reinforcing (22) and vertical strengthening ribs (23);Described Fast Installation template
For plastics;Smooth panel (1) around pulling eye (3) has been embedded in stiffener (4).
2. Fast Installation template as claimed in claim 1 it is characterised in that: described main reinforcement (2) includes two and puts down each other
The cage bar bar (201) of row and a plurality of auxiliary muscle being located between two cage bar bars (201) and two cage bar bars (201) being connected
Bar (202).
3. Fast Installation template as claimed in claim 1 it is characterised in that: the outside of pulling eye (3) be provided with annular plus
Strong muscle (24), the hole wall of described pulling eye (3) is connected with the ring stiffener (24) in outside by radial reinforced rib (25);Described
Ring stiffener (24) is also connected with cross reinforcing (22) and vertical strengthening ribs (23) respectively;Described ring stiffener (24) and
The height of radial reinforced rib (25) is consistent with main reinforcement (2).
4. Fast Installation template as claimed in claim 1 it is characterised in that: also include assistant reinforcement muscle (5), described auxiliary plus
Strong muscle (5) is in the region that main reinforcement (2) surrounds, and the height of assistant reinforcement muscle (5) is less than main reinforcement (2).
5. Fast Installation template as claimed in claim 1 it is characterised in that: the length of described template is 180cm, and width is
60cm, thickness is 8cm.
6. the Fast Installation template as any one of claim 1 to 5 it is characterised in that: described pulling eye (3) has four
Individual, and four pulling eyes (3) are dispensed along on the center line in template length direction.
7. adopt claim 1 to 6 any one of Fast Installation template composition attachment structure it is characterised in that: bag
Include polylith Fast Installation template, and be provided with connecting hole on the circumferential reinforcement (21) of every piece of Fast Installation template surrounding
(6);Polylith Fast Installation template is mutually spliced in length and/or width, and is connected by connector (7);Also include adding
Gu bar (8) and reinforcing bolt (9), described reinforcing bar (8) is at least while located at the back of two pieces of Fast Installation templates, described reinforcing
Fast Installation template is connected by the pulling eye (3) that bolt (9) passes through in Fast Installation template with reinforcing bar (8).
8. attachment structure as claimed in claim 7 it is characterised in that: described reinforcing bar (8) is made up of two steel pipes (81), two
Root steel pipe (81) staggers and overlaps, and leaves gap between two steel pipes (81), and described reinforcing bolt (9) passes through two
Gap between steel pipe snaps onto on steel pipe (81).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410454303.0A CN104196230B (en) | 2014-09-05 | 2014-09-05 | Fast installation formwork and connection structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410454303.0A CN104196230B (en) | 2014-09-05 | 2014-09-05 | Fast installation formwork and connection structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104196230A CN104196230A (en) | 2014-12-10 |
CN104196230B true CN104196230B (en) | 2017-01-18 |
Family
ID=52081579
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410454303.0A Expired - Fee Related CN104196230B (en) | 2014-09-05 | 2014-09-05 | Fast installation formwork and connection structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104196230B (en) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104847107A (en) * | 2015-03-19 | 2015-08-19 | 蔡舒廷 | Composite side wall flat mold |
CN104763139B (en) * | 2015-04-13 | 2017-01-11 | 河北润林新材料科技有限公司 | Flat plastic molding board |
CN104790653A (en) * | 2015-04-24 | 2015-07-22 | 江苏程禾高科模板有限责任公司 | Composite material plane building formwork |
CN104790654A (en) * | 2015-04-24 | 2015-07-22 | 江苏程禾高科模板有限责任公司 | Combined type plane building template structure |
CN104775613B (en) * | 2015-04-24 | 2017-05-17 | 江苏程禾高科模板有限责任公司 | External corner reinforcing system for concrete pouring in building construction |
CN104790658B (en) * | 2015-04-24 | 2017-05-17 | 江苏程禾高科模板有限责任公司 | Internal corner reinforcing system for concrete pouring in building construction |
