CN104191155A - Technique for rapidly repairing broken gear shaft by using implantation method - Google Patents

Technique for rapidly repairing broken gear shaft by using implantation method Download PDF

Info

Publication number
CN104191155A
CN104191155A CN201410361629.9A CN201410361629A CN104191155A CN 104191155 A CN104191155 A CN 104191155A CN 201410361629 A CN201410361629 A CN 201410361629A CN 104191155 A CN104191155 A CN 104191155A
Authority
CN
China
Prior art keywords
tenon
implantation
implant part
gear shaft
implant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410361629.9A
Other languages
Chinese (zh)
Other versions
CN104191155B (en
Inventor
宋科
朱建堂
岳银福
白少峰
李坤
许利华
吴佳佳
谷培军
司旭鹏
岳向东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN ZHONGFU ALUMINUM ALLOY CO Ltd
Original Assignee
HENAN ZHONGFU ALUMINUM ALLOY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN ZHONGFU ALUMINUM ALLOY CO Ltd filed Critical HENAN ZHONGFU ALUMINUM ALLOY CO Ltd
Priority to CN201410361629.9A priority Critical patent/CN104191155B/en
Publication of CN104191155A publication Critical patent/CN104191155A/en
Application granted granted Critical
Publication of CN104191155B publication Critical patent/CN104191155B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P6/00Restoring or reconditioning objects
    • B23P6/04Repairing fractures or cracked metal parts or products, e.g. castings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Gears, Cams (AREA)

Abstract

The invention belongs to the field of equipment maintenance and provides a technique for rapidly repairing a broken gear shaft by using an implantation method. According to the invention, a broken part is analyzed and materials are selected for a part that is easy to get repaired as an implantation part. Materials of an original gear shaft are determined. As to the undetermined materials, materials having chemical components approximate to those of the original gear shaft are selected to be the implantation part through chemical analysis. Rough machining and heat treatment are performed on the materials of the implantation part according to technical requirements. At the same time, tenon-and-mortise connection is adopted for a connection part of a base part and the implantation part. The required strength of the implantation part is calculated and the length L and the thickness H of a tenon are determined. Finish machining of the tenon and a mortise is performed. Interference fit is adopted for tolerance fit and heat assembly is employed. After the tenon-and-mortise structure is assembled, finish machining of the implantation part is performed according to the technical requirements for the original gear shaft for meeting technical parameter requirements. The technique is quick in repairing, stable in working performance, long in service lifetime and low in implantation cost.

Description

Implantation is repaired the process of broken teeth wheel shaft fast
Technical field
The invention belongs to maintenance of equipment field, be specifically related to the process that a kind of implantation is repaired broken teeth wheel shaft fast.
Background technology
At present in maintenance of equipment field; the gear shaft of, more complicated high to being worth; unexpected fracture in service; if it can be repaired fast, and reach operation technique requirement, will greatly reduce maintenance cost; equipment restorer running in especially streamline being produced; if caused, shut down and will cause great loss, and reduce the technical scheme of shutting down for repairing fast, will in this production process, play great effect.
Summary of the invention
The object of the invention is for the restorative procedure complexity, the cost that exist in existing technology high, specification requirement is difficult to problem up to standard, provides that a kind of rehabilitation cost is low, reparation speed is fast, can guarantee that the implantation of technological parameter requirement repairs the process of broken teeth wheel shaft fast.
For achieving the above object, the technical scheme of taking is:
Implantation is repaired a process for broken teeth wheel shaft fast, comprises following processing step:
1), from fracture location analysis, according to the fracture location of broken teeth wheel shaft, the part that complex structure is difficult for repairing stays as foundation, to the part selection again of easily repairing, as implant part, implants;
2) original gear axial wood matter is determined, can directly be determined that the material of the identical material of direct selection of material is as implant part, for can not determine material, by chemical analysis, select to study minute approaching material as implant part with original gear axiation;
3) material of implant part is carried out to roughing and heat treatment according to specification requirement, to the coupling part of foundation and implant part, adopt Tenon to be connected simultaneously, and tenon and mortise are carried out to roughing, it is the bluff body that circular arc, middle part are parallel lines that described tenon is two ends, requirement of strength to implant part is calculated, and determines length L and the thickness H of described tenon;
4) tenon and mortise are carried out to fine finishining, tolerance fit adopts interference fit, and assembling adopts hot charging to join;
5) after joinery and its construction has assembled, by original gear shaft specification requirement, implant part is carried out to fine finishining, meet technical parameter requirement.
In step 3), for the requirement of strength of implant part, by following data, calculated: the power (Kw) that 1. axle transmits; 2. the rotating speed of axle (r/min); 3. the diameter of axle (mm); 4. allowable stress (the N/mm of axle 2); 5. the moment of torsion (N.M) that axle transmits, by calculating and the check of above-mentioned parameter, determines many group L and H value, by method of comparison, selects best L and H value to implant.
Adopt technique scheme, obtained beneficial effect is:
The present invention passes through the above-mentioned problems in the prior art, by rational process, carry out the selection of the material of gear shaft, the shape of syndeton and the calculating of parameters of structural dimension, it is had repairs fast, stable work in work after implanting, long service life, and it is low to implant cost, and the production line moving for the restorer of being eager has special effect.
Accompanying drawing explanation
Fig. 1 is the structural representation of implant part.
Fig. 2 is the structural representation of foundation.
Fig. 3 is for implanting the structural representation of the gear shaft after repairing.
Sequence number in figure: 1 is that foundation, 2 is that implant part, 3 is that tenon, 4 is mortise.
The specific embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is elaborated.
Referring to Fig. 1-Fig. 3, a kind of implantation is repaired the process of broken teeth wheel shaft fast, comprise following processing step: 1) from fracture location analysis, according to the fracture location of broken teeth wheel shaft, the part that complex structure is difficult for repairing stays as foundation, to the part selection again of easily repairing, as implant part, implant; 2) original gear axial wood matter is determined, can directly be determined that the material of the identical material of direct selection of material is as implant part, for can not determine material, by chemical analysis, select to study minute approaching material as implant part with original gear axiation; 3) material of implant part is carried out to roughing and heat treatment according to specification requirement, to the coupling part of foundation and implant part, adopt Tenon to be connected simultaneously, and tenon and mortise are carried out to roughing, it is the bluff body that circular arc, middle part are parallel lines that described tenon is two ends, requirement of strength to implant part is calculated, the length L and the thickness H that determine described tenon, calculated by following data for the requirement of strength of implant part: the power (Kw) that 1. axle transmits; 2. the rotating speed of axle (r/min); 3. the diameter of axle (mm); 4. allowable stress (the N/mm of axle 2); 5. the moment of torsion (N.M) that axle transmits, by calculating and the check of above-mentioned parameter, determines many group L and H value, by method of comparison, selects best L and H value to implant; 4) tenon and mortise are carried out to fine finishining, tolerance fit adopts interference fit, and assembling adopts hot charging to join; 5) after joinery and its construction has assembled, by original gear shaft specification requirement, implant part is carried out to fine finishining, meet technical parameter requirement.

Claims (2)

1. implantation is repaired a process for broken teeth wheel shaft fast, it is characterized in that, comprises following processing step:
1), from fracture location analysis, according to the fracture location of broken teeth wheel shaft, the part that complex structure is difficult for repairing stays as foundation, to the part selection again of easily repairing, as implant part, implants;
2) original gear axial wood matter is determined, can directly be determined that the material of the identical material of direct selection of material is as implant part, for can not determine material, by chemical analysis, select to study minute approaching material as implant part with original gear axiation;
3) material of implant part is carried out to roughing and heat treatment according to specification requirement, to the coupling part of foundation and implant part, adopt Tenon to be connected simultaneously, and tenon and mortise are carried out to roughing, it is the bluff body that circular arc, middle part are parallel lines that described tenon is two ends, requirement of strength to implant part is calculated, and determines length L and the thickness H of described tenon;
4) tenon and mortise are carried out to fine finishining, tolerance fit adopts interference fit, and assembling adopts hot charging to join;
5) after joinery and its construction has assembled, by original gear shaft specification requirement, implant part is carried out to fine finishining, meet technical parameter requirement.
2. implantation according to claim 1 is repaired the process of broken teeth wheel shaft fast, it is characterized in that, in step 3), for the requirement of strength of implant part, by following data, is calculated: the power (Kw) that 1. axle transmits; 2. the rotating speed of axle (r/min); 3. the diameter of axle (mm); 4. allowable stress (the N/mm of axle 2); 5. the moment of torsion (N.M) that axle transmits, by calculating and the check of above-mentioned parameter, determines many group L and H value, by method of comparison, selects best L and H value to implant.
CN201410361629.9A 2014-07-28 2014-07-28 Technique for rapidly repairing broken gear shaft by using implantation method Expired - Fee Related CN104191155B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410361629.9A CN104191155B (en) 2014-07-28 2014-07-28 Technique for rapidly repairing broken gear shaft by using implantation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410361629.9A CN104191155B (en) 2014-07-28 2014-07-28 Technique for rapidly repairing broken gear shaft by using implantation method

Publications (2)

Publication Number Publication Date
CN104191155A true CN104191155A (en) 2014-12-10
CN104191155B CN104191155B (en) 2017-01-25

Family

ID=52076602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410361629.9A Expired - Fee Related CN104191155B (en) 2014-07-28 2014-07-28 Technique for rapidly repairing broken gear shaft by using implantation method

Country Status (1)

Country Link
CN (1) CN104191155B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105598632A (en) * 2016-01-22 2016-05-25 天津电力机车有限公司 Method for repairing mandrel of indicator valve of internal combustion locomotive
CN108080879A (en) * 2017-12-13 2018-05-29 攀枝花市朵实机械制造有限公司 Off-axis repairs location structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2053965U (en) * 1989-07-28 1990-03-07 齐鲁石油化工公司第一化肥厂 Structure for bell socket and bonding of cracked metal shaft.
CN1990169A (en) * 2005-12-26 2007-07-04 沈阳大陆激光技术有限公司 Renovation technique of steam turbine rotor shaft fracture
CN102000941A (en) * 2010-10-26 2011-04-06 湖南汉龙水电设备有限公司 Repair method of breakage of air hammer bent axle crank
CN202070554U (en) * 2011-03-22 2011-12-14 新疆八一钢铁股份有限公司 High-speed wire rod dense roller table for repairing

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2053965U (en) * 1989-07-28 1990-03-07 齐鲁石油化工公司第一化肥厂 Structure for bell socket and bonding of cracked metal shaft.
CN1990169A (en) * 2005-12-26 2007-07-04 沈阳大陆激光技术有限公司 Renovation technique of steam turbine rotor shaft fracture
CN102000941A (en) * 2010-10-26 2011-04-06 湖南汉龙水电设备有限公司 Repair method of breakage of air hammer bent axle crank
CN202070554U (en) * 2011-03-22 2011-12-14 新疆八一钢铁股份有限公司 High-speed wire rod dense roller table for repairing

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
余爱香 等: "断轴修复工艺实践及研究", 《热加工工艺》, vol. 41, no. 9, 31 May 2012 (2012-05-31), pages 229 - 231 *
王金海 等: "进口磨煤机变速箱高速轴断裂修复", 《全国火电大机组(600MW级)竞赛第九届年会》, no. 12, 31 May 2005 (2005-05-31), pages 122 - 125 *
薛福连: "断轴的修复方法", 《矿山机械》, vol. 33, no. 6, 30 June 2005 (2005-06-30), pages 100 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105598632A (en) * 2016-01-22 2016-05-25 天津电力机车有限公司 Method for repairing mandrel of indicator valve of internal combustion locomotive
CN105598632B (en) * 2016-01-22 2018-02-13 天津电力机车有限公司 A kind of diesel locomotive indicator valve mandrel restorative procedure
CN108080879A (en) * 2017-12-13 2018-05-29 攀枝花市朵实机械制造有限公司 Off-axis repairs location structure

Also Published As

Publication number Publication date
CN104191155B (en) 2017-01-25

Similar Documents

Publication Publication Date Title
CN104972276A (en) Process for processing inner ring and outer ring of wind power bearing
CN104191155A (en) Technique for rapidly repairing broken gear shaft by using implantation method
CN103737255A (en) Carburized layer depth deviation control method
CN104911659B (en) A kind of electro-brush plating machine tool of horizontal crankshaft trunnion
CN105081672A (en) Method for repairing fractured transmission shaft
CN101664818A (en) Boring jig, manufacturing method thereof and method for processing flange connection holes of generator set rotors using boring jig
CN100548566C (en) A kind of renovation technique of main drive gear of producing oxygen air compressor
CN105643185A (en) Motor main shaft repairing method
CN202851873U (en) Combined gear
CN105328399B (en) A kind of processing method of Split Casing in Aeroengine class part
CN103817483B (en) A kind of repair of crank shaft method
CN103084793A (en) Composite machining technology for serial high-accuracy shafts with notches
CN202804516U (en) Automatic welding device for thermocouples
CN103480924B (en) The processing method of bolt round corner and processing unit (plant)
CN104985444A (en) Brush electroplating machine tool of vertical crankshaft large head end
CN104084871A (en) Repair equipment for shaft diameter of high-temperature high-pressure steam turbine rotor
CN204967569U (en) Fixed structure of rotor core retaining ring
CN103586516A (en) Automatic rounding composite machining method for mortise edges of high-temperature alloy
CN209632917U (en) A kind of disassembly of TRT rotor blade positioning transformations attachment pegs is with taking connection pin assembly
CN104384640A (en) Method for removing damaged blade of stator component of aero-engine
CN102848146A (en) Processing technology of coupling
CN204620984U (en) A kind of tooth mode structure for spiral bevel gear forging near-net-shape
CN205166551U (en) On --spot turning device of steam turbine power generation unit excitation sliding ring
CN205008620U (en) Portable scraper bowl boring processing machines
CN103440371A (en) Method for modifying forging tooth profile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170125

Termination date: 20190728

CF01 Termination of patent right due to non-payment of annual fee