CN104196148B - A kind of hollow block filling wall construction technology and default pipeline - Google Patents
A kind of hollow block filling wall construction technology and default pipeline Download PDFInfo
- Publication number
- CN104196148B CN104196148B CN201410468385.4A CN201410468385A CN104196148B CN 104196148 B CN104196148 B CN 104196148B CN 201410468385 A CN201410468385 A CN 201410468385A CN 104196148 B CN104196148 B CN 104196148B
- Authority
- CN
- China
- Prior art keywords
- pipeline
- stones
- laying bricks
- building
- lateral line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Retaining Walls (AREA)
Abstract
The present invention relates to construction wall field, in particular to a kind of hollow block filling wall construction technology and filling wall.This hollow block filling wall construction technology, comprise the following steps: preset pipeline, successively build by laying bricks or stones: when building by laying bricks or stones, carry out layering to build by laying bricks or stones, part below i.e. longitudinal pipeline each virtual connection point is one layer, when building current layer by laying bricks or stones, longitudinal pipeline more than this layer and lateral line are removed, when current layer has been built by laying bricks or stones, longitudinal pipeline and the lateral line of current layer last layer is installed.This hollow block filling wall construction technology of present invention offer and default pipeline, use the method presetting virtual connection to build by laying bricks or stones, and longitudinal pipeline and transverse pipe line piece use and arrange virtual connection point, and void junction can realize dismounting.Its objective is to reduce the cutting to building block to greatest extent.The masonry way of this kind of filling wall is simple to operate, fills the good integrity of wall after building by laying bricks or stones, and performance is high, has good economic benefit and social benefit.
Description
Technical field
The present invention relates to construction wall field, in particular to a kind of hollow block filling wall construction technology and filling wall.
Background technology
Building-block has certain hollow rate, has light weight and the performance such as good insulation, heat insulation, sound insulation, is used widely in civil buildings filling wall in industry.In design and construction, national regulation, industry standard, construction drawing set pair material property, masoning method, detailing requiments etc. have all done clear stipulaties, bury the clearest and the most definite concrete grammar underground for pipeline in masonry, are completed by unit in charge of construction completely.
At present, common construction technology typically uses: hollow blocks built is become wall, afterwards further according to place on line, in building-block upper shed, after being arranged in by pipeline in building block, then by opening block.And framework, frame-shear structure a large amount of electric equipment pipeline is embedded in filling wall, if pipeline bury underground improper, it will destroying masonry structure, thus reduce masonry structure integrity energy and anti-seismic performance, produce wall body slit, impact uses and perception.
Summary of the invention
It is an object of the invention to provide a kind of hollow block filling wall construction technology and default pipeline, to solve above-mentioned problem.
Provide a kind of hollow block filling wall construction technology in an embodiment of the present invention, comprise the following steps:
Preset pipeline: at required masonry panel, preset pipeline, longitudinal direction pipeline, lateral line are fixedly mounted by its installation site, and multiple removable virtual connection point is set on described longitudinal pipeline and lateral line, when current layer has been built by laying bricks or stones, described longitudinal pipeline and the described lateral line of current layer last layer are installed;
Successively building by laying bricks or stones: when building by laying bricks or stones, carry out layering and build by laying bricks or stones, the part below each described virtual connection point of the most described longitudinal pipeline is one layer, when building current layer by laying bricks or stones, described longitudinal pipeline more than this layer and described lateral line is removed;
When building by laying bricks or stones to described longitudinal pipeline, being penetrated by the top of longitudinal pipeline by building-block, the most described building-block is built by laying bricks or stones;
When building by laying bricks or stones to described lateral line, by offering notch on the described building-block below lateral line, lateral line is arranged in notch;
Build by laying bricks or stones to described in top during longitudinal pipeline, opening is offered in the side of described building-block, the side of described building-block is nested on described longitudinal pipeline.
A kind of default pipeline, including longitudinal pipeline and lateral line, described longitudinal pipeline and described lateral line are linked and packed box;
Described longitudinal pipeline and described lateral line include a plurality of sub-canals line, are removably connected by banjo fixing butt jointing between adjacent described sub-pipeline.
Further, removably connected by banjo fixing butt jointing between described sub-pipeline and described assembling box.
Further, described longitudinal pipeline and described lateral line are provided with dismountable bracing frame.
Further, the described sub-pipeline of described longitudinal pipeline includes push rod, intermediate bar and bottom bar, and described intermediate bar is equal with the length of described bottom bar, and more than or equal to the length of described push rod.
A kind of hollow block filling wall construction technology of embodiment of the present invention offer and default pipeline, the method presetting virtual connection is used to build by laying bricks or stones, the most first preset and fill longitudinal pipeline required within the walls and lateral line, wherein, longitudinal pipeline and transverse pipe line piece use and arrange virtual connection point, and empty junction can realize dismounting.Its objective is to reduce the cutting to building block to greatest extent.
Wherein, intermediate bar and bottom bar can use the mode being from top to bottom socketed to install building block, lateral line then formerly can offer notch in building block, lateral line be arranged in notch, complete to build by laying bricks or stones;So, the only building block on push rod needs to offer on its lateral surface opening.The masonry way of this kind of filling wall is simple to operate, fills the good integrity of wall after building by laying bricks or stones, and performance is high, has good economic benefit and social benefit.
Accompanying drawing explanation
Fig. 1 shows the building by laying bricks or stones to structural representation during bottom bar of a kind of hollow block filling wall construction technology described in the embodiment of the present invention;
Fig. 2 shows the building by laying bricks or stones to structural representation during lateral line of a kind of hollow block filling wall construction technology described in the embodiment of the present invention;
Fig. 3 shows the building by laying bricks or stones to structural representation during intermediate bar of a kind of hollow block filling wall construction technology described in the embodiment of the present invention;
Fig. 4 shows the building by laying bricks or stones to structural representation during push rod of a kind of hollow block filling wall construction technology described in the embodiment of the present invention;
Fig. 5 shows the structural representation of a kind of default pipeline described in the embodiment of the present invention;
Fig. 6 shows the structural representation of the banjo fixing butt jointing of a kind of default pipeline described in the embodiment of the present invention.
In figure:
1, longitudinal pipeline;2, lateral line;3, assembling box;4, sub-pipeline;5, banjo fixing butt jointing;6, bracing frame.
Detailed description of the invention
Below by specific embodiment and combine accompanying drawing the present invention is described in further detail.
As shown in figures 1 to 6, a kind of hollow block filling wall construction technology, comprise the following steps:
Preset pipeline: at required masonry panel, preset pipeline, longitudinal direction pipeline 1, lateral line 2 are fixedly mounted by its installation site, and multiple removable virtual connection point is set on longitudinal pipeline 1 and lateral line 2, when current layer has been built by laying bricks or stones, longitudinal pipeline 1 and the lateral line 2 of current layer last layer are installed;
Successively building by laying bricks or stones: when building by laying bricks or stones, carry out layering and build by laying bricks or stones, the part below i.e. longitudinal pipeline 1 each virtual connection point is one layer, when building current layer by laying bricks or stones, longitudinal pipeline 1 more than this layer and lateral line 2 is removed;
When building by laying bricks or stones to longitudinal pipeline 1, being penetrated by the top of longitudinal pipeline 1 by building-block, from top to bottom building-block is built by laying bricks or stones;
When building by laying bricks or stones to lateral line 2, by offering notch on the building-block below lateral line 2, lateral line 2 is arranged in notch;
When building by laying bricks or stones to top longitudinal direction pipeline 1, opening is offered in the side of building-block, the side of building-block be nested on longitudinal pipeline 1.
A kind of default pipeline, including longitudinal pipeline 1 and lateral line 2, longitudinal pipeline 1 and lateral line 2 are linked and packed box 3;
Longitudinal pipeline 1 and lateral line 2 include a plurality of sub-canals line 4, are removably connected by banjo fixing butt jointing 5 between adjacent sub-pipeline 4.
Removably connected by banjo fixing butt jointing 5 between sub-pipeline 4 and assembling box 3.Wherein, assembling box 3 is electronic box or line box, removably connect using between assembling box 3 and sub-pipeline 4, the effect of virtual connection point is played in longitudinal pipeline 1, i.e. can realize, the mode using building block lateral opening to be connected between assembling box 3 with next banjo fixing butt jointing 5 connects, and longitudinal pipeline 1 below uses the mode of socket joint block.And in lateral line 2, virtual connection point is preferably arranged at assembling box 3, i.e. it is virtual connection point at the beginning and end of lateral line 2, during construction, lateral line 2 is arranged in notch, then be connected with banjo fixing butt jointing 5, convenient and swift.
Longitudinal pipeline 1 and lateral line 2 are provided with dismountable bracing frame 6.Bracing frame 6 plays the effect of temporary support, owing to being first to arrange default pipeline, is carrying out building by laying bricks or stones of body of wall, so the fixed effect presetting pipeline may not be good, by bracing frame 6, default pipeline is carried out temporary support.
The sub-pipeline 4 of longitudinal pipeline 1 includes push rod, intermediate bar and bottom bar, and intermediate bar is equal with the length of bottom bar, and more than or equal to the length of push rod.Wherein, using building block lateral opening at push rod, the side of building block overlap on female connector push rod, building block the most herein needs to arrange opening in side, and wherein, the length of push rod is the shortest, needed for arrange the building block of opening the fewest.Preferably, the length of bottom bar and intermediate bar is set to 1.5m, and the length of push rod is less than 1.5m.
A kind of hollow block filling wall construction technology of above-described embodiment offer and default pipeline, the method presetting virtual connection is used to build by laying bricks or stones, the most first preset and fill longitudinal pipeline 1 required within the walls and lateral line 2, wherein, longitudinal pipeline 1 and 2 employings of lateral line arrange virtual connection point, and empty junction can realize dismounting.Its objective is to reduce the cutting to building block to greatest extent.
Wherein, intermediate bar and bottom bar can use the mode being from top to bottom socketed to install building block, lateral line 2 then formerly can offer notch in building block, lateral line 2 be arranged in notch, complete to build by laying bricks or stones;So, the only building block on push rod needs to offer on its lateral surface opening.The masonry way of this kind of filling wall is simple to operate, fills the good integrity of wall after building by laying bricks or stones, and performance is high, has good economic benefit and social benefit.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, any modification, equivalent substitution and improvement etc. made, should be included within the scope of the present invention.
Claims (5)
1. a hollow block filling wall construction technology, it is characterised in that comprise the following steps:
Preset pipeline: at required masonry panel, preset pipeline, longitudinal direction pipeline, lateral line are fixedly mounted by its installation site, and described
On longitudinal pipeline and lateral line, multiple removable virtual connection point is set;
Successively building by laying bricks or stones: when building by laying bricks or stones, carry out layering and build by laying bricks or stones, the part below each described virtual connection point of the most described longitudinal pipeline is one layer, builds by laying bricks or stones current
During layer, described longitudinal pipeline more than this layer and described lateral line are removed, when current layer has been built by laying bricks or stones, by the institute of current layer last layer
State longitudinal pipeline and described lateral line is installed;
When building by laying bricks or stones to described longitudinal pipeline, being penetrated by the top of longitudinal pipeline by building-block, the most described building-block is built by laying bricks or stones;
When building by laying bricks or stones to described lateral line, by offering notch on the described building-block below lateral line, lateral line is arranged in notch;
Build by laying bricks or stones to described in top during longitudinal pipeline, opening is offered in the side of described building-block, the side of described building-block is nested into described
On longitudinal pipeline.
Technique the most according to claim 1, it is characterised in that described default pipeline includes longitudinal pipeline and lateral line, described longitudinal direction
Be linked and packed on pipeline and described lateral line box;
Described longitudinal pipeline and described lateral line include a plurality of sub-canals line, are removably connected by banjo fixing butt jointing between adjacent described sub-pipeline.
Technique the most according to claim 2, it is characterised in that detachable by banjo fixing butt jointing between described sub-pipeline and described assembling box
Connect.
Technique the most according to claim 2, it is characterised in that described longitudinal pipeline and described lateral line are provided with dismountable support
Frame.
