CN104179119A - Vertical-drainage type water drain pipe for bridge and mounting method for straight-line water drain pipe - Google Patents

Vertical-drainage type water drain pipe for bridge and mounting method for straight-line water drain pipe Download PDF

Info

Publication number
CN104179119A
CN104179119A CN201410401445.0A CN201410401445A CN104179119A CN 104179119 A CN104179119 A CN 104179119A CN 201410401445 A CN201410401445 A CN 201410401445A CN 104179119 A CN104179119 A CN 104179119A
Authority
CN
China
Prior art keywords
water inlet
inlet pipe
linking tube
lower linking
beam body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410401445.0A
Other languages
Chinese (zh)
Other versions
CN104179119B (en
Inventor
郭保林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Linchuan Engineering Technology Consulting Co., Ltd.
SHANDONG HI-SPEED TECHNOLOGY DEVELOPMENT GROUP CO., LTD.
Hebei University of Engineering
Original Assignee
QINGDAO LINCHUAN ENGINEERING TECHNOLOGY CONSULTING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGDAO LINCHUAN ENGINEERING TECHNOLOGY CONSULTING Co Ltd filed Critical QINGDAO LINCHUAN ENGINEERING TECHNOLOGY CONSULTING Co Ltd
Publication of CN104179119A publication Critical patent/CN104179119A/en
Application granted granted Critical
Publication of CN104179119B publication Critical patent/CN104179119B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sink And Installation For Waste Water (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a vertical-drainage type water drain pipe for a bridge and a mounting method for the straight-line water drain pipe. The water drain pipe comprises edge strips and a rubber ring, and further comprises wind boards, wherein the edge strips and the rubber ring can avoid that rainfall on the bridge deck infiltrates in reserved holes of a bridge body; the wind boards can avoid that the water drainage efficiency is reduced in strong-wind weather because the strong wind blows rainwater gathered in the vertical-drainage type water drain pipe and ponding scatters on the bridge deck again. The water drain pipe is simple in structure, convenient to mount, obvious in water drainage effect, and particularly suitable for regions which are high in rain capacity and high in wind speed and have natural freezing and thawing cycles.