CN104763146B (en) * | 2015-04-24 | 2017-05-17 | 江苏程禾高科模板有限责任公司 | Novel corner template system |
CN106545160A (en) * | 2015-09-18 | 2017-03-29 | 重庆合筑实业发展有限公司 | A kind of outer wall template composite reinforcement system |
CN108425492A (en) * | 2018-02-28 | 2018-08-21 | 福建省华银铝业有限公司 | A kind of top plate supporting structure of building template |
CN109098097A (en) * | 2018-10-19 | 2018-12-28 | 佛山科学技术学院 | A kind of bridge column foot formwork for placing convenient for assembling |
CN114411695B (en) * | 2022-01-24 | 2024-08-23 | 梁军 | Underground cast-in-situ continuous wall construction method and connection structure thereof |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204225475U (en) * | 2014-09-05 | 2015-03-25 | 中国人民武装警察部队水电第九支队 | Fast Installation template and syndeton |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1448604A (en) * | 2002-03-29 | 2003-10-15 | 南部化成株式会社 | Plastic construction stencil |
CN2653043Y (en) * | 2003-08-20 | 2004-11-03 | 叶昌财 | Building formwork with easy pull ring |
ITPD20030295A1 (en) * | 2003-12-03 | 2005-06-04 | Geoplast Srl Ora Geoplast Spa | MODULAR CASE REUSABLE WITH IMPROVED RIBS. |
CN202299400U (en) * | 2011-08-11 | 2012-07-04 | 聂云龙 | Plastic combined type template for building construction |
CN203257089U (en) * | 2013-03-13 | 2013-10-30 | 青岛三林塑料模板有限公司 | Modularized plastic formwork |
CN203475815U (en) * | 2013-08-11 | 2014-03-12 | 丛建敏 | Building plastic formwork |
-
2014
- 2014-09-05 CN CN201410454303.0A patent/CN104196230B/en not_active Expired - Fee Related
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204225475U (en) * | 2014-09-05 | 2015-03-25 | 中国人民武装警察部队水电第九支队 | Fast Installation template and syndeton |
Also Published As
Publication number | Publication date |
---|---|
CN104196230A (en) | 2014-12-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104196230B (en) | Fast installation formwork and connection structure | |
CN104264899B (en) | Embedded outsourcing U-shaped steel-concrete composite beam | |
CN201943045U (en) | Automatic-moving hydraulic cantilever gantry concrete placement device for wave wall | |
CN204282187U (en) | A kind of novel Butterfly Arch Bridge | |
CN206186048U (en) | A side mould for precast concrete superimposed sheet | |
CN204225475U (en) | Fast Installation template and syndeton | |
CN104153579B (en) | A kind of formwork for placing structure of non-standard layers structure and construction method | |
CN106049754B (en) | The assembled section of the standard of assembly concrete combined column and the combined column being made up of assembly section | |
CN103243664B (en) | The assembled steel reinforced concrete culvert component in large aperture | |
CN206928323U (en) | A kind of ring muscle fastens assembled pipe gallery | |
CN105442737B (en) | A kind of complex heat-preservation floorboard and its construction method | |
CN207647031U (en) | A kind of reinforced column shaft segment structure for building industrialization | |
CN206632972U (en) | Mobile assembly type reinforcement raw material storage yard | |
CN205712471U (en) | A kind of prefabricated building structure post | |
CN204152197U (en) | Gate brace type large steel moulding plate | |
CN204357107U (en) | A kind of biodegradation type modifying waste plastic high molecule plastic formwork | |
CN211312249U (en) | Arch bridge reinforced structure | |
CN204059943U (en) | A kind of formwork for placing structure of non-standard layers structure | |
CN104847111B (en) | Construction method for coupling beam between shear wall limbs | |
CN210194671U (en) | Tower crane foundation for tower drum construction | |
CN203361631U (en) | Variable-diameter fabricated sliding mode platform of sliding mode system | |
CN208380076U (en) | A kind of staircase structure particular manufacturing craft | |
CN105908783A (en) | Attractiveness-strengthened trench cover slab | |
CN201865243U (en) | Separation type T-shaped concrete-filled steel pipe core column | |
CN101929200A (en) | Prefabricated vertical component and construction method in application thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170118 Termination date: 20170905 |
|
CF01 | Termination of patent right due to non-payment of annual fee |