CN104164813A - Modularizedly-combined piled road - Google Patents

Modularizedly-combined piled road Download PDF

Info

Publication number
CN104164813A
CN104164813A CN201410352154.7A CN201410352154A CN104164813A CN 104164813 A CN104164813 A CN 104164813A CN 201410352154 A CN201410352154 A CN 201410352154A CN 104164813 A CN104164813 A CN 104164813A
Authority
CN
China
Prior art keywords
boss
road
rectangular body
combined
highway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410352154.7A
Other languages
Chinese (zh)
Inventor
李圣根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GANGGANGLI HEAVY STEEL JIANGSU Co Ltd
Original Assignee
GANGGANGLI HEAVY STEEL JIANGSU Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GANGGANGLI HEAVY STEEL JIANGSU Co Ltd filed Critical GANGGANGLI HEAVY STEEL JIANGSU Co Ltd
Priority to CN201410352154.7A priority Critical patent/CN104164813A/en
Publication of CN104164813A publication Critical patent/CN104164813A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to a modularizedly-combined piled road. The modularizedly-combined piled road is composed of road modules by splicing. The road module comprises a rectangular main body, left and right sides of the rectangular main body are respectively provided with a left boss and a right boss, the boss surface of the right boss is provided with multiple vertical boss installation columns, the left boss is provided with multiple vertical boss installation holes which have sizes matching sizes of the boss installation columns and are located at positions corresponding to the boss installation columns, and the sum of the heights of the left boss and the right boss is equal to the height of the rectangular main body. The modularizedly-combined piled road is economic and reasonable and saves resources.

Description

Modular combined stack is built highway
Technical field
The present invention relates to a kind of modular combined stack and build highway.
Background technology
traditional highway is built laying by sandstone cement, once highway rebuilding, whole piece or main plot section highway all cancel, cannot regeneration.Caused the waste of serious social resources and wealth.The expense of annual maintenance and maintain road is also very high.
Summary of the invention
Technical problem to be solved by this invention is to provide modular combined stack a kind of very economical rationality, that can economize on resources, cut the waste to build highway.
Modular combined stack of the present invention is built highway, described highway is to be spliced and combined and formed by polylith highroad module, described highroad module comprises a rectangular body, on the left and right side of described rectangular body, be respectively arranged with left boss and right boss, in the boss face of described right boss, be provided with a plurality of vertical boss erection columns, on described left boss, be provided with and described boss erection column size a plurality of vertical boss installing hole that match, that position is corresponding, the height sum of described left boss and right boss equals the height of rectangular body.
Install the side that is provided with a plurality of levels on the leading flank of described rectangular body, is provided with the side installing hole with size a plurality of levels that match, that position is corresponding of described side erection column on trailing flank; Or on the front and back sides of described rectangular body, be respectively arranged with the side installing hole of the level that a plurality of and outside erection column matches.
Adopt highroad module splicing highway of the present invention, stable connection between highroad module.Adopt after highroad module splicing highway, in highway renovation, as long as highroad module is removed, can reuse.The maintenance cost of highway also can significantly reduce.
Accompanying drawing explanation
Fig. 1 is the stereogram of the embodiment of the present invention;
Fig. 2 be Fig. 1 A to schematic diagram.
The specific embodiment
As shown in the figure, a kind of modular combined stack is built highway, described highway is to be spliced and combined and formed by polylith highroad module, described highroad module comprises a rectangular body 1, on the left and right side of described rectangular body 1, be respectively arranged with left boss 2 and right boss 3, in the boss face of described right boss 3, be provided with a plurality of vertical boss erection columns 5, on described left boss 2, be provided with and described boss erection column 5 sizes a plurality of vertical boss installing hole 4 that match, that position is corresponding, the height sum of described left boss 2 and right boss 3 equals the height of rectangular body 1.
On the leading flank of described rectangular body 1, be provided with the side erection column 7 of a plurality of levels, on trailing flank, be provided with the side installing hole 6 with size a plurality of levels that match, that position is corresponding of described side erection column 7;
Or on the front and back sides of described rectangular body 1, be respectively arranged with the side installing hole 6 of the level that a plurality of and outside erection column matches.
Because the left and right width on road surface is smaller, in splicing highroad module, can first highroad module be connected into a module body on left and right directions, then adjacent block body splices on fore-and-aft direction again.

Claims (2)

1. a modular combined stack is built highway, it is characterized in that: described highway is to be spliced and combined and formed by polylith highroad module, described highroad module comprises a rectangular body (1), on the left and right side of described rectangular body (1), be respectively arranged with left boss (2) and right boss (3), in the boss face of described right boss (3), be provided with a plurality of vertical boss erection columns (5), on described left boss (2), be provided with described boss erection column (5) size and match, a plurality of vertical boss installing hole (4) that position is corresponding, the height sum of described left boss (2) and right boss (3) equals the height of rectangular body (1).
2. modular combined stack according to claim 1 is built highway, it is characterized in that: on the leading flank of described rectangular body (1), be provided with the side erection column (7) of a plurality of levels, on trailing flank, be provided with the side installing hole (6) with size a plurality of levels that match, that position is corresponding of described side erection column (7); Or on the front and back sides of described rectangular body (1), be respectively arranged with the side installing hole (6) of the level that a plurality of and outside erection column matches.
CN201410352154.7A 2014-07-23 2014-07-23 Modularizedly-combined piled road Pending CN104164813A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410352154.7A CN104164813A (en) 2014-07-23 2014-07-23 Modularizedly-combined piled road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410352154.7A CN104164813A (en) 2014-07-23 2014-07-23 Modularizedly-combined piled road

Publications (1)

Publication Number Publication Date
CN104164813A true CN104164813A (en) 2014-11-26

Family

ID=51908786

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410352154.7A Pending CN104164813A (en) 2014-07-23 2014-07-23 Modularizedly-combined piled road

Country Status (1)

Country Link
CN (1) CN104164813A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2284825Y (en) * 1996-09-25 1998-06-24 厦门市开元区石川工艺石材厂 Prefabricated block
KR20070048830A (en) * 2005-11-07 2007-05-10 주식회사 엘지화학 Constructing structure of rubber block using waste tire having construction stability
CN101078193A (en) * 2007-06-18 2007-11-28 南京工业大学 Composite material road tie plate and assembling technique
KR100838693B1 (en) * 2008-01-04 2008-06-16 주식회사 라스아이티에스 Interlocking-block and method of construction thereof
KR20110045578A (en) * 2009-10-27 2011-05-04 (주)한미글로벌건축사사무소 Uneven Bottom Type Interlocking Block
CN204023346U (en) * 2014-07-23 2014-12-17 加加力重钢江苏有限公司 Modular combined stack builds highway

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2284825Y (en) * 1996-09-25 1998-06-24 厦门市开元区石川工艺石材厂 Prefabricated block
KR20070048830A (en) * 2005-11-07 2007-05-10 주식회사 엘지화학 Constructing structure of rubber block using waste tire having construction stability
CN101078193A (en) * 2007-06-18 2007-11-28 南京工业大学 Composite material road tie plate and assembling technique
KR100838693B1 (en) * 2008-01-04 2008-06-16 주식회사 라스아이티에스 Interlocking-block and method of construction thereof
KR20110045578A (en) * 2009-10-27 2011-05-04 (주)한미글로벌건축사사무소 Uneven Bottom Type Interlocking Block
CN204023346U (en) * 2014-07-23 2014-12-17 加加力重钢江苏有限公司 Modular combined stack builds highway

Similar Documents

Publication Publication Date Title
CN104480862B (en) A kind of erection method of cable stayed bridge end bay steel truss girder
ATE498745T1 (en) MULTIPLE-MODULE BUILDING
CN204023346U (en) Modular combined stack builds highway
CN104164813A (en) Modularizedly-combined piled road
CN203346799U (en) Double-layer frame bridge structure applicable to existing railway jacking construction
CN103835498A (en) Steel wedge hang mould convenient to demount
CN204097924U (en) Dividing strip guardrail and median barrier
CN204401626U (en) A kind of П type assembling sheet pile supporting and protection structure
CN203347266U (en) Prefabricated type fast-installing building structure
CN205116705U (en) To wall form system of tectorial membrane multiply wood not damaged in manufacturing process
CN204000912U (en) A kind of caisson inner core reinforcing bar binding frame
CN102733285A (en) Overlapping type airfield pavement structure
CN204343189U (en) A kind of Anti-slip type splices platform fast
CN204343183U (en) A kind of circular quick-assembling platform
CN103867210B (en) A kind of city underground list branch-cut bridge excavating construction method
CN105113851A (en) Multifunctional prefabricated assembled building construction fence and construction method thereof
CN205076187U (en) Simple and easy strutting arrangement of packing box
CN203173646U (en) Elevator car roof
CN203782935U (en) Containment structure type PVC (polyvinyl chloride) building wall
CN204356675U (en) A kind of pollution discharge type quick-assembling platform
CN204754189U (en) Building templates of easy form removal
CN205205701U (en) Template system is contained in shrink movable type side
CN204401382U (en) Without traffic lights crossroad
CN204356679U (en) A kind of quick-assembling platform of Optional assembling
CN202577881U (en) Dismountable platform panel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20141126

RJ01 Rejection of invention patent application after publication