CN104144361B - Logical resource test acceptance method and system under FTTH patterns - Google Patents

Logical resource test acceptance method and system under FTTH patterns Download PDF

Info

Publication number
CN104144361B
CN104144361B CN201310170724.6A CN201310170724A CN104144361B CN 104144361 B CN104144361 B CN 104144361B CN 201310170724 A CN201310170724 A CN 201310170724A CN 104144361 B CN104144361 B CN 104144361B
Authority
CN
China
Prior art keywords
information
obd
acceptance
server
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310170724.6A
Other languages
Chinese (zh)
Other versions
CN104144361A (en
Inventor
林尧
卞正皑
崔亮亮
陈品洲
沈春马
陈超
施文全
林开群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Telecom Corp Ltd
Original Assignee
China Telecom Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Telecom Corp Ltd filed Critical China Telecom Corp Ltd
Priority to CN201310170724.6A priority Critical patent/CN104144361B/en
Publication of CN104144361A publication Critical patent/CN104144361A/en
Application granted granted Critical
Publication of CN104144361B publication Critical patent/CN104144361B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Small-Scale Networks (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The present invention discloses logical resource test acceptance method and system under a kind of FTTH patterns.Wherein under FTTH patterns in logical resource test acceptance method, when user terminal is connected with completing the ONT equipment of registration, user terminal sends access request information to certificate server, and wherein access request information includes testing account information;When certificate server is to testing account information certification success, certificate server extracts the service resources information associated with PON ports, is sent to user terminal and is successfully accessed response message;User terminal, which is received, to be successfully accessed after response message, and acceptance information is sent to acceptance server, and wherein acceptance information includes testing account information and the OBD information associated with OBD equipment to be measured;Acceptance server obtains service resources information from certificate server, if acceptance server judges that service resources information is corresponding with OBD information, and acceptance server judges to check and accept successfully.Thus guaranteed service opens the accuracy of logical resource when distributing telephone numbers.

Description

Logical resource test acceptance method and system under FTTH patterns
Technical field
The present invention relates to the communications field, more particularly to a kind of FTTH(Fiber To The Home, fiber to the home)Under pattern Logical resource tests acceptance method and system.
Background technology
FTTH refers to completely using optical fiber as communications carrier between local side and user, by ONT(Optical Network Terminal, ONT Optical Network Terminal)It is installed on user terminal.Current FTTH access networks use PON(Passive Optical Network, EPON)Technology, by the OLT for being installed on local side(Optical Line Terminal, optical line terminal)、 It is installed on the ONT and ODN between the two of user terminal(Optical Distribution Network, Optical Distribution Network)Three Part is constituted, and ODN includes OBD(Optical Branching Device, optical branching device)With the passive device such as optical fiber.
Fig. 1 is FTTH network topology structures schematic diagram in the prior art.As shown in figure 1, user terminal by ONT equipment 1, OBD equipment 2 and OLT device 3, can access such as IP(Internet Protocol, Internet protocol)Network, PSTN(Public Switched Telephone Network, PSTN)Network, can also pass through wave multiplexer 4 access CATV (Cable Television, cable television).
FTTH access networks not only provide high bandwidth, and enhance network to data format, speed, wavelength and agreement The transparency, relax to environmental condition and power supply etc. require, simplify maintenance with install, be optimal access network technology. In recent years, global FTTH business developments constantly accelerate, fiber to the home large-scale promotion application.China is FTTH industry in recent years Be engaged in fastest-rising country, and by the end of the year 2011, family's number of national FTTH coverings is up to 45,000,000 families.Executive Meeting of the State Council Pass through on May 9th, 2012《On development and some opinions ensured information safety conscientiously of energetically applying IT》, will be " wide Band China " engineering formally rises to national strategy aspect from enterprise and industry aspect.Fiber to the home is the base of broadband China strategy Stone, optical fiber will be registered one's residence as water, electricity, gas as important public infrastructure.The coming years, FTTH networks will gradually replace Copper cable access network.
While FTTH engineerings are constantly built, some technological means matched therewith are also required to constantly improve, for example The acceptance method of FTTH cellular logic resources.Traditional ADSL(Asymmetric Digital Subscriber Line are non-right Claim DSL)、LAN(Local Area Network, LAN)Business can by broadband precise location information with The means such as the rear comparison of resource, business be pre-configured, ensure the Gao Zhun of resource information while realizing that broadband services is efficiently provided True property, but part personalized network business datum configuration-direct needs to swash by corresponding business in FTTH service fulfillments at present Live system is generated, it is impossible to accomplish that network equipment data are pre-configured end to end before engineering is distributed telephone numbers, therefore FTTH engineering openings are put It must assure that logical resource information is accurate before number, under the customer service of activation of service system opens activation instruction ability correctly Hair and execution, FTTH business could be smoothly open-minded.And it is all to rely on work that the logical resource information of country's FTTH engineerings, which is checked and accepted, at present Journey operating personnel scene manual confirmation, lacks effective technological means to avoid logical resource information caused by human error wrong By mistake.Once logical resource information errors, when distributing telephone numbers, the instruction of activation of service system can not be issued correctly, and business can not be normal Open-minded, Engineering operation personnel will come and go scene and check resource again, and strong influence engineering is distributed telephone numbers efficiency, and easily triggers user Complain.
The content of the invention
The technical problem to be solved in the present invention is to provide logical resource test acceptance method and system under a kind of FTTH patterns. The information of the testing information gathered from certificate server and received by itself is contrasted to realize to patrolling by acceptance server Collect resource information and carry out test examination, so as to ensure the accuracy of logical resource when service fulfillment is distributed telephone numbers.
Acceptance method is tested there is provided logical resource under a kind of FTTH patterns according to an aspect of the present invention, including:
ONT equipment is registered after being connected with OBD equipment to be measured to OLT device;
When user terminal is connected with completing the ONT equipment of registration, user terminal is sent out by OLT device to certificate server Access request information is sent, wherein access request information includes testing account information;
Certificate server is authenticated to testing account information;
When certificate server is to testing account information certification success, certificate server extracts associated with PON ports Service resources information, service resources information is associated with testing account information, sent and accessed to user terminal by OLT device Success response information, wherein PON ports are the ports that OBD equipment to be measured accesses OLT device;
User terminal, which is received, to be successfully accessed after response message, and acceptance information is sent to acceptance server by OLT device, Wherein acceptance information includes testing account information and the OBD information associated with OBD equipment to be measured;
Acceptance server obtains the service resources information associated with testing account information from certificate server;
Acceptance server judges whether service resources information is corresponding with OBD information;
If service resources information is corresponding with OBD information, acceptance server judges to check and accept successfully.
Acceptance Test System is tested there is provided logical resource under a kind of FTTH patterns according to another aspect of the present invention, including ONT is set OBD equipment standby, to be measured, OLT device, certificate server, acceptance server, user terminal, wherein:
OBD equipment to be measured, for being connected with OLT device, realizes the information exchange between OLT device and ONT equipment;
ONT equipment, for realizing the information exchange between OBD equipment to be measured and user terminal;Connect with OBD equipment to be measured After connecing, registered to OLT device;
User terminal, for when being connected with completing the ONT equipment of registration, being sent by OLT device to certificate server Access request information, wherein access request information include testing account information;After receiving and being successfully accessed response message, pass through OLT device to acceptance server send acceptance information, wherein acceptance information include testing account information and with OBD equipment phase to be measured The OBD information of association;
OLT device, for being registered to ONT equipment;The access request information that user terminal is sent is sent to certification Server, is sent to user terminal, the examination that user terminal is sent by the response message that is successfully accessed that certificate server is sent Information is sent to acceptance server;
Certificate server, for after access request information is received, being authenticated to testing account information;When testing account During the success of number authentification of message, the service resources information associated with PON ports is extracted, by service resources information and testing account letter Manner of breathing is associated, and is sent by OLT device to user terminal and is successfully accessed response message, wherein PON ports are that OBD equipment to be measured connects Enter the port of OLT device;
Acceptance server, for after acceptance information is received, obtaining related to testing account information from certificate server The service resources information of connection;Judge whether service resources information is corresponding with OBD information, if service resources information and OBD information It is corresponding, then judge to check and accept successfully.
Whole data of the invention by pre-setting ONT equipment, by realizing that the pre- testing of FTTH business is checked and accepted, engineering behaviour The difference of network resource information data and actual environment can directly be compared at the scene by making personnel, and mistake occur live can rectify and improve, Avoid repeatedly coming and going scene, effectively improve engineering timeliness.The location information obtained is checked and accepted by pre- testing it is effectively guaranteed that money The accuracy of source system logic resource, and then ensure to swash when the pre-configured correctness of broadband services plane data and business datum are distributed telephone numbers Smoothly issuing and perform for instruction living, can effectively lift the disposable of FTTH business and open success rate.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, without having to pay creative labor, may be used also To obtain other accompanying drawings according to these accompanying drawings.
Fig. 1 is FTTH network topology structures schematic diagram in the prior art.
Fig. 2 is the schematic diagram of logical resource test acceptance method one embodiment under FTTH patterns of the present invention.
Fig. 3 is the schematic diagram that ONT equipment of the present invention to OLT device register one embodiment.
Fig. 4 is the schematic diagram that acceptance server of the present invention obtains service resources information one embodiment from certificate server.
Fig. 5 is the schematic diagram of logical resource test Acceptance Test System one embodiment under FTTH patterns of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.Below Description only actually at least one exemplary embodiment is illustrative, is never used as to the present invention and its application or makes Any limitation.Based on the embodiment in the present invention, those of ordinary skill in the art are not making creative work premise Lower obtained every other embodiment, belongs to the scope of protection of the invention.
Unless specifically stated otherwise, the part and positioned opposite, the digital table of step otherwise illustrated in these embodiments Do not limited the scope of the invention up to formula and numerical value.
Simultaneously, it should be appreciated that for the ease of description, the size of the various pieces shown in accompanying drawing is not according to reality Proportionate relationship draw.
It may be not discussed in detail for technology, method and apparatus known to person of ordinary skill in the relevant, but suitable In the case of, the technology, method and apparatus should be considered as authorizing a part for specification.
In shown here and discussion all examples, any occurrence should be construed as merely exemplary, without It is as limitation.Therefore, the other examples of exemplary embodiment can have different values.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi It is defined, then it need not be further discussed in subsequent accompanying drawing in individual accompanying drawing.
Fig. 2 is the schematic diagram of logical resource test acceptance method one embodiment under FTTH patterns of the present invention.Such as Fig. 2 institutes Show, the method and step of the present embodiment is as follows:
Step 201, ONT equipment is registered after being connected with OBD equipment to be measured to OLT device.
Step 202, when user terminal is connected with completing the ONT equipment of registration, user terminal is by OLT device to certification Server sends access request information, and wherein access request information includes testing account information.
Step 203, certificate server is authenticated to testing account information.
Step 204, when certificate server is to testing account information certification success, certificate server is extracted and PON ports Associated service resources information, service resources information is associated with testing account information, by OLT device to user terminal Transmission is successfully accessed response message, and wherein PON ports are the ports that OBD equipment to be measured accesses OLT device.
Step 205, user terminal, which is received, is successfully accessed after response message, is sent by OLT device to acceptance server Acceptance information, wherein acceptance information include testing account information and the OBD information associated with OBD equipment to be measured.
Step 206, acceptance server obtains the service resources information associated with testing account information from certificate server.
Step 207, acceptance server judges whether service resources information is corresponding with OBD information.
Step 208, if service resources information is corresponding with OBD information, acceptance server judges to check and accept successfully.
Logical resource test acceptance method under the FTTH patterns provided based on the above embodiment of the present invention, by pre-setting The whole data of ONT equipment, by realizing that the pre- testing of FTTH business is checked and accepted, Engineering operation personnel can directly compare net at the scene The difference of network resource information data and actual environment, mistake occur live can rectify and improve, it is to avoid repeatedly comes and goes scene, effectively improves work Cheng Shixiao.The location information obtained is checked and accepted by pre- testing it is effectively guaranteed that the accuracy of resource system logical resource, and then Ensure that the smooth of activation instruction is issued and performed when the pre-configured correctness of broadband services plane data and business datum are distributed telephone numbers, and can be had The disposable of effect lifting FTTH business opens success rate.
It is preferred that, in above-mentioned steps 207, if service resources information is answered with OBD Asymmetry informations, acceptance server is utilized Service resources information inquiry goes out the PON port informations that OBD equipment to be measured is currently accessed.Acceptance server is by OLT device by PON Port information is sent to user terminal.
Generally, this not corresponding the reason for is due to that OBD first line of a couplet fibre circuit is not laid by design drawing, has accessed mistake PON ports, cause the service VLAN of port association(Virtual Local Area Network, VLAN)Information with The information of advance typing is inconsistent.Because the service VLAN that there is unique association each PON ports is planned, Acceptance Test System can be according to The account provided according to Verification System information of reaching the standard grade carries out inverse, draws the PON ports that OBD is currently accessed, and testing personnel can be with Testing again after quickly correcting is carried out to circuit according to prompting.
Fig. 3 is the schematic diagram that ONT equipment of the present invention to OLT device register one embodiment.As shown in figure 3, above-mentioned After ONT equipment is connected with OBD equipment to be measured, the step of being registered to OLT device includes:
Step 301, after ONT equipment is connected with OBD equipment to be measured, registration information is sent to OLT device, wherein registering Solicited message includes the logical identifier LOID information associated with ONT equipment.
Step 302, OLT device is authenticated to LOID information.
Step 303, when OLT device is to the success of LOID authentification of messages, OLT device completes the registration of ONT equipment.
In order to realize the configuration of live testing path, it is necessary to the distribution deployment unification on OLT in units of engineering section Test LOID.
Fig. 4 is the schematic diagram that acceptance server of the present invention obtains service resources information one embodiment from certificate server. As shown in figure 4, above-mentioned acceptance server obtains the service resources information associated with testing account information from certificate server Step includes:
Step 401, acceptance server judges whether OBD information is legal.
Step 402, if judging, OBD information is legal, and authentication server sends inquiry request information to certificate server, wherein Inquiry request information includes testing account information.
If OBD information is illegal, show the OBD information errors that user terminal is provided.
Step 403, certificate server judges whether the service resources information associated with testing account information.
Step 404, if in the presence of the service resources information associated with testing account information, certificate server provides business Source information is sent to acceptance server.
If being probably the testing that user terminal is provided in the absence of the service resources information associated with testing account information Account information is wrong, so that certificate server can not inquire the record of reaching the standard grade of account, now needs to remind testing personnel to enter Row is corresponding to be examined.
It is preferred that, service resources information is BRAS(Broadband Remote Access Server, broad band remote access Server)_ IP information and NAS(Network Access Server, network access server)_ PORT_ID information.
In the present invention, the whole business datum from ONT equipment to BAS Broadband Access Server is preset.Wherein whole business number According to including for pinpoint service resources information BRAS_IP information and NAS-PORT-ID information, the information and PON ports There is unique corresponding relation.When engineering enters business acceptance phase, tester accesses OBD to be checked and accepted by ONT is tested, using unified Account and password are tested, internet is accessed with dialup connection.Now certificate server will gather what is carried when account is reached the standard grade BRAS_IP and NAS-PORT-ID information, it is compared with default service resources information in acceptance server.If the two It is consistent, then proves that OBD and the corresponding relation of OLT device and port are correct, examination passes through, otherwise does not pass through.Cause the two information The main reason not being inconsistent is due to that OBD first line of a couplet fibre circuit is not laid by design drawing, has accessed non-designated PON ports, this When acceptance server can point out the OLTPON ports that OBD is currently accessed, testing personnel can carry out fast according to prompting to circuit Testing again after speed amendment.After examination passes through, OBD accurate resource information is imported into resource system by Acceptance Test System.
The present invention is introduced below by specific example.
The overall plan of logical resource test examination is under FTTH patterns:Default OBD Data Enters, system are automatically performed entirely The configuration of journey business datum, scene dialing are verified, verify that system is derived automatically from completion resource after examination & verification confirmation.
Wherein, in specific implementation, the particular content of each link is as follows:
" 1. typing OBD information " link
The link is completed the typing of the engineering related physical resource information on basis, main information bag by engineering construction personnel Include:OBD codings, light splitting rank, OBD titles, OBD models, installation addresses, whether tip circuit, OLT device office are to, OLT device Place subregion, OLT codings, OLT titles, OLT webmasters IP and PON mouthfuls of OLT device numbering etc..
After the completion of typing, what resource Acceptance Test System was automatically performed physical resource and logical resource associates matching.Tested in resource In receipts system, the mapping relations of physical resource and logical resource are planned in advance, to its mapping relations, details are as follows with effect:
1)Each construction area is assigned unique unified test LOID, " OLT device office to " and " OLT by typing Subregion where equipment " parameter completes mapping, testing workmen thus clear and definite testing when the terminal test LOID that need to configure.
2)Each OLT producers have independent professional network management configuration interface to be connected with resource Acceptance Test System, and resource checks and accepts system System determines to call the interface and corresponding configuration template of correspondence producer by " OLT device producer model " parameter.Under normal circumstances, OLT reaches the standard grade go into operation before completed under each PON ports the pre-configured of test ONT authentication informations.The interface and configuration template can be It is pre-configured with mistaking, test ONT authentication informations is verified and corrected in " data configuration " link.
3)When OLT device reaches the standard grade operation, resource Acceptance Test System is the first line of a couplet facility information for retaining the OLT(For example BRAS IP, BRAS port informations).By " OLT codings ", " OLT titles ", " three parameter coordinations of OLT webmasters IP " can be unique It is determined that the corresponding OLT device of OBD to be checked and accepted, namely the benchmark first line of a couplet BRAS port informations compared when testing is checked and accepted are determined.
4)OBD first line of a couplet physical resource Information granularity is accurate to PON ports by " PON mouthfuls of numberings of OLT device ", it is ensured that work The accuracy of journey physical resource.Meanwhile, there are mapping relations each PON ports with each service VLAN, and resource Acceptance Test System can be with this For foundation, whole business datum is associated, verified and corrected in " data configuration " link.
In addition, OBD codings, light splitting rank, OBD titles, OBD models, installation addresses, whether tip circuit etc. is used as engineering Detailed information also needs typing, the archive information for engineering site initial test, final acceptance inspection.
" 2. data configuration " link
The verification of the link finishing service passage configuration data is with issuing.The information of typing includes BRAS titles, BRAS IP, BRAS port, and broadband, IAD(Integrated Access Device, integrated access equipment)、ITMS (Integrated Terminal Management System, terminal total management system)、ITV(Interaction Television, interactive television)Deng the inside and outside layer vlan information of 4 business.
Because resource Acceptance Test System preserves OLT first line of a couplet facility information data, the parameter of BRAS IP, BRAS ports two Can automatically it be filled by way of auto-associating.When due to BRAS ports missing, change or newly-increased first line of a couplet relaying, money is appeared in When there is no the situation of corresponding first line of a couplet facility information in the Acceptance Test System database of source, can also by the manual typing of maintenance person mode Changed.Similarly, the inside and outside layer vlan information of the business such as broadband, IAD, ITMS, ITV is also advised before service fulfillment Draw, can select to fill by way of auto-associating or manual mode typing.
After above- mentioned information typing, resource Acceptance Test System is entered to this link resource information and " typing OBD information " link information Row is integrated, and completes the collection of test all associated configuration information of ONT.After resource information collection is neat, resource Acceptance Test System is set to BRAS It is standby to issue corresponding sub-interface configuration-direct automatically, complete the configuration of whole business datum.When test ONT authentication informations and ONT extremely After the completion of BRAS whole business datum is configured, test ONT to BRAS service dial testing passage is just got through, can have been entered " dialing checking " link starts the acceptance of work.
The link is provided with manpower intervention interface, and resource accuracy, test ONT authentication informations, service channel can be matched somebody with somebody Put etc. and to be examined and be corrected.When OBD relevant information typing mistakes, testing work order can be retracted to " typing OBD information " ring Section modification;The problem of for service dial testing passage, the configuration inspection function of being provided by system, maintenance person can be to service dial testing The configuration integrity and correctness of passage are verified, and if any missing or mistake, can automatically issue again or manual entry is set It is standby to modify, thereby ensure that the reliability of " data configuration " link typing resource information." rerecorded in corresponding flow correspondence OBD information " and " data are reconfigured " link.
" 3. dialing checking " link
When engineering enters after business acceptance phase, trouble ticket dispatch to " dialing checking ", testing personnel can enter to OBD to be measured Row testing verifies that details are as follows for testing checking and accepting:
1)According to the construction area belonging to OBD, testing personnel configure corresponding testing LOID for test ONT terminals, will eventually Terminate into OBD to be measured, to OLT device initiating terminal register flow path.OLT has completed to test ONT authentication informations under each PON ports It is pre-configured, as long as the ODN networks towpath of the OBD first line of a couplet is normal, at the same terminal testing LOID with affiliated area is pre-configured is consistent, end End can smoothly complete the registration process on OLT.
2)After the success of testing endpoint registration, the computer access terminal Ethernet interface of carrying is used testing by testing personnel Broadband account and password, initiate network insertion request, account and password are in Verification System with dialup connection on computers After checking, computer completes linking Internet, and the domain name addresses of Acceptance Test System can be accessed in WEB webpage modes.
3)Testing librarian use personal user name logging resource Acceptance Test System webpage, is filled in OBD Informations to be checked and accepted The OBD numberings of this time testing, fill in testing broadband account, Acceptance Test System starts automatic comparison mistake after confirmation in testing account column Journey.
4)Comparison process is automatically performed by Acceptance Test System on backstage, and principle is as follows:Testing broadband account is in aaa authentication system Upper to pass through after checking, Verification System will gather BRAS_IP the and NAS-PORT-ID information carried when account is reached the standard grade, wherein NAS- PORT-ID is i.e. by BRAS ports, business PVLAN(Private VLAN, particular virtual local area network)With business CVLAN (Customer VLAN, user's VLAN)Composition, the service resources information of itself and typing in " data configuration " link is entered Row is compared, if the two is consistent, and proves that OBD and the corresponding relation of OLT device and port are correct, examination passes through.
Testing is likely to occur in the link not pass through, and checks and accepts the situation of failure.Main cause and solution are described below:
1)Failure is checked and accepted caused by flow is lack of standardization, main cause not yet circulates to dialing for work order and checks and accepts link, testing Account number is introduced into test account number pond etc..OBD numbering correspondence work orders such as input, which not yet circulate to " dialing checking " link, to be carried out Testing, the Acceptance Test System testing page can point out the testing personnel OBD work orders not yet to arrive this link, after PLSCONFM circulation is normal again Testing;Testing broadband account such as input does not test account number pond standby, then points out testing personnel contact background support personnel's addition account Number.
2)Typing information is not inconsistent with default resource information during testing, common testing personnel input OBD numberings and testing broadband Account is wrong.When the OBD numberings of the OBD numberings that testing personnel input and " typing OBD information " link are inconsistent, testing is pointed out Personnel's OBD numberings are not present and need to examine;When testing broadband account and the account of actual use are not inconsistent, Verification System can not be looked into The record of reaching the standard grade of the account is ask, then the prompting testing personnel account is reached the standard grade to record to be not present and needs to examine.
3)Reach the standard grade resource information and " data configuration " link of the account of Verification System is compared and is not inconsistent, and is primarily due to OBD first line of a couplet fibre circuit is not laid by design drawing, has been accessed the PON ports of mistake, has been caused the service VLAN of port association to be believed Cease inconsistent with " data configuration " link typing.Because the service VLAN that there is unique association each PON ports is planned, check and accept System can according to Verification System provide account reach the standard grade information carry out inverse, draw the PON ports that OBD is currently accessed, dial Survey personnel can carry out testing again after quickly correcting according to prompting to circuit.
" 4. export of being completed " link
Can be completed according to batch state screening can be derived, the examination work order that export passes through checking.Batch information bag Batch state, typing personnel, entry time, batch is included to last, submit time-out time etc. i.e..
" 5. on-site verification and examination & verification " link
The batch information of typing first line of a couplet information can be needed according to batch state inquiry;Batch information include batch state, The checking that typing personnel, entry time, batch are lasted, submit i.e. by time-out time etc. and inquire about all link states under each batch Information.
Below to the planning of test ONT associated datas, the generation that network VLAN is planned, test ONT is pre-configured and attention thing Item etc. is explained:
(1)Test ONT LOID and CVLAN data schemas and allocation example
To realize the configuration of live testing path, it is necessary to the unified survey of distribution deployment on OLT in units of engineering section LOID is tried, and disposes BRAS, OLT data in advance;Needs preempt light splitting all the way on OBD and used for test LOID simultaneously, and for it Distributing uniform CVLAN(Inner VLAN).By taking certain telecommunications company as an example:FTTH CVLAN scopes are 3536-3599, distribution VLAN3599 is the unified CVLAN for testing LOID.Table 1 is the incidence relation that certain telecommunications company tests No. LOID and engineering section.
No. LOID Engineering section
A5911234500 Horse hair
A5911234501 Fuqing
A5911234502 It is permanently happy
A5911234503 Minhou
A5911234504 Minqing
A5911234505 Luoyuan
A5911234506 Liaanjiang county
A5911234507 Yongtai
A5911234508 Pingtan
A5911234512 Cang Shan
A5911234509 Drum tower south
A5911234510 Drum tower north
A5911234513 Jin An
A5911234511 Taijiang
Table 1
(2)Network VLAN is planned
Before FTTH service fulfillments, PON VLAN distribution and networking need to be made rational planning for.Using certain telecommunications company as Example, OLT construction modes use direct connection BRAS/SR(ServiceRouter, business router)Mode, OLT broadbands PVLAN(Outer layer Vlan)Planning is in units of PON mouthfuls, and ITV/ITMS/IAD PVLAN are in units of groove position, and concrete plan information is as shown in table 2.
Table 2
(3) test ONT and its pre-configured generation
In newly-increased OLT nodes or newly-increased OLT PON boards, i.e., using the unified test LOID in the section planned in OLT On do the pre- deployment of configuration, and create corresponding whole operational trials passage.Configuration service TCH test channel can be using producer's specialty The northbound interface instruction of webmaster or the CMD instruction two ways of TELNET network elements.Both modes will be done and illustrated respectively below (Huawei's equipment using north orientation instruction by the way of, in emerging equipment use TELNET modes):
1. in emerging equipment TELNET modes CMD instruction
interface epon-olt_0/10/1
vlan-smart-qinq enable
onu1type ZTE-F420SN A5911234512
exit
interface epon-onu_0/10/1:2
authentication enable
bandwidth-profile ONT_DBA
exit
pon-onu-mng epon-onu_0/10/1:2
no Forbid-auto-dispatch
no Forbid-auto-dispatch voip
vlan port eth_0/1mode tag vlan3599priority0
exit
vlan-smart-qinq ingress-port epon-olt_0/10/1cvlan3536to3663svlan2036
2. Huawei's equipment northbound interface instruction mode
(4)Engineering points for attention
Because the basic no extraneous power supply in testing scene is, it is necessary to which the relevant device such as battery, charger, should be noted connection During ONT equipment, positive and negative level is unable to wrong, otherwise will cause device power supply (DPS) short circuit.During testing, every OBD only needs one end of testing Mouthful, if ODN uses secondary light-splitting, need to carry out testing examination to each two grades of OBD.
Fig. 5 is the schematic diagram of logical resource test Acceptance Test System one embodiment under FTTH patterns of the present invention.Such as Fig. 5 institutes Show, the system includes ONT equipment 501, OBD equipment 502 to be measured, OLT device 503, certificate server 504, acceptance server 505th, user terminal 506.Wherein:
OBD equipment 502 to be measured, for being connected with OLT device 503, realizes that the information between OLT device and ONT equipment is handed over Mutually.
ONT equipment 501, for realizing the information exchange between OBD equipment to be measured and user terminal;Set with OBD to be measured After standby connection, registered to OLT device.
User terminal 506, for when being connected with completing the ONT equipment of registration, being sent out by OLT device to certificate server Access request information is sent, wherein access request information includes testing account information;After receiving and being successfully accessed response message, lead to Cross OLT device to acceptance server send acceptance information, wherein acceptance information include testing account information and with OBD equipment to be measured Associated OBD information.
OLT device 503, for being registered to ONT equipment;The access request information that user terminal is sent, which is sent to, recognizes Server is demonstrate,proved, the response message that is successfully accessed that certificate server is sent user terminal is sent to, by testing that user terminal is sent Collection of letters breath is sent to acceptance server.
Certificate server 504, for after access request information is received, being authenticated to testing account information;When dial When surveying account information certification success, the service resources information associated with PON ports is extracted, by service resources information and testing account Number information is associated, and is sent by OLT device to user terminal and is successfully accessed response message, wherein PON ports are that OBD to be measured is set The port of standby access OLT device.
Acceptance server 505, for after acceptance information is received, being obtained and testing account information phase from certificate server The service resources information of association;Judge whether service resources information is corresponding with OBD information, if service resources information is believed with OBD Manner of breathing correspondence, then judge to check and accept successfully.
Logical resource test Acceptance Test System under the FTTH patterns provided based on the above embodiment of the present invention, by pre-setting The whole data of ONT equipment, by realizing that the pre- testing of FTTH business is checked and accepted, Engineering operation personnel can directly compare net at the scene The difference of network resource information data and actual environment, mistake occur live can rectify and improve, it is to avoid repeatedly comes and goes scene, effectively improves work Cheng Shixiao.The location information obtained is checked and accepted by pre- testing it is effectively guaranteed that the accuracy of resource system logical resource, and then Ensure that the smooth of activation instruction is issued and performed when the pre-configured correctness of broadband services plane data and business datum are distributed telephone numbers, and can be had The disposable of effect lifting FTTH business opens success rate.
For convenience's sake, a user terminal is illustrate only in Figure 5.Those skilled in the art it will be appreciated that Each ONT equipment can provide access service for multiple user terminals.
It is preferred that, acceptance server 505 is additionally operable to seasonable in service resources information and OBD Asymmetry informations, is provided using business Source information inquires the PON port informations that OBD equipment to be measured is currently accessed, and PON port informations are sent into use by OLT device Family terminal.
It is preferred that, acceptance server 505 is additionally operable to after acceptance information is received, and judges whether OBD information is legal, if sentencing Disconnected OBD information is legal, then sends inquiry request information to certificate server, and wherein inquiry request information is believed including testing account Breath.
Certificate server 504 is additionally operable to judge whether the service resources information associated with testing account information, if In the presence of the service resources information associated with testing account information, then service resources information is sent to acceptance server.
It is preferred that, ONT equipment 501 is additionally operable to after being connected with OBD equipment to be measured, and registration request letter is sent to OLT device Breath, wherein registration information include the logical identifier LOID information associated with ONT equipment.
OLT device 503 is additionally operable to be authenticated LOID information, when to the success of LOID authentification of messages, completes ONT equipment Registration.
It is preferred that, service resources information is BRAS_IP information and NAS_PORT_ID information.
The present invention is preset using the test LOID that unified configuration is introduced in OLT PON ports, generation test ONT information Test ONT whole data, it is possible to achieve the pre- testing of FTTH business is checked and accepted, and Engineering operation personnel can directly compare net at the scene The difference of network resource information data and actual environment, mistake occur live can rectify and improve, it is to avoid repeatedly comes and goes scene, effectively improves work Cheng Shixiao.The location information obtained is checked and accepted by pre- testing it is effectively guaranteed that the accuracy of resource system logical resource, and then Ensure that the smooth of activation instruction is issued and performed when the pre-configured correctness of broadband services plane data and business datum are distributed telephone numbers, and can be had The disposable of effect lifting FTTH business opens success rate.
One of ordinary skill in the art will appreciate that realizing that all or part of step of above-described embodiment can be by hardware To complete, the hardware of correlation can also be instructed to complete by program, described program can be stored in a kind of computer-readable In storage medium, storage medium mentioned above can be read-only storage, disk or CD etc..
Description of the invention is provided for the sake of example and description, and is not exhaustively or by the present invention It is limited to disclosed form.Many modifications and variations are obvious for the ordinary skill in the art.Select and retouch State embodiment and be more preferably to illustrate the principle and practical application of the present invention, and one of ordinary skill in the art is managed The solution present invention is so as to design the various embodiments with various modifications suitable for special-purpose.

Claims (10)

1. logical resource tests acceptance method under a kind of FTTH patterns, it is characterised in that including:
ONT equipment is registered after being connected with OBD equipment to be measured to OLT device;
When user terminal is connected with completing the ONT equipment of registration, user terminal is sent to certificate server by OLT device and connect Enter solicited message, wherein access request information includes testing account information;
Certificate server is authenticated to testing account information;
When certificate server is to testing account information certification success, certificate server extracts the business associated with PON ports Resource information, service resources information is associated with testing account information, sent and be successfully accessed to user terminal by OLT device Response message, wherein PON ports are the ports that OBD equipment to be measured accesses OLT device;
User terminal, which is received, to be successfully accessed after response message, and acceptance information is sent to acceptance server by OLT device, wherein Acceptance information includes testing account information and the OBD information associated with OBD equipment to be measured;
Acceptance server obtains the service resources information associated with testing account information from certificate server;
Acceptance server judges whether service resources information is corresponding with OBD information;
If service resources information is corresponding with OBD information, acceptance server judges to check and accept successfully.
2. according to the method described in claim 1, it is characterised in that:
If service resources information is answered with OBD Asymmetry informations, acceptance server goes out OBD to be measured using service resources information inquiry and set The standby PON port informations being currently accessed;
PON port informations are sent to user terminal by acceptance server by OLT device.
3. method according to claim 1 or 2, it is characterised in that:
The step of acceptance server obtains the service resources information associated with testing account information from certificate server includes:
Acceptance server judges whether OBD information is legal;
If judging, OBD information is legal, and authentication server sends inquiry request information, wherein inquiry request information to certificate server Including testing account information;
Certificate server judges whether the service resources information associated with testing account information;
If in the presence of the service resources information associated with testing account information, service resources information is sent to by certificate server Acceptance server.
4. method according to claim 1 or 2, it is characterised in that:
After ONT equipment is connected with OBD equipment to be measured, the step of being registered to OLT device includes:
After ONT equipment is connected with OBD equipment to be measured, registration information is sent to OLT device, wherein registration information includes The logical identifier LOID information associated with ONT equipment;
OLT device is authenticated to LOID information;
When OLT device is to the success of LOID authentification of messages, OLT device completes the registration of ONT equipment.
5. method according to claim 1 or 2, it is characterised in that:
Service resources information is Broadband Remote Access Server IP address BRAS_IP information and network access server port-mark NAS_PORT_ID information.
6. under a kind of FTTH patterns logical resource test Acceptance Test System, it is characterised in that including ONT equipment, OBD equipment to be measured, OLT device, certificate server, acceptance server, user terminal, wherein:
OBD equipment to be measured, for being connected with OLT device, realizes the information exchange between OLT device and ONT equipment;
ONT equipment, for realizing the information exchange between OBD equipment to be measured and user terminal;It is connected with OBD equipment to be measured Afterwards, registered to OLT device;
User terminal, for when being connected with completing the ONT equipment of registration, being sent and being accessed to certificate server by OLT device Solicited message, wherein access request information include testing account information;After receiving and being successfully accessed response message, pass through OLT Equipment sends acceptance information to acceptance server, and wherein acceptance information includes testing account information and related to OBD equipment to be measured The OBD information of connection;
OLT device, for being registered to ONT equipment;The access request information that user terminal is sent is sent to authentication service Device, is sent to user terminal, the acceptance information that user terminal is sent by the response message that is successfully accessed that certificate server is sent It is sent to acceptance server;
Certificate server, for after access request information is received, being authenticated to testing account information;When testing account letter When ceasing certification success, the service resources information associated with PON ports is extracted, by service resources information and testing account information phase Association, is sent to user terminal by OLT device and is successfully accessed response message, and wherein PON ports are OBD equipment accesses to be measured The port of OLT device;
Acceptance server, for after acceptance information is received, obtaining associated with testing account information from certificate server Service resources information;Judge whether service resources information is corresponding with OBD information, if service resources information is relative with OBD information Should, then judge to check and accept successfully.
7. system according to claim 6, it is characterised in that:
Acceptance server is additionally operable to seasonable in service resources information and OBD Asymmetry informations, goes out to treat using service resources information inquiry The PON port informations that OBD equipment is currently accessed are surveyed, PON port informations are sent to by user terminal by OLT device.
8. the system according to claim 6 or 7, it is characterised in that:
Acceptance server is additionally operable to after acceptance information is received, and judges whether OBD information is legal, if judging, OBD information is legal, Inquiry request information then is sent to certificate server, wherein inquiry request information includes testing account information;
Certificate server is additionally operable to judge whether the service resources information associated with testing account information, if in the presence of with dialling The associated service resources information of account information is surveyed, then service resources information is sent to acceptance server.
9. the system according to claim 6 or 7, it is characterised in that:
ONT equipment is additionally operable to after being connected with OBD equipment to be measured, and registration information, wherein registration request are sent to OLT device Information includes the logical identifier LOID information associated with ONT equipment;
OLT device is additionally operable to be authenticated LOID information, when to the success of LOID authentification of messages, completes the registration of ONT equipment.
10. the system according to claim 6 or 7, it is characterised in that:
Service resources information is Broadband Remote Access Server IP address BRAS_IP information and network access server port-mark NAS_PORT_ID information.
CN201310170724.6A 2013-05-10 2013-05-10 Logical resource test acceptance method and system under FTTH patterns Active CN104144361B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310170724.6A CN104144361B (en) 2013-05-10 2013-05-10 Logical resource test acceptance method and system under FTTH patterns

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310170724.6A CN104144361B (en) 2013-05-10 2013-05-10 Logical resource test acceptance method and system under FTTH patterns

Publications (2)

Publication Number Publication Date
CN104144361A CN104144361A (en) 2014-11-12
CN104144361B true CN104144361B (en) 2017-09-08

Family

ID=51853416

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310170724.6A Active CN104144361B (en) 2013-05-10 2013-05-10 Logical resource test acceptance method and system under FTTH patterns

Country Status (1)

Country Link
CN (1) CN104144361B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104618010B (en) * 2014-12-31 2017-03-15 山东信通电子股份有限公司 Optical network resource information verification method
CN106685525B (en) * 2017-01-13 2019-02-19 浪潮软件集团有限公司 Line quality hanging measurement method based on broadband engineering
CN111083006B (en) * 2019-11-19 2021-11-09 中国联合网络通信集团有限公司 Broadband data auditing method, device, equipment and storage medium
CN112291162B (en) * 2020-10-02 2022-12-06 中盈优创资讯科技有限公司 Business dynamic resource allocation method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1968089A (en) * 2006-09-29 2007-05-23 华为技术有限公司 Subscriber authentication method for passive optical network
CN101141448A (en) * 2007-09-28 2008-03-12 西安大唐电信有限公司 Method for implementing IEEE802.1x user port authentication in ethernet passive optical network

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4236398B2 (en) * 2001-08-15 2009-03-11 富士通株式会社 Communication method, communication system, and communication connection program
JP2003242118A (en) * 2002-02-19 2003-08-29 Allied Tereshisu Kk Communication system, relay device, and program
KR100605855B1 (en) * 2003-09-08 2006-07-31 삼성전자주식회사 Switched broadcasting FTTH system using single fiber

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1968089A (en) * 2006-09-29 2007-05-23 华为技术有限公司 Subscriber authentication method for passive optical network
CN101141448A (en) * 2007-09-28 2008-03-12 西安大唐电信有限公司 Method for implementing IEEE802.1x user port authentication in ethernet passive optical network

Also Published As

Publication number Publication date
CN104144361A (en) 2014-11-12

Similar Documents

Publication Publication Date Title
CN107018127A (en) The Internet of Things virtual gateway and node access authentication method of a kind of compatible various protocols
CN102726069B (en) The dynamic Service group of dialogue-based attribute
CN104144361B (en) Logical resource test acceptance method and system under FTTH patterns
US8873969B2 (en) Method for ONU registration in a passive optical network
CN103236951B (en) A kind of allocation identification method and system of optical network resource
CN102739455B (en) A kind of method of network equipments configuration and device
CN109698758A (en) A kind of network resource information check method and system
CN102437938A (en) Large-scale network monitoring oriented virtual deployment system and method
CN102665216B (en) User authentication method for extensible and distributed wireless local area network (WLAN)
CN106488525A (en) A kind of wireless network construction method of IP dynamic binding and corresponding network framework
CN110505100A (en) Network work order configuration method, device, electronic equipment and computer-readable medium
CN105656672B (en) A kind of failure anticipation diagnostic tool and method based on APP
CN106506230A (en) Method and system based on wireless network remote maintenance field apparatus
CN106992986A (en) A kind of method and system of hybrid authentication
CN107294755B (en) Method, device and system for binding user information and equipment
CN103905236A (en) Terminal positioning method, system and device
CN106331197A (en) Method for managing Internet protocol host, broadband access server and management server
CN112929387B (en) Broadband network multiple authentication and encryption method applied to intelligent community
CN110460474A (en) The configuration method and device of functions of the equipments, storage medium, electronic equipment
CN105323095B (en) A kind of network fault detecting method, system and access device
CN113872817A (en) Network connection control method, device, equipment, storage medium and system
CN109902777A (en) Method based on handheld terminal real time inspection intelligent apparatus on-line testing result
CN203313206U (en) Optical network equipment and optical network resource distribution and identification system
CN100486187C (en) A test method and system for L2TP tunnel specification
CN113660560B (en) Intelligent substation process layer switch topology real-time verification method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant