CN104164947A - 大跨度屋面桁架檩条 - Google Patents
大跨度屋面桁架檩条 Download PDFInfo
- Publication number
- CN104164947A CN104164947A CN201410382926.1A CN201410382926A CN104164947A CN 104164947 A CN104164947 A CN 104164947A CN 201410382926 A CN201410382926 A CN 201410382926A CN 104164947 A CN104164947 A CN 104164947A
- Authority
- CN
- China
- Prior art keywords
- unit
- truss
- truss purlins
- purlins
- chord
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410382926.1A CN104164947A (zh) | 2014-08-06 | 2014-08-06 | 大跨度屋面桁架檩条 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410382926.1A CN104164947A (zh) | 2014-08-06 | 2014-08-06 | 大跨度屋面桁架檩条 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104164947A true CN104164947A (zh) | 2014-11-26 |
Family
ID=51908918
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410382926.1A Pending CN104164947A (zh) | 2014-08-06 | 2014-08-06 | 大跨度屋面桁架檩条 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104164947A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105350716A (zh) * | 2015-11-24 | 2016-02-24 | 江苏华海钢结构有限公司 | 一种冷弯薄壁型钢组合式桁架檩条 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1998011307A1 (en) * | 1996-09-10 | 1998-03-19 | Alpine Engineered Products, Inc. | Hinged pitch break connector |
WO2003070395A1 (fr) * | 2002-02-22 | 2003-08-28 | Usinor | Procédé de fabrication d'une structure plane en treillis tubulaire pour la réalisation d'un élément d'ossature de bâtiment et notamment d'une ferme ou d'une panne |
CN201433510Y (zh) * | 2009-05-21 | 2010-03-31 | 中国电子工程设计院 | 一种钢屋盖系统 |
EP2607565A1 (de) * | 2011-12-21 | 2013-06-26 | Wilhelm Layher Verwaltungs-GmbH | Kederdachfirstträger und Kederdachträgereinrichtung |
CN204001417U (zh) * | 2014-08-06 | 2014-12-10 | 河南天丰钢结构建设有限公司 | 大跨度屋面桁架檩条 |
-
2014
- 2014-08-06 CN CN201410382926.1A patent/CN104164947A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1998011307A1 (en) * | 1996-09-10 | 1998-03-19 | Alpine Engineered Products, Inc. | Hinged pitch break connector |
WO2003070395A1 (fr) * | 2002-02-22 | 2003-08-28 | Usinor | Procédé de fabrication d'une structure plane en treillis tubulaire pour la réalisation d'un élément d'ossature de bâtiment et notamment d'une ferme ou d'une panne |
CN201433510Y (zh) * | 2009-05-21 | 2010-03-31 | 中国电子工程设计院 | 一种钢屋盖系统 |
EP2607565A1 (de) * | 2011-12-21 | 2013-06-26 | Wilhelm Layher Verwaltungs-GmbH | Kederdachfirstträger und Kederdachträgereinrichtung |
CN204001417U (zh) * | 2014-08-06 | 2014-12-10 | 河南天丰钢结构建设有限公司 | 大跨度屋面桁架檩条 |
Non-Patent Citations (1)
Title |
---|
唐潮等: "桁架式檩条在钢结构厂房中的应用", 《钢结构》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105350716A (zh) * | 2015-11-24 | 2016-02-24 | 江苏华海钢结构有限公司 | 一种冷弯薄壁型钢组合式桁架檩条 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101581123B (zh) | 一种钢屋盖系统 | |
CN101597918B (zh) | 一种预应力巨型支撑-框架结构 | |
CN104988994B (zh) | 一种组合构件 | |
CN104563494A (zh) | 一种用于承插盘扣式钢管支撑架的转换支撑体系及施工工法 | |
CN204475846U (zh) | 一种用于承插盘扣式钢管支撑架的转换支撑体系 | |
CN105442705A (zh) | 一种大跨度钢桁架结构及其安装方法 | |
CN201202289Y (zh) | 钢结构厂房刚接框架 | |
CN204238349U (zh) | 一种波折腹板h型钢电缆通廊 | |
CN204001417U (zh) | 大跨度屋面桁架檩条 | |
CN104164947A (zh) | 大跨度屋面桁架檩条 | |
CN107419806B (zh) | 一种大跨x型网格立体张弦结构体系及其施工方法 | |
CN202509667U (zh) | 组合式钢筋桁架楼承板 | |
CN105350716A (zh) | 一种冷弯薄壁型钢组合式桁架檩条 | |
CN203347105U (zh) | 一种空腹扁梁 | |
CN102425269A (zh) | 可悬吊重物的大板梁及其构筑方法 | |
CN201433510Y (zh) | 一种钢屋盖系统 | |
CN103866700A (zh) | 已投入使用站台改造用双吊杆悬吊加宽结构 | |
CN205259350U (zh) | 大跨度温室结构 | |
CN204959995U (zh) | 一种屋梁的模块化结构 | |
RU153641U1 (ru) | Железобетонное покрытие одноэтажного производственного здания на спаренных колоннах | |
RU180553U1 (ru) | Стальная стропильная ферма покрытия | |
CN202790959U (zh) | 基于高空横向支撑的钢管桁架结构 | |
CN203879037U (zh) | 已投入使用站台改造用斜撑加宽结构 | |
CN201443161U (zh) | 一种重工业用大跨度屋面空间管桁架结构 | |
CN201486038U (zh) | 一种钢屋盖系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Song Xinli Inventor after: Tian Lei Inventor after: Yang Dexi Inventor after: Hu Wenti Inventor after: Zhao Feng Inventor after: Liu Shuhua Inventor after: Zhang Shilin Inventor before: Song Xinli Inventor before: Tian Lei Inventor before: Yang Dexi Inventor before: Hu Wenti Inventor before: Zhao Feng Inventor before: Liu Shuhua Inventor before: Zhang Shilin |
|
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20141126 |
|
RJ01 | Rejection of invention patent application after publication |