CN104164828B - A kind of Multifunctional road construction equipment - Google Patents

A kind of Multifunctional road construction equipment Download PDF

Info

Publication number
CN104164828B
CN104164828B CN201410340745.2A CN201410340745A CN104164828B CN 104164828 B CN104164828 B CN 104164828B CN 201410340745 A CN201410340745 A CN 201410340745A CN 104164828 B CN104164828 B CN 104164828B
Authority
CN
China
Prior art keywords
arranges
hopper
leading screw
chute
baffle plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410340745.2A
Other languages
Chinese (zh)
Other versions
CN104164828A (en
Inventor
孙福海
刘文宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410340745.2A priority Critical patent/CN104164828B/en
Publication of CN104164828A publication Critical patent/CN104164828A/en
Application granted granted Critical
Publication of CN104164828B publication Critical patent/CN104164828B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Machines (AREA)
  • Road Repair (AREA)

Abstract

The invention provides a kind of Multifunctional road construction equipment, this device forms primarily of hopper, and the side of hopper arranges quick change bracket, arranges the base plate that can dig in hopper, and the bottom of base plate arranges oil cylinder, and oil cylinder is connected with the hydraulic circuit of loader; The side of hopper is arranged Lou expects mouth, leaks material mouth and arranges control baffle plate in the one end with quick change bracket homonymy, and control baffle plate welds leading screw, leading screw is fixed on hopper rear wall by nut, and leading screw and nut form a set of leading screw width, the lifting of regulable control baffle plate; Leak outside material mouth and be bolted pressing roller holder or curb scraper stent, the pressing roller holder left and right sides arranges chute, and pressing roller holder arranges pressure roller, and the two ends of pressure roller central axis are arranged in chute, and hang with extension spring, and the other end of extension spring is fixed on the below of chute; Curb scraper stent welds curb scraper plate.Which solves the blank of associated construction equipment, need not be artificial, do not pollute road surface, for the later stage heap low bank of earth between fields, shoulder of repairing the roads have saved expense.

Description

A kind of Multifunctional road construction equipment
Technical field
The invention belongs to highway engineering machine technical field, be specifically related to a kind of heap low bank of earth between fields, level road shoulder Versatile apparatus.
Background technology
At present, the work progress of two-ash broken stones and water stabilized zone in construction of the highway, edge is compacting not easily, and waste material.Major part uses rigid edge or construction of manually earthing up, and after having constructed, rigid edge needs dismounting, and manually earth up construction cost time take a lot of work, pollute road surface again.
Summary of the invention
The object of the present invention is to provide a kind of Multifunctional road construction equipment, to solve the problems of the technologies described above.
The present invention forms primarily of hopper, and the side of hopper arranges quick change bracket, arranges the base plate that can dig in hopper, and the bottom of base plate arranges oil cylinder, and oil cylinder is connected with the hydraulic circuit of loader; The side of hopper is arranged Lou expects mouth, leaks material mouth and arranges control baffle plate in the one end with quick change bracket homonymy, and control baffle plate welds leading screw, leading screw is fixed on hopper rear wall by nut, and leading screw and nut form a set of leading screw width, the lifting of regulable control baffle plate; Leak outside material mouth and be bolted pressing roller holder or curb scraper stent, the pressing roller holder left and right sides arranges chute, and pressing roller holder arranges pressure roller, and the two ends of pressure roller central axis are arranged in chute, and hang with extension spring, and the other end of extension spring is fixed on the below of chute; Curb scraper stent welds curb scraper plate.
Apparatus of the present invention are connected with wheel loader and use, and during use, are connected by quick change bracket with loader, by oil pipe, oil cylinder are connected on (not used time, this oil circuit shutoff) on the hydraulic circuit of loader.Fill earth material in hopper, primer fluid pressing system, dug by base plate and about 60 degree, ground, along with the walking of loader, earth material spills from leakage material mouth, controls the hoisting depth of leaking material mouth baffle plate, can control the height of the earth material spilt; After earth material spills, pressure roller is real by soil pressure, so just forms the low bank of earth between fields at highway edge.During level road shoulder, pressure roller is removed, installs scraper plate, along with the walking of loader, curb is struck off.
The invention solves the blank of associated construction equipment, need not be artificial, do not pollute road surface, for the later stage heap low bank of earth between fields, shoulder of repairing the roads have saved expense.
Accompanying drawing explanation
Above-mentioned and/or additional aspect of the present invention and advantage will become obvious and easy understand from the following description of the accompanying drawings of embodiments, wherein:
Fig. 1 is structural representation of the present invention (top view installs the state of pressing roller holder and pressure roller);
Fig. 2 is structural representation of the present invention (top view installs the state of curb scraper stent and curb scraper plate);
Fig. 3 is structural representation of the present invention (complete section rear elevation);
Fig. 4 is structural representation of the present invention (complete section left view installs the state of pressing roller holder and pressure roller);
In figure, 1 hopper, 2 base plates, 3 quick change brackets, 4 leak material mouth, 5 and control baffle plate, 6 leading screws, 7 nuts, 8 pressing roller holders, 9 pressure rollers, 10 oil pipes, 11 curb scraper plates, 12 curb scraper stents, 13 base plate right side walls, 14 hinges, 15 oil cylinders, 16 hopper right side walls, 17 chutes, 18 extension springs.
Detailed description of the invention
Be described below in detail embodiments of the present invention, described embodiment is exemplary, only for explaining the present invention, and can not be interpreted as limitation of the present invention.
As shown in the figure, the side of hopper 1 arranges the following description of quick change bracket 3(with quick change bracket for initial point), the end 2 plate that can dig is set in hopper 1, the left side wall of hopper 1 is made up of two parts, a part and base plate 2 are integrated, dig with base plate 2 when base plate 2 is dug, another part left side wall and hopper 1 are integrated; The top that the right part of base plate 2 arranges base plate right side wall 13(base plate right side wall 13 is concordant with base plate 2), the two ends of base plate right side wall 13 are welded on the front and back inwall of hopper 1, hinge 14 is set between base plate 2 and base plate right side wall 13, rotates around hinge 14 when base plate 2 is dug; The bottom of base plate 2 arranges oil cylinder 15, controls digging of base plate 2 and land by oil cylinder 15, and oil cylinder 15 is connected with the hydraulic circuit of loader by oil pipe 10; The area of the base plate 2 can dug in hopper 1 is less than the area bottom hopper 1, and base plate right side wall 13 is formed to leak with hopper right side wall 16 expects mouth 4; In hopper 1, arrange in the rear end of leaking material mouth 4 side hopper 1 and control baffle plate 5, control baffle plate 5 welds leading screw 6, leading screw 6 is fixed on hopper 1 rear wall by nut 7, and leading screw 6 and nut 7 form a set of leading screw width, the lifting of regulable control baffle plate 5; Leak outside material mouth 4, rear wall outside hopper 1 is bolted pressing roller holder 8 or curb scraper stent 12, pressing roller holder 8 left and right sides arranges chute 17, pressing roller holder 8 is arranged pressure roller 9, the two ends of pressure roller 9 central axis are arranged in chute 17, and hanging with extension spring 18, the other end of extension spring 18 is fixed on the below of chute 17; Curb scraper stent 12 welds curb scraper plate 11.
Apparatus of the present invention are connected with wheel loader and use, and during use, are connected by quick change bracket with loader, by oil pipe, oil cylinder are connected on (not used time, this oil circuit shutoff) on the hydraulic circuit of loader.Fill earth material in hopper, primer fluid pressing system, dug by base plate and about 60 degree, ground, along with the walking of loader, earth material spills from leakage material mouth, controls to leak the hoisting depth that material mouth controls baffle plate, can control the height of the earth material spilt; After earth material spills, pressure roller is real by soil pressure, so just forms the low bank of earth between fields at highway edge.During level road shoulder, pressure roller is removed, installs scraper plate, along with the walking of loader, curb is struck off.

Claims (1)

1. a Multifunctional road construction equipment, is characterized in that, primarily of hopper composition, the side of hopper arranges quick change bracket, arranges the base plate that can dig in hopper, and the bottom of base plate arranges oil cylinder, and oil cylinder is connected with the hydraulic circuit of loader; The side of hopper is arranged Lou expects mouth, leaks material mouth and arranges control baffle plate in the one end with quick change bracket homonymy, and control baffle plate welds leading screw, leading screw is fixed on hopper rear wall by nut, and leading screw and nut form a set of leading screw width, the lifting of regulable control baffle plate; Leak outside material mouth and be bolted pressing roller holder or curb scraper stent, the pressing roller holder left and right sides arranges chute, and pressing roller holder arranges pressure roller, and the two ends of pressure roller central axis are arranged in chute, and hang with extension spring, and the other end of extension spring is fixed on the below of chute; Curb scraper stent welds curb scraper plate.
CN201410340745.2A 2014-07-17 2014-07-17 A kind of Multifunctional road construction equipment Expired - Fee Related CN104164828B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410340745.2A CN104164828B (en) 2014-07-17 2014-07-17 A kind of Multifunctional road construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410340745.2A CN104164828B (en) 2014-07-17 2014-07-17 A kind of Multifunctional road construction equipment

Publications (2)

Publication Number Publication Date
CN104164828A CN104164828A (en) 2014-11-26
CN104164828B true CN104164828B (en) 2016-04-13

Family

ID=51908801

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410340745.2A Expired - Fee Related CN104164828B (en) 2014-07-17 2014-07-17 A kind of Multifunctional road construction equipment

Country Status (1)

Country Link
CN (1) CN104164828B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3032495A1 (en) * 1980-08-28 1982-04-01 Heilit + Woerner Bau-AG, 8000 München Tracked sliding form machine building concrete road deck - travels on levelled auxiliary path set up at road side
JPH03206201A (en) * 1990-01-09 1991-09-09 Taisei Doro Kk Method and machine for paving road with rolled concrete
CN2575143Y (en) * 2002-09-20 2003-09-24 高先猛 Road roller with paving function
CN102168400A (en) * 2011-03-15 2011-08-31 河北路桥集团有限公司 Machine for constructing concrete pavement of large-span road
CN204059163U (en) * 2014-07-17 2014-12-31 孙福海 A kind of Multifunctional road construction equipment

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3032495A1 (en) * 1980-08-28 1982-04-01 Heilit + Woerner Bau-AG, 8000 München Tracked sliding form machine building concrete road deck - travels on levelled auxiliary path set up at road side
JPH03206201A (en) * 1990-01-09 1991-09-09 Taisei Doro Kk Method and machine for paving road with rolled concrete
CN2575143Y (en) * 2002-09-20 2003-09-24 高先猛 Road roller with paving function
CN102168400A (en) * 2011-03-15 2011-08-31 河北路桥集团有限公司 Machine for constructing concrete pavement of large-span road
CN204059163U (en) * 2014-07-17 2014-12-31 孙福海 A kind of Multifunctional road construction equipment

Also Published As

Publication number Publication date
CN104164828A (en) 2014-11-26

Similar Documents

Publication Publication Date Title
CN204533813U (en) A kind of slurry-water balance type push pipe system
CN204059163U (en) A kind of Multifunctional road construction equipment
CN203361215U (en) Pavement leveling and tamping vehicle
CN108086308B (en) Construction method for punching cast-in-place pile on local buried sludge bag in sea-filling area
CN104164828B (en) A kind of Multifunctional road construction equipment
CN205776454U (en) A kind of bull-dozer excavating groove and backfill excavation
CN106032674B (en) A kind of bull-dozer for excavating groove and backfilling excavation
CN205235487U (en) Multistage recovery unit that subsides of rare earth polishing powder waste material
CN105133614A (en) Tool and method for marking underground pile position of engineering site
CN106223342B (en) Repair operating pit quick supporting device and application method
CN204785071U (en) Be located chemical industry pipeline under pressure protection device under road
CN215330125U (en) Trench excavation equipment for municipal road construction
CN212357904U (en) Inspection well lid mounting tool with adjustable
JP2010084383A (en) Rolling compaction bucket
CN108729365A (en) The construction method of wavy metal tube passage
CN204060584U (en) A kind of tool-type gravity slurry mud separator
CN205046659U (en) Prosthetic devices is consolidated to drainage pipe inspection shaft
CN104452731B (en) Low-frequency high-amplitude multifunctional table back of the body compacting facility
CN107268534A (en) Approach channel shore protection repairs structure and its method
CN108374468B (en) Method for blocking damage of old flood drainage system of tailing pond
CN202689057U (en) Pressure release valve for floating resistance of structure
CN205205901U (en) A groove wall compaction device for gardens ditching construction
CN204803719U (en) High -efficient leveler
CN108385696B (en) Position-moving-preventing gravel backfilling device and construction method
CN202064362U (en) Earth rock dam inverted filter spreading tank

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Sun Fuhai

Inventor after: Liu Wenyu

Inventor before: Sun Fuhai

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160413

Termination date: 20170717