A kind of well lid execution management method therefor based on electronic tag
Technical field
The present invention relates to well lid construction management technical field, particularly a kind of well lid execution management method therefor based on electronic tag.
Background technology
Well lid is the facility that urban road is very necessary, and its use is safeguarded and all needed by unified management, the normal use of guarantee well lid.The management of existing well lid is only to register in the scene of realizing workmen by electronic tag, and after registering, whether workmen has the operation of carrying out, and the various states of the progress of operation and operation cannot be followed the trail of.For unified management and to workmen's management and control, all exist problem like this.
Summary of the invention
In view of this, the object of this invention is to provide a kind of well lid execution management method therefor based on electronic tag, can realize the construct track record of whole process of well lid.
The present invention adopts following scheme to realize: a kind of well lid execution management method therefor based on electronic tag, is characterized in that comprising the following steps:
Step S01 a: long-distance management system is provided, sets up well lid information database in this long-distance management system; This long-distance management system receives construction task data, forms job order;
Step S02: workmen's handheld terminal receives job order, shows the place of well lid to be onstructed;
Step S03: workmen reaches the spot, carries out construction task, and this construction task comprises following flow process:
Step S031: workmen first reads with handheld terminal the electronic tag being arranged on well lid, and the information reading is carried out to verification; Verification succeeds, enters step S032; Otherwise prompting, well lid is not right;
Step S032: workmen, every a schedule time, utilizes handheld terminal to read once the label of this well lid and the picture that gathers well lid state, and editing mode content, sends to described long-distance management system;
Step S033: long-distance management system receives after information, stores;
Step S04: construction finishes, and workmen sends ending message to described long-distance management system by handheld terminal.
In an embodiment of the present invention, in described step S02, the place that shows well lid to be onstructed is that the digital map navigation by handheld terminal shows.
In an embodiment of the present invention, step S02: it is to carry out job order by long-distance management system by the mode of note or voice to assign that workmen's handheld terminal receives job order.
In an embodiment of the present invention, in described step S031, after verification succeeds, described handheld terminal triggers one and registers successful information to described long-distance management system, realizes remote scene and registers.
In an embodiment of the present invention, the structure of described editing mode content is: construction stage sequence number+maintenance content.
In an embodiment of the present invention, described handheld terminal is mobile phone or palm PC.
In an embodiment of the present invention, reading described electronic tag is to realize by an electronic tag read head, and this electronic tag read head is given described handheld terminal by bluetooth by the communication reading.
In an embodiment of the present invention, also comprise in described constructor's tour process, the well lid that discovery is gone wrong, by handheld terminal, clap the electronic tag of picture+this well lid of getting this problem well lid, be sent to described long-distance management system, after long-distance management system is received, automatically form job order, be handed down to this constructor's handheld terminal.
The present invention is by constructor's handheld terminal, utilize electronic tag, realized registering and status tracking and the record of work progress of well lid construction, for well lid management send, work summary responses, construction responsibility are clear and definite, the Real-time Feedback of constructing, management process automation, saves managerial cost.
Accompanying drawing explanation
Fig. 1 is embodiment of the present invention schematic flow sheet.
Embodiment
Below in conjunction with drawings and Examples, the present invention will be further described.
As shown in Figure 1, the present embodiment provides a kind of well lid execution management method therefor based on electronic tag, it is characterized in that comprising the following steps:
Step S01 a: long-distance management system is provided, sets up well lid information database in this long-distance management system; This long-distance management system receives construction task data, forms job order;
Step S02: workmen's handheld terminal receives job order, shows the place of well lid to be onstructed;
Step S03: workmen reaches the spot, carries out construction task, and this construction task comprises following flow process:
Step S031: workmen first reads with handheld terminal the electronic tag being arranged on well lid, and the information reading is carried out to verification; Verification succeeds, enters step S032; Otherwise prompting, well lid is not right;
Step S032: workmen, every a schedule time, utilizes handheld terminal to read once the label of this well lid and the picture that gathers well lid state, and editing mode content, sends to described long-distance management system;
Step S033: long-distance management system receives after information, stores;
Step S04: construction finishes, and workmen sends ending message to described long-distance management system by handheld terminal.
In described step S02, the place that shows well lid to be onstructed is that the digital map navigation by handheld terminal shows.
Preferably, in an embodiment of the present invention, in described step S02, the place that shows well lid to be onstructed is that the digital map navigation by handheld terminal shows.Like this, constructor can be according to the map, or directly the position of well lid to be onstructed is found in navigation, avoids workmen for looking for well lid to lose time.In addition, at step S02: it is to carry out job order by long-distance management system by the mode of note or voice to assign that workmen's handheld terminal receives job order.
In an embodiment of the present invention, in described step S031, after verification succeeds, described handheld terminal triggers one and registers successful information to described long-distance management system, realizes remote scene and registers.
In order better to record Construction State, the structure of the editing mode content described in the present embodiment is: construction stage sequence number+maintenance content.For example: after registering, the first stage, open well lid, state content is: 1+ uncaps; Also can be by the mode of voice, i.e. recording: the first stage uncaps.Be sent to long-distance management system, and carry out stored record.So not only be conducive to supvr workmen's Construction State is monitored in real time, also can be used as the inquiry of historical data.Improved the efficiency that well lid is safeguarded.
It is worth mentioning that, described handheld terminal is mobile phone or palm PC.In addition, read described electronic tag and also can realize by an electronic tag read head, this electronic tag read head is given described handheld terminal by bluetooth by the communication reading.
In addition, method of the present invention also comprises in described constructor's tour process, the well lid that discovery is gone wrong, by handheld terminal, clap the electronic tag of picture+this well lid of getting this problem well lid, be sent to described long-distance management system, after long-distance management system is received, automatically form job order, be handed down to this constructor's handheld terminal.Like this, method of the present invention can realize the interaction of well lid management, and the interaction between constructor and the task person of issuing, accomplishes well lid management personalization, high efficiency.
The foregoing is only preferred embodiment of the present invention, all equalizations of doing according to the present patent application the scope of the claims change and modify, and all should belong to covering scope of the present invention.