CN104143125A - Engineering project visualization system management method - Google Patents
Engineering project visualization system management method Download PDFInfo
- Publication number
- CN104143125A CN104143125A CN201410034369.4A CN201410034369A CN104143125A CN 104143125 A CN104143125 A CN 104143125A CN 201410034369 A CN201410034369 A CN 201410034369A CN 104143125 A CN104143125 A CN 104143125A
- Authority
- CN
- China
- Prior art keywords
- engineering
- monomer
- project
- communication network
- feature information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention discloses an engineering project visualization system management method. According to the method, a three-dimensional model is built with single engineering as the basic unit for an engineering project and is implanted in a GPS positioning map so as to position the geographical positions where all single engineering are located; mobile phones of all-level project management personnel are respectively provided with a visual management system; when the systems are started and the mobile phone cameras are aligned with the direction in which a certain single engineering is located, the mobile phone cameras will display corresponding three-dimensional pictures of the single engineering and display basic feature information of the single engineering on the corresponding three-dimensional pictures, and all-level project management personnel can directly inquire the three-dimensional pictures of all single engineering and real-time updated basic feature information any time through a public communication network according to permission. By means of the engineering project visualization system management method, the visual management of engineering projects is achieved, and the actual situations of all engineering can be clear at a glance and visually and clearly known even through the project management personnel are not at the construction site or are unfamiliar with the site construction situations.
Description
Technical field
a kind of method that the present invention relates to engineering project visualization system management, belongs to project management technical field.
Background technology
along with the continuous increase of national economy, urban construction is advanced by leaps and bounds, especially the city integrated body project of ultra-large type is of common occurrence, and this type of engineering is being used under the pattern of conventional management, can not be in time between business decision layer, administration and supervision authorities, each functional department and project management department, information interchange fully, contain much information, the leader of enterprise in the face of magnanimity is mixed and disorderly, correctness and the ageing information can not be guaranteed, be difficult to carry out science decision.
Summary of the invention
the object of the invention is to, a kind of method of engineering project visualization system management is provided, fully use visualization system to manage integrated management and the regulation and control to engineering site for the city integrated body project of ultra-large type.
technical scheme of the present invention:
a method for engineering project visualization system management, the method is that engineering project is set up to three-dimensional model taking monomer engineering as basic composition unit, three-dimensional model comprises the basic feature information of each monomer engineering; Three-dimensional model is implanted to GPS positioning map, for the location in each monomer engineering geographic position of living in; On project managers' at different levels mobile phone, Visualized management system is installed, after system is enabled, when mobile phone camera is aimed to a certain monomer engineering direction of living in, on mobile phone screen, will show the three-dimensional picture of this monomer engineering, and on three-dimensional picture, show the basic feature information of this monomer engineering, project managers at different levels directly pass through the basic feature information of public communication network real-time update monomer engineering according to authority on mobile phone, or inquire about at any time the three-dimensional picture of each monomer engineering and the basic feature information of real-time update.
in preceding method, described basic feature information comprises title, building height, the area information of monomer engineering.
in preceding method, described real-time information comprises the material installation of monomer engineering; , construction number, construct current progress msg and monomer project director information.
in preceding method, described public communication network is China Telecom's communication network, mobile communication network, UNICOM's communication network or Global Link communication network.
compared with prior art, the present invention can long-range, visualized operation, engineering information real-time update, realize engineering project visual management directly perceived, especially the city integrated body project of ultra-large type, also can be very clear even if do not come to working-yard personally or be unfamiliar with site operation situation, the actual conditions of each engineering are inquired about in simple and clear understanding.
Embodiment
below in conjunction with embodiment, the present invention is described in further detail, but not as any limitation of the invention.
a method for engineering project visualization system management, the method is that engineering project is set up to three-dimensional model taking monomer engineering as basic composition unit, three-dimensional model comprises the basic feature information of each monomer engineering; Three-dimensional model is implanted to GPS positioning map, for the location in each monomer engineering geographic position of living in; On project managers' at different levels mobile phone, Visualized management system is installed, after system is enabled, when mobile phone camera is aimed to a certain monomer engineering direction of living in, on mobile phone screen, will show the three-dimensional picture of this monomer engineering, and on three-dimensional picture, show the basic feature information of this monomer engineering, project managers at different levels directly pass through the basic feature information of public communication network real-time update monomer engineering according to authority on mobile phone, or inquire about at any time the three-dimensional picture of each monomer engineering and the basic feature information of real-time update.Basic feature information comprises title, building height, the area information of monomer engineering.Real-time information comprises the material installation of monomer engineering; , construction number, construct current progress msg and monomer project director information.Public communication network is China Telecom's communication network, mobile communication network, UNICOM's communication network or Global Link communication network.
Embodiment
when concrete enforcement, engineering project is set up to three-dimensional model taking monomer engineering as basic composition unit, three-dimensional model comprises the basic feature information of each monomer engineering, as the title of monomer engineering, building height, area information.Three-dimensional model is implanted to GPS positioning map, for the location in each monomer engineering geographic position of living in.This Visualized management system is installed simultaneously on project all levels of management personnel's mobile phone, when enabling after this system, by own mobile phone camera is aimed to engineering project direction of living in, on mobile phone screen, the basic feature information of each monomer engineering directly will be covered and is presented on three-dimensional model picture, all levels of management personnel press authority typing by public communication network and upgrade real-time information, as comprise material, the equipment of monomer engineering; , construction number, construct current progress msg and monomer project director information etc., also can inquire about at any time real-time information and the basic feature information of each monomer engineering.
Claims (4)
1. a method for engineering project visualization system management, is characterized in that: the method is that engineering project is set up to three-dimensional model taking monomer engineering as basic composition unit, and three-dimensional model comprises the basic feature information of each monomer engineering; Three-dimensional model is implanted to GPS positioning map, for the location in each monomer engineering geographic position of living in; On project managers' at different levels mobile phone, Visualized management system is installed, after system is enabled, when mobile phone camera is aimed to a certain monomer engineering direction of living in, on mobile phone screen, will show the three-dimensional picture of this monomer engineering, and on three-dimensional picture, show the basic feature information of this monomer engineering, project managers at different levels directly pass through the basic feature information of public communication network real-time update monomer engineering according to authority on mobile phone, or inquire about at any time the three-dimensional picture of each monomer engineering and the basic feature information of real-time update.
2. method according to claim 1, is characterized in that: described basic feature information comprises title, building height, the area information of monomer engineering.
3. method according to claim 1, is characterized in that: described real-time information comprises monomer construction material equipment; Construction number, construct current progress msg and monomer project director information.
4. method according to claim 1, is characterized in that: described public communication network is China Telecom's communication network, mobile communication network, UNICOM's communication network or Global Link communication network.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410034369.4A CN104143125A (en) | 2014-01-24 | 2014-01-24 | Engineering project visualization system management method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410034369.4A CN104143125A (en) | 2014-01-24 | 2014-01-24 | Engineering project visualization system management method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104143125A true CN104143125A (en) | 2014-11-12 |
Family
ID=51852294
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410034369.4A Pending CN104143125A (en) | 2014-01-24 | 2014-01-24 | Engineering project visualization system management method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104143125A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105844380A (en) * | 2016-01-26 | 2016-08-10 | 湖北文理学院 | BIM-based BIM project element management method and system |
CN105912655A (en) * | 2016-04-11 | 2016-08-31 | 东南大学 | WebGL-based three-dimensional model display method and corresponding Web-BIM engineering information integration management system |
CN110415334A (en) * | 2019-06-26 | 2019-11-05 | 广东康云科技有限公司 | A kind of outdoor scene threedimensional model application system and method |
CN110580266A (en) * | 2019-09-23 | 2019-12-17 | 重庆渝高科技产业(集团)股份有限公司 | large-scale project display method of urban project management platform |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102903142A (en) * | 2012-10-18 | 2013-01-30 | 天津戛唛影视动漫文化传播有限公司 | Method for realizing three-dimensional augmented reality |
CN103150751A (en) * | 2013-01-10 | 2013-06-12 | 江苏易图地理信息工程有限公司 | Three-dimensional modeling method for achieving building inside and outside integration in digital map |
-
2014
- 2014-01-24 CN CN201410034369.4A patent/CN104143125A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102903142A (en) * | 2012-10-18 | 2013-01-30 | 天津戛唛影视动漫文化传播有限公司 | Method for realizing three-dimensional augmented reality |
CN103150751A (en) * | 2013-01-10 | 2013-06-12 | 江苏易图地理信息工程有限公司 | Three-dimensional modeling method for achieving building inside and outside integration in digital map |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105844380A (en) * | 2016-01-26 | 2016-08-10 | 湖北文理学院 | BIM-based BIM project element management method and system |
CN105912655A (en) * | 2016-04-11 | 2016-08-31 | 东南大学 | WebGL-based three-dimensional model display method and corresponding Web-BIM engineering information integration management system |
CN110415334A (en) * | 2019-06-26 | 2019-11-05 | 广东康云科技有限公司 | A kind of outdoor scene threedimensional model application system and method |
CN110415334B (en) * | 2019-06-26 | 2023-03-10 | 广东康云科技有限公司 | Real-scene three-dimensional model application system and method |
CN110580266A (en) * | 2019-09-23 | 2019-12-17 | 重庆渝高科技产业(集团)股份有限公司 | large-scale project display method of urban project management platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207617740U (en) | A kind of rail traffic production operation command system | |
CN107879260B (en) | Tower crane collision avoidance system and security system based on BIM | |
EP3690851A1 (en) | Planning method for express lane and unit | |
CN104143125A (en) | Engineering project visualization system management method | |
CN203816124U (en) | Rescue guiding system of fire fighting truck | |
CN107040991B (en) | A kind of power transmission work monitor system and method | |
CN103426061B (en) | A kind of emergency maintenance based on target following and renewal integral system and method | |
CN103116982B (en) | Traffic offence assistant management system based on mobile internet device | |
KR100973505B1 (en) | Apparatus and system for providing a parking lot information and method thereof | |
CN103366525A (en) | Intelligent multi-police command center management platform | |
CN103281672A (en) | Method for protecting position privacy by mobile terminals | |
CN103366246A (en) | Electrical geographic information service platform system | |
US20140009557A1 (en) | Method and system for acquiring road condition information in real time | |
CN104991932B (en) | The method and its system of satellite real-time early warning grid equipment fire based on power grid GIS | |
CN102622908A (en) | Television monitoring system of automatic tracking vehicle and method thereof | |
CN103268585A (en) | Emergency rescue universal situation map system and implementation method thereof | |
CN206696702U (en) | Robot automated navigation system | |
CN105956045A (en) | Smart surveying and mapping polling and monitoring platform of Beidou positioning and navigation city pipe network | |
CN109712048A (en) | A kind of visual command system based on PGIS | |
CN101945333B (en) | System and method for positioning smart mobile phones one another | |
CN101520866A (en) | Emergency preplan situation map asynchronous cooperation plotting system and realization method thereof | |
CN204740347U (en) | Pile location auxiliary system based on RTK technique | |
CN107202938A (en) | Transmission open acess and display system | |
CN104457776A (en) | Traffic information display method, navigation apparatus, server and navigation system | |
EP3270348A1 (en) | Automated controlled parking fee management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20141112 |