CN104123373B - Determine the method and device of data processing progress - Google Patents

Determine the method and device of data processing progress Download PDF

Info

Publication number
CN104123373B
CN104123373B CN201410363950.0A CN201410363950A CN104123373B CN 104123373 B CN104123373 B CN 104123373B CN 201410363950 A CN201410363950 A CN 201410363950A CN 104123373 B CN104123373 B CN 104123373B
Authority
CN
China
Prior art keywords
data processing
processing progress
features
application
construction schedule
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410363950.0A
Other languages
Chinese (zh)
Other versions
CN104123373A (en
Inventor
陈伟明
屈添祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Huaduo Network Technology Co Ltd
Original Assignee
Guangzhou Huaduo Network Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Huaduo Network Technology Co Ltd filed Critical Guangzhou Huaduo Network Technology Co Ltd
Priority to CN201410363950.0A priority Critical patent/CN104123373B/en
Publication of CN104123373A publication Critical patent/CN104123373A/en
Application granted granted Critical
Publication of CN104123373B publication Critical patent/CN104123373B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types

Abstract

The invention discloses a kind of method and device for determining data processing progress, belong to field of computer technology.This method includes:Extract the current schedules characteristic information of application;Current schedules characteristic information is matched according to the mapping relations between the features of construction schedule information and data processing progress pre-established;Current data processing progress is determined according to matching result.The present invention determines current data processing progress by being matched according to the mapping relations between the features of construction schedule information and data processing progress pre-established to current schedules characteristic information, due to that can pre-establish using the mapping relations between features of construction schedule information and data processing progress, therefore, not only determine the method simple and flexible of data processing progress, and all applications for having built up mapping relations can be applied to, the scope of application is wider.It is therefore, more accurate according to the data processing progress that current schedules characteristic information is determined because current schedules characteristic information is often relevant with current data disposition.

Description

Determine the method and device of data processing progress
Technical field
The present invention relates to field of computer technology, more particularly to a kind of method and device for determining data processing progress.
Background technology
With developing rapidly for computer technology, various applications are occurred in that.Each application is required to by processing Data support that different data processing progresses often correspond to different application affairs in the normal operation of application, and application.Example Such as, for game, different data processing progresses often corresponds to different game events in game.In the mistake of operation application Cheng Zhong, it is often necessary to determine data processing progress according to the actual requirements, is handled with the running situation clearly applied and application Current event.If for example, application is game, and is currently needed for the game events that stop to be currently running, then in order to subsequently can be with Therefrom game is continued to run with the corresponding game events of stop, it is thus necessary to determine that the current data processing progress of game.
In addition, the interactivity in order to expand application, often sets third party's common platform to manage the operation of application.Example Such as, third party's gaming platform can be set, and different clients can run same game under third party's gaming platform, it is real The battle now played.However, for some applications, because third party's common platform does not possess specific data and the application of application Implement process so that third party's common platform determines that the data processing progress of application is generally relatively difficult.For example, for trip For play, because third party's common platform does not possess each specific service data of playing.Therefore, third party's common platform is determined The game progress of different players is relatively difficult.
Correlation technique it is determined that during data processing progress, third party's common platform often simply according to the operation of application when Between wait realize.For example, for game, third party's common platform determines what player ran frequently by the time of player's running game The data processing progress of game.
During the present invention is realized, inventor has found that correlation technique at least has problems with:
Because application is numerous and diverse various, even if the time of different user operation application is identical, different users may also correspond to Different data processing progresses.For example, for game, because different players play different to the proficiency of game, therefore, no The same time often corresponds to different game events, causes to determine that the data processing progress of game is inaccurate by playtime. Therefore, the data processing progress determined according to the time is not only not accurate enough, and flexibility is not high.In addition, being determined according to the time Data processing progress may be only applicable to be directed to the corresponding data processing progress identical application of identical time, such as video Deng restricted application.
The content of the invention
The problem of in order to solve correlation technique, the embodiments of the invention provide it is a kind of determine data processing progress method and Device.The technical scheme is as follows:
First aspect includes there is provided a kind of method for determining data processing progress, methods described:
Extract the current schedules characteristic information of application;
According to the mapping relations between the features of construction schedule information and data processing progress pre-established to the current schedules Characteristic information is matched;
The current data processing progress of the application is determined according to matching result.
With reference in a first aspect, in the first possible implementation of first aspect, the working as extraction application, advances Spend before characteristic information, in addition to:
Start and run the application, the data processing progress being collected into is obtained in the running of the application, is carried Take features of construction schedule information corresponding with the data processing progress being collected into;
It is special according to the data processing progress being collected into and the progress corresponding with the data processing progress being collected into extracted The mapping relations that reference breath is set up between features of construction schedule information and date processing progress.
With reference in a first aspect, in second of possible implementation of first aspect, what the basis was pre-established enters Mapping relations between degree characteristic information and data processing progress are matched to the current schedules characteristic information, including:
The progress in mapping relations between the features of construction schedule information and data processing progress that are pre-established described in inquiry is special Reference ceases, and determines in the features of construction schedule information in the mapping relations with the presence or absence of consistent with the current schedules characteristic information Features of construction schedule information;
The current data processing progress that the application is determined according to matching result, including:
If entered in the features of construction schedule information in the mapping relations in the presence of consistent with the current schedules characteristic information Characteristic information is spent, then by the corresponding number of features of construction schedule information consistent with the current schedules characteristic information in the mapping relations It is defined as the current data processing progress of the application according to processing progress.
With reference in a first aspect, in the third possible implementation of first aspect, the features of construction schedule information is at least Function that program including the resource related to the application, the composition application includes, the corresponding parameter of the function and Using picture.
Any of the third possible implementation with reference to first aspect to first aspect possible implementation, It is described to determine that the current data of the application is handled according to matching result in the 4th kind of possible implementation of first aspect After progress, in addition to:
To each client for running the application recommend the recommendation information related to the current data processing progress or Application strategy.
Second aspect includes there is provided a kind of device for determining data processing progress, described device:
First extraction module, the current schedules characteristic information for extracting application;
Matching module, for according to the mapping relations pair between the features of construction schedule information and data processing progress pre-established The current schedules characteristic information is matched;
Determining module, the current data processing progress for determining the application according to matching result.
With reference to second aspect, in the first possible implementation of second aspect, described device, in addition to:
Module is run, for starting and running the application;
Acquisition module, the data processing progress being collected into for being obtained in the running of the application;
Second extraction module, the corresponding features of construction schedule information of data processing progress for extracting with being collected into;
Set up module, for according to the data processing progress being collected into and extract with the data processing progress that is collected into The mapping relations that corresponding features of construction schedule information is set up between features of construction schedule information and date processing progress.
With reference to second aspect, in second of possible implementation of second aspect, the matching module, for inquiring about The features of construction schedule information in mapping relations between the features of construction schedule information pre-established and data processing progress, determines institute State and whether there is the features of construction schedule information consistent with the current schedules characteristic information in the features of construction schedule information in mapping relations;
The determining module, for special with the current schedules when existing in the features of construction schedule information in the mapping relations It is when reference ceases consistent features of construction schedule information, progress consistent with the current schedules characteristic information in the mapping relations is special Reference ceases the current data processing progress that corresponding data processing progress is defined as the application.
With reference to second aspect, in the third possible implementation of second aspect, the features of construction schedule information is at least Function that program including the resource related to the application, the composition application includes, the corresponding parameter of the function and Using picture.
Any of the third possible implementation with reference to second aspect to second aspect possible implementation, In the 4th kind of possible implementation of second aspect, described device, in addition to:
Recommending module is related to the current data processing progress for recommending to each client for running the application Recommendation information or application strategy.
The beneficial effect that technical scheme provided in an embodiment of the present invention is brought is:
By extracting the current schedules characteristic information of application, and according to the features of construction schedule information pre-established and data processing Mapping relations between progress are matched to determine current data processing progress to current schedules characteristic information, because meeting is advance The mapping relations set up between application features of construction schedule information and data processing progress, therefore, not only determine data processing progress Method is simple, and can determine the data processing progress of application in real time according to current schedules characteristic information.Due to current schedules Characteristic information is often relevant with current data disposition, therefore, is entered according to the data processing that current schedules characteristic information is determined Degree is more accurate.
Brief description of the drawings
Technical scheme in order to illustrate the embodiments of the present invention more clearly, makes required in being described below to embodiment Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for For those of ordinary skill in the art, on the premise of not paying creative work, other can also be obtained according to these accompanying drawings Accompanying drawing.
Fig. 1 is that the implementation environment involved by a kind of method for determination data processing progress that one embodiment of the invention is provided shows It is intended to;
Fig. 2 is a kind of method flow diagram for determination data processing progress that another embodiment of the present invention is provided;
Fig. 3 is a kind of method flow diagram for determination data processing progress that another embodiment of the present invention is provided;
Fig. 4 is a kind of apparatus structure schematic diagram for determination data processing progress that another embodiment of the present invention is provided;
Fig. 5 is a kind of apparatus structure schematic diagram for determination data processing progress that another embodiment of the present invention is provided;
Fig. 6 is a kind of apparatus structure schematic diagram for determination data processing progress that another embodiment of the present invention is provided.
Embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with accompanying drawing to embodiment party of the present invention Formula is described in further detail.
As shown in figure 1, it illustrates the reality involved by the method for determination data processing progress provided in an embodiment of the present invention Apply environment schematic.As shown in figure 1, the implementation environment includes third party's common platform 101 and each client 102.Wherein, Tripartite's common platform 101 provides various applications, different client 102 can by log in third party's common platform 101 come Realization runs each application under third party's common platform 101.For example, third party's common platform 101 can include it is various types of The game of type, different users can log in third party's common platform 101 by corresponding client 102, and the 3rd Square common battle for playing game or game of 101 times realizations of common platform, etc..
Wherein, third party's common platform 101 is connected by network with each client 102, and the network can be wired network Network, or wireless network.On the concrete form of third party's common platform 101, the embodiment of the present invention is not especially limited. When it is implemented, third party's common platform 101 can include features of construction schedule Information Collection System, features of construction schedule information extraction system System and progress judge system.Wherein, features of construction schedule Information Collection System and features of construction schedule information extracting system respectively with progress Judgement system is connected.Features of construction schedule Information Collection System can collect the features of construction schedule information and date processing of various applications in advance Progress, so that being formed includes the database of features of construction schedule information and date processing progress.Features of construction schedule information extracting system can be with Extract the current schedules characteristic information of application.Progress judges that system can be according to features of construction schedule Information Collection System and features of construction schedule Information extracting system determines that this applies current data processing progress.
In addition, each client 102 include but is not limited to can for smart mobile phone, tablet personal computer, E-book reader, MP3 (Moving Picture Experts Group Audio Layer III, dynamic image expert's compression standard audio aspect 3) player, MP4 (Moving Picture Experts Group Audio Layer IV, dynamic image expert's compression standard Audio aspect 3) player, pocket computer on knee and desktop computer, etc..
Specific method each embodiment as described below for determining data processing progress:
Fig. 2 is a kind of flow chart of the method for determination data processing progress according to an exemplary embodiment.Referring to Fig. 2, method flow provided in an embodiment of the present invention includes:
201:Extract the current schedules characteristic information of application.
202:According to the mapping relations between the features of construction schedule information and data processing progress pre-established to current schedules Characteristic information is matched.
Alternatively, before the current schedules characteristic information for extracting application, in addition to:
Start and run application, the data processing progress being collected into is obtained in the running of application, extract with collecting The corresponding features of construction schedule information of data processing progress arrived;
It is special according to the data processing progress being collected into and the progress corresponding with the data processing progress being collected into extracted The mapping relations that reference breath is set up between features of construction schedule information and date processing progress.
Alternatively, features of construction schedule information at least include to application related resource, composition apply program include function, The corresponding parameter of function and apply picture.
203:The current data processing progress of application is determined according to matching result.
Alternatively, worked as according to the mapping relations between the features of construction schedule information and data processing progress pre-established to described Preceding progress characteristic information is matched, including:
The features of construction schedule letter inquired about in the mapping relations between the features of construction schedule information pre-established and data processing progress Breath, is determined in the features of construction schedule information in mapping relations with the presence or absence of the features of construction schedule letter consistent with current schedules characteristic information Breath;
The current data processing progress of application is determined according to matching result, including:
If having the features of construction schedule consistent with current schedules characteristic information in the features of construction schedule information in mapping relations to believe The corresponding data processing progress of features of construction schedule information consistent with current schedules characteristic information in mapping relations, then be defined as by breath The current data processing progress of application.
Alternatively, after the current data processing progress that application is determined according to matching result, in addition to:
Each client to operation application recommends the recommendation information or application strategy related to current data processing progress.
Method provided in an embodiment of the present invention, by extracting the current schedules characteristic information of application, and according to pre-establishing Features of construction schedule information and data processing progress between mapping relations current schedules characteristic information is matched determine work as Preceding data processing progress, due to that can pre-establish using the mapping relations between features of construction schedule information and data processing progress, because This, not only determines the method simple and flexible of data processing progress, and can have built up answering for mapping relations suitable for all With the scope of application is wider.Further, since current schedules characteristic information is often relevant with current data disposition, therefore, according to The data processing progress that current schedules characteristic information is determined is more accurate.
The content of implementation environment and above-described embodiment with reference to shown in Fig. 1, Fig. 3 is provided according to an exemplary embodiment A kind of flow chart for the method for determining data processing progress.Referring to Fig. 3, method flow provided in an embodiment of the present invention includes:
301:Start and run application, obtain the data processing progress being collected into the running of application, extract with The corresponding features of construction schedule information of data processing progress being collected into, according to the data processing progress being collected into and extract with receipts The mapping that the corresponding features of construction schedule information of data processing progress collected is set up between features of construction schedule information and date processing progress Relation.
Wherein, the step of the mapping relations between features of construction schedule information and date processing progress of the step to set up application Suddenly.For the ease of determining data processing progress, method provided in an embodiment of the present invention is supported to pre-establish the progress of each application Mapping relations between characteristic information and data processing progress, can subsequently be determined according to the mapping relations of the application of the foundation should Data processing progress.In order to set up the mapping relations between the features of construction schedule information and date processing progress of application, it is necessary to Start and run application, and the data processing progress being collected into is obtained in the running of application, and extract with being collected into The corresponding features of construction schedule information of data processing progress.
Mode on starting and running application, the embodiment of the present invention is not especially limited.When it is implemented, including but not It is limited to obtain application program operating instruction, and is started according to the application program operating instruction and run application.
Wherein, the mode for the data processing progress being collected into is obtained in the running of application can many kinds.Tool When body is implemented, when collecting data processing progress, include but is not limited to collect personnel in application by default value application message Running in operate the application, and some for determining in the application have the transition point of explicit data processing progress so that Each transition point is defined as each data processing progress.Determine furthermore it is also possible to collect personnel by default value application message When collect application data processing progress, and from timed collection to application data processing progress in extract available data processing and enter Degree.Wherein, third party's common platform is including but not limited to advance by the application when obtaining the data processing progress being collected into The data processing progress typing interface of setting obtains each application message and collects the data processing progress that personnel determine and submitted.
If for example, application is game, and game includes many outposts of the tax office, then application message collection personnel can be in operation trip During play, using each outpost of the tax office as a transition point, will each the outpost of the tax office as a determination data processing progress, and Submitted by the data processing progress typing interface pre-set after the data processing progress determined, third party's common platform passes through Receive the data processing progress submitted and obtain the data processing progress being collected into.
Wherein, the embodiment of the present invention is not defined to the particular content of features of construction schedule information.When it is implemented, progress is special Reference breath at least includes the corresponding parameter of function, function included to the program of the related resource of application, composition application and should Use picture.Certainly, features of construction schedule information can also include the information such as application operation duration, and the embodiment of the present invention is not made specifically to this Limit.
In addition, the corresponding parameter of function, function that includes of program on being applied to the related resource of application, composition and Using the particular content of the features of construction schedule information such as picture, the embodiment of the present invention is equally not especially limited.When it is implemented, can be with There are different contents with reference to different types of application.If for example, application is game, due to that can be related to many materials in game Matter, stage property etc., therefore, it can to play material, stage property for being related to etc. are used as the resource related to game.Further, since in fortune During row game, different game events are generally required by running when certain function realization and operation function often The corresponding parameter of the function is called, therefore, the parameter of the corresponding function of each game events and function call can be used as game Features of construction schedule information in composition game the function that includes of program and the corresponding parameter of function.Further, since each game Event corresponds at least one image, therefore, can be using image as applying picture.When certainly, herein only with application for game Features of construction schedule information has been carried out for example, when it is implemented, the type of application can be any type, the embodiment of the present invention is not Make specific limit.
Mode on extracting features of construction schedule information corresponding with the data processing progress being collected into, can combine progress special Depending on the particular content of reference breath.If for example, features of construction schedule information includes the program to the related resource of application, composition application Including function, the corresponding parameter of function and apply picture, then extract progress corresponding with the data processing progress being collected into Characteristic information includes:Extract the program applied with the related resource of application, composition corresponding to the data processing progress being collected into Including function, the corresponding parameter of function and apply picture.
Further, the data processing progress that is collected into, and the data processing progress extracted and be collected into are being got After corresponding features of construction schedule information, just can according to the data processing progress being collected into and extract with the data that are collected into The mapping relations that the corresponding features of construction schedule information of reason progress is set up between features of construction schedule information and date processing progress.In addition, Set up after the mapping relations, the mapping relations of foundation can be stored.On the mode of the mapping relations of storage, the present invention is implemented Example is not especially limited.When it is implemented, including but is not limited to be stored by way of as shown in Table 1.
Table one
Data processing progress Features of construction schedule information
Data processing progress A Features of construction schedule information A
Data processing progress B Features of construction schedule information B
Wherein, when storing progress characteristic information in Table 1, when features of construction schedule information includes and the related resource of application, group When the function, the parameter of function call and the application picture that include into the program of application, features of construction schedule letter can also be further stored Cease the function included with the program of the related resource of application, composition application included to features of construction schedule information, the ginseng of function call The mapping relations of number and application picture.As shown in Table 2, it illustrates a kind of storage progress characteristic information and features of construction schedule information Including the function included to the program of the related resource of application, composition application, the parameter of function call and apply picture reflecting Penetrate the form of relation.
Table two
Certainly, each parameter is only used for citing in above-mentioned table two, does not constitute the limitation to the embodiment of the present invention.
It should be noted that between the features of construction schedule information and date processing progress applied due to step 301 for foundation The step of mapping relations, due to being not every time it is determined that being required to set up the features of construction schedule information of application during data processing progress With the mapping relations between data processing progress.Therefore, it is not to determine to be required to perform the step during data processing progress every time Suddenly, it is ensured that it is determined that setting up the mapping relations between features of construction schedule information and date processing progress before data processing.
302:Extract the current schedules characteristic information of application.
Each client access to third-party common platform, and after third party's common platform runs a certain application, the present invention The method that embodiment is provided by way of extracting the current schedules characteristic information for the application that each client is run triggering determination The data processing progress of the application of each client operation.Wherein, on each client access to third-party common platform, and Third party's common platform runs the mode of a certain application, includes but is not limited to:Each client logs in the by corresponding account Tripartite's common platform, and in third party's common platform selection one application of operation.
On the mode for the current schedules characteristic information for extracting application, the embodiment of the present invention is not especially limited.It is specific real Shi Shi, may refer to the mode of the corresponding features of construction schedule information of the data processing progress extracting be collected into above-mentioned steps 301 Unanimously.Specifically, if features of construction schedule information includes function, the letter included to the program of the related resource of application, composition application Count corresponding parameter and apply picture, then extracting the current schedules characteristic information of application includes:Extract what application was currently loaded Resource, the function currently called, the corresponding parameter of function currently called and current application picture.
303:According to the mapping relations between the features of construction schedule information and data processing progress pre-established to current schedules Characteristic information is matched, and the current data processing progress of application is determined according to matching result.
Mapping relations between the features of construction schedule information and data processing progress that are pre-established on basis are to current schedules The mode that characteristic information is matched, and according to matching result determine application current data processing progress mode, this hair Bright embodiment is not especially limited.When it is implemented, according between the features of construction schedule information and data processing progress pre-established Mapping relations when being matched to current schedules characteristic information, include but is not limited to:Inquire about the features of construction schedule letter pre-established The features of construction schedule information in mapping relations between breath and data processing progress, and determine the features of construction schedule information in mapping relations In whether there is the features of construction schedule information consistent with current schedules characteristic information.
Wherein, the progress in the mapping relations between the features of construction schedule information and data processing progress that inquiry is pre-established Characteristic information, and determine to whether there is the progress consistent with current schedules characteristic information in the features of construction schedule information in mapping relations During characteristic information, include but is not limited to carry out by the features of construction schedule information for including current schedules characteristic information and mapping relations Compare to realize one by one.
Specifically, if features of construction schedule information include to application related resource, composition apply program include function, The corresponding parameter of function and apply picture, then by current schedules characteristic information and the application features of construction schedule information pre-established and Mapping relations between data processing progress are matched, including:Inquire about the features of construction schedule information pre-established and data processing What the program applied to the related resource of application, composition that the features of construction schedule information in the mapping relations between progress includes included The corresponding parameter of function, function and picture is applied, determine that the features of construction schedule information in mapping relations includes related to application Resource, the corresponding parameter of function, function that includes of program of composition application and application picture in whether there is with when advancing The resource of the current loading that includes of degree characteristic information, the function currently called, the corresponding parameter of function currently called and work as The application features of construction schedule information of preceding application picture unanimously.
Current data processing progress on determining application according to matching result, includes but is not limited to:If mapping relations In features of construction schedule information in exist the features of construction schedule information consistent with current schedules characteristic information, then by mapping relations with work as The corresponding data processing progress of the consistent features of construction schedule information of preceding progress characteristic information be defined as application current data handle into Degree.If for example, features of construction schedule information consistent with current schedules characteristic information in mapping relations be features of construction schedule information A, and Data processing progress corresponding with features of construction schedule information A is data processing progress A, then data processing progress A is defined as into application Current data processing progress.
Specifically, if features of construction schedule information include to application related resource, composition apply program include function, The corresponding parameter of function and picture is applied, then current data processing progress is determined according to matching result, including:If mapping is closed The function, the function that include to the program of the related resource of application, composition application that features of construction schedule information in system includes are corresponding Parameter and application picture in exist include with current schedules characteristic information current loading resource, currently call function, The application features of construction schedule information of the corresponding parameter of function and current application picture currently called unanimously, then by mapping relations Parameter corresponding with resource, the function currently called, the current calling function of the current loading that current schedules characteristic information includes And the corresponding data processing progress of application features of construction schedule information of current application picture unanimously as the current data of application at Reason progress.
304:To each client recommendation of operation application recommendation information related to current data processing progress or application Strategy.
The step is optional step.It is determined that after data processing progress, for the client correspondence for the operation application User the method for some corresponding applications of processing current data processing progress is provided, or recommend some current numbers with application According to the related recommendation information of processing progress, the step can be performed.
Wherein, not pair recommendation information related to current data processing progress or application strategy of the embodiment of the present invention is specific Content is defined.When it is implemented, the particular content of the related recommendation information of current data processing progress or application strategy with The type of application is relevant.If for example, application is game, the recommendation information related to current data processing progress or applying plan Slightly include but is not limited to the attack skill for going game progress, or stage property corresponding with current data processing progress, advertisement Information etc..
Method provided in an embodiment of the present invention, by extracting the current schedules characteristic information of application, and according to pre-establishing Features of construction schedule information and data processing progress between mapping relations current schedules characteristic information is matched determine work as Preceding data processing progress, due to that can pre-establish using the mapping relations between features of construction schedule information and data processing progress, because This, not only determines the method simple and flexible of data processing progress, and can have built up answering for mapping relations suitable for all With the scope of application is wider.Further, since current schedules characteristic information is often relevant with current data disposition, therefore, according to The data processing progress that current schedules characteristic information is determined is more accurate.
Fig. 4 is a kind of structural representation of the device of determination data processing progress according to an exemplary embodiment, The terminal is used to perform the method for providing fixed number really in the corresponding embodiments of above-mentioned Fig. 2 or Fig. 3 according to processing progress.Referring to Fig. 4, The device includes:
First extraction module 401, the current schedules characteristic information for extracting application;
Matching module 402, for being closed according to the mapping between the features of construction schedule information and data processing progress pre-established System matches to current schedules characteristic information;
Determining module 403, the current data processing progress for determining application according to matching result.
Alternatively, referring to Fig. 5, device, in addition to:
Module 404 is run, for starting and running application;
Acquisition module 405, the data processing progress being collected into for being obtained in the running of application;
Second extraction module 406, the corresponding features of construction schedule information of data processing progress for extracting with being collected into;
Set up module 307, for according to the data processing progress being collected into and extract with the data processing that is collected into The mapping relations that the corresponding features of construction schedule information of progress is set up between features of construction schedule information and date processing progress.
Alternatively, matching module 402, for inquiring about between the features of construction schedule information pre-established and data processing progress Features of construction schedule information in mapping relations, determines to whether there is and current schedules feature in the features of construction schedule information in mapping relations The consistent features of construction schedule information of information;
Determining module 403, for when in the features of construction schedule information in mapping relations exist and current schedules characteristic information one During the features of construction schedule information of cause, by the corresponding data of features of construction schedule information consistent with current schedules characteristic information in mapping relations Processing progress is defined as the current data processing progress of application.
Alternatively, features of construction schedule information at least include to application related resource, composition apply program include function, The corresponding parameter of function and apply picture.
Alternatively, referring to Fig. 6, device, in addition to:
Recommending module 408, related to current data processing progress push away is recommended for each client to operation application Recommend information or application strategy.
Device provided in an embodiment of the present invention, by extracting the current schedules characteristic information of application, and according to pre-establishing Features of construction schedule information and data processing progress between mapping relations current schedules characteristic information is matched determine work as Preceding data processing progress, due to that can pre-establish using the mapping relations between features of construction schedule information and data processing progress, because This, not only determines the method simple and flexible of data processing progress, and can have built up answering for mapping relations suitable for all With the scope of application is wider.Further, since current schedules characteristic information is often relevant with current data disposition, therefore, according to The data processing progress that current schedules characteristic information is determined is more accurate.
It should be noted that:Above-described embodiment provide really fixed number according to the device of processing progress it is determined that data processing progress When, only with the division progress of above-mentioned each functional module for example, in practical application, as needed can divide above-mentioned functions With by different functional module completions, i.e., the internal structure of device is divided into different functional modules, to complete above description All or part of function.In addition, above-described embodiment provides device and determination data processing of the fixed number according to processing progress really The embodiment of the method for progress belongs to same design, and it implements process and refers to embodiment of the method, repeats no more here.
The embodiments of the present invention are for illustration only, and the quality of embodiment is not represented.
One of ordinary skill in the art will appreciate that realizing that all or part of step of above-described embodiment can be by hardware To complete, the hardware of correlation can also be instructed to complete by program, described program can be stored in a kind of computer-readable In storage medium, storage medium mentioned above can be read-only storage, disk or CD etc..
The foregoing is only presently preferred embodiments of the present invention, be not intended to limit the invention, it is all the present invention spirit and Within principle, any modification, equivalent substitution and improvements made etc. should be included in the scope of the protection.

Claims (8)

1. a kind of method for determining data processing progress, it is characterised in that methods described includes:
Extract application current schedules characteristic information, the features of construction schedule information at least include the resource related to the application, Constitute function, the corresponding parameter of the function and apply picture that the program of the application includes;
According to the mapping relations between the features of construction schedule information and data processing progress pre-established to the current schedules feature Information is matched;
The current data processing progress of the application is determined according to matching result.
2. according to the method described in claim 1, it is characterised in that before the current schedules characteristic information for extracting application, Also include:
Start and run the application, obtain the data processing progress being collected into the running of the application, extract with The corresponding features of construction schedule information of data processing progress being collected into;
Believed according to the data processing progress being collected into and the features of construction schedule corresponding with the data processing progress being collected into extracted Cease the mapping relations set up between features of construction schedule information and date processing progress.
3. according to the method described in claim 1, it is characterised in that features of construction schedule information and data that the basis is pre-established Mapping relations between processing progress are matched to the current schedules characteristic information, including:
Features of construction schedule letter in mapping relations between the features of construction schedule information and data processing progress that are pre-established described in inquiry Breath, determines to whether there is the progress consistent with the current schedules characteristic information in the features of construction schedule information in the mapping relations Characteristic information;
The current data processing progress that the application is determined according to matching result, including:
If it is special to there is the progress consistent with the current schedules characteristic information in the features of construction schedule information in the mapping relations Reference ceases, then by the corresponding data of features of construction schedule information consistent with the current schedules characteristic information in the mapping relations Reason progress is defined as the current data processing progress of the application.
4. the method according to any claim in claims 1 to 3, it is characterised in that described true according to matching result After the current data processing progress of the fixed application, in addition to:
To each client recommendation for running the application recommendation information related to the current data processing progress or application Strategy.
5. a kind of device for determining data processing progress, it is characterised in that described device includes:
First extraction module, the current schedules characteristic information for extracting application, the features of construction schedule information at least includes and institute State the function included using the program of related resource, the composition application, the corresponding parameter of the function and apply picture;
Matching module, the mapping relations between the features of construction schedule information and data processing progress that are pre-established for basis are to described Current schedules characteristic information is matched;
Determining module, the current data processing progress for determining the application according to matching result.
6. device according to claim 5, it is characterised in that described device, in addition to:
Module is run, for starting and running the application;
Acquisition module, the data processing progress being collected into for being obtained in the running of the application;
Second extraction module, the corresponding features of construction schedule information of data processing progress for extracting with being collected into;
Set up module, for according to the data processing progress being collected into and extract it is corresponding with the data processing progress being collected into The mapping relations set up between features of construction schedule information and date processing progress of features of construction schedule information.
7. device according to claim 5, it is characterised in that the matching module, for inquiring about described pre-establish Features of construction schedule information in mapping relations between features of construction schedule information and data processing progress, is determined in the mapping relations It whether there is the features of construction schedule information consistent with the current schedules characteristic information in features of construction schedule information;
The determining module, for when in the features of construction schedule information in the mapping relations exist and the current schedules feature believe When ceasing consistent features of construction schedule information, features of construction schedule consistent with the current schedules characteristic information in the mapping relations is believed Cease the current data processing progress that corresponding data processing progress is defined as the application.
8. the device according to any claim in claim 5 to 7, it is characterised in that described device, in addition to:
Recommending module, for recommending push away related to the current data processing progress to each client for running the application Recommend information or application strategy.
CN201410363950.0A 2014-07-28 2014-07-28 Determine the method and device of data processing progress Active CN104123373B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410363950.0A CN104123373B (en) 2014-07-28 2014-07-28 Determine the method and device of data processing progress

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410363950.0A CN104123373B (en) 2014-07-28 2014-07-28 Determine the method and device of data processing progress

Publications (2)

Publication Number Publication Date
CN104123373A CN104123373A (en) 2014-10-29
CN104123373B true CN104123373B (en) 2017-08-08

Family

ID=51768784

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410363950.0A Active CN104123373B (en) 2014-07-28 2014-07-28 Determine the method and device of data processing progress

Country Status (1)

Country Link
CN (1) CN104123373B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1541009A (en) * 2003-04-22 2004-10-27 英业达股份有限公司 Method for downloading game data to mobile phone in batches
CN102393830A (en) * 2011-06-28 2012-03-28 用友软件股份有限公司 Data processing time acquisition method and device
CN103699473A (en) * 2013-12-13 2014-04-02 乐视网信息技术(北京)股份有限公司 Indicating method and device for task progress

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090106684A1 (en) * 2007-10-22 2009-04-23 Al Chakra System and Method to Facilitate Progress Forking
TWI480733B (en) * 2012-03-29 2015-04-11 Phison Electronics Corp Data writing mehod, and memory controller and memory storage device using the same

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1541009A (en) * 2003-04-22 2004-10-27 英业达股份有限公司 Method for downloading game data to mobile phone in batches
CN102393830A (en) * 2011-06-28 2012-03-28 用友软件股份有限公司 Data processing time acquisition method and device
CN103699473A (en) * 2013-12-13 2014-04-02 乐视网信息技术(北京)股份有限公司 Indicating method and device for task progress

Also Published As

Publication number Publication date
CN104123373A (en) 2014-10-29

Similar Documents

Publication Publication Date Title
CN102904936B (en) Method, server, device, system and apparatus for establishing session
CN102111730B (en) Mobile terminal address list-based information-distributing method and system
CN103118031B (en) Log in method and the electronic equipment of application account
CN108022583A (en) Meeting summary generation method, application server and computer-readable recording medium
CN105657471B (en) A kind of method and apparatus of account executive
CN111160976A (en) Resource allocation method, device, electronic equipment and storage medium
CN106792250A (en) Barrage information interacting method and device
EP2811399A1 (en) Method and terminal for starting music application
CN109756766A (en) Virtual present display methods, storage medium, electronic equipment and the system of platform is broadcast live
CN105727558A (en) Interaction invitation processing method and device
CN108282393A (en) A kind of good friend's adding method, device, computer equipment and readable storage medium storing program for executing
CN104915588B (en) The method for secret protection and device of electronic equipment
CN110177041B (en) Voice information sending method and device, storage medium and electronic device
CN108647023A (en) Picture compression method, apparatus, equipment and the storage medium of Software Development Tools
CN106227813A (en) For the method and apparatus preventing voice ballot cheating
CN104317473B (en) A kind of interface display method and client
CN107391748A (en) Question and answer political affairs management method, device, system and computer-readable recording medium
CN105549844A (en) Picture or information sticky method and device and mobile terminal
CN106503080A (en) Information issuing method and device
CN104123373B (en) Determine the method and device of data processing progress
CN106162231A (en) The method and device that a kind of net cast turning point is broadcast
CN112667081A (en) Bullet screen display method and device, storage medium and terminal
CN104111993B (en) The recognition methods of application archive and device
CN107665465A (en) Obtain history sharing information method, mobile terminal and the device with store function
CN113138702B (en) Information processing method, device, electronic equipment and storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 511446 Guangzhou City, Guangdong Province, Panyu District, South Village, Huambo Business District Wanda Plaza, block B1, floor 28

Applicant after: Guangzhou Huaduo Network Technology Co., Ltd.

Address before: 510655, Guangzhou, Whampoa Avenue, No. 2, creative industrial park, building 3-08,

Applicant before: Guangzhou Huaduo Network Technology Co., Ltd.

GR01 Patent grant