CN104155919B - Bearing ring processing control method - Google Patents

Bearing ring processing control method Download PDF

Info

Publication number
CN104155919B
CN104155919B CN201410391013.6A CN201410391013A CN104155919B CN 104155919 B CN104155919 B CN 104155919B CN 201410391013 A CN201410391013 A CN 201410391013A CN 104155919 B CN104155919 B CN 104155919B
Authority
CN
China
Prior art keywords
planker
slide plate
anteposition
action
judged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410391013.6A
Other languages
Chinese (zh)
Other versions
CN104155919A (en
Inventor
赵鑫森
丁杭城
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang tuoman Intelligent Technology Co.,Ltd.
Original Assignee
Zhejiang Toman Precision Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Toman Precision Machinery Co Ltd filed Critical Zhejiang Toman Precision Machinery Co Ltd
Priority to CN201410391013.6A priority Critical patent/CN104155919B/en
Publication of CN104155919A publication Critical patent/CN104155919A/en
Application granted granted Critical
Publication of CN104155919B publication Critical patent/CN104155919B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Numerical Control (AREA)
  • Sewing Machines And Sewing (AREA)

Abstract

The present invention processes different structure for prior art、Need to regroup for its structure during the bearing ring of specification、Adjustment processing control procedure,So that the big deficiency of workload during processing bearing ring,A kind of general bearing ring processing control method is provided,The method is,Structure according to bearing ring、The shape of working position and required processing determines the quantity of required cutter,So that it is determined that the quantity and priority sequence of movement of planker and slide plate,Classification is carried out by the quantity and priority sequence of movement of planker and slide plate and develops machining code,Each machining code constitutes the processing control procedure of complete set,According to the different working positions code corresponding with shape selection,It is sequentially completed the processing to each position of bearing ring,When being processed to the bearing ring of different structure using this method,Can different machining codes be selected according to the design feature of bearing itself to select corresponding control program,Make process simple、Easy,Improve operating efficiency.

Description

Bearing ring processing control method
Technical field
The present invention relates to a kind of bearing ring processing control method, the particularly processing control method of miniature bearing lasso.
Background technology
Bearing ring is the critical piece of bearing inner race and outer ring, has generally been designed with ditch in its inner ring or outer peripheral surface Road, dustproof groove and chamfering etc..Its structure often has change.Control program currently without a unified standardization is processing Bearing ring, and processing control procedure is designed temporarily according to the concrete structure of bearing ring, so, when bearing ring structure difference Or during specification difference, need to redesign different processing control procedures, this just brings inconvenience to machining control work, increases Workload.
Content of the invention
The purpose of the present invention is needed to tie for which during for prior art processing different structure, the bearing ring of specification Structure is regrouped, adjusts processing control procedure so that the big deficiency of workload during processing bearing ring, there is provided a kind of general Bearing ring processing control method.
The purpose of the present invention is achieved through the following technical solutions:
A kind of bearing ring processing control method, the shape of structure, working position and required processing according to bearing ring The quantity of cutter needed for determining, so that it is determined that the quantity and priority sequence of movement of planker and slide plate, by planker and the quantity of slide plate Classification is carried out with priority sequence of movement and develops machining code, each machining code constitutes the processing control procedure of complete set, according to The different working positions code corresponding with shape selection, is sequentially completed the processing to each position of bearing ring;Described adds Work control program is divided into single planker control program, double planker control programs, when the operation that is processed needs single planker to process, enters Enter single planker control program, when the operation that is processed needs double plankers to be processed, enter into double planker control programs, described Double planker control programs include that two control program of one control program of planker and planker, described single planker control program press planker One control program is run, and described one control program of planker is identical with described two control program of planker, and described planker one is controlled By whetheing there is, whether slide plate one, slide plate one and planker one link processing procedure sequence, whether slide plate one first moves, whether one anteposition of planker has time delay Carry out permutation and combination, by permutation and combination after each program be arranged to the different machining codes, each machining code is to having Without slide plate, slide plate whether single action, whether slide plate is advanced, whether single action and planker have anteposition time delay to be judged to planker, according to The output control slide plate of judgement, the action of planker are so as to completing the processing to workpiece;When entering double planker control programs, by planker One and the sequence of movement of planker two form different programs, be arranged to different machining codes, to planker one, planker two be while Action or priority action are judged, by the priority sequence of movement that judged result controls planker one and planker two, so as to complete Processing to workpiece;
Further, described processing control procedure is made up of following planker control machining code, under corresponding code Corresponding output as follows:
A, single planker, first dynamic, one anteposition of planker has time delay code slide plate one, linkage, slide plate one:Programmable Logic Controller journey Sequence makes the following judgment, and controls to state order and carry out action as lower component is pressed:Single planker or double plankers are judged,Singly drag During plate,One control program of planker is entered, is then judged to slide plate one whether there is slide plate, when having slide plate for the moment, to slide plate one, planker One single-action linkage judged, when linkage, slide plate one is first moved no judge, when slide plate one is first moved, export slide plate one Enter, when slide plate one enters one anteposition of slide plate, planker one enters while blow, and when reaching one anteposition of planker, whether there is cunning to slide plate one Plate judged, when having slide plate for the moment, slide plate one is first moved no judge, when slide plate one is first moved, output slide plate one is moved back, and is moved back To slide plate one in situ when, one anteposition of planker is had no-delay judge, when one anteposition of planker has time delay, planker one is in planker One anteposition enters line delay, and one anteposition delay arrival time of planker, output planker one are moved back, and cutter is counted, and is closed and is blown, and planker one falls back on planker Output clip pine during one middle position, when planker one falls back on one original position of planker, circulation primary terminates, and completes adding for this procedure Work;
B, single planker, there is slide plate one, linkage, planker one first dynamic, the no-delay code of one anteposition of planker:Programmable Logic Controller journey Sequence makes the following judgment, and controls to state order and carry out action as lower component is pressed:Single planker or double plankers are judged, works as list During planker, one control program of planker is introduced into, is judged to slide plate one whether there is slide plate, when there is slide plate for the moment, to slide plate one, dragged One single-action linkage of plate is judged, when linkage, is judged to whether slide plate one first moves, and when planker one is first moved, output is dragged Plate one enter and blow for cool down cutter and exclude cutting swarf prepare, enter one anteposition of planker when, enter to slide plate one whether there is slide plate Row judges, when having slide plate for the moment, slide plate one is first moved no judge, when planker one is first moved, to slide plate one, one single action of planker Linkage is judged, when linkage, output slide plate one enters, and when entering one anteposition of slide plate, in one anteposition time delay of slide plate, time delay is to cunning Plate one is moved back, slide plate one fall back on slide plate one in situ when, judge to whetheing there is one anteposition time delay of planker, when one anteposition of planker no-delay When, output planker is moved back, and cutter is counted, and is closed and is blown, and the output clip pine when planker one falls back on one middle position of planker, until planker one is moved back During to one original position of planker, circulation primary terminates, and complete this procedure is machined into discharging control program;
C, when code be set to single planker, have slide plate one, slide plate one first move, single action, one anteposition of planker have time delay when, can compile Range controller makes the following judgment, and controls to state order and carry out action as lower component is pressed:Single planker or double plankers are sentenced Disconnected, one control program of planker is entered when single planker, is judged to slide plate one whether there is slide plate, when having slide plate for the moment, to slide plate First, one single-action linkage of planker is judged, when single action, then output planker one enters and blows, when entering one anteposition of planker, to cunning Plate one whether there is slide plate to be judged, when having slide plate for the moment, slide plate one is first moved no judge, when slide plate one is first moved, then defeated Go out slide plate one to move back, fall back on slide plate one in situ when one anteposition of planker is had no-delay judge, when there is one anteposition time delay of planker, And planker anteposition delay arrival time, then exporting planker one and move back, cutter is counted, and is closed and is blown, and output when planker one falls back on planker middle position is pressed from both sides Head pine, when planker one falls back on one original position of planker, circulation primary terminates, and completes the processing of this procedure;
D, single planker, have slide plate one, single action, planker one first to move, the no-delay code of one anteposition of planker, Programmable Logic Controller enters Row is following to be judged, and controls to state order and carry out action as lower component is pressed:Single planker or double plankers are judged, when single planker When enter one control program of planker, rightWhether there is slide plate oneJudged, when having slide plate for the moment, slide plate one, one single action of planker are joined Move and judged, when single action, output planker one enters and blows, when entering one anteposition of planker, rightWhether there is slide plate oneJudged, When having slide plate for the moment, slide plate one is first moved no judge, when planker one is first moved, slide plate one, one single-action linkage of planker are entered Row judges, when single action, then output slide plate one is moved back, fall back on slide plate one in situ when, one anteposition of planker is had no-delay judge, When planker anteposition is no-delay, output planker one is moved back, and cutter is counted, and is closed and is blown, output clip pine when planker one falls back on planker middle position, When planker one falls back on one original position of planker, circulation primary terminates, and completes the processing of this procedure;
E, single planker, there are time delay code, Programmable Logic Controller to make the following judgment, and control without slide plate one, one anteposition of planker System such as lower component is pressed and states order and carry out action:Single planker or double plankers are judged, when single planker, rightWhether there is slide plate one Judged, when without slide plate, for the moment, output planker one enters, and blows, and when planker one arrives one anteposition of planker, slides into slide plate one whether there is Row judges, when without slide plate for the moment, then one anteposition of planker is had no-delay judge, export when one anteposition of planker has time delay and drag One anteposition time delay of plate, delay arrival time planker one are moved back, and cutter is counted, and are closed and are blown, output clip pine when planker falls back on planker middle position, directly When falling back on one original position of planker to planker one, circulation primary terminates, and completes the processing of this procedure;
A, have slide plate two, linkage, slide plate two first move, two anteposition of planker have time delay code:Programmable controller program is carried out Following judge, and control to state order and carry out action as lower component is pressed:Single planker or double plankers are judged,During double plankers, Two control program of planker is entered, is then judged to slide plate two whether there is slide plate, when there is slide plate two, single to slide plate two, planker two Dynamic linkage judged, when linkage, slide plate two is first moved no judge, when slide plate two is first moved, output slide plate two enters, when When slide plate two enters two anteposition of slide plate, planker two enters while blowing, when reaching two anteposition of planker, whetheing there is slide plate to slide plate two is carried out Judge, when there is slide plate two, to slide plate two first move no judge, when slide plate two first move when, output slide plate two move back, fall back on slide plate Two in situ when, two anteposition of planker is had no-delay judge, when two anteposition of planker has time delay, planker two is in two anteposition of planker Enter line delay, two anteposition delay arrival time of planker, output planker two are moved back, and cutter is counted, and is closed and is blown, and planker two is fallen back in planker two Position;
B, have slide plate two, linkage, planker two first move, the no-delay code of two anteposition of planker:Programmable controller program is carried out Following judge, and control to state order and carry out action as lower component is pressed:Single planker or double plankers are judged, when single planker When, two control program of planker is introduced into, is judged to slide plate two whether there is slide plate, when there is slide plate two, to slide plate two, planker two Single-action linkage is judged, when linkage, is judged to whether slide plate two first moves, when planker two is first moved, is exported planker two Enter and blow for cool down cutter and exclude cutting swarf prepare, enter two anteposition of planker when, sentence to slide plate two whether there is slide plate Disconnected, when there is slide plate two, slide plate two is first moved no judge, when planker two is first moved, to slide plate two, two single-action linkage of planker Judged, when linkage, output slide plate two enters, and when entering two anteposition of slide plate, in two anteposition time delay of slide plate, time delay is to slide plate two Move back, when slide plate two falls back on two original position of slide plate, judge to whetheing there is two anteposition time delay of planker, when two anteposition of planker is no-delay, Output planker two is moved back, and cutter is counted, and is closed and is blown, and planker two falls back on two middle position of planker;
C, when code be provided with slide plate two, slide plate two first move, single action, two anteposition of planker have time delay when, PLC technology Device makes the following judgment, and controls to state order and carry out action as lower component is pressed:Single planker or double plankers are judged, works as list Two control program of planker is entered during planker, judged to slide plate two whether there is slide plate, when there is slide plate two, to slide plate two, planker Two single-action linkages are judged, when single action, then output planker two enters and blows, and when entering two anteposition of planker, slide plate two is had Judged without slide plate, when there is slide plate two, to slide plate two first move no judge, when slide plate two first move when, then export slide plate Two move back, fall back on slide plate two in situ when two anteposition of planker is had no-delay judge, when there is two anteposition time delay of planker, and planker Anteposition delay arrival time, then export planker two and move back, and cutter is counted, and is closed and is blown, and planker two falls back on two middle position of planker;
D, have slide plate two, single action, planker two first move, the no-delay code of two anteposition of planker, Programmable Logic Controller carries out as follows Judge, and control to state order and carry out action as lower component is pressed:Single planker or double plankers are judged, is entered when single planker Two control program of planker, judges to slide plate two whether there is slide plate, when there is slide plate two, to slide plate two, two single-action linkage of planker Judged, when single action, output planker two enters and blows, and when entering two anteposition of planker, sentences to slide plate two whether there is slide plate Disconnected, when there is slide plate two, slide plate two is first moved no judge, when planker two is first moved, to slide plate two, two single-action linkage of planker Judged, when single action, then output slide plate two is moved back, fall back on slide plate two in situ when, two anteposition of planker is had and no-delay is sentenced Disconnected, when planker anteposition is no-delay, output planker two is moved back, and cutter is counted, and is closed and is blown, and planker two falls back on two middle position of planker;
E, there are time delay code, Programmable Logic Controller to make the following judgment, and control such as bottom without slide plate two, two anteposition of planker Part carries out action by following order:Single planker or double plankers are judged, when single planker, rightWhether there is slide plate twoSentenced Disconnected, when without slide plate two, output planker two enters, and blows, when planker two arrives two anteposition of planker, rightWhether there is slide plate twoJudged, When without slide plate two, then two anteposition of planker is had no-delay judge, when two anteposition of planker has time delay output planker two before Position time delay, delay arrival time planker two are moved back, and cutter is counted, and are closed and are blown, and planker two falls back on two middle position of planker;
F, double plankers, one advanced code of planker:Programmable Logic Controller makes the following judgment, and controls to press such as lower component and state Order carries out action, and single planker or double plankers are judged, when double plankers, planker one advanced when, be introduced into one control of planker Code action in the A-E of program setting processed, enters back into two control program of planker and when planker one falls back on planker middle position by front The situation for stating a-e codes carries out action, when planker two falls back on planker middle position output clip pine, until planker two, planker one all When falling back on planker original position, circulation primary terminates;
G, double plankers, two advanced code of planker, Programmable Logic Controller make the following judgment, and control to press such as lower component and state Order carries out action, when double plankers, planker two are advanced, in two control program of advanced planker the aforementioned a-e codes by setting Code carry out action, enter back into one control program of planker when planker two falls back on planker middle position, and by the aforementioned A-E generations for setting Code in code carries out action, and when planker one falls back on planker middle position, output clip pine, drags until one planker two of planker all falls back on When plate is in situ, circulation primary terminates.
H, double planker codes, Programmable Logic Controller make the following judgment, and control as lower component press state order enter action Make, when double plankers, PLC technology program simultaneously enters two control program of one control program of planker and planker, planker one is by setting Respective code in fixed aforementioned A-E codes carries out action, and planker two enters action by the code in the aforementioned a-e codes for setting Make, the output clip pine when planker one and planker two all fall back on planker middle position, until one planker two of planker all falls back on planker original position When, circulation primary terminates;
Further, before processing to bearing ring, feeding is controlled by feeding control program, is started in equipment Afterwards, it is sequentially output manipulator feeding and opens and blows material-feeding anteposition and time delay-pass blows that material-chuck is tight and time delay-time delay is moved back to-feeding Signal, when feeding falls back on feeding original position, carries out planker and selects to enter into described processing control procedure.
When being processed to the bearing ring of different structure using the processing control method of the present invention, can be according to bearing sheet The design feature of body selects different machining codes to select corresponding control program, makes process simple, easy, improves While operating efficiency, it is ensured that the crudy of bearing ring, be conducive to the pipe is standardized by PLC technology program Reason.
Description of the drawings
Fig. 1 .1-1.3 are the processing control method control flow example structure schematic diagram of bearing ring of the present invention,
Fig. 1 .1- Fig. 1 .3 constitute an overall flow figure, carry out blocking mark as mark line with m lines and n lines;
Technological process when Fig. 2 .1-2.4 constitute the processing control method processing bearing inner ring of bearing ring of the present invention is illustrated Figure;
Technological process when Fig. 3 .1-3.4 constitute the processing control method processing bearing outside collar of bearing ring of the present invention is illustrated Figure.
Description of reference numerals
In 1- endoporus 2- one 4- of the outer outer dust rings of raceway 3- in one 5- of chamfering, two 6- of outer dust ring in two 7- of chamfering 2 1.1 running orbit of dust ring, one 1.2- running orbits, two 1.3.1 running orbits three in one 10- of dust ring in raceway 8- 1.3.2- four 1.4.1 running orbits of running orbit, five 1.4.2- running orbits, six 2.1- running orbits, seven 2.2- running orbits Eight 2.3- running orbits, nine 2.4- running orbits ten
Specific embodiment
The present invention is further described with reference to specific embodiment:
The miniature bearing lasso processing control method of the present invention is realized on miniature bearing lasso lathe for machining, the car Bed includes that left side feeds planker and right side feeding planker.Slide plate can be set on left side feeding planker, on right side feeding planker Slide plate is may also set up, whether slide plate is set on planker and is determined according to processing technology actual conditions, when slide plate is arranged on planker, Cutter is arranged on slide plate, is run by slide plate band cutter, and slide plate can drive slide plate action in planker top offset by planker;When When being not provided with slide plate on planker, cutter is arranged on planker, drives tool motion by planker.It is preferred that left side feed planker or It is the direction of feed traverse feed planker 21 vertical with lathe spindle 3 to have a planker in right side feeding planker, and another planker is The oblique feeding planker 22 that direction of feed is inclined with the main shaft 3, the direction of feed of its oblique feeding planker 22 and 3 axis of main shaft Angle be 15 °~30 °, preferably 20 °.
In machining programming, determine the need for arranging " having slide plate " according to processing technology actual conditions, work as setting When " having slide plate ", on slide plate, bogey of the planker as slide plate drives skateboarding, slide plate to exist by planker to Cutting tool installation manner Can move on planker under the driving of its driving means, so as to realizing the feeding of cutter or exiting;When arranging " without slide plate ", point Two kinds of situations, the first situation are to work as to drive the hydraulic jack of slide plate to share magnetic valve with the hydraulic jack for driving planker and slide When being fitted without travel switch on plate, then Cutting tool installation manner drives tool motion to realize tool feeding and move back by slide plate on slide plate Go out, now, on planker, actual installation has slide plate, for no other reason than that the hydraulic cylinder of the hydraulic cylinder and slide plate of planker shares magnetic valve, institute To be arranged to without slide plate in the controls.
When slide plate is fitted without on planker, planker is driven to drive tool motion to realize tool feeding and move back by hydraulic jack Go out planker, travel switch is connected with PLC technology by travel switch on planker.
When using equipment, single planker can be only installed, double plankers can be also installed.In order to describe conveniently, when single planker, No matter planker is referred to as planker one installed in left side or right side, and the slide plate on planker one is referred to as slide plate one, when double plankers, by a left side The planker of side is referred to as planker one, and the slide plate on planker one is referred to as slide plate one, the planker on right side is referred to as planker two, on planker two Slide plate is referred to as slide plate two.Each planker is provided with three position signallings, planker original position, planker middle position and planker anteposition, works as planker Illustrate when being located in situ that planker has fallen back on the home position of planker, explanation planker has fallen back on middle position when planker is located at middle position, when When planker is located at anteposition, explanation planker has entered planker anteposition, and equally each slide plate is provided with two position signallings, and slide plate is in situ With slide plate anteposition, when slide plate is located at original position, explanation slide plate has fallen back on slide plate home position, and the explanation when slide plate is located at anteposition is slided Plate has entered slide plate anteposition.In process, in order to ensure crudy, need to be controlled the quality of cutter, here, We carry out cutter quality control using the method counted by the access times to cutter, when cutter completes a number of adding After work number of times, prompting user is forced to change cutter.In this lathe, carry out air blowing using blowning installation to cutter to reduce cutter The temperature for producing in process, and take away cutting swarf etc..
In the present invention, the shape that need to be processed according to workpiece to be machined and position, the quantity of cutter needed for determining and cutter Running orbit, so that it is determined that the quantity of planker, slide plate and priority sequence of movement, complete the processing to workpiece.The totality of the processing Program can be divided into, manipulator feeding control program, one control program of planker, two control program of planker, and concrete each control sequence is as follows:
First, manipulator feeding control program:When loop start condition meets, start button is pressed, Programmable Logic Controller is defeated Go out manipulator feeding and enter to open to blow material, above expect that material is blown in feeding anteposition time delay, delay arrival time output pass, output clip is tight when blowing material pass And time delay, delay arrival time output feeding moves back, enters planker and select to judge, when code is set to single planker when manipulator falls back on original position When, one control program of planker is entered, when code is set to double plankers, planker one, two control program of planker is simultaneously entered;The present age Code be set to double plankers, planker one advanced when, be introduced into one control program of planker, when planker one falls back on one middle position of planker, Enter back into two control program of planker;When code is set to double plankers, when planker two is advanced, be introduced into two control program of planker until When planker two falls back on two middle position of planker, one control program of planker is entered back into.
2nd, one control program of planker, is divided into following five class according to planker one, the combination of slide plate one and sequence of movement, Namely following five kinds of codes:
A, when code be set to single planker, have slide plate one, linkage, slide plate one first move, one anteposition of planker have time delay when, can compile Range controller program makes the following judgment, and controls to state order and carry out action as lower component is pressed:When single planker, planker is entered One control program, then judge to slide plate one whether there is slide plate, when there is slide plate for the moment, slide plate one, one single-action linkage of planker is entered Row judge, when linkage when, to slide plate one first move no judge, when slide plate one first move when, output slide plate one enter, when slide plate one enters During to one anteposition of slide plate, planker one enters while blow, and during arrival one anteposition of planker, judges to slide plate one whether there is slide plate, when Have slide plate for the moment, slide plate one is first moved no judge, when slide plate one is first moved, output slide plate one is moved back, and falls back on slide plate one in situ When, one anteposition of planker is had no-delay judge, when there is one anteposition of planker to have time delay, planker one is carried out in one anteposition of planker Time delay, one anteposition delay arrival time of planker, output planker one are moved back, and cutter is counted, and are closed and are blown, and planker one falls back on defeated during one middle position of planker Go out chuck pine, when planker one falls back on one original position of planker, circulation primary terminates, and completes the processing of this procedure.
B, when code be set to single planker, have slide plate one, linkage, planker one first move, one anteposition of planker no-delay when, can compile Range controller makes the following judgment, and controls to state order and carry out action as lower component is pressed:When single planker, planker one is introduced into Control program, judges to slide plate one whether there is slide plate, when there is slide plate for the moment, slide plate one, one single-action linkage of planker is sentenced Disconnected, when linkage, judge to whether slide plate one first moves, when planker one is first moved, output planker one enters and blows as cooling Cutter and cutting swarf is excluded when preparing, entering one anteposition of planker, judged to slide plate one whether there is slide plate, when there is slide plate one When, to slide plate one first move no judge, when planker one first move when, slide plate one, one single-action linkage of planker are judged, work as connection When dynamic, output slide plate one enters, and when entering one anteposition of slide plate, in one anteposition time delay of slide plate, time delay is moved back to slide plate one, and slide plate one falls back on When slide plate one is in situ, judge to whetheing there is one anteposition time delay of planker, when one anteposition of planker is no-delay, output planker is moved back, knife Have and count, close and blow, the output clip pine when planker one falls back on one middle position of planker, when planker one falls back on one original position of planker, Circulation primary terminates, and complete this procedure is machined into discharging control program.
C, when code be set to single planker, have slide plate one, slide plate one first move, single action, one anteposition of planker have time delay when, can compile Range controller makes the following judgment, and controls to state order and carry out action as lower component is pressed:Enter planker one to control when single planker Processing procedure sequence, judge to slide plate one whether there is slide plate, when there is slide plate for the moment, slide plate one, one single-action linkage of planker judged, When single action, then output planker one enters and blows, and when entering one anteposition of planker, judges to slide plate one whether there is slide plate, when having Slide plate for the moment, slide plate one is first moved no judge, when slide plate one is first moved, then output slide plate one is moved back, and falls back on slide plate one in situ When one anteposition of planker is had no-delay judge, when there is one anteposition time delay of planker, and planker anteposition delay arrival time, then export Planker one is moved back, and cutter is counted, and is closed and is blown, and output clip pine when planker one falls back on planker middle position, until planker one falls back on planker one When in situ, circulation primary terminates, and completes the processing of this procedure.
D, when code be set to single planker, have slide plate one, single action, planker one first move, one anteposition of planker no-delay, may be programmed Controller makes the following judgment, and controls to state order and carry out action as lower component is pressed:Enter planker one to control when single planker Program, judges to slide plate one whether there is slide plate, when there is slide plate for the moment, slide plate one, one single-action linkage of planker is judged, when During single action, output planker one enters and blows, and when entering one anteposition of planker, judges to slide plate one whether there is slide plate, when there is slide plate For the moment, to slide plate one first move no judge, when planker one first move when, slide plate one, one single-action linkage of planker are judged, when During single action, then output slide plate one is moved back, fall back on slide plate one in situ when, one anteposition of planker is had no-delay judge, when before planker Position is no-delay, and output planker one is moved back, and cutter is counted, and is closed and is blown, and output clip pine when planker one falls back on planker middle position, until planker One fall back on planker one in situ when, circulation primary terminates, and completes the processing of this procedure.
When E, code are set to single planker, have time delay without slide plate one, one anteposition of planker, Programmable Logic Controller is sentenced as follows Disconnected, and control to state order and carry out action as lower component is pressed:Judge when single planker, to slide plate one whether there is slide plate, work as nothing For the moment, output planker one enters slide plate, blows, and when planker one arrives one anteposition of planker, slides into capable judgement to slide plate one whether there is, when without cunning Plate for the moment, then one anteposition of planker is had no-delay judge, export one anteposition time delay of planker when one anteposition of planker has time delay, Delay arrival time planker one is moved back, and cutter is counted, and is closed and is blown, and output clip pine when planker falls back on planker middle position, until planker one falls back on When planker one is in situ, circulation primary terminates, and completes the processing of this procedure.
Three. two control program of planker, because two control program of planker identical with the operating principle that planker one is controlled, so here Five kind setting codes of planker two control program are only simply included, as follows:
A. code be provided with slide plate two, linkage, slide plate two first move, two anteposition of planker have time delay.
B. code be provided with slide plate two, linkage, planker two first move, two anteposition of planker no-delay.
C. code be provided with slide plate two, slide plate two first move, single action, two anteposition of planker have time delay.
D. code be provided with slide plate two, single action, planker two first move, two anteposition of planker no-delay.
E. code is set to have time delay without before slide plate two, planker two.
4th, when needing double plankers to process, PLC technology program enters double planker control programs, PLC technology program When working under double planker control programs, the action of planker one and slide plate one, planker two and slide plate two regards the tool of workpiece with coordinating Depending on body technology, now it is illustrated below:
F, when code be set to double plankers, planker one advanced when, Programmable Logic Controller makes the following judgment, and controls as follows Part carries out action by following order, when double plankers, planker one advanced when, be introduced into one control program of planker and by set Code in aforementioned A-E codes carries out action, reenter when planker one falls back on planker middle position into two control program of planker and by The situation of aforementioned a-e codes carries out action, and the output clip pine when planker two falls back on planker middle position, until planker two, planker one When all falling back on planker original position, circulation primary terminates.
G, when code is set to double plankers, when planker two is advanced, Programmable Logic Controller makes the following judgment, and controls as follows Part carries out action by following order, and when double plankers, planker two are advanced, two control program of advanced planker is simultaneously aforementioned by set Code in a-e codes carries out action, enters back into one control program of planker when planker two falls back on planker middle position, and by setting Code in aforementioned A-E codes carries out action, and the output clip pine when planker one falls back on planker middle position, until one planker two of planker When all falling back on planker original position, circulation primary terminates.
H, when code is set to double plankers, Programmable Logic Controller makes the following judgment, and controls to state time as lower component is pressed Sequence carries out action, and when double plankers, PLC technology program simultaneously enters one control program of planker the feelings by aforementioned A-E codes Condition carries out action and two control program of planker and carries out action by the code in the a-e codes of aforementioned setting, when planker one and drags Plate two all falls back on output clip pine when dragging middle position, and when one planker two of planker all falls back on planker original position, circulation primary terminates.
Embodiment 1 is processed to bearing inner ring
, as shown in Fig. 2 .1, final finished is as shown in Fig. 2 .4 for workpiece blank.
Its processing process is divided into four procedures, the first in-car hole 1 of the first procedure, the outer raceway 2 of second operation work car, Three process in-car chamfering 1 and outer dustproof groove 1, the 4th procedure interior chamfering 26 of the turn-over car other end and outer anti-again Dirt groove 25.In the car during hole 1, the running orbit 1 of cutter, as shown in Fig. 2 .1, is rhombus, now, slide plate one and planker one Synchronous, the hydraulic cylinder magnetic valve of the hydraulic cylinder common drive planker of slide plate is driven, and on slide plate, is fitted without travel switch, now Slide plate one simultaneously drives cutter, code to be therefore set to slide plate 1 without slide plate with planker one,;When the outer raceway 2 of car, the operation of cutter As shown in Fig. 2 .2, now, planker drives cutter operation for track 2 1.2;In the car chamfering one and outer dustproof groove for the moment, cutter Four 1.3.2 of running orbit of three 1.3.1 of running orbit and cutter as shown in Fig. 2 .3, at this time, it may be necessary to planker one is distinguished with planker two Drive cutter operation;When the 4th procedure in-car chamfering two and outer dustproof groove two, five 1.4.1's of running orbit and cutter of cutter Six 1.4.2 of running orbit is as shown in Fig. 2 .4, at this time, it may be necessary to planker 1 drives cutter to run with planker two respectively;
During processing, then the first procedure selects single planker, has time delay code without slide plate one, one anteposition of planker, by slide plate one On cutter vehicle endoporus 1, second operation work selects single planker, has time delay code without slide plate one, one anteposition of planker, with planker one The outer raceway 2 of cutter vehicle, three process selects double plankers, without slide plate one, one anteposition of planker have time delay, slide plate two without slide plate, When two anteposition of planker has time delay, one advanced code of planker, in-car chamfering one is distinguished with planker one and the cutter on planker two and prevented Dirt groove one, the 4th procedure select double plankers, have time delay, slide plate two without slide plate, 2 anteposition of planker without slide plate one, one anteposition of planker When having time delay, planker 1 to select into code, with planker one and the in-car chamfering two of the difference of the cutter on planker two and dustproof groove two.
Embodiment 2 is processed to bearing outside collar
, as shown in Fig. 3 .1, final finished is as shown in Fig. 3 .4 for workpiece blank.
Its processing process is divided into four procedures, first operation endoporus 1 of first car, second operation work in-car raceway again 7, the three process interior chamfering 1 of car one end and interior dustproof groove 1 again, the interior chamfering of the 4th procedure turn-over car other end again 26 and interior dustproof groove 2 10.In first operation endoporus of car, the running orbit 7 2.1 of cutter, as shown in Fig. 3 .1, is rhombus, At this time, it may be necessary to simultaneously drive cutter to run by slide plate and planker;When raceway in car second operation work, the running orbit eight of cutter 2.2 as shown in Figure 3 .2, at this time, it may be necessary to planker one enters planker anteposition and keeps planker one to enter state, then slide plate one enters, and enters Slide plate anteposition time delay, time delay are arrived, and slide plate falls back on one original position of slide plate again and again, then planker one is moved back, and complete to drive cutter operation;In car Three process outer ring chamfering one and outer collar dustproof groove for the moment, the running orbit 9 2.3 of cutter as shown in Fig. 3 .3, at this time, it may be necessary to Planker drives cutter operation;The chamfering two and during outer collar dustproof groove two in car outer ring, the running orbit 10 of cutter and such as Fig. 3 .4 Shown, at this time, it may be necessary to planker drives cutter operation;
During processing, then the first procedure selects single planker, and without slide plate one, one anteposition of planker has time delay code, by planker band Cutter vehicle endoporus 1 on dynamic slide plate one, second operation work select single planker, have slide plate one, and planker one is first moved, linked, planker During the no-delay code of one anteposition, with the outer raceway 2 of cutter vehicle on slide plate one, three process selects single planker, has slide plate one, joins Dynamic, planker one is first moved, one anteposition of planker no-delay code when, drive two cutters on slide plate one outer chamfering of car simultaneously with planker One and dustproof groove one, the 4th procedure selects single planker, has slide plate one, and linkage, planker one are first moved, one anteposition of planker no-delay generation During code, two cutters on slide plate one are driven while the outer chamfering two of car and dustproof groove two with planker one.

Claims (3)

1. a kind of bearing ring processing control method, it is characterised in that structure, working position according to bearing ring and required plus The shape of work determines the quantity of required cutter, so that it is determined that the quantity and priority sequence of movement of planker and slide plate, by planker and cunning The quantity of plate and priority sequence of movement carry out classification and develop machining code, and each machining code constitutes the machining control of complete set Program, according to the different working positions code corresponding with shape selection, is sequentially completed the processing to each position of bearing ring;
Described processing control procedure is divided into single planker control program, double planker control programs, when the operation that is processed needs list When planker is processed, single planker control program is entered, when the operation that is processed needs double plankers to be processed, enter into double plankers Control program, described double planker control programs include two control program of one control program of planker and planker, described single planker Control program presses the operation of one control program of planker, and described one control program of planker is identical with described two control program of planker, By whetheing there is, whether slide plate one, slide plate one and planker one link described one control program of planker, whether slide plate one first moves, planker one Whether anteposition has time delay to carry out permutation and combination, by permutation and combination after each program be arranged to the different machining codes, each institute Machining code is stated to whetheing there is slide plate, slide plate whether single action, whether slide plate is advanced, whether whether single action and planker have anteposition to prolong to planker Shi Jinhang judges, it is judged that output control slide plate, the action of planker is so as to completing the processing to workpiece;
When entering double planker control programs, different programs are formed by the sequence of movement of planker one and planker two, be arranged to difference Machining code, be while action or priority action judge to planker one, planker two, control planker one by judged result With the priority sequence of movement of planker two, so as to complete the processing to workpiece.
2. bearing ring processing control method as claimed in claim 1, it is characterised in that described processing control procedure is by such as Lower planker control machining code composition, the corresponding output under corresponding code are as follows:
A, single planker, first dynamic, one anteposition of planker has time delay code slide plate one, linkage, slide plate one:Programmable controller program enters Row is following to be judged, and controls to state order and carry out action as lower component is pressed:Single planker or double plankers are judged, during single planker One control program of planker is entered, is then judged to slide plate one whether there is slide plate, when having slide plate for the moment, single to slide plate one, planker one Dynamic linkage judged, when linkage, slide plate one is first moved no judge, when slide plate one is first moved, output slide plate one enters, when When slide plate one enters one anteposition of slide plate, planker one enters while blowing, when reaching one anteposition of planker, whetheing there is slide plate to slide plate one is carried out Judge, when having slide plate for the moment, slide plate one is first moved no judge, when slide plate one is first moved, output slide plate one is moved back, and falls back on slide plate One in situ when, one anteposition of planker is had no-delay judge, when one anteposition of planker has time delay, planker one is in one anteposition of planker Enter line delay, one anteposition delay arrival time of planker, output planker one are moved back, and cutter is counted, and is closed and is blown, and planker one falls back on one middle position of planker When output clip pine, until planker one fall back on planker one in situ when, circulation primary terminates, and completes the processing of this procedure;
B, single planker, there is slide plate one, linkage, planker one first dynamic, the no-delay code of one anteposition of planker:Programmable controller program enters Row is following to be judged, and controls to state order and carry out action as lower component is pressed:Single planker or double plankers are judged, when single planker When, one control program of planker is introduced into, is judged to slide plate one whether there is slide plate, when having slide plate for the moment, to slide plate one, planker one Single-action linkage is judged, when linkage, is judged to whether slide plate one first moves, when planker one is first moved, is exported planker one Enter and blow for cool down cutter and exclude cutting swarf prepare, enter one anteposition of planker when, sentence to slide plate one whether there is slide plate Disconnected, when having slide plate for the moment, slide plate one is first moved no judge, when planker one is first moved, to slide plate one, one single-action linkage of planker Judged, when linkage, output slide plate one enters, and when entering one anteposition of slide plate, in one anteposition time delay of slide plate, time delay is to slide plate one Move back, when slide plate one falls back on one original position of slide plate, judge to whetheing there is one anteposition time delay of planker, when one anteposition of planker is no-delay, Output planker is moved back, and cutter is counted, and is closed and is blown, and the output clip pine when planker one falls back on one middle position of planker, until planker one falls back on When planker one is in situ, circulation primary terminates, and complete this procedure is machined into discharging control program;
C, when code be set to single planker, have slide plate one, slide plate one first move, single action, one anteposition of planker have time delay when, programmable control Device processed makes the following judgment, and controls to state order and carry out action as lower component is pressed:Single planker or double plankers are judged, when One control program of planker is entered during single planker, is judged to slide plate one whether there is slide plate, when there is slide plate for the moment, to slide plate one, drag One single-action linkage of plate is judged, when single action, then output planker one enters and blows, when entering one anteposition of planker, to slide plate one Whether there is slide plate to be judged, when having slide plate for the moment, slide plate one is first moved no judge, when slide plate one is first moved, then output is slided Plate one is moved back, fall back on slide plate one in situ when one anteposition of planker is had no-delay judge, when there is one anteposition time delay of planker, and drag Plate anteposition delay arrival time, then export planker one and move back, and cutter is counted, and is closed and is blown, output clip pine when planker one falls back on planker middle position, When planker one falls back on one original position of planker, circulation primary terminates, and completes the processing of this procedure;
D, single planker, have slide plate one, single action, planker one first to move, the no-delay code of one anteposition of planker, Programmable Logic Controller carry out as Lower judgement, and control to state order and carry out action as lower component is pressed:Single planker or double plankers are judged, is entered when single planker Enter one control program of planker, judge to whetheing there is slide plate one, when there is slide plate for the moment, slide plate one, one single-action linkage of planker are entered Row judges, when single action, output planker one enters and blows, and when entering one anteposition of planker, judges to whetheing there is slide plate one, when having Slide plate for the moment, slide plate one is first moved no judge, when planker one is first moved, slide plate one, one single-action linkage of planker are sentenced Disconnected, when single action, then output slide plate one is moved back, fall back on slide plate one in situ when, one anteposition of planker is had no-delay judge, when dragging Plate anteposition is no-delay, and output planker one is moved back, and cutter is counted, and is closed and is blown, output clip pine when planker one falls back on planker middle position, until When planker one falls back on one original position of planker, circulation primary terminates, and completes the processing of this procedure;
E, single planker, there are time delay code, Programmable Logic Controller to make the following judgment, and control such as without slide plate one, one anteposition of planker Lower component carries out action by following order:Single planker or double plankers are judged, is carried out when single planker, to whetheing there is slide plate one Judge, when without slide plate, for the moment, output planker one enters, and blows, and when planker one arrives one anteposition of planker, sentences to whetheing there is slide plate one Disconnected, when without slide plate for the moment, then one anteposition of planker is had no-delay judge, export planker one when one anteposition of planker has time delay Anteposition time delay, delay arrival time planker one are moved back, and cutter is counted, and are closed and are blown, and output clip pine when planker falls back on planker middle position, until dragging When plate one falls back on one original position of planker, circulation primary terminates, and completes the processing of this procedure;
A, have slide plate two, linkage, slide plate two first move, two anteposition of planker have time delay code:Programmable controller program carries out as follows Judge, and control to state order and carry out action as lower component is pressed:Single planker or double plankers are judged, during double plankers, is entered Two control program of planker, then judge to slide plate two whether there is slide plate, when there is slide plate two, slide plate two, two single action of planker is joined Dynamic judged, when linkage, slide plate two is first moved no judge, when slide plate two is first moved, output slide plate two enters, and works as slide plate Two when entering two anteposition of slide plate, and planker two enters while blow, and when reaching two anteposition of planker, sentences to slide plate two whether there is slide plate Disconnected, when there is slide plate two, slide plate two is first moved no judge, when slide plate two is first moved, output slide plate two is moved back, and falls back on slide plate two When in situ, two anteposition of planker is had no-delay judge, when two anteposition of planker has time delay, planker two enters in two anteposition of planker Line delay, two anteposition delay arrival time of planker, output planker two are moved back, and cutter is counted, and are closed and are blown, and planker two falls back on two middle position of planker;
B, have slide plate two, linkage, planker two first move, the no-delay code of two anteposition of planker:Programmable controller program carries out as follows Judge, and control to state order and carry out action as lower component is pressed:Single planker or double plankers are judged, when single planker, first Two control program of planker is entered, is judged to slide plate two whether there is slide plate, when there is slide plate two, to slide plate two, two single action of planker Linkage is judged, when linkage, is judged to whether slide plate two first moves, and when planker two is first moved, output planker two enters simultaneously Blow for cool down cutter and exclude cutting swarf prepare, enter two anteposition of planker when, judge to slide plate two whether there is slide plate, when When having slide plate two, to slide plate two first move no judge, when planker two first move when, slide plate two, two single-action linkage of planker are carried out Judge, when linkage, output slide plate two enters, and when entering two anteposition of slide plate, in two anteposition time delay of slide plate, time delay is moved back to slide plate two, When slide plate two falls back on two original position of slide plate, judge to whetheing there is two anteposition time delay of planker, when two anteposition of planker is no-delay, output Planker two is moved back, and cutter is counted, and is closed and is blown, and planker two falls back on two middle position of planker;
C, when code be provided with slide plate two, slide plate two first move, single action, two anteposition of planker have time delay when, Programmable Logic Controller enters Row is following to be judged, and controls to state order and carry out action as lower component is pressed:Single planker or double plankers are judged, when single planker When enter two control program of planker, judge to slide plate two whether there is slide plate, when there is slide plate two, single to slide plate two, planker two Dynamic linkage is judged, when single action, then output planker two enters and blows, and when entering two anteposition of planker, whether there is cunning to slide plate two Plate is judged, when there is slide plate two, to slide plate two first move no judge, when slide plate two first move when, then output slide plate two move back, Fall back on slide plate two in situ when two anteposition of planker is had no-delay judge, when there is two anteposition time delay of planker, and planker anteposition Delay arrival time, then export planker two and move back, and cutter is counted, and is closed and is blown, and planker two falls back on two middle position of planker;
D, have slide plate two, single action, planker two first to move, the no-delay code of two anteposition of planker, Programmable Logic Controller makes the following judgment, And control to state order and carry out action as lower component is pressed:Single planker or double plankers are judged, planker is entered when single planker Two control programs, judge to slide plate two whether there is slide plate, when there is slide plate two, slide plate two, two single-action linkage of planker are carried out Judge, when single action, output planker two enters and blows, and when entering two anteposition of planker, judges to slide plate two whether there is slide plate, when When having slide plate two, to slide plate two first move no judge, when planker two first move when, slide plate two, two single-action linkage of planker are carried out Judge, when single action, then output slide plate two is moved back, fall back on slide plate two in situ when, two anteposition of planker is had no-delay judge, when Planker anteposition is no-delay, and output planker two is moved back, and cutter is counted, and is closed and is blown, and planker two falls back on two middle position of planker;
E, there are time delay code, Programmable Logic Controller to make the following judgment without slide plate two, two anteposition of planker, and control lower component such as and press Following order carry out action:Single planker or double plankers are judged, is judged when single planker, to whetheing there is slide plate two, when During without slide plate two, output planker two enters, and blows, and when planker two arrives two anteposition of planker, judges to whetheing there is slide plate two, when without cunning During plate two, then two anteposition of planker is had no-delay judge, when two anteposition of planker has time delay export two anteposition time delay of planker, Delay arrival time planker two is moved back, and cutter is counted, and is closed and is blown, and planker two falls back on two middle position of planker;
F, double plankers, one advanced code of planker:Programmable Logic Controller makes the following judgment, and controls to press such as lower component and state order Carry out action, single planker or double plankers judged, when double plankers, planker one advanced when, be introduced into planker one control journey Code action in the A-E that sequence sets, enters back into two control program of planker and when planker one falls back on planker middle position by aforementioned a-e The situation of code carries out action, and the output clip pine when planker two falls back on planker middle position, until planker two, planker one all fall back on and drag When plate is in situ, circulation primary terminates;
G, double plankers, two advanced code of planker, Programmable Logic Controller make the following judgment, and control to press such as lower component and state order Action is carried out, when double plankers, planker two are advanced, two control program of advanced planker simultaneously presses the generation in the aforementioned a-e codes for setting Code carries out action, enters back into when planker two falls back on planker middle position in one control program of planker, and the aforementioned A-E codes by setting Code carry out action, the output clip pine when planker one falls back on planker middle position, until one planker two of planker, all to fall back on planker former During position, circulation primary terminates;
H, double planker codes, Programmable Logic Controller make the following judgment, and control to state order and carry out action as lower component is pressed, when During double plankers, PLC technology program simultaneously enters two control program of one control program of planker and planker, before planker one is by setting Stating the respective code in A-E codes carries out action, and planker two carries out action by the code in the aforementioned a-e codes for setting, when dragging Output clip pine when plate one and planker two all fall back on planker middle position, when one planker two of planker all falls back on planker original position, circulation Once terminate.
3. the bearing ring processing control method as described in one of claim 1-2 items, it is characterised in that to bearing ring Before processing, feeding is controlled by feeding control program, equipment start after, be sequentially output manipulator feeding open blow material-on Simultaneously the tight simultaneously time delay-time delay of material-chuck is blown to-feeding bounce number in time delay-pass to material anteposition, when feeding falls back on feeding original position, carries out Planker selects to enter into described processing control procedure.
CN201410391013.6A 2014-08-11 2014-08-11 Bearing ring processing control method Active CN104155919B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410391013.6A CN104155919B (en) 2014-08-11 2014-08-11 Bearing ring processing control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410391013.6A CN104155919B (en) 2014-08-11 2014-08-11 Bearing ring processing control method

Publications (2)

Publication Number Publication Date
CN104155919A CN104155919A (en) 2014-11-19
CN104155919B true CN104155919B (en) 2017-03-15

Family

ID=51881445

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410391013.6A Active CN104155919B (en) 2014-08-11 2014-08-11 Bearing ring processing control method

Country Status (1)

Country Link
CN (1) CN104155919B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107861772B (en) * 2017-11-03 2021-10-08 潍柴动力股份有限公司 Code processing method and device
CN110253237B (en) * 2019-07-24 2022-06-03 山东蓝宇精密轴承制造有限公司 Preparation method of bearing inner ring with arc-shaped sealing groove

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003108209A (en) * 2001-09-27 2003-04-11 Toyoda Mach Works Ltd Numerical control device
JP2010157095A (en) * 2008-12-26 2010-07-15 Amada Co Ltd Numerical controlling device and method
CN101934484A (en) * 2009-06-29 2011-01-05 鸿富锦精密工业(深圳)有限公司 Method and device for grinding cutter
CN102626886A (en) * 2012-04-20 2012-08-08 浙江进泰机械设备有限公司 Bearing ring turning and cutting feed method
CN103218214A (en) * 2011-11-28 2013-07-24 赐福科技股份有限公司 System and method for editing processing file of numerical control machine tool
CN103567762A (en) * 2013-10-29 2014-02-12 芜湖陀曼精机科技有限公司 Numerical control turning and grinding combined machine tool
CN103939477A (en) * 2014-05-14 2014-07-23 浙江优特轴承有限公司 Machining method of assembly line of angular contact ball bearing sleeve ring

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003108209A (en) * 2001-09-27 2003-04-11 Toyoda Mach Works Ltd Numerical control device
JP2010157095A (en) * 2008-12-26 2010-07-15 Amada Co Ltd Numerical controlling device and method
CN101934484A (en) * 2009-06-29 2011-01-05 鸿富锦精密工业(深圳)有限公司 Method and device for grinding cutter
CN103218214A (en) * 2011-11-28 2013-07-24 赐福科技股份有限公司 System and method for editing processing file of numerical control machine tool
CN102626886A (en) * 2012-04-20 2012-08-08 浙江进泰机械设备有限公司 Bearing ring turning and cutting feed method
CN103567762A (en) * 2013-10-29 2014-02-12 芜湖陀曼精机科技有限公司 Numerical control turning and grinding combined machine tool
CN103939477A (en) * 2014-05-14 2014-07-23 浙江优特轴承有限公司 Machining method of assembly line of angular contact ball bearing sleeve ring

Also Published As

Publication number Publication date
CN104155919A (en) 2014-11-19

Similar Documents

Publication Publication Date Title
CN102172860B (en) Multi-axis linkage numerical-control burr and flashing cutting machine tool
CN105500088B (en) A kind of Digit Control Machine Tool automatic tool changer and method
CN104155919B (en) Bearing ring processing control method
EP1704959B1 (en) Device with movable chip-conveying baffle for toolholder heads
CN105458705A (en) Combination drilling-milling machine tool for universal-joint cross shaft
CN106513496A (en) Inner hexagon stamping equipment of core bodies of valve cores
CN103111659A (en) Numerical-control racket drilling method and machine
CN106346033A (en) Hydraulic control three-jaw chuck device with function of preventing blockage of iron chips
CN102626886A (en) Bearing ring turning and cutting feed method
CN104999500B (en) Intelligent pith paper cutting robot device
CN205414924U (en) Gear bores central oilhole combination drilling machine
CN103143982B (en) Control method for overtravel of cutter advancing and retracting during manufacturing process of five-axis machining center
CN102284730B (en) Lost foam digital machining method and equipment thereof
CN106001792B (en) Portable three-shaft linkage numerical control screw thread milling machine
CN106737663A (en) Truss method for controlling robot
CN106814703A (en) A kind of method of high-speed single chip microcontroller control model fast and smooth handoff
CN105081041A (en) Brute-force hot-spinning accurate plastic forming method for hollow train shaft workblank
CN107052221A (en) A kind of hot upsetting device for automatically molding
CN105149954B (en) Digital controlled drill for machining radial holes of shaft parts
CN209035623U (en) A kind of special vertical CNC milling machine for line gear processing
CN101712139A (en) Grinding wheel dressing method used for slewing support roller path grinding
CN107838460A (en) A kind of two-way punch device
CN104551672B (en) Gear ring blank machining method
CN101417343B (en) Full-cam automatic lathe
CN207447358U (en) It is a kind of for producing the controllable lathe of size of automobile connector

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: No.29, Xinshi Road, Xinchang Industrial Park, Shaoxing City, Zhejiang Province 312500

Patentee after: Zhejiang tuoman Intelligent Technology Co.,Ltd.

Address before: 312580 No. 29, Xinshi Road, industrial park, Xinchang County, Shaoxing City, Zhejiang Province

Patentee before: ZHEJIANG TOMAN PRECISION MACHINERY Co.,Ltd.

CP03 Change of name, title or address