Description

Direct-discharging tapping pipe and mounting method thereof for a kind of bridge
The application is that March 1, application number in 2013 are 201310066344.8 the applying date that to be applicant Qingdao Lin Chuan engineering Advisory Co., Ltd submit to State Intellectual Property Office, denomination of invention the dividing an application with the application for a patent for invention of direct-discharging tapping pipe and mounting method thereof that be a kind of bridge.
Technical field
The present invention relates to direct-discharging tapping pipe and mounting method thereof for a kind of bridge, be particularly useful for that amount of precipitation is large, wind speed is high, have the circulate draining of regional bridge floor of nature freeze thawing.
Background technology
Existing bridge construction generally comprises concrete beam and is arranged on the Asphalt Concrete Deck Pavement above concrete beam, for the rainwater on bridge floor being discharged fast to driving region, generally can a tapping pipe be set at a certain distance at bridge lower edge, the installation of tapping pipe is carried out mostly after deck paving completes.
Often there is a bit following or some problem in the mounting method of existing bridge water discharge pipe or tapping pipe:
1, in order to ensure tapping pipe, can install smoothly, the external diameter of tapping pipe is often slightly little compared with the internal diameter of beam body preformed hole, still leaves certain gap after installation between the two; In addition, tapping pipe when mounted, the horn mouth bottom of tapping pipe is not closely sealed with mortar bonding, cause also having penetrating passage between the horn mouth bottom of tapping pipe and beam body end face, rainwater on bridge floor can be by these gaps or the unrestrained bottom that is seeped into beam body frange plate of passage, if things go on like this, can cause that near concrete mortar tapping pipe peels off, aggregate is exposed, corrosion of steel bar, the region that this phenomenon is mingled with deicer salts in bridge floor rainwater more so.
2, tapping pipe is made by PVC or cast iron process conventionally, prolongation along with service time, PVC can become fragile gradually, efflorescence, the continuous corrosion of cast iron meeting, useful area reduces gradually, this will become greatly the gap between tapping pipe and beam body preformed hole gradually, and the amount of rainfall that infiltrates beam body frange plate also can strengthen.
3, for the larger region of wind speed, strong wind can blow afloat the rainwater that imports direct-discharging tapping pipe, and rainwater is scattered on bridge floor again, has reduced the effect of draining and the safety of driving.
As can be seen here, prior art awaits further improving.
Summary of the invention
The present invention is the weak point of avoiding above-mentioned prior art to exist, and direct-discharging tapping pipe and mounting method thereof for a kind of bridge is provided.
The technical solution adopted in the present invention is:
A bridge direct-discharging tapping pipe, comprises tapping pipe body, and described tapping pipe body comprises water inlet pipe and lower linking tube, and described water inlet pipe and lower linking tube are one and are connected; Described water inlet pipe is horn-like, and described lower linking tube is cylindric; The top nozzle diameter of described water inlet pipe is greater than the diameter of described lower linking tube, the bottom nozzle diameter of described water inlet pipe and the equal diameters of lower linking tube; Described lower linking tube is embedded in the preformed hole of beam body, and the top of described water inlet pipe is embedded in mating formation between layer of beam body top, and the bottom of described water inlet pipe is embedded between the beam body of above-mentioned preformed hole top; On the lateral wall of described water inlet pipe bottom, be provided with two ribs that are parallel to each other, described rib is plugged in the mortar between beam body and water inlet pipe; The outside, top of described lower linking tube is arranged with rubber ring; The bottom of described lower linking tube is provided with verge board.
The diameter in the cross section of described rubber ring is than the large 3~10mm of the difference of the external diameter of the internal diameter of the preformed hole of beam body and lower linking tube, and described rubber ring has been realized closely sealed between tapping pipe and the preformed hole of beam body.
The rib of described rib is high is 5~20mm, the spacing between two ribs is 10~50mm, and described rib has been strengthened being connected of tapping pipe and mortar, and has prevented that moisture from entering the gap between tapping pipe and the preformed hole of beam body from the bottom margin of water inlet pipe.
The bottom of described lower linking tube is provided with bearing pin, and above-mentioned verge board can be take this bearing pin as boundary around this bearing pin rotation, and described verge board is divided into the first verge board and the second verge board, and described first, second verge board is all semicircle shape.
The diameter of described the first verge board is than the little 1~5mm of the internal diameter of lower linking tube; The diameter of described the second verge board equates with the external diameter of lower linking tube; When calm, under Gravitative Loads, described the first verge board is positioned at lower linking tube inside, and the second verge board is positioned at lower linking tube outside; While having wind, verge board rotates around above-mentioned bearing pin, and its maximum anglec of rotation is 90 °.
The top of described water inlet pipe is provided with rain perforaled strainer.
A mounting method for direct-discharging tapping pipe for bridge, this mounting method comprises the steps:
(1), choose one and be trumpet-shaped water inlet pipe and a columned lower linking tube, and this water inlet pipe is arranged on to the top of described lower linking tube; The top nozzle diameter of described water inlet pipe is greater than the diameter of described lower linking tube, the bottom nozzle diameter of described water inlet pipe and the equal diameters of lower linking tube;
(2), on the lateral wall of the bottom of above-mentioned water inlet pipe, two ribs that are parallel to each other are installed, making two spacing between rib is 10~50mm;
(3), a sheathed rubber ring outside the top of lower linking tube; In the bottom of lower linking tube, a bearing pin is installed at mouth of pipe place, then in the bottom of lower linking tube, installing one can be around the verge board of above-mentioned bearing pin rotation, take this bearing pin as boundary, described verge board is divided into the first verge board and the second verge board, described first, second verge board is all semicircle shape, the diameter of the first verge board is arranged to than the little 1~5mm of the internal diameter of lower linking tube, the diameter of the second verge board is arranged to equate with the external diameter of lower linking tube; Described first, second verge board can be 90 ° around the maximum angle of above-mentioned bearing pin rotation; So far, tapping pipe body installs;
(4), choose the preformed hole of beam body and beam body, at the end face of beam body, smear uniformly after one deck mortar, described lower linking tube is installed in the preformed hole of beam body, the top of described water inlet pipe is embedded in mating formation between layer of beam body top, the bottom of described water inlet pipe is embedded between the beam body of above-mentioned preformed hole top, with mortar, fill up water inlet pipe lower periphery, to guarantee that water inlet pipe is in extreme lower position simultaneously; Then in the bottom surface of beam body, collet is installed, with mortar plug, is filled out the gap between tapping pipe body and preformed hole, until fill up simultaneously; Then the upper edge of collet is filled in mortar, to guarantee both effective adhesives that has;
(5), on the top of water inlet pipe, rain perforaled strainer is installed.
In described step (2), by the high 5~20mm that is set to of the rib of rib, described rib has been strengthened being connected of tapping pipe and mortar, and has prevented that moisture from entering the gap between tapping pipe and the preformed hole of beam body from the bottom margin of water inlet pipe.
In described step (3), the diameter in the cross section of rubber ring is set to than the large 3~10mm of the difference of the external diameter of the internal diameter of the preformed hole of beam body and lower linking tube, and described rubber ring has been realized closely sealed between tapping pipe and the preformed hole of beam body.
In described step (3), the diameter of the first verge board is set to than the little 1~5mm of the internal diameter of lower linking tube; The diameter of the second verge board is arranged to equate with the external diameter of lower linking tube.
Owing to having adopted technique scheme, the obtained beneficial effect of the present invention is:
1, in the present invention, rib and rubber ring have been realized closely sealed between tapping pipe and the preformed hole of beam body, thereby have reduced the permeability of rainwater, have reduced, to the erosion of beam body and damage, to have reduced the potential safety hazard of bridge.
2, the verge board in the present invention can effectively prevent under strong wind weather, and the rainwater importing in direct-discharging tapping pipe is blown afloat and is again scattered on bridge floor, thereby has improved the drainage efficiency of tapping pipe under strong wind weather.
3, the present invention is simple in structure, and cost is lower and installation and maintenance convenient, and drainage effect is obvious, is specially adapted to the area that amount of precipitation is large, wind speed is high, exist nature freeze thawing to circulate.
Accompanying drawing explanation
Fig. 1 is mounting structure schematic diagram of the present invention.
Fig. 2 is the top view of tapping pipe body in the present invention.
Wherein,
1, water inlet pipe 2, rib 3, rubber ring 4, mortar 5, beam body 6, mat formation layer 7, rain perforaled strainer 8, the second verge board 9, collet 10, lower linking tube 11, trajectory 12, bearing pin 13, the first verge board
The specific embodiment
Below in conjunction with accompanying drawing and specific embodiment, the present invention is described in further detail, but the present invention is not limited to these embodiment.
As shown in Figures 1 and 2, a kind of bridge direct-discharging tapping pipe, comprises tapping pipe body, and described tapping pipe body comprises water inlet pipe 1 and lower linking tube 10, and described water inlet pipe 1 and lower linking tube 10 are one and are connected; Described water inlet pipe 1 is horn-like, and described lower linking tube 10 is cylindric; The top nozzle diameter of described water inlet pipe 1 is greater than the diameter of described lower linking tube 10, the bottom nozzle diameter of described water inlet pipe 1 and the equal diameters of lower linking tube 10; Described lower linking tube 10 is embedded in the preformed hole of beam body 5, and the top of described water inlet pipe 1 is embedded in mating formation between layer 6 of beam body 5 tops, and the bottom of described water inlet pipe 1 is embedded between the beam body 5 of above-mentioned preformed hole top; The top of described water inlet pipe 1 is provided with rain perforaled strainer 7.
On the lateral wall of described water inlet pipe 10 bottoms, be provided with two ribs that are parallel to each other 2, described rib 2 is plugged in the mortar 4 between beam body 5 and water inlet pipe 1; The rib of described rib 2 is high is 5~20mm, the spacing between two ribs is 10~50mm, and described rib 2 has been strengthened being connected of tapping pipe and mortar 4, and has prevented that moisture from entering the gap between tapping pipe and the preformed hole of beam body 5 from the bottom margin of water inlet pipe 1.
The outside, top of described lower linking tube 10 is arranged with rubber ring 3; The diameter in the cross section of described rubber ring 3 is than the large 3~10mm of difference of the external diameter of the internal diameter of the preformed hole of beam body 5 and lower linking tube 10, and described rubber ring 3 has been realized closely sealed between tapping pipe and the preformed hole of beam body 5.
The bottom of described lower linking tube 10 is provided with verge board and bearing pin 12, and described verge board can be around these bearing pin 12 rotations, and with this bearing pin 12Wei circle, described verge board is divided into the first verge board 13 and the second verge board 8, and described first, second verge board is all semicircle shape; The diameter of described the first verge board 13 is than the little 1~5mm of the internal diameter of lower linking tube 10; The diameter of described the second verge board 8 equates with the external diameter of lower linking tube 10; When calm, under Gravitative Loads, described the first verge board 13 is positioned at lower linking tube 10 inside, and the second verge board 8 is positioned at the outside of lower linking tube 10; While having wind, verge board is around above-mentioned bearing pin 12 rotations, and its maximum anglec of rotation is 90 °.Under strong wind weather, rotatable nearly 90 ° of verge board, thereby stop most air quantity, prevented that the rainwater importing in direct-discharging tapping pipe from being blown afloat and being again scattered on bridge floor, rainwater will be discharged with lower linking tube 10 bottom edge from the first verge board 13, the second verge board 8 under Gravitative Loads, improve the drainage efficiency of tapping pipe under strong wind weather; Under the weather of calm or gentle breeze, verge board, in plumbness, does not reduce the cross-section of river of tapping pipe, has guaranteed that ponding can flow through smoothly.
As shown in Figures 1 and 2, the mounting method of direct-discharging tapping pipe for a kind of bridge, this mounting method comprises the steps:
(1), choose one and be trumpet-shaped water inlet pipe 1 and a columned lower linking tube 10, and this water inlet pipe 1 is arranged on to the top of described lower linking tube 10; The top nozzle diameter of described water inlet pipe 1 is greater than the diameter of described lower linking tube 10, the bottom nozzle diameter of described water inlet pipe 1 and the equal diameters of lower linking tube 10;
(2), on the lateral wall of the bottom of above-mentioned water inlet pipe 1, two ribs that are parallel to each other 2 are installed, making two spacing between rib is 10~50mm;
(3), a sheathed rubber ring 3 outside the top of lower linking tube 10; At mouth of pipe place, the bottom of lower linking tube 10, one bearing pin 12 is installed, then in the bottom of lower linking tube 10, installing one can be around the verge board of above-mentioned bearing pin 12 rotations, described verge board comprises the first verge board 13 and the second verge board 8, described first, second verge board is all semicircle shape, and the diameter of the first verge board 13 is set to than the little 1~5mm of the internal diameter of lower linking tube 10; The diameter of the second verge board 8 is set to equate with the external diameter of lower linking tube 10; Described verge board can be 90 ° around the maximum angle of above-mentioned bearing pin 12 rotations; Under strong wind weather, rotatable nearly 90 ° of verge board, thereby stop most air quantity, prevented that the rainwater importing in direct-discharging tapping pipe from being blown afloat and being again scattered on bridge floor, rainwater will be discharged with lower linking tube 10 bottom edge from the first verge board 13, the second verge board 8 under Gravitative Loads, improve the drainage efficiency of tapping pipe under strong wind weather; Under the weather of calm or gentle breeze, verge board, in plumbness, does not reduce the cross-section of river of tapping pipe, has guaranteed that ponding can flow through smoothly; So far, tapping pipe body installs;
(4), choose the preformed hole of beam body 5 and beam body 5, at the end face of beam body 5, smear uniformly after one deck mortar, described lower linking tube 10 is installed in the preformed hole of beam body 5, the top of described water inlet pipe 1 is embedded in mating formation between layer 6 of beam body 5 tops, the bottom of described water inlet pipe 1 is embedded between the beam body 5 of above-mentioned preformed hole top, with mortar 4, fill up water inlet pipe 1 lower periphery, to guarantee that water inlet pipe 1 is in extreme lower position simultaneously; Then in the bottom surface of beam body 5, collet 9 is installed, with mortar 4 plugs, is filled out the gap between tapping pipe body and preformed hole, until fill up simultaneously; Then the upper edge of collet 9 is filled in mortar 4, to guarantee both effective adhesives that has;
(5), on the top of water inlet pipe 1, rain perforaled strainer 7 is installed.
In described step (2), by the high 5~20mm that is set to of the rib of rib 2, described rib 2 has been strengthened being connected of tapping pipe and mortar 4, and has prevented that moisture from entering the gap between tapping pipe and the preformed hole of beam body 5 from the bottom margin of water inlet pipe 1.
In described step (3), the diameter in the cross section of rubber ring 3 is arranged to the large 3~10mm of difference than the external diameter of the internal diameter of the preformed hole of beam body 5 and lower linking tube 10, described rubber ring 3 has been realized closely sealed between tapping pipe and the preformed hole of beam body 5.
The present invention is simple in structure, easily implements, and drainage effect is obvious, has avoided unrestrained the oozing of bridge floor precipitation to beam body preformed hole, has improved the drainage efficiency of tapping pipe under strong wind weather, is particularly useful for the area that amount of precipitation is large, wind speed is high, exist nature freeze thawing to circulate.
Need to further illustrate, specific embodiment described herein is only to spiritual example explanation of the present invention.Those skilled in the art can make various modifications or supplement or adopt similar mode to substitute described specific embodiment, but can't depart from spirit of the present invention or surmount the defined scope of appended claims.

Claims (3)

1. a mounting method for direct-discharging tapping pipe for bridge, is characterized in that: this mounting method comprises the steps:
(1), choose one and be trumpet-shaped water inlet pipe and a columned lower linking tube, and this water inlet pipe is arranged on to the top of described lower linking tube; The top nozzle diameter of described water inlet pipe is greater than the diameter of described lower linking tube, the bottom nozzle diameter of described water inlet pipe and the equal diameters of lower linking tube;
(2), on the lateral wall of the bottom of above-mentioned water inlet pipe, two ribs that are parallel to each other are installed, making two spacing between rib is 10~50mm;
(3), a sheathed rubber ring outside the top of lower linking tube; In the bottom of lower linking tube, a bearing pin is installed at mouth of pipe place, then in the bottom of lower linking tube, installing one can be around the verge board of above-mentioned bearing pin rotation, take this bearing pin as boundary, described verge board is divided into the first verge board and the second verge board, described first, second verge board is all semicircle shape, the diameter of the first verge board is arranged to than the little 1~5mm of the internal diameter of lower linking tube, the diameter of the second verge board is arranged to equate with the external diameter of lower linking tube; Described first, second verge board can be 90 ° around the maximum angle of above-mentioned bearing pin rotation; So far, tapping pipe body installs;
(4), choose the preformed hole of beam body and beam body, at the end face of beam body, smear uniformly after one deck mortar, described lower linking tube is installed in the preformed hole of beam body, the top of described water inlet pipe is embedded in mating formation between layer of beam body top, the bottom of described water inlet pipe is embedded between the beam body of above-mentioned preformed hole top, with mortar, fill up water inlet pipe lower periphery, to guarantee that water inlet pipe is in extreme lower position simultaneously; Then in the bottom surface of beam body, collet is installed, with mortar plug, is filled out the gap between tapping pipe body and preformed hole, until fill up simultaneously; Then the upper edge of collet is filled in mortar, to guarantee both effective adhesives that has;
(5), on the top of water inlet pipe, rain perforaled strainer is installed.
2. the mounting method of direct-discharging tapping pipe for a kind of bridge according to claim 1, it is characterized in that: in described step (2), by the high 5~20mm that is set to of the rib of rib, described rib has been strengthened being connected of tapping pipe and mortar, and has prevented that moisture from entering the gap between tapping pipe and the preformed hole of beam body from the bottom margin of water inlet pipe.
3. the mounting method of direct-discharging tapping pipe for a kind of bridge according to claim 2, it is characterized in that: in described step (3), the diameter in the cross section of rubber ring is set to than the large 3~10mm of the difference of the external diameter of the internal diameter of the preformed hole of beam body and lower linking tube, and described rubber ring has been realized closely sealed between tapping pipe and the preformed hole of beam body.
CN201410401445.0A 2013-03-01 2013-03-01 A kind of mounting method of Bridge-use straight-line type water drain pipe Expired - Fee Related CN104179119B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310066344.8A CN103122606B (en) 2013-03-01 2013-03-01 Bridge-use straight-line type water drain pipe and installation method thereof

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201310066344.8A Division CN103122606B (en) 2013-03-01 2013-03-01 Bridge-use straight-line type water drain pipe and installation method thereof

Publications (2)

Publication Number Publication Date
CN104179119A true CN104179119A (en) 2014-12-03
CN104179119B CN104179119B (en) 2015-12-30

Family

ID=48453733

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201410401445.0A Expired - Fee Related CN104179119B (en) 2013-03-01 2013-03-01 A kind of mounting method of Bridge-use straight-line type water drain pipe
CN201310066344.8A Expired - Fee Related CN103122606B (en) 2013-03-01 2013-03-01 Bridge-use straight-line type water drain pipe and installation method thereof

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201310066344.8A Expired - Fee Related CN103122606B (en) 2013-03-01 2013-03-01 Bridge-use straight-line type water drain pipe and installation method thereof

Country Status (1)

Country Link
CN (2) CN104179119B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106812062A (en) * 2017-03-20 2017-06-09 石狮市川朗机械设计有限公司 A kind of bridge sewer pipe cap device
CN107059598A (en) * 2017-03-20 2017-08-18 石狮市川朗机械设计有限公司 A kind of sewer pipe cap device on bridge
CN110241721A (en) * 2019-06-28 2019-09-17 沈炜 Environmentally friendly easily blowdown bridge

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103452042A (en) * 2013-08-15 2013-12-18 龙口丛林中德车体系统工程有限公司 Drainage system for aluminum alloy pedestrian bridge
CN110042753A (en) * 2019-05-21 2019-07-23 山东省路桥集团有限公司 Bridge bridge floor water drain pipe device and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1441120A (en) * 2003-04-07 2003-09-10 沈阳铁路工程建设集团有限公司 Bridge drainage pipe installing construction process
JP2003301414A (en) * 2002-04-09 2003-10-24 Zen Corporation:Kk Rainwater falling-preventive bridge drainage basin
KR20090105519A (en) * 2008-04-03 2009-10-07 주식회사 리더스산업 A water collect device for bridge
CN201485788U (en) * 2009-05-08 2010-05-26 北京市市政专业设计院有限责任公司 Bridge drainage device
CN202295311U (en) * 2011-10-08 2012-07-04 镇江浩博航空铁道设备研发有限公司 Channel downpipe of boarding bridge
CN202644395U (en) * 2012-07-16 2013-01-02 浙江灵通管业有限公司 Water discharge pipe for railroad bridge

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006299750A (en) * 2005-04-25 2006-11-02 Nippon Sharyo Seizo Kaisha Ltd Drain bolt-nut and stagnant water preventive drain structure of steel box using this drain bolt-nut
CN201099833Y (en) * 2007-08-17 2008-08-13 无锡市政设计研究院有限公司 Viaduct drainage
CN202000865U (en) * 2011-01-19 2011-10-05 毅鑫实业股份有限公司 Pressure balance drain pipe for inner hollow aluminium window
CN203065961U (en) * 2013-03-01 2013-07-17 青岛路桥建设集团有限公司 Straight-line drain pipe for bridge

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003301414A (en) * 2002-04-09 2003-10-24 Zen Corporation:Kk Rainwater falling-preventive bridge drainage basin
CN1441120A (en) * 2003-04-07 2003-09-10 沈阳铁路工程建设集团有限公司 Bridge drainage pipe installing construction process
KR20090105519A (en) * 2008-04-03 2009-10-07 주식회사 리더스산업 A water collect device for bridge
CN201485788U (en) * 2009-05-08 2010-05-26 北京市市政专业设计院有限责任公司 Bridge drainage device
CN202295311U (en) * 2011-10-08 2012-07-04 镇江浩博航空铁道设备研发有限公司 Channel downpipe of boarding bridge
CN202644395U (en) * 2012-07-16 2013-01-02 浙江灵通管业有限公司 Water discharge pipe for railroad bridge

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106812062A (en) * 2017-03-20 2017-06-09 石狮市川朗机械设计有限公司 A kind of bridge sewer pipe cap device
CN107059598A (en) * 2017-03-20 2017-08-18 石狮市川朗机械设计有限公司 A kind of sewer pipe cap device on bridge
CN107059598B (en) * 2017-03-20 2019-03-08 福建省昊立建设工程有限公司 A kind of sewer pipe cap device on bridge
CN110241721A (en) * 2019-06-28 2019-09-17 沈炜 Environmentally friendly easily blowdown bridge

Also Published As

Publication number Publication date
CN104179119B (en) 2015-12-30
CN103122606A (en) 2013-05-29
CN103122606B (en) 2015-03-11

Similar Documents

Publication Publication Date Title
CN104179119B (en) A kind of mounting method of Bridge-use straight-line type water drain pipe
CN204238330U (en) A kind of novel town road discharge structure
CN203716414U (en) Straight double-layer drainage device
CN201151884Y (en) Desert highway surface self-cleaning wind-guiding wall
CN205369377U (en) Automatic abandon class, retaining, overflow integration rainwater collection system
CN105369994B (en) The discharge structure and its construction method of open valley side wall
CN203346755U (en) Waterproof drainage structure of road surface layer
CN206289586U (en) Hydraulic engineering ecological protection slope
CN203065961U (en) Straight-line drain pipe for bridge
CN105113621A (en) Vertical fence mesh well lid
CN203383418U (en) Roof rainwater desilting device
CN202440922U (en) Infiltration system capable of reducing discharge intensity of house surface rainwater
CN101463586A (en) Cement concrete road with drain tank
CN201202297Y (en) High insulated telegraph pole
CN206581511U (en) A kind of GRC eaves gutters structure
CN205742465U (en) A kind of anti-blocking close cellular type expressway slope discharge structure
CN209307989U (en) One kind save land efficient rectangle field irrigation and draining integrated plastic channel
CN208965445U (en) A kind of road sign of slidable adjustment
CN202492799U (en) Waterproof and drainage structure for bridge pavement layer
CN207829139U (en) Dirty Vatch basin is cut for municipal storm sewer
CN201972231U (en) Sewage inspection well
CN201981463U (en) Drainage flat stone for road paving
CN201486108U (en) Residence discharge flue funnel cap
CN206457774U (en) Road ice melting snow melting device
CN206289709U (en) Road pavement dewatering structure energy conserving system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Guo Baolin

Inventor after: Lu Jianqing

Inventor after: Guo Xiangfei

Inventor after: Dong Hui

Inventor after: Wu Pingchuan

Inventor after: Pan Xifeng

Inventor after: Li Linfang

Inventor after: Duan Bin

Inventor after: Zhang Hongtao

Inventor after: Li Wenjing

Inventor after: Cao Xue

Inventor after: Bai Jing

Inventor after: Gao Shutang

Inventor before: Guo Baolin

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20151112

Address after: 266520 Qingdao economic and Technological Development Zone, Shandong, No. 182 Jinshatan Road

Applicant after: Qingdao Linchuan Engineering Technology Consulting Co., Ltd.

Applicant after: SHANDONG HI-SPEED TECHNOLOGY DEVELOPMENT GROUP CO., LTD.

Applicant after: Hebei University of Engineering

Address before: 266520 Qingdao economic and Technological Development Zone, Shandong, No. 182 Jinshatan Road

Applicant before: Qingdao Linchuan Engineering Technology Consulting Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151230

Termination date: 20170301

CF01 Termination of patent right due to non-payment of annual fee