Technique the most according to claim 2, it is characterised in that the described sub-pipeline of described longitudinal pipeline includes push rod, intermediate bar and the end
Bar, described intermediate bar is equal with the length of described bottom bar, and more than or equal to the length of described push rod.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410468385.4A CN104196148B (en) | 2014-09-15 | 2014-09-15 | A kind of hollow block filling wall construction technology and default pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410468385.4A CN104196148B (en) | 2014-09-15 | 2014-09-15 | A kind of hollow block filling wall construction technology and default pipeline |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104196148A CN104196148A (en) | 2014-12-10 |
CN104196148B true CN104196148B (en) | 2016-12-07 |
Family
ID=52081499
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410468385.4A Expired - Fee Related CN104196148B (en) | 2014-09-15 | 2014-09-15 | A kind of hollow block filling wall construction technology and default pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104196148B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114277969A (en) * | 2021-12-06 | 2022-04-05 | 中建一局集团建设发展有限公司 | Grooving-free construction method for filling electromechanical pipelines of wall body with hollow building blocks |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN86106157A (en) * | 1986-07-29 | 1988-02-10 | 约瑟·科尔霍·多斯·森托斯 | Assembling building block and use the building method of this building block |
US5678373A (en) * | 1994-11-07 | 1997-10-21 | Megawall Corporation | Modular precast wall system with mortar joints |
CN2786229Y (en) * | 2005-03-01 | 2006-06-07 | 张水明 | Wall building block with wire groove |
CN102477780A (en) * | 2010-11-26 | 2012-05-30 | 深圳市嘉达高科产业发展有限公司 | Light combined wall of building, wallboard and slurry |
CN103061515B (en) * | 2012-12-29 | 2015-10-14 | 陕西省第三建筑工程公司 | Concrete hollow block infilled wall pre-buried PVC conduit poling mounting method |
CN203755528U (en) * | 2014-04-04 | 2014-08-06 | 黄文侃 | Wall unit board for building |
CN103938869B (en) * | 2014-05-13 | 2016-04-27 | 二十二冶集团第一建设有限公司 | The construction method of spool, line box in masonry panel after MS building block |
-
2014
- 2014-09-15 CN CN201410468385.4A patent/CN104196148B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN104196148A (en) | 2014-12-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EA034920B1 (en) | Slab which can receive equipment that is accessible | |
CN104405065B (en) | One exempts from form removal panel structure and construction method thereof | |
CN104863290B (en) | A kind of assembled wall of single dry wall section and construction method | |
CN102691366A (en) | Precast concrete self-insulating shear wall and assembly type concrete building shear wall structure | |
CN104631662A (en) | Hollow steel mesh keel inner formwork cement partition wall construction method | |
CN107893496A (en) | A kind of assembly concrete integrated floor and its manufacture method | |
CN204112525U (en) | Band perps precast shear wall structure in strong concrete precast frame | |
KR101458434B1 (en) | Half precast concrete column manufacturing method using prefabricated PC panels and constructing method using the same | |
US20080092465A1 (en) | Bricks for pipe laying and construction work using this | |
CN104196148B (en) | A kind of hollow block filling wall construction technology and default pipeline | |
CN102926553A (en) | Method for reinforcing row-lock wall through adopting wire entanglement and cement mortar | |
CN208379831U (en) | A kind of pseudo-classic architecture external wall structure | |
CN104810744A (en) | Free pre-burying construction method of wall pipeline | |
CN207453225U (en) | A kind of superstructure unit and assembly concrete integrated floor | |
CN105019579B (en) | Masonry filler wall reinforcement and plastering constructional column and construction method thereof | |
CN101858118A (en) | Reinforced concrete hollow floor slab and construction method | |
CN105714943B (en) | Exterior-wall heat insulation reinforcement composite plate, heat-preserving wall integral structure and construction method | |
CN105970995A (en) | Bearing platform mold | |
JP4976938B2 (en) | Seismic reinforcement structure | |
CN206328916U (en) | Precast type panel structure | |
CN211499326U (en) | Synchronous construction structures of concrete infilled wall and cast-in-place structure | |
RU2011112603A (en) | BUILDING ELEMENTS SUCH AS A WALL UNIT, FLOOR PLATE, JUMBER-SEISMICALLY STRUCTURED DESIGN | |
CN104652677A (en) | Template and floor slab | |
CN206873691U (en) | A kind of assembled wall and its installation constitution | |
CN205090097U (en) | Brickwork wall poling line structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |