CN205822123U - 20 ton deep water sheet pile quay wall structure - Google Patents

20 ton deep water sheet pile quay wall structure Download PDF

Info

Publication number
CN205822123U
CN205822123U CN201620138711.XU CN201620138711U CN205822123U CN 205822123 U CN205822123 U CN 205822123U CN 201620138711 U CN201620138711 U CN 201620138711U CN 205822123 U CN205822123 U CN 205822123U
Authority
CN
China
Prior art keywords
wall
front wall
anchorage
pile
cushion cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620138711.XU
Other languages
Chinese (zh)
Inventor
刘永绣
季则舟
刘进生
吴荔丹
周庆文
王玉红
崔冠辰
李梅
侯伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbour Consultants Co Ltd
Original Assignee
CCCC First Harbour Consultants Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbour Consultants Co Ltd filed Critical CCCC First Harbour Consultants Co Ltd
Priority to CN201620138711.XU priority Critical patent/CN205822123U/en
Application granted granted Critical
Publication of CN205822123U publication Critical patent/CN205822123U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

This utility model provides a kind of 20 ton deep water sheet pile quay wall structure, this structure includes front wall, anchorage wall, anchorage pull bar, at the rear of described front wall, off-load cushion cap is set, connect in the lower section of off-load cushion cap and have passive stake, coupled together by anchorage pull bar between described front wall, off-load cushion cap and anchorage wall or coupled together by anchorage pull bar between front wall and off-load cushion cap and between off-load cushion cap and anchorage wall.Effect of the present utility model is that on the one hand this sheet-pile structure can reduce the soil pressure acting on harbour front wall effectively, the bearing capacity of front wall can be significantly improved again simultaneously, thus sheet-pile wharf can be changed and can only build the present situation in 10 ton berths at present, it is achieved build the breakthrough of 20 ton deep water sheep pile wharf structure technology.This sheet-pile structure easy construction, has cost low, the advantage that the construction period is short.It is applicable to 20 ton deepwater wharf quay wall structure or deep water bank protection structures.

Description

20 ton deep water sheet pile quay wall structure
Technical field
This utility model relates to deepwater wharf, shore protection quay wall structure, is a kind of to can be suitably used for the 200000 of 20 ton berths Tonne deep water sheet pile quay wall structure.
Background technology
Sheet pile formula structure is one of harbour primary structure pattern, known sheet pile formula structure be by front wall 1, anchorage pull bar 3, The anchorage wall 2 structure composition at rear, as shown in Figure 1.Sheet-pile structure has the features such as easy construction, cost be low, at harbour, builds Ship building, hydraulic engineering and architectural engineering have a wide range of applications.But owing to sheet pile formula dock structure is at the depth of water and gear soil During extended height, front wall 1 internal force is increased dramatically, and conventional section is difficult to bear, the domestic sheet pile formula dock structure built at present It is confined to below 10 tons.For meeting 10 ton above deep water sheet-pile wharfs and deep water shore protection construction requirements, need exploitation New sheet pile bulkhead structural shape.
Summary of the invention
The purpose of this utility model is to provide a kind of 20 ton deep water sheet pile quay wall structure, is beneficial to before reduction acts on The soil pressure of wall, and improve the bearing capacity of front wall, it is adaptable to 20 tons are large-scale, the building of deep water sheet-pile wharf or deep water shore protection If.
For achieving the above object, the technical solution adopted in the utility model is to provide a kind of 20 ton deep water sheet pile bulkheads Structure, this structure includes front wall, anchorage wall, anchorage pull bar, wherein: described front wall is RC T shape diaphram wall Or combined steel plate pile, when described front wall uses T-shaped ground-connecting-wall structure, off-load cushion cap is held on the web of T-shaped ground-connecting-wall;Institute Stating RC T shape diaphram wall section configuration and be T-shaped or top is T-shaped, bottom is that the T-shaped of rectangle combines shape with rectangle Structure.
Effect of the present utility model is that this separation discharging type sheet-pile structure can reduce the front wall acting on harbour effectively Soil pressure, and significantly improve the bearing capacity of front wall, thus create and can build 20 ton deep water sheet-pile wharfs or deep water protects The structural shape of bank, has broken sheep pile wharf structure and has been only applicable to the present situation in 10 ton berths at present.Meanwhile, this separation off-load Formula quay wall structure easy construction, has cost low, the advantage that the construction period is short.
Accompanying drawing explanation
Fig. 1 is an embodiment organigram of the present utility model;
Fig. 2 is another embodiment organigram of the present utility model;
Fig. 3 is another embodiment organigram of the present utility model;
Fig. 4 is the structure section figure of another embodiment of the present utility model.
In figure:
1, front wall 2, anchorage wall 3, anchorage pull bar 4, off-load cushion cap
5, stake 6, ground 7, the soil body
Detailed description of the invention
In conjunction with accompanying drawing, the deep water sheet pile quay wall structure in 20 ton berths of the present utility model is further illustrated.
20 ton deep water sheet pile quay wall structure of the present utility model are that this structure includes front wall 1, anchorage wall 2, anchorage Pull bar 3, is provided with off-load cushion cap 4 at the rear of described front wall 1, connects many in the lower section of off-load cushion cap 4 and plays a supportive role Stake 5, be connected with each other by anchorage pull bar 3 between described front wall 1, off-load cushion cap 4 and anchorage wall 2;Described front wall 1 mixes for reinforcing bar Solidifying soil T-shaped diaphram wall or combined steel plate pile;Described stake 5 is one or more group of multiple rows of straight stake, taper pile, fork stake Close stake.
Described front wall 1 is RC T shape diaphram wall or combined steel plate pile, described RC T shape underground Diaphragm wall section configuration is T-shaped or top is T-shaped, and bottom is that the T-shaped of rectangle combines shape with rectangle;Described combined steel plate pile King pile is steel-pipe pile or I-steel sheet pile, and the auxiliary stake of combined steel plate pile is U-shaped or Z bar sheet pile;The section configuration of described stake 5 For square, rectangle, T-shaped, circle, annular, trapezoidal, box-shaped, U-shaped, the combination of one or more section configurations of Z-shaped, H-shaped Shape.
When described front wall 1 uses T-shaped ground-connecting-wall structure, off-load cushion cap 4 is held on the web of T-shaped ground-connecting-wall.Described Anchorage pull bar 3 is reinforcing pull rod or cable wire.
As it is shown in figure 1, anchorage pull bar 3 is located at above off-load cushion cap 4, it is straight that off-load cushion cap 4 supports the stake 5 connected below Stake or taper pile combination.Front wall 1 couples together by anchorage pull bar 3 with anchorage wall 2, and anchorage wall 2 is embedded in the soil body 7, the bottom of front wall 1 Sinking in ground 6, top anchorage pull bar 3 is held, and anchorage pull bar 3 is reinforcing pull rod or cable wire.The soil body 7 produces soil pressure and acts on Front wall 1, for keeping stability and the requirement of strength of front wall 1, should reduce the soil pressure acting on front wall 1 as far as possible, and improve front wall 1 Profile cross-section modulus make it have sufficiently high bearing capacity.Off-load cushion cap 4 is supported by stake 5, assume responsibility for off-load cushion cap more than 4 Soil body weight and the load of end face, play the effect of soil pressure reducing front wall 1, front wall 1 be RC T shape underground company Continuous wall or combined steel plate pile, create and strengthen the wharf apron depth of water to the condition of the 20 ton boats and ships that can berth.In order to avoid The factors such as structure differential settlement produce excessive structural internal force, separate or hinged between off-load cushion cap 4 with front wall 1.
As in figure 2 it is shown, anchorage pull bar 3 is connected with off-load cushion cap 4, off-load cushion cap 4 stake 5 below is straight stake or taper pile, front Wall 1 is RC T shape diaphram wall or combined steel plate pile.Pass through anchorage pull bar 3 and unload between front wall 1 and anchorage wall 2 Lotus cushion cap 4 connects, by anchorage pull bar 3 or use hinged or short rod to couple together between off-load cushion cap 4 and front wall 1, other The structure of part is same as shown in Figure 1.
As it is shown on figure 3, the stake 5 that off-load cushion cap 4 is below is fork stake and straight stake combination, the structure of other parts is identical with Fig. 1.
Fig. 4 show the case history of port and pier, and wherein sheet-pile wharf uses and separates discharging type ground-connecting-wall sheet-pile structure, The harbour face a height of 4.2m of top mark, mud face, wharf apron absolute altitude is respectively-20m.Front wall 1 uses the ground-connecting-wall sheet pile of T-shaped section, its Profile height is 2.8m, and flange width is 4.0m, and height is 0.8m, and web height is 2.0m, and width is 0.8m, absolute altitude at the bottom of wall For-34.0m;Being cast-in-situ steel reinforced concrete off-load cushion cap 4 after front wall, cushion cap width is 12.5m, and a height of 0.0m of cushion cap top mark holds Platform thickness 1.0m, side, off-load cushion cap 4 sea rides on the web of T-shaped cross section front wall 1, arranges the poured pile base of two row Φ 1200 under cushion cap Plinth 5, sea side stake leaving wharf frontal line 7.65m, sea peg is 5.25m with side, land stake horizontal spacing, and longitudinal pitch is 4.0m, at the bottom of stake Absolute altitude is-38.0m.Anchorage wall 2 is continuous underground wall structure, and anchorage wall thickness is 1.1m, and absolute altitude at the bottom of wall is-16.0m, wall top mark A height of-0.5m, it pours nose girder, a height of 3.0m of nose girder top mark.Φ 70, i.e. bollard is used between front wall 1 and anchorage wall 2 Place uses Φ 75, the high-strength steel pull bar 3 of S550 level to connect, and pull bar 3 absolute altitude is 0.4m, the front wall 1 of average headway 1.5m and anchorage Wall 2 clear distance is 44.0m, backfills Extra-fine sand therebetween, uses vibro densification to process.
The construction method of described front wall 1, anchorage wall 2 continuous underground wall structure and bored concrete pile 5 is: first position grooving, in groove Use mud off, then lay steel reinforcement cage, more Down-Up casting concrete, to predetermined absolute altitude, forms front wall, anchorage wall, filling Note stake.Then pour breastwork and nose girder, off-load cushion cap, dredge by the basin before dress pull bar, backfill soil and harbour.
This embodiment advantage of this utility model structure, great promotion and application are worth.

Claims (2)

1. a 20 ton deep water sheet pile quay wall structure, this structure includes front wall (1), anchorage wall (2), anchorage pull bar (3), The rear of described front wall (1) is provided with off-load cushion cap (4), connects many in the lower section of off-load cushion cap (4) and play a supportive role Stake (5), be connected with each other by anchorage pull bar (3) between described front wall (1), off-load cushion cap (4) and anchorage wall (2);Its feature It is: described front wall (1) is RC T shape diaphram wall or combined steel plate pile that described front wall (1) uses T-shaped ground-connecting-wall During structure, off-load cushion cap (4) is held on the web of T-shaped ground-connecting-wall;Described RC T shape diaphram wall section shape Shape is T-shaped or top is T-shaped, and bottom is that the T-shaped of rectangle combines shape structure with rectangle.
20 ton deep water sheet pile quay wall structure the most according to claim 1, is characterized in that: the master of described combined steel plate pile Stake is steel-pipe pile or I-steel sheet pile, and the auxiliary stake of combined steel plate pile is U-shaped or Z bar sheet pile.
CN201620138711.XU 2016-02-24 2016-02-24 20 ton deep water sheet pile quay wall structure Active CN205822123U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620138711.XU CN205822123U (en) 2016-02-24 2016-02-24 20 ton deep water sheet pile quay wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620138711.XU CN205822123U (en) 2016-02-24 2016-02-24 20 ton deep water sheet pile quay wall structure

Publications (1)

Publication Number Publication Date
CN205822123U true CN205822123U (en) 2016-12-21

Family

ID=58149037

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620138711.XU Active CN205822123U (en) 2016-02-24 2016-02-24 20 ton deep water sheet pile quay wall structure

Country Status (1)

Country Link
CN (1) CN205822123U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106996102A (en) * 2017-04-28 2017-08-01 中交第航务工程勘察设计院有限公司 Major-minor stake formula steel plate pilework
CN107022999A (en) * 2017-04-28 2017-08-08 中交第航务工程勘察设计院有限公司 Major-minor stake formula ground-connecting-wall structure
CN110438939A (en) * 2019-08-16 2019-11-12 中交第四航务工程勘察设计院有限公司 A kind of novel sheep pile wharf structure
CN112627109A (en) * 2020-12-15 2021-04-09 浙江海洋大学 Liftable truss type wharf

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106996102A (en) * 2017-04-28 2017-08-01 中交第航务工程勘察设计院有限公司 Major-minor stake formula steel plate pilework
CN107022999A (en) * 2017-04-28 2017-08-08 中交第航务工程勘察设计院有限公司 Major-minor stake formula ground-connecting-wall structure
CN110438939A (en) * 2019-08-16 2019-11-12 中交第四航务工程勘察设计院有限公司 A kind of novel sheep pile wharf structure
CN112627109A (en) * 2020-12-15 2021-04-09 浙江海洋大学 Liftable truss type wharf
CN112627109B (en) * 2020-12-15 2022-02-22 浙江海洋大学 Liftable truss type wharf

Similar Documents

Publication Publication Date Title
CN205822123U (en) 20 ton deep water sheet pile quay wall structure
CN201172810Y (en) Separate unloading type sheet pile bulkhead structure
CN106012960B (en) A kind of assembled long piled wharf superstructure system and its construction method
CN107034842A (en) A kind of modular assembly formula pile foundation wharfs structural system and its construction method
CN202626971U (en) Steel pipe sheet pile combination structure
CN210887094U (en) Gravity wharf upgrading structure
CN104294749A (en) Method for installing cylinder foundation trestle structure
CN202787247U (en) PHC (prestressed high-strength concrete) pile and steel pipe pile composited pile for long piled wharfs
CN103321237B (en) A kind of pile tube combining structure and for the method for construction of Wharf Engineering
CN102477716A (en) Application of trestle type beam slab bridge in inland river with beaches at both sides
CN208517891U (en) The novel reinforced structure of gravity type quay
CN103498420A (en) Large-scale steel box beam ashore construction method
CN102839660A (en) Composite pile of long piled wharf PHC (prestressed high-strength concrete) pile and steel pipe pile
CN207597341U (en) A kind of modular assembly formula pile foundation wharfs structural system
KR102601005B1 (en) Interlocking block And Port structure using interlocking blocks And Construction method of port structure using interlocking block
CN211006518U (en) Novel sheet pile wharf structure
CN104878720B (en) Pile foundation half gravity cushion cap harbour and construction method thereof
CN212896121U (en) Disconnect-type high stake ore pier structure
CN106996102A (en) Major-minor stake formula steel plate pilework
CN104195980B (en) A kind of outfitting quay structure
CN108487316A (en) It is a kind of to reduce underground structure grand heavy device and its construction method using building enclosure
CN209958290U (en) Take shore protection structure of pile foundation
CN203346849U (en) Gravity type balancing weight unloading quay wall structure
CN105735196A (en) Frame barrel wharf structure and manufacturing method thereof
CN206706740U (en) Major-minor stake formula steel plate pilework

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant