CN205776454U - A kind of bull-dozer excavating groove and backfill excavation - Google Patents

A kind of bull-dozer excavating groove and backfill excavation Download PDF

Info

Publication number
CN205776454U
CN205776454U CN201620709968.6U CN201620709968U CN205776454U CN 205776454 U CN205776454 U CN 205776454U CN 201620709968 U CN201620709968 U CN 201620709968U CN 205776454 U CN205776454 U CN 205776454U
Authority
CN
China
Prior art keywords
dozer
axle
bull
pusher blade
blade
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620709968.6U
Other languages
Chinese (zh)
Inventor
高峰
王娜
史秀平
崔先觉
龚育超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changan University
Original Assignee
Changan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changan University filed Critical Changan University
Priority to CN201620709968.6U priority Critical patent/CN205776454U/en
Application granted granted Critical
Publication of CN205776454U publication Critical patent/CN205776454U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Operation Control Of Excavators (AREA)

Abstract

This utility model discloses a kind of bull-dozer excavating groove and backfill excavation, including frame, and is connected to the dozer of frame front end and is connected to the compaction hammer of frame rear end;Dozer includes cutterhead, milling cutter, right pusher blade I, left pusher blade I, driving means and axle II;Cutterhead is circular, and circumferencial direction is evenly equipped with milling cutter, and cutterhead is fixed on axle II, is positioned at the centre position of dozer, can dismantle;The both sides of axle II are connected with left pusher blade I, right pusher blade I;Axle II two ends are supported on bearing I and bearing II, and one end of axle connects driving means;The rear end of bull-dozer is provided with support;Compaction hammer is installed on the lower surface of support.The earth dug out can be elapsed the both sides of dozer by the left and right pusher blade on axle II, after pipeline paving, installs two pusher blades being positioned at scraper bowl both sides additional, and driving means reversely rotates, and elapses in groove by the earthwork of both sides, compaction hammer carries out hitting reality.This utility model principle is simple, and work efficiency is high.

Description

一种开挖沟槽和回填挖方的推土机A bulldozer for excavating trenches and backfilling excavations

技术领域technical field

本实用新型属于工程机械技术领域,特别涉及一种开挖沟槽和回填挖方的推土机。The utility model belongs to the technical field of construction machinery, in particular to a bulldozer for excavating trenches and backfilling excavation.

背景技术Background technique

管道是用管子、管子联接件和阀门等联接成的用于输送气体、液体或带固体颗粒的流体的装置。由于管道的方便性,使得其在世界范围内具有广泛的运用。由于城市的布局规划,大多数的管道都埋于地下。传统的方法采用挖掘机开挖或者人工开挖。人工开挖沟槽时,工作效率低,而且两种方法容易超挖或扰动基底土层。一般来说,在挖至槽底标高以上20cm时,再用人工挖除、修整槽底,边挖边修,并立即进行基础施工。若超挖,采用土回填应按照有关回填压实要求进行回填。如此效率很低,而且深度不容易控制。管道铺设完成后,还需要将挖方进行回填,效率很低。A pipeline is a device used to transport gas, liquid or fluid with solid particles connected by pipes, pipe connectors and valves. Due to the convenience of the pipeline, it is widely used in the world. Due to the layout of the city, most of the pipes are buried underground. The traditional method is excavation by excavator or manual excavation. When excavating trenches manually, the work efficiency is low, and the two methods are easy to over-excavate or disturb the base soil layer. Generally speaking, when the height of the bottom of the trench is 20cm above the level, the bottom of the trench will be manually excavated and trimmed while digging, and the foundation construction will be carried out immediately. In case of over-excavation, soil backfill shall be carried out in accordance with relevant backfill compaction requirements. This is very inefficient, and the depth is not easy to control. After the pipeline laying is completed, the excavation needs to be backfilled, which is very inefficient.

实用新型内容Utility model content

本实用新型的目的在于提供一种开挖沟槽和回填挖方的推土机,以解决现有推土机的不足,这种推土机控制开挖沟槽的深度,防止超挖,对基层扰动小,实现连续作业过程,效率高,实用性强。The purpose of the utility model is to provide a bulldozer for excavating trenches and backfilling excavation to solve the deficiencies of existing bulldozers. This bulldozer controls the depth of excavating trenches, prevents over-excavation, has little disturbance to the base, and realizes continuous operation. process, high efficiency and strong practicability.

为了实现上述目的,本实用新型采用如下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:

一种开挖沟槽和回填挖方的推土机,包括机架,以及连接在机架前端的推土铲和连接在机架后端的击实锤;推土铲包括刀盘、铣刀、右推料叶片Ⅰ、左推料叶片Ⅰ、驱动装置和轴Ⅱ;刀盘为圆形,圆周方向均布有铣刀,刀盘固定在轴Ⅱ上,位于推土铲的中间位置,能拆卸;轴Ⅱ的两侧固接有左推料叶片Ⅰ、右推料叶片Ⅰ;轴Ⅱ两端支撑在轴承Ⅰ和轴承Ⅱ上,轴的一端连接有驱动装置;推土机的后端设置有支架;击实锤安装于支架的下端面。A bulldozer for excavating trenches and backfilling excavation, including a frame, a bulldozing blade connected to the front end of the frame, and a compacting hammer connected to the rear end of the frame; the bulldozer includes a cutter head, a milling cutter, a right pusher Blade I, left pusher blade I, driving device and shaft II; the cutter head is circular, with milling cutters evenly distributed in the circumferential direction, the cutter head is fixed on the shaft II, located in the middle of the bulldozing blade, and can be disassembled; the shaft II There are left push blade Ⅰ and right push blade Ⅰ fixedly connected to both sides of the shaft; the two ends of the shaft II are supported on the bearing I and the bearing II, and one end of the shaft is connected with a driving device; the rear end of the bulldozer is provided with a bracket; the compaction hammer Installed on the lower end surface of the bracket.

进一步的:机架上设置有驾驶室,驾驶室的下方安装有用于驱动推土机行进的履带和驱动轮。Further: the frame is provided with a cab, and crawlers and driving wheels for driving the bulldozer are installed under the cab.

进一步的:推土铲后端通过提升液压缸、垂直液压缸、顶推架与机架相连接。Further: the rear end of the bulldozing blade is connected with the frame through a lifting hydraulic cylinder, a vertical hydraulic cylinder, and a pushing frame.

进一步的:推土铲前端设置有升降油缸Ⅰ和升降油缸Ⅱ。Further: the front end of the bulldozing blade is provided with a lifting cylinder I and a lifting cylinder II.

进一步的:升降油缸Ⅰ的一端通过接点A与轴承Ⅰ铰接,另一端通过接点B与推土铲铰接。Further: One end of the lifting cylinder I is hinged to the bearing I through the joint A, and the other end is hinged to the bulldozing blade through the joint B.

进一步的:升降油缸Ⅱ的一端通过接点D与轴承Ⅱ铰接,另一端通过接点C与推土铲铰接。Further: one end of the lifting cylinder II is hinged to the bearing II through the joint D, and the other end is hinged to the bulldozing blade through the joint C.

进一步的:驾驶室中设置有用来控制提升液压缸、垂直液压缸、升降油缸Ⅰ和升降油缸Ⅱ的控制器。Further: the cab is provided with a controller for controlling the lifting hydraulic cylinder, the vertical hydraulic cylinder, the lifting cylinder I and the lifting cylinder II.

进一步的:还包括轴Ⅰ、轴Ⅲ、左推料叶片Ⅱ和右推料叶片Ⅱ;轴Ⅲ通过联轴器与轴Ⅱ相连接,能够拆卸,位于推土铲的左侧,其上安装有左推料叶片Ⅱ;轴Ⅰ安装在驱动装置上,位于推土铲的右侧,能够拆卸,其上安装有右推料叶片Ⅱ。Further: it also includes shaft I, shaft III, left pushing blade II and right pushing blade II; shaft III is connected with shaft II through a coupling, can be disassembled, and is located on the left side of the bulldozing blade, on which is installed The left pusher blade II; the shaft I is installed on the driving device, located on the right side of the bulldozing blade, and can be disassembled, and the right pusher blade II is installed on it.

