CN209632917U - A kind of disassembly of TRT rotor blade positioning transformations attachment pegs is with taking connection pin assembly - Google Patents

A kind of disassembly of TRT rotor blade positioning transformations attachment pegs is with taking connection pin assembly Download PDF

Info

Publication number
CN209632917U
CN209632917U CN201920469563.3U CN201920469563U CN209632917U CN 209632917 U CN209632917 U CN 209632917U CN 201920469563 U CN201920469563 U CN 201920469563U CN 209632917 U CN209632917 U CN 209632917U
Authority
CN
China
Prior art keywords
attachment pegs
pressing plate
rotor blade
disassembly
connection pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920469563.3U
Other languages
Chinese (zh)
Inventor
范兴海
涂俊魁
许杰峰
龚胜辉
钟凛
陈雪兵
赖金春
崔学峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Magang Equipment Overhaul Co Ltd
Original Assignee
Anhui Magang Equipment Overhaul Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Magang Equipment Overhaul Co Ltd filed Critical Anhui Magang Equipment Overhaul Co Ltd
Priority to CN201920469563.3U priority Critical patent/CN209632917U/en
Application granted granted Critical
Publication of CN209632917U publication Critical patent/CN209632917U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of disassemblies of TRT rotor blade positioning transformations attachment pegs with connection pin assembly is taken, and is related to pin dismantling technology field.The TRT rotor blade positioning transformations attachment pegs are dismantled with connection pin assembly, including pressing plate is taken, and are provided through pull rod on the pressing plate, the surface of the pull rod and are arranged with nut above pressing plate, and the two sides of the pressing plate bottom are provided with hydraulic top.TRT rotor blade positioning transformations attachment pegs disassembly is with taking connection pin assembly, shorten the time of rotor blade positioning attachment pegs disassembly, reduce labor intensity of workers, improve labor efficiency, reduce rehabilitation expense, the relative dimensions parameter and performance indicator for making TRT rotor reach former design requirement, produce for rationally group and provide guarantee.

Description

A kind of disassembly of TRT rotor blade positioning transformations attachment pegs is with taking connection pin assembly
Technical field
The utility model relates to pin dismantling technology field, specially a kind of TRT rotor blade positioning transformations attachment pegs Disassembly is with taking connection pin assembly.
Background technique
TRT, that is, blast furnace coal gas residual pressure recovery turbine power generation set, TRT be the pressure energy having using top gas and Thermal energy makes coal gas, come driven generator power generation, carry out a kind of device of energy regenerating by turbo-expander acting, when work, Blast furnace gas draws acting, and is converted into kinetic energy effect and movable vane, rotates entire turbine rotor, rotor is driven by shaft coupling Engine is rotated together and is generated electricity, and turbine host mainly holds cylinder by casing, rotor, blade, adjusts cylinder and its regulating mechanism, axis The components such as envelope, bearing, bearing housing, shaft coupling, pedestal composition, complete machine use subdivision structure, and rotor is uniform internal diameter.
Rotor is rigid rotator, is made of movable vanes at different levels, spacer, main shaft etc..Main shaft using high-alloy steel solid forging, Precision Machining forms, and blade is along the circumferential direction packed into tree-like blade root slot, is positioned between two blades with spacer.Two-stage movable vane piece It is processed using stainless steel forgings blank, blade face specially treated, using dedicated blade profile.Due to containing dust in TRT medium, blade is easy Abrasion is used for a long time, blade also can fatigue fracture, TRT after a period of use, needs to disassemble the blade of damage into progress Replacement.
Since TRT revolving speed is high, main shaft required precision is high, and movable vane piece is fixed on rotor using taper bolt, using taper bolt Positioning connection, self-locking performance is good, and positioning accuracy is high, and the influence to positioning accuracy is smaller, in actual use, positioning attachment pegs due to Long-term loaded deformation, disassembly is extremely difficult, and using conventional pin pulling out device or weight impingement method is split out and machining process The unsuitable taper bolt herein such as dismounting is removed, and working efficiency is reduced.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of TRT rotor blade positioning transformations attachment pegs and tears open It unloads with connection pin assembly is taken, solves in actual use, for positioning attachment pegs due to long-term loaded deformation, disassembly is extremely difficult, It is split out using conventional pin pulling out device or weight impingement method and the unsuitable taper bolts herein such as machining process is removed is torn open Except the problem of.
(2) technical solution
In order to achieve the above object, the utility model is achieved by the following technical programs: a kind of TRT rotor blade is fixed Deformation attachment pegs disassembly in position is provided through pull rod, the table of the pull rod with connection pin assembly, including pressing plate is taken on the pressing plate Face and be located at pressing plate above be arranged with nut, the two sides of the pressing plate bottom are provided with hydraulic top.
(3) beneficial effect
The utility model provides a kind of disassembly of TRT rotor blade positioning transformations attachment pegs with taking connection pin assembly.Tool For following the utility model has the advantages that TRT rotor blade positioning transformations attachment pegs disassembly shortens rotor movable vane with connection pin assembly is taken Piece positions the time of attachment pegs disassembly, reduces labor intensity of workers, improves labor efficiency, reduce rehabilitation expense, makes TRT The relative dimensions parameter and performance indicator of rotor reach former design requirement, produce for rationally group and provide guarantee.
Detailed description of the invention
Fig. 1 is the structural schematic diagram for taking connection pin assembly;
Fig. 2 is the three-dimensional figure schematic diagram of TRT rotor.
In figure: 1, pressing plate;2, nut;3, hydraulic top;4, pull rod.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
The utility model provides a kind of technical solution referring to FIG. 1-2: a kind of TRT rotor blade positioning transformations connection Pin disassembly is provided through pull rod 4 with connection pin assembly, including pressing plate 1 is taken on pressing plate 1, the surface of pull rod 4 and positioned at pressing plate 1 Top be arranged with nut 2, the two sides of 1 bottom of pressing plate are provided with hydraulic top 3.
A kind of method for dismounting of TRT rotor blade positioning transformations attachment pegs, including TRT rotor blade positioning transformations connection Outbound is dismantled with connection pin assembly is taken, using following steps:
S1, apparatus for placing prepare: welding for steel structure being fabricated to the device of horizontal positioned TRT rotor, while guaranteeing level Placing TRT rotor can be rotated in disassembly positioning transformations attachment pegs with 360 °.
S2, tool prepare: it is (auxiliary to prepare magnetic drill, 50T hydraulic top, oxy-acetylene full set heating device and auxiliary equipment Helping facility includes: angle grinder, file, hand hammer, flat chisel, tinted glasses, copper needle, gloves, magnifying glass, loosening agent, steel seal code, silk Cone, drill bit, monkey spanner, 42CrMo pole, steel pressing plate).
S3, rotor blade are removed: TRT rotor is lain in a horizontal plane in can be torn open on rotating device by welding for steel structure production Do sequence steel seal code labeling on rotor blade before point, guarantee blade and the same position of spacer (point I on a TRT rotor, II grade blade, every I grade has 30 blades, 60 positioning attachment pegs, after carrying out position mark on rotor, according to what is assembled in the past Sequence finds out the blade finally assembled, determines and turns to the beginning TRT rotor is horizontally arranged using steel construction rotating device after blade The blade of the corresponding disassembly in 12 positions of clock).
S4, removing surface: cleaning rotor surface exposes attachment pegs position, if attachment pegs rotor surface welds, using angle Grinding machine cleaning polishes exposing pin location, then stamps centre bore, using magnetic drill, bores and removes attachment pegs, attachment pegs length is 320mm first selects φ 16mm drill bit to remove 180mm by rotor surface horizontal drilling, and centre empties 2/3rds, is adopted by rotor surface Expanded by magnetic drill into 50mm with φ 20mm drill bit, then tapping again.
S5, take out movable vane piece positioning transformations attachment pegs: preparation takes connection pin assembly, and mating φ 22mm pull rod 4 is mounted on In positioning attachment pegs after mantle fiber, 1 central punch of pressing plate covers on pull rod 4, and fixed φ 22mm nut 2 cooperates 4 He of steady brace 3 position size of hydraulic top is adjusted in pressing plate 1, and concrete operations are as follows:
In positioning attachment pegs after pull rod 4 being horizontally arranged at mantle fiber, pressing plate 1 is installed on pull rod 4, has measured hydraulic top φ 22mm nut 2 is fixed in 3 positions, then installs hydraulic top 3, two sides with the rotor surface for being equipped with positioning attachment pegs in pressing plate 1 Being applied for pressure simultaneously is 40 megapascal, and the positioning attachment pegs that centre empties 2/3 generate contraction distortion and counteract movable vane piece and positioning The deflection generated between mutual cooperation face in use between pin finally taps 4 top of pull rod using sledgehammer, hears sound Acoustic compliance benefit takes out movable vane piece positioning transformations attachment pegs, if when taking movable vane piece positioning transformations very big attachment pegs, and pull rod 4 In positioning attachment pegs after being horizontally arranged at mantle fiber, pressing plate 1 is installed on pull rod 4, has measured the fixed φ 22mm in 3 position of hydraulic top Then nut 2 installs hydraulic top 3 in pressing plate 1 and positioning attachment pegs rotor surface, it is 40 megapascal that two sides are applied for pressure simultaneously, The positioning attachment pegs that centre empties 2/3 generate contraction distortion and counteract between movable vane piece and positioning pin phase interworking in use The deflection generated between conjunction face, when finally tapping 4 top of pull rod without hearing that sound is difficult to take out using sledgehammer, using oxygen second Alkynes full set heating device, M3 side of heater blade pedestal quickly remove the very big attachment pegs of blade positioning transformations.
In conclusion it is dynamic to shorten rotor with connection pin assembly is taken for TRT rotor blade positioning transformations attachment pegs disassembly Blade positions the time of attachment pegs disassembly, reduces labor intensity of workers, improves labor efficiency, reduce rehabilitation expense, makes The relative dimensions parameter and performance indicator of TRT rotor reach former design requirement, produce for rationally group and provide guarantee.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (1)

1. a kind of disassembly of TRT rotor blade positioning transformations attachment pegs is with taking connection pin assembly, it is characterised in that: including pressing plate (1), be provided through pull rod (4) on the pressing plate (1), the surface of the pull rod (4) and be located at pressing plate (1) above be arranged with The two sides of nut (2), pressing plate (1) bottom are provided with hydraulic top (3).
CN201920469563.3U 2019-04-09 2019-04-09 A kind of disassembly of TRT rotor blade positioning transformations attachment pegs is with taking connection pin assembly Active CN209632917U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920469563.3U CN209632917U (en) 2019-04-09 2019-04-09 A kind of disassembly of TRT rotor blade positioning transformations attachment pegs is with taking connection pin assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920469563.3U CN209632917U (en) 2019-04-09 2019-04-09 A kind of disassembly of TRT rotor blade positioning transformations attachment pegs is with taking connection pin assembly

Publications (1)

Publication Number Publication Date
CN209632917U true CN209632917U (en) 2019-11-15

Family

ID=68497423

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920469563.3U Active CN209632917U (en) 2019-04-09 2019-04-09 A kind of disassembly of TRT rotor blade positioning transformations attachment pegs is with taking connection pin assembly

Country Status (1)

Country Link
CN (1) CN209632917U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109877767A (en) * 2019-04-09 2019-06-14 安徽马钢设备检修有限公司 A kind of method for dismounting and its device of TRT rotor blade positioning transformations attachment pegs

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109877767A (en) * 2019-04-09 2019-06-14 安徽马钢设备检修有限公司 A kind of method for dismounting and its device of TRT rotor blade positioning transformations attachment pegs

Similar Documents

Publication Publication Date Title
CN102218638B (en) Process method for repairing gas turbine vanes by micro-arc deposition coating
CN209632917U (en) A kind of disassembly of TRT rotor blade positioning transformations attachment pegs is with taking connection pin assembly
CN204724246U (en) 2PCF-2022 single segment hammer type crusher rotor
CN209698387U (en) A kind of TRT rotor blade taking-up blading
CN109877767A (en) A kind of method for dismounting and its device of TRT rotor blade positioning transformations attachment pegs
CN108202202B (en) Steam seal tooth repairing system and method for steam turbine rotor
CN207245761U (en) TRT holds cylinder stator blade axle hole position reconstruction structure
CN215392486U (en) Device for drawing circle on top of fir-tree-shaped blade root TRT (rotary top gas turbine) blade and rotor
CN211220537U (en) Extracting tool of steam turbine low pressure final stage impeller balance bolt
CN104084871A (en) Repair equipment for shaft diameter of high-temperature high-pressure steam turbine rotor
CN109834452A (en) A kind of TRT rotor blade removing method and its device
CN203335358U (en) Disassembling tool of vacuum pump seal shaft sleeve
CN209774534U (en) TRT large-scale bearing of holding jar quiet leaf bearing extracting tool
CN205147343U (en) Super large wind -powered electricity generation main shaft is with top device of movable extension
CN206084331U (en) Quiet leaf graphite bearing tensioning device of TRT turbine
CN208342676U (en) A kind of Simple rotary adjusting spanner for dismounting cylinder pedestal
CN206153640U (en) Profile prosthetic devices in cellular embedding of engine piece
CN106392153A (en) Engine honeycombed embedded block inner moulded surface repairing device and repairing method thereof
CN2494983Y (en) Bush scraping testing machine
CN105643183B (en) The restorative procedure of liquid-piston compressor impeller fragmentation under a kind of strong acid operating mode
CN207746786U (en) A kind of high-accuracy position system for face miller positioning
CN206185182U (en) A online prosthetic devices for standing grind wearing and tearing of rocking arm bearing frame
CN203843306U (en) Correcting device for bolt holes of split positioning pins of low-pressure outer cylinders of steam turbines
CN100462189C (en) Renovation technique of combustion turbine retaining ring
CN219434270U (en) Rotor dynamic balance tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant