CN104153372B - 一种基坑竖向支护构件兼作承载桩方法 - Google Patents

一种基坑竖向支护构件兼作承载桩方法 Download PDF

Info

Publication number
CN104153372B
CN104153372B CN201410368769.9A CN201410368769A CN104153372B CN 104153372 B CN104153372 B CN 104153372B CN 201410368769 A CN201410368769 A CN 201410368769A CN 104153372 B CN104153372 B CN 104153372B
Authority
CN
China
Prior art keywords
support unit
anchored
underground chamber
reinforcing bar
foundation ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410368769.9A
Other languages
English (en)
Other versions
CN104153372A (zh
Inventor
薛勇
由广明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai urban space architectural design Co.,Ltd.
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN201410368769.9A priority Critical patent/CN104153372B/zh
Publication of CN104153372A publication Critical patent/CN104153372A/zh
Application granted granted Critical
Publication of CN104153372B publication Critical patent/CN104153372B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Foundations (AREA)

Abstract

本发明公开了一种基坑竖向支护构件兼作承载桩方法,包括以下步骤:A.在基坑竖向支护构件内预埋连接件;B.基坑挖土施工至坑底预定深度后,利用支护构件内的连接件与接出地梁、锚接头钢筋连接,浇筑接出地梁和锚接头混凝土,在所述锚接头内预留锚接钢筋用以锚入地下洞室底板;C.地下洞室底板等处防水层及其保护层完成后绑扎地下洞室底板钢筋,并调整锚接头预留的锚接钢筋的位置,而后浇筑洞室底板,使地下洞室与接出地梁形成一体;D.施工剩余地下洞室结构。本发明可最大限度的控制占用地下空间以及充分挖掘有限的地下空间资源,与设置承载桩相比,既可节省工程造价又可加快工期,而地下洞室全包防水仍可按常规方法实施。

Description

一种基坑竖向支护构件兼作承载桩方法
技术领域
本发明适用于明挖法施工现浇钢筋混凝土地下结构如隧道、地铁车站等地下洞室利用基坑竖向支护构件兼作承载桩方法。
技术背景
对于明挖法施工的全包防水地下洞室,在地基竖向承载力不足或抗浮不满足要求时,可在底板设置桩基,以满足要求。如抗浮不满足要求时,可考虑在洞室底板下设置桩基或在洞室顶板与支护构件之间设置压顶梁,以利用支护构件的竖向承载力。对于不考虑全包防水明挖法施工的地下洞室,则可通过在支护结构内预留钢筋,后期凿出该钢筋直接与地下洞室侧墙连接,以利用支护构件的竖向承载力。
但随着城市建设的不断发展,地下空间的利用越来越受到人们的重视,地下建、构筑物之间的距离也越来越近。当新建地下洞室结构需预留其它地下建、构筑物的实施空间,或当地下洞室结构临近既有地下建、构筑物上方新建,或紧邻地下洞室上方需设置各类管线等,地下洞室结构无法设置桩基或压顶梁来满足竖向承载力的要求;而地下洞室要求全包防水,不便于利用支护结构内预留钢筋直接与地下洞室侧墙连接的方法以满足地下洞室竖向承载力要求。
发明内容
发明的目的在于提供一种基坑竖向支护构件兼作承载桩方法,即可充分利用支护结构的竖向承载力,又可在地下洞室设置全包防水层。
为了实现上述目的,本发明技术方案是:一种基坑竖向支护构件兼作承载桩方法,其特征在于:所述的基坑竖向支护构件兼作承载桩方法包括以下步骤:A.施工基坑竖向支护构件的同时在该构件内预埋连接件;B.基坑挖土施工至坑底预定深度后,利用支护构件内的预埋连接件与接出地梁、锚接头钢筋连接,浇筑接出地梁和锚接头混凝土,在所述锚接头内预留锚接钢筋用以锚入地下洞室底板;C.地下洞室底板等处防水层及其保护层完成后绑扎地下洞室底板钢筋,并调整锚接头预留的锚接钢筋的位置,而后浇筑洞室底板,使地下洞室与接出地梁形成一体;D.施工剩余地下洞室结构。步骤A中的连接件为连接钢筋或接驳器,步骤B中,将支护结构内的预留的连接钢筋扳出或利用接驳器接长钢筋并与接出地梁、锚接头钢筋连接。
本发明的优点在于:当新建地下洞室结构需预留其它地下建、构筑物的实施空间,或当地下洞室结构需在既有地下建、构筑物上方新建,采用本方法可不必对地下洞室设置以满足竖向承载力(承载或抗浮)为目地的桩基等构件,仅通过设置接出地梁将支护结构以锚接钢筋与地下洞室底板相连即可满足承载力要求。如此实施,首先可最大限度的控制占用地下空间以及充分挖掘有限的地下空间资源,其次与设置承载桩相比,既可节省工程造价又可加快工期,而地下洞室全包防水仍可按常规方法实施。
附图说明
图1为新建地下洞室与周边相关地下建、构筑物剖面图。
图2为支护结构内预留连接钢筋的详图。
图3为连接钢筋扳出后的示意图。
图4为支护结构内预留接驳器的详图。
图5为接驳器接长钢筋的示意图。
图6为接出地梁、锚接头平面图。
图7为地下洞室和支护结构与接出地梁连接的剖面图。
具体实施方式
下面结合附图对本发明作进一步描述:
本发明为一种基坑竖向支护构件兼作承载桩方法,其实施方法步骤如下:
1.在新建地下洞室1的支护结构2内预埋连接钢筋3或接驳器4;
2.在地下洞室结构基坑开挖至设计标高后,凿出预留钢筋3或接驳器4;
3.将支护结构内的预留连接钢筋3扳出或利用接驳器4接长钢筋并与接出地梁5、锚接头6钢筋连接,同时考虑洞室底板8与接出地梁5的连接,要求在接出地梁的锚接头6内预留锚接钢筋7用以锚入地下洞室底板8,浇筑混凝土接出地梁5及锚接头6;
4.待接出地梁5、锚接头6混凝土达到预计强度后,即可按现有技术处理锚接头6与洞室底板8之间的防水层9的敷设以及相应的防水构造;
5.绑扎地下洞室底板8的钢筋,调整锚接头6的锚接钢筋7,浇筑洞室底板8等相关部分的混凝土。
图中10为既有地下构筑物,11为预留地下构筑物。本发明在支护结构预留连接措施如预埋钢筋或接驳器等,以满足后续施工接出地梁与支护结构的连接,并通过接出地梁将基坑支护结构与地下洞室连接成一体。如图2所示,支护结构内预留钢筋3,该钢筋弯曲缩入支护结构内,待需要时将支护结构内的预留的连接钢筋扳出(如图3),如图4所示,支护结构内设置与支护构件内钢筋连接的接驳器4,待需要时利用接驳器接长钢筋(如图5)。
本发明的基坑竖向支护构件既可采用排桩也可采用地下连续墙等构件。基坑支护采用图示排桩构件时,不仅可以采用三桩成组形成接出地梁和一个锚接头,也可单桩、两桩或多桩成组形成接出地梁和一个锚接头。

Claims (3)

1.一种基坑竖向支护构件兼作承载桩方法,其特征在于:所述的基坑竖向支护构件兼作承载桩方法包括以下步骤:A.施工基坑竖向支护构件的同时在该构件内预埋连接件;B.基坑挖土施工至坑底预定深度后,利用支护构件内的预埋连接件与接出地梁、锚接头钢筋连接,浇筑接出地梁和锚接头混凝土,在所述锚接头内预留锚接钢筋用以锚入地下洞室底板;C.地下洞室底板处防水层及其保护层完成后绑扎地下洞室底板钢筋,并调整锚接头预留的锚接钢筋的位置,而后浇筑洞室底板,使地下洞室与接出地梁形成一体;D.施工剩余地下洞室结构。
2.根据权利要求1所述的一种基坑竖向支护构件兼作承载桩方法,其特征在于:步骤A中的连接件为连接钢筋或与支护构件内钢筋连接的接驳器,步骤B中,将支护结构内的预留的连接钢筋扳出或利用接驳器接长钢筋并与接出地梁、锚接头钢筋连接。
3.根据权利要求1所述的一种基坑竖向支护构件兼作承载桩方法,其特征在于:基坑竖向支护构件采用排桩或地下连续墙构件。
CN201410368769.9A 2014-07-30 2014-07-30 一种基坑竖向支护构件兼作承载桩方法 Active CN104153372B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410368769.9A CN104153372B (zh) 2014-07-30 2014-07-30 一种基坑竖向支护构件兼作承载桩方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410368769.9A CN104153372B (zh) 2014-07-30 2014-07-30 一种基坑竖向支护构件兼作承载桩方法

Publications (2)

Publication Number Publication Date
CN104153372A CN104153372A (zh) 2014-11-19
CN104153372B true CN104153372B (zh) 2016-06-22

Family

ID=51878986

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410368769.9A Active CN104153372B (zh) 2014-07-30 2014-07-30 一种基坑竖向支护构件兼作承载桩方法

Country Status (1)

Country Link
CN (1) CN104153372B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107448681A (zh) * 2017-09-07 2017-12-08 鞍山三冶建筑工程有限公司 一种石油管线的支护结构
CN107701810A (zh) * 2017-09-07 2018-02-16 鞍山三冶建筑工程有限公司 一种石油管线的支护方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1155606A (zh) * 1996-09-27 1997-07-30 邹先欣 基坑挡土墙作地下室侧墙及其施工方法
CN101117800A (zh) * 2007-08-22 2008-02-06 浙江大学 一种地下工程中一桩三用的方法
CN103321231A (zh) * 2013-06-10 2013-09-25 叶长青 基坑支护施工方法
CN103669402A (zh) * 2013-12-25 2014-03-26 华东建筑设计研究院有限公司 一种主体地下室外墙与围护桩相结合的桩墙一体化构造
CN203613565U (zh) * 2013-11-28 2014-05-28 华东建筑设计研究院有限公司 一种基础筏板与“两墙合一”地下连续墙的连接

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4657759B2 (ja) * 2005-02-25 2011-03-23 株式会社奥村組 建物の杭基礎構造

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1155606A (zh) * 1996-09-27 1997-07-30 邹先欣 基坑挡土墙作地下室侧墙及其施工方法
CN101117800A (zh) * 2007-08-22 2008-02-06 浙江大学 一种地下工程中一桩三用的方法
CN103321231A (zh) * 2013-06-10 2013-09-25 叶长青 基坑支护施工方法
CN203613565U (zh) * 2013-11-28 2014-05-28 华东建筑设计研究院有限公司 一种基础筏板与“两墙合一”地下连续墙的连接
CN103669402A (zh) * 2013-12-25 2014-03-26 华东建筑设计研究院有限公司 一种主体地下室外墙与围护桩相结合的桩墙一体化构造

Also Published As

Publication number Publication date
CN104153372A (zh) 2014-11-19

Similar Documents

Publication Publication Date Title
CN105298507B (zh) 一种上部明挖下部掘进机施工的地下管廊施工方法
CN103981898B (zh) 一种整体明挖节点逆作的地下工程施工方法
CN103291326B (zh) 一种大变形巷道围岩再造承载层控制技术
CN105240024B (zh) 一种平行盾构法扩建施工地铁车站的方法
CN101644632B (zh) 相似模型试验中无充填型溶洞或岩溶管道系统及埋设方法
CN105178291A (zh) 大型桩基施工方法
CN205530280U (zh) 一种新型预制两墙合一基坑围护体系
CN204098043U (zh) 留土后开挖结合内支撑双排桩支护结构
CN103775110A (zh) 软土地区多层地下空间的暗挖施工方法
CN107700496B (zh) 深基坑的逆顺结合施工方法
CN207092107U (zh) 一种利用地下连续墙的抗沉陷结构
CN104005773A (zh) 适用于深埋大直径软岩水工隧洞预留变形量的确定方法
CN103306682A (zh) 一种大跨度高边墙地下空间建筑物及其开挖支护方法
CN103866701A (zh) 一种地下箱涵结构预留横向加宽的结构构造方法
CN207278276U (zh) 过地裂缝破碎带的浅埋暗挖隧道支护结构
CN104153372B (zh) 一种基坑竖向支护构件兼作承载桩方法
CN103243721B (zh) 软弱地质条件下高层建筑筏板基础及核心筒开挖施工方法
CN107724399A (zh) 中等富水地区开挖受限地段深基坑开挖施工的方法
CN204825923U (zh) 一种接力式基坑支护结构
CN204311456U (zh) 基坑加固结构
CN103669422B (zh) 一种锚杆静压桩桩头防水施工方法
CN104047607A (zh) 盾构机围护结构条件下吊出工法
CN107476315A (zh) 一种针对紧邻型基坑的预制式构件及其施工方法
CN208815566U (zh) 既有建筑下方明挖或盖挖地下主体结构的横向扩挖构造
CN102061701A (zh) 利用冲孔灌注桩安装垂直接地极的施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211019

Address after: 200092 No. two, 901 North Road, Yangpu District, Shanghai, Zhongshan

Patentee after: SHANGHAI MUNICIPAL ENGINEERING DESIGN INSTITUTE (Group) Co.,Ltd.

Patentee after: Shanghai urban space architectural design Co.,Ltd.

Address before: 200092 No. two, 901 North Road, Yangpu District, Shanghai, Zhongshan

Patentee before: SHANGHAI MUNICIPAL ENGINEERING DESIGN INSTITUTE (Group) Co.,Ltd.