Summary of the invention
The object of this invention is to provide a kind of outfitting quay structure, to overcome currently available technology above shortcomings.
The object of the invention is to be achieved through the following technical solutions:
A kind of outfitting quay structure, comprise soft rock layer, the end face of described soft rock layer is provided with composite earthwork antiseepage film, the top of described composite earthwork antiseepage film is provided with mud jacking rubble bedding, the top of this mud jacking rubble bedding is horizontal plane, on this horizontal plane, be provided with integrated laying foundation, the top bilateral symmetry of described integrated laying foundation is provided with the piping lane track foundation of holding concurrently, the top middle portion of described integrated laying foundation and hold concurrently and be provided with runway layer between track foundation at described piping lane.
Further, described composite earthwork antiseepage film comprises two-layer non-woven geotextile and layer of plastic film, and described plastic sheeting is arranged between two-layer non-woven geotextile.
Further, described mud jacking rubble bedding consists of the uniform rubble of grating and the cement paste that is filled in rubble space, and embedding in described mud jacking rubble bedding have a Grouting Pipe.
Further, on holding concurrently the face that track foundation contacts, described integrated laying foundation and described piping lane be provided with shearing resistance steel part.
Further, one end of described shearing resistance steel part is provided with semicircle crotch, and one end of described semicircle crotch is arranged on described piping lane and holds concurrently in track foundation, and the other end of described shearing resistance steel part is arranged in described integrated laying foundation.
Further, the described piping lane track foundation of holding concurrently comprises header board, dividing plate, track foundation, top board and base plate; The equal horizontal arrangement of described top board and base plate, the left end between described top board and base plate, middle part and right-hand member are disposed with header board, dividing plate and track foundation.
Further, the junction of described track foundation and described top board is provided with rail groove, and the axis of described rail groove overlaps with the vertical axis of described track foundation.
Further, described runway layer comprises cast-in-situ concrete surface layer, hardcore bed and Telford base from top to bottom successively.
Beneficial effect of the present invention is: efficiently solve in prior art that harbour globality is poor, the large problem of differential settlement between the operating period; In addition, adopt the design of integrated laying foundation, thereby the quantity that has greatly reduced prefabricated units significantly improves efficiency of construction, produces good economic benefit; This device, in the situation that a crane is set, meets the lift heavy demand of both sides, outfitting quay simultaneously, makes harbour good integrity, can not produce the situation of differential settlement between the operating period, and efficiency of construction is fast, and has effectively saved resource.
The specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is only the present invention's part embodiment, rather than whole embodiment.Embodiment based in the present invention, the every other embodiment that those of ordinary skills obtain, belongs to the scope of protection of the invention.
As shown in Figure 1, a kind of outfitting quay structure described in the embodiment of the present invention, comprise composite earthwork antiseepage film 1, mud jacking rubble bedding 2, integrated laying foundation 3, the piping lane track foundation 4 of holding concurrently, runway layer 5 and soft rock layer 6, described composite earthwork antiseepage film 1 is arranged at the end face of soft rock layer 6, on the top of described composite earthwork antiseepage film 1, be provided with mud jacking rubble bedding 2, and the top of described mud jacking rubble bedding 2 is horizontal plane, on described horizontal plane, be provided with integrated laying foundation 3, the top bilateral symmetry of described integrated laying foundation 3 is provided with the piping lane track foundation 4 of holding concurrently, the top middle portion of described integrated laying foundation 3 and hold concurrently and be provided with runway layer 5 between track foundation 4 at described piping lane.
As shown in Figure 2, described composite earthwork antiseepage film 1 comprises two-layer non-woven geotextile 11 and layer of plastic film 12, and described plastic sheeting 12 is arranged between two-layer non-woven geotextile 11, and the thickness of described plastic sheeting 12 is 2-3mm.
As shown in Figure 3, described mud jacking rubble bedding 2 is comprised of with the cement paste 22 being filled in rubble 21 spaces the uniform rubble 21 of grating, embedding in described mud jacking rubble bedding 2 have a Grouting Pipe 23, on described mud jacking rubble bedding 2 and under described Grouting Pipe 23 vertical, evenly has several circular holes.
As shown in Fig. 4-5, the width of described integrated laying foundation 3 is corresponding with the harbour width in outfitting quay, and generally, the width of described integrated laying foundation 3 is 18-22m, concrete, according to the gauge of crane 7, determines; Generally, described integrated laying foundation 3 is 15-30m along the length of orientation line of pier direction, concrete, according to the making ability of harbour length and Precast Caisson factory, comprehensively determines; On holding concurrently the face that track foundation 4 contacts, described integrated laying foundation 3 and described piping lane be provided with shearing resistance steel part 36; One end of described shearing resistance steel part 36 is provided with semicircle crotch, and one end of described semicircle crotch is arranged on described piping lane and holds concurrently in track foundation 4, and the other end of described shearing resistance steel part 36 is arranged in described integrated laying foundation 3.
As shown in Figure 6, the described piping lane track foundation 4 of holding concurrently comprises header board 41, dividing plate 42, track foundation 43, top board 44 and base plate 45; Described top board 44 and the equal horizontal arrangement of base plate 45, left end, middle part and right-hand member between described top board 44 and base plate 45 is provided with header board 41, dividing plate 42 and track foundation 43 successively, described top board 44 and base plate 45 are mutually perpendicular to described header board 41, dividing plate 42 and track foundation 43 and be the relation of being rigidly connected, generally, the clear distance between described top board 44 and described base plate 45 is more than or equal to 1.8m; Described track foundation 43 is provided with rail groove 46 with the junction of described top board 44, the axis of described rail groove 46 overlaps with the vertical axis of described track foundation 43, generally, the width of described rail groove 46 is 0.5m, the degree of depth is 0.2m, and the track of walking for crane 7 is arranged in described rail groove 46.
As shown in Figure 7, described runway layer 5 comprises cast-in-situ concrete surface layer 51, hardcore bed 52 and Telford base 53 from top to bottom successively, generally, the thickness h 1 of described cast-in-situ concrete surface layer 51 is 0.2-0.3m, the thickness h 2 of described hardcore bed 52 is 0.4-0.5m, the thickness of described Telford base 53=described piping lane height-h1-h2 of track foundation 4 that holds concurrently.
During concrete use, the present invention is applied to certain outfitting quay engineering, this harbour general layout becomes jetty formula to arrange, quayage 300m, harbour width 20m, the fully loaded tonnage that harbour is stopped ship type is 100,000 tons, harbour face design service load 50kPa, planning to build quayside geology can be divided into from top to bottom: Mud Layer, Muddy Bottoms farinose argillic horizon, medium-sand seam, slate layer, design high-water is 4.31m, design lowest stage is-0.43m, working water level 2.0m, wharf apron design head is-9.0m, for meeting wharf apron design head needs, soil supporting layer need be excavated to slate layer.
The primary strength of slate is 350kPa, have and meet water disintegration, softening feature, initial deformation modulus 25MPa, through laboratory experiment, slate is exposed in seawater, the seawater pressure of bearing when bearing this pressure simulation slate of strong 125 kPa(of hydraulic pressure at working water level), under effect, physical and mechanical property index is as follows over time:
After exposed 7 days, strength decreased 6.1%, modulus of deformation reduces by 3.5%;
After exposed 14 days, strength decreased 9.3%, modulus of deformation reduces by 5.2%;
After exposed 21 days, strength decreased 13.5%, modulus of deformation reduces by 12.6%;
After exposed 28 days, strength decreased 19.2%, modulus of deformation reduces by 21.7%;
The present invention is applied to this outfitting quay engineering, as shown in Figure 1, a kind of outfitting quay of the present invention structure comprises composite earthwork antiseepage film 1, mud jacking rubble bedding 2, integrated laying foundation 3, piping lane hold concurrently track foundation 4 and runway layer 5, end face at harbour is provided with crane 7, the biggest lifting capacity is 50 tons, the side of harbour is provided with rubber fender 8, the end face of harbour is provided with 100 tons of mooring dolphins 9, wherein: described composite earthwork antiseepage film 1 is laid in the end face of soft rock layer 6, described mud jacking rubble bedding 2 is placed in the end face of described composite earthwork antiseepage film 1 and the end face of described mud jacking rubble bedding 2 is horizontal plane, described integrated laying foundation 3 is placed on described mud jacking rubble bedding 2, the described piping lane track foundation 4 of holding concurrently has two covers and the symmetrical left and right sides that is arranged on described integrated laying foundation 3 respectively, described runway layer 5 is arranged on the described piping lane of two covers and holds concurrently between track foundation 4 and be shelved on the end face of described integrated laying foundation 3.
As shown in Figure 2, described composite earthwork antiseepage film 1 is comprised of two-layer non-woven geotextile 11 and layer of plastic film 12, and described plastic sheeting 12 is arranged on the centre of two-layer non-woven geotextile 11; Described non-woven geotextile 11 adopts polyethylene synthetic fibre material, and tensile strength is 8kN/m, and mass area ratio is 450g/m2; The thickness of described plastic sheeting 12 is 2.5mm.
As shown in Figure 3, described mud jacking rubble bedding 2 is comprised of the uniform rubble 21 of grating and the cement paste 22 that is filled in the space of 21 of rubbles, the particle size range of described rubble 21 is 5mm ~ 20mm, described cement paste 22 adopts portland cement preparation, the strength grade of described portland cement is 42.5 grades, cement paste 22 after preparation is carried out to laboratory experiment, and 100mm test cube compressive strength is 10MPa; Embedding in described mud jacking rubble bedding 2 have a Grouting Pipe 23, and the joint length of described Grouting Pipe 23 is 25m, along orientation line of pier direction interval 5m, arranges; It is the pvc pipe that 50mm, wall thickness are 3mm that Grouting Pipe 23 adopts diameters, and 0.5m even perforate in interval under described Grouting Pipe 23 vertical, has 55 circular holes altogether, and the diameter of circular hole is 13.5mm.
The width of described integrated laying foundation 3 is 20m, and this width is the harbour width in outfitting quay.Described integrated laying foundation 3 is 15m along the length of orientation line of pier direction, the total length of considering harbour is 300m, the Design of length of described integrated laying foundation 3 is 15m, and the long harbour of 300m can be established 20 caissons just, and local Precast Caisson factory possesses the making ability of this yardstick caisson.
As shown in Figure 4, described integrated laying foundation 3 is provided with 2 caisson longitudinal side walls 31, the thickness 0.35m of described caisson longitudinal side wall 31, the thickness of 2 caisson lateral sidewalls 32 is 0.30m, the thickness of 3 caisson withes 33 is 0.20m, the thickness 0.20m of 3 caisson across bulkheads 34, the thickness 0.55m of Bottom plate of sinkbox 35; Described integrated laying foundation 3 adopts reinforced concrete structure, concrete strength grade C40, freeze proof grade F250; Heavily approximately 1571 tons, each caisson.
Described integrated laying foundation 3 and described piping lane are held concurrently on the face that track foundation 4 contacts and are provided with shearing resistance steel part 36; In the present embodiment, described in each, on integrated laying foundation 3, be evenly provided with altogether 20 shearing resistance steel parts 36; Described shearing resistance steel part 36 adopts Q235 round steel, and diameter is 36mm, and one end of described shearing resistance steel part 36 is provided with the semicircle crotch structure of length 0.5m; One end that described shearing resistance steel part 36 is provided with crotch structure is imbedded described piping lane and is held concurrently in track foundation 4; The other end of described shearing resistance steel part 36 is imbedded in described integrated laying foundation 3; Hold concurrently track foundation 4 of described piping lane adopts reinforced concrete structures, concrete strength grade C35, freeze proof grade F200.
As shown in Figure 5, the hold concurrently thickness of header board 41 of track foundation 4 of described piping lane is 1.0m, the thickness of described dividing plate 42 is 0.40m, the thickness of described track foundation 43 is 1.0m, the thickness of described top board 44 is 0.80m, the thickness of described base plate 45 is 0.70m, and the clear distance between described top board 44 and described base plate 45 equals 1.8m, and this clear distance can ensure passing through of construction operation personnel and maintenance personal; Described top board 44 is provided with rail groove 46 with the junction of described track foundation 43, the dead in line of track foundation 43 described in track foundation 4 of holding concurrently of the axis of described rail groove 46 and described piping lane, the width of described rail groove 46 is 0.5m, the degree of depth is 0.2m, and the track of walking for crane 7 is arranged in described rail groove 46.
As shown in Figure 6, described runway layer 5 comprises cast-in-situ concrete surface layer 51, hardcore bed 52 and Telford base 53 from top to bottom successively; The thickness h 1 of described cast-in-situ concrete surface layer 51 is 0.3m, and the thickness h 2 of described hardcore bed 52 is 0.5m, the thickness of described Telford base 53=described piping lane height (3.50m)-h1-h2=3.5m-0.3m-0.5m=2.7m of track foundation 4 that holds concurrently.
Concrete operating principle is as follows:
(1) by lay described composite earthwork antiseepage film 1 at soft rock layer 6 end face, played the effect of locating soft rock layer 6 under sea water intrusion harbour that hinders, exposed surface after soft rock layer 6 excavation has been carried out to effective protection, the weight of the described mud jacking rubble bedding 2 of installing immediately is closely pressed in described composite earthwork antiseepage film 1 on soft rock layer 6, along with the installation of track foundation 4 of holding concurrently of described integrated laying foundation 3 and described piping lane, heavier load will be pressed in described composite earthwork antiseepage film 1, under high pressure load (being 520kPa in the present embodiment), soil particle in soft rock layer 6 fits tightly, the transmission coefficient minimum (being 0.0001m/d) of soil under this state, in addition the inhibition of 1 pair of seawater of described composite earthwork antiseepage film, can effectively protect soft rock layer 6.
Harbour built up after 2 years, and soft rock layer 6 core boring sampling to locating under harbour, carry out laboratory experiment, and strength decreased is only 0.1%, and it is only 0.2% that modulus of deformation reduces.As can be seen here, the present invention has carried out effective protection to soft rock layer 6.
(2) described mud jacking rubble bedding 2 can bulk deformation, more stressed more evenly rationally than traditional bulk cargo piece ground mass bed, and described mud jacking rubble bedding 2 also can play antiseepage effect simultaneously.
(3) width of described integrated laying foundation 3 is 20m, can make can ensure that the both sides lift heavy in outfitting quay is required in the situation that harbour end face only arranges a crane 7; Integrated laying foundation 3 integral body are born upper load, avoid the front and back rail of crane 7 to produce differential settlement; In addition, the vertical load of 3 pairs of described mud jacking rubble beddings 2 of integrated laying foundation is very even, has reduced described mud jacking rubble bedding 2 and soft rock layer 6 and because bearing inhomogeneous load, has produced the possibility of inhomogeneous deformation.
(4) the described piping lane track foundation 4 double stressed basis of doing current piping lane and track simultaneously of holding concurrently, the front and back track of crane 7 is respectively installed in the rail groove 46 of the harbour left and right sides, and these technical measures can be delivered to the wheel load of crane 7 on described integrated laying foundation 3 effectively.
(5) axis of described rail groove 46 and described piping lane hold concurrently track foundation 43 described in track foundation 4 dead in line can so that described track foundation 43 in vertical axle center stress, effectively prevent described track foundation 43 eccentric forces, avoid crack to produce, thereby guarantee structural safety.
As shown in Figure 8, a kind of constructing structure schematic diagram of outfitting quay, its construction method comprises the following steps:
Step 1: the foundation trench in excavation section by section outfitting quay, described foundation trench is 15m along the length of orientation line of pier direction, this length equals described integrated laying foundation 3 just along the length of orientation line of pier direction;
Step 2: after described foundation trench excavation, with laying immediately described composite earthwork antiseepage film 1 after rubble 21 levelling excavation faces, described foundation trench is covered;
Step 3: every section of described composite earthwork antiseepage film 1 laying is complete, carries out immediately the installation of described integrated laying foundation 3 and the construction of described mud jacking rubble bedding 2, concrete:
A) first at rubble 21 described in end face throwing one deck of described composite earthwork antiseepage film 1, more described Grouting Pipe 23 is placed in to the end face of described rubble 21, and then described in throwing rubble 21 to design height;
B) the rubble bedding end face after throwing is laid one deck woven geotextile, the object of laying this woven geotextile is the phenomenon that prevents from producing in slip casting process cement paste 22 spillages, this woven geotextile adopts polypropylene material, tensile strength 9.5kN/m, mass area ratio 5000g/m2.
C) described integrated laying foundation 3 is installed to b in step 3) end face of woven geotextile described in step;
D) by described Grouting Pipe 23, with the pressure of 1.5MPa, described cement paste 22 is injected in the space of 21 of described rubbles;
Step 4: set up template, assembling reinforcement, the construction of track foundation 4 of holding concurrently of described piping lane is carried out in segmentation, after assembling reinforcement, the installation of embedded parts of described rubber fender 8 and described mooring dolphin 9 is good, then carries out concrete building; Concrete reach design strength 80% after, described rubber fender 8 and described mooring dolphin 9 are installed;
Step 5: the construction of described runway layer 5 is carried out in segmentation, first lays described Telford base 53 and re-lays described hardcore bed 52, by described Telford base 53 and 52 compactings of described hardcore bed, finally builds described cast-in-situ concrete surface layer 51;
Step 6: execute above step 1 ~ 5, completed the main body construction process in outfitting quay;
Step 7: erection crane 7.
According to above-mentioned principle and concrete implementation step, can effectively solve in prior art that harbour globality is poor, the large shortcoming of differential settlement between the operating period; In addition, thereby the design of integrated laying foundation 3 has greatly reduced the quantity of prefabricated units and has improved efficiency of construction approximately 28%, produced good economic benefit, the present invention is in the situation that arranging a crane 7, meet the lift heavy demand of both sides, outfitting quay simultaneously, effectively saved resource, harbour good integrity, fast without differential settlement, efficiency of construction between the operating period, the advantage that economizes on resources.
The present invention is not limited to above-mentioned preferred forms; anyone can draw other various forms of products under enlightenment of the present invention; no matter but do any variation in its shape or structure; every have identical with a application or akin technical scheme, within all dropping on protection scope of the present invention.