进一步的:推土铲的铲斗两侧未设置侧壁,左推料叶片Ⅱ和右推料叶片Ⅱ伸出至推土铲外侧。Further: there are no side walls on both sides of the bucket of the bulldozing blade, and the left pushing blade II and the right pushing blade II protrude to the outside of the bulldozing blade.

本实用新型的技术方案具有以下有益效果:The technical solution of the utility model has the following beneficial effects:

当驱动装置带动轴旋转时,刀盘上的铣刀也跟着旋转,控制器控制提升液压缸、垂直液压缸、升降油缸Ⅰ、升降油缸Ⅱ动作,使得刀盘上的铣刀对基层材料进行铣削,保证了沟槽的深度,不会有超挖的现象,避免了人工修整,提高了效率,节约了成本。左推料叶片和右推料叶片能够将铣刀铣削掉进而卷入推土铲中的泥土分别向左右推移,使得泥土不会在推土铲中堆积,保证了施工作业的连续性,效率大大提高。管道铺设完毕后,只需将刀盘从轴上拆卸掉,轴进行反转,左右推料叶片将沟槽两边的泥土输送到沟槽中,由击实锤进行击实,提高工作效率。When the driving device drives the shaft to rotate, the milling cutter on the cutterhead also rotates, and the controller controls the lifting hydraulic cylinder, vertical hydraulic cylinder, lifting cylinder I, and lifting cylinder II to move, so that the milling cutter on the cutterhead mills the base material , to ensure the depth of the trench, there will be no over-excavation phenomenon, avoid manual trimming, improve efficiency and save costs. The left pusher blade and the right pusher blade can mill the milling cutter and move the soil involved in the bulldozer to the left and right respectively, so that the soil will not accumulate in the bulldozer, ensuring the continuity and efficiency of construction operations Greatly improve. After the pipeline is laid, it is only necessary to remove the cutter head from the shaft, and the shaft is reversed, and the left and right pushing blades transport the soil on both sides of the groove into the groove, and the compaction hammer compacts it to improve work efficiency.

附图说明Description of drawings

图1是本实用新型整体结构示意图。Fig. 1 is a schematic diagram of the overall structure of the utility model.

图2是工作装置的侧视图。Fig. 2 is a side view of the working device.

图中各个标号的含义有:1-支架;2-击实锤;3-驱动轮;4-履带;5-顶推架;6-垂直液压缸;7-刀盘;8-铣刀;9-提升液压缸;10-输油管;11-驾驶室;12-控制器;13-轴Ⅰ;14-轴承Ⅰ;15-驱动装置;16-接点A;17-升降油缸Ⅰ;18-接待B;19-推土铲;20-右推料叶片Ⅰ;21-左推料叶片Ⅰ;22-接点C;23-升降油缸Ⅱ;24接点D;25-轴承Ⅱ;26-轴Ⅱ,27-左推料叶片Ⅱ,28-轴Ⅲ,29-联轴器,30-管道,31-右推料叶片Ⅱ。The meanings of each label in the figure are: 1-support; 2-compacting hammer; 3-driving wheel; 4-track; -lifting hydraulic cylinder; 10-oil delivery pipe; 11-cab; 12-controller; 13-axis I; 14-bearing I; 15-driving device; 16-contact A; 17-lift cylinder I; 18-reception B; 19-Bulldozer blade; 20-Right pusher blade Ⅰ; 21-Left pusher blade Ⅰ; 22-Contact C; 23-Lift cylinder II; 24 Contact D; 25-Bearing II; Pushing blade II, 28-shaft III, 29-coupling, 30-pipeline, 31-right pushing blade II.

具体实施方式detailed description

以下给出本实用新型的具体实施例,需要说明的是本实用新型并不局限于以下具体实施例,凡在本申请技术方案基础上做的等同变换均落入本实用新型的保护范围。The specific embodiments of the present utility model are provided below, and it should be noted that the present utility model is not limited to the following specific embodiments, and all equivalent transformations done on the basis of the technical solution of the application all fall into the protection scope of the present utility model.

请参阅图1所示,一种开挖沟槽和回填挖方的推土机,包括机架,以及连接在机架前端的推土铲19和连接在机架后端的击实锤2;Please refer to shown in Fig. 1, a kind of bulldozer for trench excavation and backfill excavation, comprises frame, and the bulldozing blade 19 that is connected at the front end of frame and the compaction hammer 2 that is connected at frame rear end;

推土铲19包括刀盘7、铣刀8、右推料叶片Ⅰ20、左推料叶片Ⅰ21、左推料叶片Ⅱ27、右推料叶片Ⅱ31、驱动装置15、轴;刀盘7为圆形,圆周方向均布有铣刀8,刀盘7固定在轴Ⅱ26Ⅱ上,位于推土铲19的铲斗中间位置,能拆卸;轴Ⅱ26上位于刀盘7的两侧固接有左推料叶片Ⅰ21、右推料叶片Ⅰ20;轴Ⅱ26两端支撑在轴承Ⅰ14和轴承Ⅱ25上,轴Ⅱ26的一端连接有驱动装置15;轴Ⅲ28通过联轴器29与轴Ⅱ26相连接,可以拆卸,位于推土铲19的左侧,其上安装有左推料叶片Ⅱ21;轴Ⅰ13安装在驱动装置15上,位于推土铲19的右侧,可以拆卸,其上安装有右推料叶片Ⅱ31。推土铲19的铲斗两侧未设置侧壁,左推料叶片Ⅱ21和右推料叶片Ⅱ31伸出至推土铲19外侧。Dozer shovel 19 comprises cutterhead 7, milling cutter 8, right pusher blade I20, left pusher blade I21, left pusher blade II27, right pusher blade II31, driving device 15, shaft; cutterhead 7 is circular, There are milling cutters 8 evenly distributed in the circumferential direction, and the cutter head 7 is fixed on the shaft II 26 II, which is located in the middle of the bucket of the bulldozer 19 and can be disassembled; the shaft II 26 is fixed on both sides of the cutter head 7 with left pusher blades I 21 1. The right pusher blade I20; the two ends of the shaft II26 are supported on the bearing I14 and the bearing II25, and one end of the shaft II26 is connected with the driving device 15; the shaft III28 is connected with the shaft II26 through a coupling 29, which can be disassembled and located on the bulldozing blade The left side of 19 is equipped with left pushing blade II 21 on it; Axis I 13 is installed on the drive unit 15, is positioned at the right side of bulldozing blade 19, can disassemble, and right pushing blade II 31 is installed on it. There are no side walls on both sides of the bucket of the bulldozing blade 19 , and the left pushing blade II 21 and the right pushing blade II 31 protrude to the outside of the bulldozing blade 19 .

当驱动装置带动轴旋转时,刀盘7上的铣刀8也跟着旋转,使得刀盘7上的铣刀8对基层材料进行铣削。左推料叶片Ⅰ21和右推料叶片Ⅰ20能够将铣刀8铣削掉进而卷入推土铲19中的泥土分别向左右推移,使得泥土不会在推土铲中堆积。When the driving device drives the shaft to rotate, the milling cutter 8 on the cutter head 7 also rotates, so that the milling cutter 8 on the cutter head 7 mills the base material. The left pushing blade I21 and the right pushing blade I20 can mill the milling cutter 8 and then move the soil involved in the bulldozing blade 19 to the left and right, so that the soil will not accumulate in the bulldozing blade.

击实锤2安装于推土机后端支架1的下端面。当管道铺设完毕后,将刀盘7从轴上拆卸掉,轴Ⅱ26进行反转,左推料叶片Ⅱ21和右推料叶片Ⅱ31将开挖时推至推土铲19两侧的泥土输送到推土铲19内侧,经左推料叶片Ⅰ21和右推料叶片Ⅰ20将泥土进一步的输送到沟槽中,由击实锤2进行击实。The compaction hammer 2 is installed on the lower end surface of the rear end bracket 1 of the bulldozer. After the pipeline is laid, the cutter head 7 is disassembled from the shaft, the shaft II 26 is reversed, and the left pushing blade II 21 and the right pushing blade II 31 transport the soil that is pushed to both sides of the bulldozing blade 19 during excavation to the pushing blade. The inner side of the soil shovel 19, through the left pushing blade I21 and the right pushing blade I20, the soil is further transported into the groove, and compacted by the compacting hammer 2.

机架上设置有驾驶室11,驾驶室11内部安装有控制器12,驾驶室11的下方安装有履带4、驱动轮3。A cab 11 is arranged on the frame, and a controller 12 is installed inside the cab 11 , and crawler belts 4 and drive wheels 3 are installed below the cab 11 .

推土铲19后端通过提升液压缸9、垂直液压缸6、顶推架5与机架相连接。提升液压管9后面连接有输油管10。推土铲19前端设置有升降油缸Ⅰ17和升降油缸Ⅱ23。升降油缸Ⅰ17的一端通过接点A16与轴承Ⅰ14铰接,另一端通过接点B18与推土铲19铰接。升降油缸Ⅱ23的一端通过接点D24与轴承Ⅱ25铰接,另一端通过接点C22与推土铲19铰接。The rear end of the bulldozing blade 19 is connected with the frame through the lifting hydraulic cylinder 9, the vertical hydraulic cylinder 6, and the pushing frame 5. An oil delivery pipe 10 is connected behind the lifting hydraulic pipe 9 . The front end of the bulldozing blade 19 is provided with a lifting cylinder I17 and a lifting cylinder II23. One end of the lifting cylinder I17 is hinged to the bearing I14 through the joint A16, and the other end is hinged to the bulldozing blade 19 through the joint B18. One end of the lifting cylinder II23 is hinged to the bearing II25 through the joint D24, and the other end is hinged to the bulldozing blade 19 through the joint C22.

控制器12用来控制提升液压缸9、垂直液压缸6、升降油缸Ⅰ17、升降油缸Ⅱ23。保证了沟槽的深度,避免超挖的现象。The controller 12 is used to control the lifting hydraulic cylinder 9, the vertical hydraulic cylinder 6, the lifting cylinder I17, and the lifting cylinder II23. Guarantee the depth of the trench and avoid the phenomenon of over digging.

具体工作过程如下:The specific working process is as follows:

当推土机开始工作时,将轴Ⅰ和轴Ⅲ拆卸掉,驱动装置15带动支撑在轴承Ⅰ14和轴承Ⅱ25上的轴Ⅱ26旋转,从而带动安装在轴Ⅱ26上的刀盘7旋转。控制器12控制提升液压缸9、垂直液压缸6、升降油缸Ⅰ17、升降油缸Ⅱ23动作,对铣削的深度进行精确的控制。刀盘7上的铣刀8将基层铣削掉的土直接卷入推土铲19中,旋转的左推料叶片Ⅰ21和右推料叶片Ⅰ20带动堆积在推土铲19中的土向推土铲19两侧推移,保证了整个作业过程的连续性。当管道30铺设完成后,将轴Ⅰ13安装在驱动装置15上,位于推土铲19的右侧,轴Ⅲ28通过联轴器29安装在推土铲19的左侧,并且将刀盘7从轴Ⅱ26上拆卸掉,驱动装置15带动轴Ⅰ13、轴Ⅱ26、轴Ⅲ28进行反转,轴Ⅰ13上安装的右推料叶片Ⅱ31和轴Ⅲ28上安装的左推料叶片Ⅱ27将推土铲19两侧的土向中间推移,在安装在轴Ⅱ26上的左推料叶片Ⅰ21和右推料叶片Ⅰ20的作用下,将左推料叶片Ⅱ27和右推料叶片Ⅱ31推移过来的泥土输送到沟槽中,由击实锤2进行击实,完成整个管道的铺设。When the bulldozer starts to work, the shafts I and III are removed, and the driving device 15 drives the shaft II26 supported on the bearing I14 and the bearing II25 to rotate, thereby driving the cutter head 7 mounted on the shaft II26 to rotate. The controller 12 controls the actions of the lifting hydraulic cylinder 9, the vertical hydraulic cylinder 6, the lifting cylinder I17, and the lifting cylinder II23 to precisely control the depth of milling. The milling cutter 8 on the cutter head 7 directly rolls the soil milled off the base layer into the bulldozing blade 19, and the rotating left pushing blade I21 and right pushing blade I20 drive the soil accumulated in the bulldozing blade 19 to the bulldozing blade. 19 both sides move, have guaranteed the continuity of the whole operation process. After the pipeline 30 is laid, the shaft I13 is installed on the driving device 15 on the right side of the bulldozing blade 19, the shaft III28 is installed on the left side of the bulldozing blade 19 through the coupling 29, and the cutter head 7 is connected from the shaft Dismantled on II26, driving device 15 drives shaft I13, shaft II26, and shaft III28 to reverse, and the right pusher blade II31 installed on the shaft I13 and the left pusher blade II27 installed on the shaft III28 will push the blades on both sides of the bulldozing blade 19 The soil moves to the middle, and under the action of the left pusher blade I21 and the right pusher blade I20 installed on the shaft II26, the soil pushed over by the left pusher blade II27 and the right pusher blade II31 is transported into the groove, and the The compaction hammer 2 performs compaction to complete the laying of the entire pipeline.

Claims (9)

1. the bull-dozer excavating groove and backfill excavation, it is characterised in that: include frame, and be connected to frame front end Dozer (19) and be connected to the compaction hammer (2) of frame rear end;
Dozer (19) includes cutterhead (7), milling cutter (8), right pusher blade I (20), left pusher blade I (21), driving means And axle II (26) (15);Cutterhead (7) is circular, and circumferencial direction is evenly equipped with milling cutter (8), and cutterhead (7) is fixed on axle II (26), position In the centre position of dozer (19), can dismantle;The both sides of axle II (26) are connected with left pusher blade I (21), right pusher blade I (20);Axle II (26) two ends are supported on bearing I (14) and bearing II (25), and one end of axle (26) connects driving means (15);
The rear end of bull-dozer is provided with support (1);Compaction hammer (2) is installed on the lower surface of support (1).
A kind of bull-dozer excavating groove and backfill excavation the most according to claim 1, it is characterised in that: arrange in frame There are driver's cabin (11), the lower section of driver's cabin (11) that the crawler belt (4) for driving bull-dozer to advance and driving wheel (3) are installed.
A kind of bull-dozer excavating groove and backfill excavation the most according to claim 2, it is characterised in that: dozer (19) Rear end is connected with frame by lifting hydraulic cylinder (9), vertical hydraulic cylinder (6), pushing frame (5).
A kind of bull-dozer excavating groove and backfill excavation the most according to claim 3, it is characterised in that: dozer (19) Front end is provided with hoist cylinder I (17) and hoist cylinder II (23).
A kind of bull-dozer excavating groove and backfill excavation the most according to claim 4, it is characterised in that: hoist cylinder I (17) one end is hinged with bearing I (14) by contact A (16), and the other end is hinged with dozer (19) by contact B (18).
A kind of bull-dozer excavating groove and backfill excavation the most according to claim 5, it is characterised in that: hoist cylinder II (23) one end is hinged with bearing II (25) by contact D (24), and the other end is hinged with dozer (19) by contact C (22).
A kind of bull-dozer excavating groove and backfill excavation the most according to claim 6, it is characterised in that: driver's cabin sets It is equipped with for controlling lifting hydraulic cylinder (9), vertical hydraulic cylinder (6), hoist cylinder I (17) and the controller of hoist cylinder II (23) (12)。
A kind of bull-dozer excavating groove and backfill excavation the most according to claim 1, it is characterised in that: also include axle I (13), axle III (28), left pusher blade II (27) and right pusher blade II (31);Axle III (28) is by shaft coupling (29) and axle II (26) it is connected, it is possible to dismounting, is positioned at the left side of dozer (19), it is provided with left pusher blade II (21);Axle I (13) is pacified It is contained in driving means (15), is positioned at the right side of dozer (19), it is possible to dismounting, it is provided with right pusher blade II (31).
A kind of bull-dozer excavating groove and backfill excavation the most according to claim 8, it is characterised in that: dozer (19) Scraper bowl both sides be not provided with sidewall, left pusher blade II (21) and right pusher blade II (31) extend out to dozer (19) outside.
CN201620709968.6U 2016-07-05 2016-07-05 A kind of bull-dozer excavating groove and backfill excavation Expired - Fee Related CN205776454U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620709968.6U CN205776454U (en) 2016-07-05 2016-07-05 A kind of bull-dozer excavating groove and backfill excavation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620709968.6U CN205776454U (en) 2016-07-05 2016-07-05 A kind of bull-dozer excavating groove and backfill excavation

Publications (1)

Publication Number Publication Date
CN205776454U true CN205776454U (en) 2016-12-07

Family

ID=58124681

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620709968.6U Expired - Fee Related CN205776454U (en) 2016-07-05 2016-07-05 A kind of bull-dozer excavating groove and backfill excavation

Country Status (1)

Country Link
CN (1) CN205776454U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106032674A (en) * 2016-07-05 2016-10-19 长安大学 A bulldozer for excavating trenches and backfilling excavations
CN109183877A (en) * 2018-11-11 2019-01-11 吴慧军 A kind of excavation molding machine for irrigation canals and ditches construction
CN109763528A (en) * 2019-02-13 2019-05-17 陈洪荣 Double-row bulldozing type cable ditcher for electric power construction
CN115807455A (en) * 2022-12-07 2023-03-17 福建鑫联众建设发展有限公司 A water conservancy pipeline laying slotting device and slotting method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106032674A (en) * 2016-07-05 2016-10-19 长安大学 A bulldozer for excavating trenches and backfilling excavations
CN106032674B (en) * 2016-07-05 2018-08-17 长安大学 A kind of bull-dozer for excavating groove and backfilling excavation
CN109183877A (en) * 2018-11-11 2019-01-11 吴慧军 A kind of excavation molding machine for irrigation canals and ditches construction
CN109183877B (en) * 2018-11-11 2020-11-06 福建华航建设集团有限公司 A excavate forming device for irrigation canals and ditches construction
CN109763528A (en) * 2019-02-13 2019-05-17 陈洪荣 Double-row bulldozing type cable ditcher for electric power construction
CN115807455A (en) * 2022-12-07 2023-03-17 福建鑫联众建设发展有限公司 A water conservancy pipeline laying slotting device and slotting method

Similar Documents

Publication Publication Date Title
CN205776454U (en) A kind of bull-dozer excavating groove and backfill excavation
CN208136981U (en) Excavator with full wind-up
CN205024740U (en) Civil engineering uses multi -functional excavating machinery
CN106032674B (en) A kind of bull-dozer for excavating groove and backfilling excavation
CN105780837B (en) The continuous method for digging and its excavating gear of diaphram wall
CN102677721B (en) Excavating and cable-paving integrated machine
CN203729876U (en) Multifunctional non-excavation horizontal orientation drilling machine
CN206667324U (en) A kind of engineering machinery presses road all-in-one with multi-functional digging and soil-shifting
CN103741742B (en) Ditcher
CN204001021U (en) A kind of excavation of earthwork conveying device of U-shaped irrigation canals and ditches development machine
CN205742318U (en) A kind of milling digging machine of automatic material-absorbing
CN203668994U (en) Ditcher
CN203834543U (en) Groove excavation vehicle
CN106869165A (en) City integrated prefabricated piping lane open cut formula is from construction of prevention work method and self-propelled laydown machine
CN202559411U (en) Excavating cable-paving all-in-one machine
CN205438877U (en) Muddy water agitating unit
CN104631479A (en) Construction method of soil-changing and stirring waterproof curtain
CN204001007U (en) A kind of U-shaped irrigation canals and ditches earthwork development machine
CN109914500A (en) One kind being suitable for river bend irrigation district Multifunctional soil shifter
CN219710340U (en) Portable groove backfilling device
CN210342043U (en) Civil engineering foundation pit excavating device
CN206554118U (en) City integrated piping lane protects self-propelled laydown machine certainly
CN220319555U (en) Underground excavation tunnel earthwork excavation device and loading machinery
CN104179215B (en) A kind of earthwork heading end of U-shaped irrigation canals and ditches development machine
CN204001008U (en) A kind of earthwork heading end of U-shaped irrigation canals and ditches development machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161207

Termination date: 20170705