CN104104146B - 一种大电网变电设备在线监测数据模型建立方法 - Google Patents
一种大电网变电设备在线监测数据模型建立方法 Download PDFInfo
- Publication number
- CN104104146B CN104104146B CN201410264803.8A CN201410264803A CN104104146B CN 104104146 B CN104104146 B CN 104104146B CN 201410264803 A CN201410264803 A CN 201410264803A CN 104104146 B CN104104146 B CN 104104146B
- Authority
- CN
- China
- Prior art keywords
- model
- system model
- transformer substation
- transformer
- substation system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/16—Electric power substations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/242—Home appliances
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410264803.8A CN104104146B (zh) | 2014-06-16 | 2014-06-16 | 一种大电网变电设备在线监测数据模型建立方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410264803.8A CN104104146B (zh) | 2014-06-16 | 2014-06-16 | 一种大电网变电设备在线监测数据模型建立方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104104146A CN104104146A (zh) | 2014-10-15 |
CN104104146B true CN104104146B (zh) | 2016-12-07 |
Family
ID=51672054
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410264803.8A Active CN104104146B (zh) | 2014-06-16 | 2014-06-16 | 一种大电网变电设备在线监测数据模型建立方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104104146B (zh) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104331562B (zh) * | 2014-11-06 | 2016-05-11 | 国家电网公司 | 一种电网信息系统中地理接线图的沿布方法及装置 |
CN104485750A (zh) * | 2015-01-07 | 2015-04-01 | 山东鲁能智能技术有限公司 | 一种基于认知的自适应匹配变电站一体化电源系统 |
CN105652137B (zh) * | 2015-12-28 | 2018-07-24 | 云南电网有限责任公司电力科学研究院 | 一种变电站在线监测诊断模型识别方法及装置 |
CN110516899B (zh) * | 2019-07-03 | 2022-03-15 | 南方电网科学研究院有限责任公司 | 一种实时仿真的网级与省级agc联合闭环测试方法及装置 |
CN111190983B (zh) * | 2019-12-25 | 2024-04-26 | 南方电网数字电网科技(广东)有限公司 | 一种变电站图模与输电线路拼接装置、系统和方法 |
CN113625644B (zh) * | 2021-08-19 | 2022-04-15 | 国网四川省电力公司电力科学研究院 | 一种交流系统调试的辅助系统 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101958582A (zh) * | 2010-10-29 | 2011-01-26 | 广东电网公司电力科学研究院 | 变电站视频及环境监控省级主站系统 |
CN102510127A (zh) * | 2011-10-21 | 2012-06-20 | 南京南瑞继保电气有限公司 | 电网在线监测的一次和二次设备统一模型的方法 |
CN102929911A (zh) * | 2012-09-10 | 2013-02-13 | 福建省电力有限公司 | 变电站与调度主站一体化建模方法 |
CN103457356A (zh) * | 2013-09-14 | 2013-12-18 | 毛振刚 | 智能化电网输变电设备在线监测系统 |
-
2014
- 2014-06-16 CN CN201410264803.8A patent/CN104104146B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101958582A (zh) * | 2010-10-29 | 2011-01-26 | 广东电网公司电力科学研究院 | 变电站视频及环境监控省级主站系统 |
CN102510127A (zh) * | 2011-10-21 | 2012-06-20 | 南京南瑞继保电气有限公司 | 电网在线监测的一次和二次设备统一模型的方法 |
CN102929911A (zh) * | 2012-09-10 | 2013-02-13 | 福建省电力有限公司 | 变电站与调度主站一体化建模方法 |
CN103457356A (zh) * | 2013-09-14 | 2013-12-18 | 毛振刚 | 智能化电网输变电设备在线监测系统 |
Non-Patent Citations (3)
Title |
---|
房岭峰等.基于IEC61850标准的变电站设备分布式在线监测系统的研究.《华东电力》.2013,第41卷(第5期),1085-1089. * |
王德文等.变电站在线监测系统的一体化建模与模型维护.《电力系统自动化》.2013,第37卷(第23期),78-82. * |
黄新波等.智能变电站在线监测系统的IEC61850信息建模与通信实现.《广东电力》.2014,第27卷(第1期),66-70,80. * |
Also Published As
Publication number | Publication date |
---|---|
CN104104146A (zh) | 2014-10-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104104146B (zh) | 一种大电网变电设备在线监测数据模型建立方法 | |
CN202261389U (zh) | 输电线路运维巡检管理信息系统 | |
CN104091034B (zh) | 基于图形匹配的线路联络图自动成图系统及方法 | |
CN104950351B (zh) | 基于气象的多气象要素复合横向展示方法及系统 | |
CN104217305A (zh) | 一种用于电网快速抢修的数据采集及定位监控系统 | |
CN204348052U (zh) | 低压电网用电信息采集系统 | |
CN109933634B (zh) | 一种基于电源辐射范围的电力系统图绘制方法 | |
CN104036374A (zh) | 电网运行事故处置辅助方法 | |
CN104102790A (zh) | 基于gis的供电图自动成图系统及方法 | |
CN104902235A (zh) | 一种无线网络通讯实时监控系统及监控方法 | |
CN102156948B (zh) | 一种电力线路杆塔电子识别与登杆人员自动定位系统 | |
CN107896004B (zh) | 一种基于lbs的变电站设备状态信息显示方法及系统 | |
CN105320113A (zh) | 电网空间信息服务平台与配电自动化系统的信息交互方法 | |
CN109447299A (zh) | 一种移动厕所管理系统和预约方法 | |
CN204906439U (zh) | 设备移动监控系统 | |
CN104200679A (zh) | 一种道路交叉口智能交通设备集成平台系统 | |
CN103377241A (zh) | 电网数据整合的方法和系统 | |
CN105827466A (zh) | 一种基于云计算的3d地下管线综合管理方法 | |
CN202058016U (zh) | 电力线路杆塔电子识别与登杆人员自动定位系统 | |
CN104570964A (zh) | 基于物联网的车载系统 | |
CN102867273A (zh) | 一种基于soa的配网双编码系统 | |
CN203136169U (zh) | 一种矿井导航定位及其实时三维显示系统 | |
CN109003203A (zh) | 一种施工数据管理系统及方法 | |
CN112242744B (zh) | 一种变电站一次设备在线监测信息融合系统及方法 | |
CN203882340U (zh) | 电力营销作业现场智能化监督管理装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210602 Address after: 510700 3rd, 4th and 5th floors of building J1 and 3rd floor of building J3, No.11 Kexiang Road, Science City, Luogang District, Guangzhou City, Guangdong Province Patentee after: China Southern Power Grid Research Institute Co.,Ltd. Address before: 510080 Guangzhou, Yuexiu District, Guangdong Province Dongfeng East Road, 6 water tower, Guangdong tower. Patentee before: China Southern Power Grid Research Institute Co.,Ltd. Patentee before: CSG POWER GRID TECHNOLOGY RESEARCH CENTER |