CN1041022A - Construction method and enforcement thereof - Google Patents

Construction method and enforcement thereof Download PDF

Info

Publication number
CN1041022A
CN1041022A CN 89106406 CN89106406A CN1041022A CN 1041022 A CN1041022 A CN 1041022A CN 89106406 CN89106406 CN 89106406 CN 89106406 A CN89106406 A CN 89106406A CN 1041022 A CN1041022 A CN 1041022A
Authority
CN
China
Prior art keywords
gripper shoe
joint
plate
anchor support
retaining wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 89106406
Other languages
Chinese (zh)
Inventor
伊安·罗伯特·麦唐纳德
伊安·格兰特·麦唐纳德
卡梅伦·约翰·麦唐纳德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cenefill Pty Ltd
Original Assignee
Cenefill Pty Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cenefill Pty Ltd filed Critical Cenefill Pty Ltd
Publication of CN1041022A publication Critical patent/CN1041022A/en
Pending legal-status Critical Current

Links

Images

Abstract

The present invention relates to construction appliance used in building retaining wall, bank protection, road and suspended span bridge floor etc. and their using method.Basic building block be by be roughly rectangle and along its longitudinal axis be at least one the folding the gripper shoe that flap constituted, this gripper shoe can be used for building the load-bearing surface of various angles.By various terminal and annex, can squeeze into ground to this support, also can be by various anchor supports and rod member, this plate is connected with soil, anchor support is hinged and imbed in the ground with closed condition with bar, after bar is applied suitable pulling force, makes the anchor support be opening and combines closely with soil.

Description

Construction method and enforcement thereof
The present invention relates to build the structure of wall, bank protection, road, suspended floor and the like.Particularly a cover directly applies to many areas, and construction appliance and the using method thereof used in general job practices.
When new building of construction or similar structure, in the place that will build this building,, almost at first excavate ground always in order to build desired basis, general operation is to dig a suitable foundation ditch on this ground.When this basis of construction, do not subside, need support the wall of this foundation ditch for the wall that makes foundation ditch.When building near an existing building of one of construction, especially need this support, when lacking proper supporting, basic the lighter of existing building may be moved, and can collapse in adjacent foundation ditch when serious.
For needed deep excavation such as modern high-rise building thing such as office building and hotel etc., it is dark usually to need to excavate at least 6 meters of below grounds, and, move in order to prevent any of adjacent structure, before any excavation, usually need build retaining wall at below ground.
Equally, when building a new dam, usually be necessary to provide the retaining wall of certain form on every side, so that prevention soil etc. enter in the water body in this building site, dam.And, also be for water body is blocked in the scope of appointment.
Traditional method is to adopt interlocking sheet pile " piling " technology to build this retaining wall, and the width of each sheet pile reaches the 6M(way that applies big impact force repeatedly near 0.33M) ground is squeezed in these stakes, form the wall of needed width.This method is lost time, and the cost height.Because, at first to squeeze into ground to many stakes, after the basis of building, wall etc. are built up, again they are pulled out from underground then.And a large amount of stakes and equipment need at first support.Could squeeze into ground to these stakes then, so just make underground retaining wall not build near the wall or the similar structure of existing building.Also have, these are squeezed into the needed very big power in ground (what for example jump bit applied from driving piles) can produce shock wave by ground, this vibrations wave energy is destroyed the basis of adjacent existing building.
Another method of attempting is to replace aforementioned sheet pile with metal sheet, and these metal sheets are generally wide than this sheet pile, and these metal sheets are also squeezed into ground., although this method has shortened the time of the retaining wall of setting up specific length, in the building foundation, after walls etc. have been constructed, still need these metal sheets are taken out, because these metal sheets are very expensive, cannot only using once, the back is embedded in them underground forever.And, for the plate of this specification is fixed on the needed position, also needs top said traditional, huge equipment and apply big impact force, and this has brought their additional trouble.
A kind of to the improved method of this class known technology-in No. 1074054, BP UK-1, be described-at first a sizable plate of weight is squeezed into ground.Then it is pulled out from underground, again second block of lighter plate of weight inserted in " groove " that is produced.
Although it is underground that this improving one's methods (operating weight is lighter, thereby the manufacturing of plate is more cheap) can allow second block of plate to be embedded in forever, before second block of plate injected ground, make " groove " in fact always.It is many that thereby the time of building retaining wall does not reduce, and still need big impact force when first block of plate poured ground, and these big impact forces have been brought their trouble again.
When building a bank protection, at first nearly all need water is drained from the place that will build bank protection, so that building foundation there.On the other hand, the similar structure such as basis of will constructing in the place of those draining inconvenience (as on the beach) can only just can be constructed when ebb tide, or adopt earlier current are drawn away in the construction area again and construct.
In addition, bank protection is generally built with rock or stone, can be placed on needed place to rock or stone with the dried method of piling up.If necessary, also can be or lay a reticulated structure thing (using metal usually) thereon rock or stone further are fixed in its position with cement.These methods are lost time, and because their labour intensity is big, also have, and these rocks or stone must ship from the area away from slope protection construction usually, so the cost height.
Another method of having attempted is to give the smooth place that need build bank protection well earlier, and for example, employing is cut the earth or built with soil or rubble mound, provides this bank protection needed profile.Lay the pad of pair of lamina wall more in the above, use the high pressure pouring concrete then.This method is still not exclusively satisfactory, because, set up needed profile with cutting the earth if desired, so still may need draining or diversion.
Other several problems that known systems is brought are: (1) is for the needed deep excavation of modern high-rise building thing, needed retaining wall usually has outside a face is exposed to, this face is quite dark, thereby the ground pressure on another side can be quite big.Under the influence of this pressure, moving inwardly may appear in this retaining wall, no longer is in needed angle; (2) same, when this retaining wall or bank protection were built on the weak soil, as sand or similar item, when particularly wet, this retaining wall also can take place similarly to move.
By convention, this retaining wall is to use concrete grout to come anchoring,, bores a hole of being with steel cable earlier in soil that is, then concrete is irritated in this hole, and metal cord is buried within it.In case this concrete by maintenance good after, this metal cord just is fixed on the retaining wall, stop this retaining wall to move.
The shortcoming of this conventional method has: (1) must dig up soil before concrete is poured into a mould, thereby needed special rig; (2) before this grouting can be used, concrete maintenance needs several days time; (3) do not replace removed soil if pour into a mould enough grouting, then sedimentation will appear in the peripheral region; (4) if when grouting must be cast near the existing basis of a contiguous solitary building, because rig is huge, just the problem of Chan Shenging can occur therefrom; (5) must in time loosen the stress (destress does not produce on every side the sedimentation of soil and other moves possibly, and these can destroy to new structure and/or to the adjacent building deposits yields) of this anchor device; (6) concrete grout is nonvolatil, does not have reusable material.
Be that the vertical relevant existing issue of supporting wall is discussed basically above to building.But, also need quite high-intensity " level " supporting, for example, needed big suspended span flooring in modern offices and retail market, and road particularly, the needed the sort of big suspended span bridge floor of these type of structure such as bridge.
Traditional material-timber that builds a bridge has been out of favour now.Because its price increases, and wood supply is just becoming more difficult.Wooden bridge also needs regularly to carry out big maintenance.Therefore, keep in repair and replace the bridge deck of existing wooden bridge now, and build new bridge, all trend towards agreeing to use other material, the most frequently used is steel concrete or with certain suitable load-bearing material covering steel plate thereon.
Although strength of reinforced concrete is quite high, and very durable, iff being used as area supported, then need a large amount of concrete, thereby cost is very high with concrete.And, also need a large amount of templates to come placing of concrete, just can remove up to these concrete settings.Therefore,, used a kind of steel bridge deck in order to make great efforts to overcome this problem, i.e. laying type steel plate at first, and then with various suitable packing materials shop thereon, these packing materials can with concrete from the compacted soil to the structure.
A shortcoming of this bridge floor of steel plate is before packing material is spread on the road surface, and this road surface can not bearing load.This makes usually and is necessary with manually coming this packing material of bedding, because initial bridge floor of steel plate does not have enough intensity to support massive vehicle, such as the concrete load wagon that transports this material, so need be with manually laying this packing material, both lost time, labour intensity is big again, thereby cost is quite high.
The objective of the invention is to overcome, or be to improve one or more top problems at least, and several construction appliances and their using method be provided, they are suitable for using the supporting that all needs to bear quite big load thus on all directions at one on a large scale.
The inventor finds that if replace known the sort of plate with the special plate of a kind of profile, thereby the special plate of this profile has very high intensity.Such as, can be installed in them on the position that needs with small device.If necessary, apply much smaller power, just can be fixed on this plate in the ground.And if again they are pulled out unlikely words from ground, even it is underground to allow them be embedded in forever, so also very economical.Can directly insert this plate in the ground, come to open and " groove " for this plate thereby also can save the hammering plate that need to use beginning.If situation needs, a kind of anchor support that the application of the invention proposes can further connect this plate with this ground.In addition, this plate can level be installed.If so, because they are not having under the situation of further strengthening handling enough bearing capacities are just arranged, so they can use at any time.
Therefore, according to first aspect of the present invention, provide a kind of gripper shoe that is used to build bearing surface; For example, retaining wall, suspended span flooring, road etc., said this gripper shoe is:
One is essentially tetragonal flap, at least around its longitudinal axis wrinkle, thereby produces at least one folding in described plate.
In the application of gripper shoe, such as retaining wall, because this gripper shoe of the present invention is lighter than traditional plate weight of the prior art, so, find this gripper shoe is squeezed into the desired power of squeezing in ground, more much smaller than needed power in the existing technology.But, because weight wants light, thereby reduced the rigidity of this plate, so under certain conditions, make this plate lateral deflection occur owing to being subjected to the power of squeezing into.This problem can overcome in the following method, promptly before gripper shoe is squeezed into ground, a joint is fixed on this gripper shoe top.Have been found that this joint is applied vibration force, can all squeeze into ground to the whole length of this gripper shoe; Remove this joint then,, this gripper shoe is got to the ground level place by by means of the annex that is installed between this gripper shoe and the vibration force source.
Therefore,, provide as previously described a kind of, be used for the joint of gripper shoe as second aspect of the present invention.Said this joint is:
(a) one is essentially tetragonal flap, at least around its longitudinal axis wrinkle.Thereby in described plate, produce at least one folding;
(b) this joint is removably mounted on device on the said gripper shoe.
Here the quantity of said at least one folding and position are basic identical with the quantity and the position of said gripper shoe.
As the 3rd aspect of the present invention, provide one as previously described, be used for the annex of gripper shoe.Said annex is:
1. one is essentially strip, is suitable for connecting the parts at the top of said gripper shoe.
2. removedly said elongated member is connected to the device in vibration force source.
As you know, in certain environment, may there be tree root in underground, rock and other rubble, and they may stop the smooth injection of gripper shoe.Equally, after beginning to squeeze into this gripper shoe, owing to run into unforeseeable tree root, rock etc., process is stopped possibly.This problem can by use the cutting plate be overcome-to the additional shape of the said gripper shoe in front, but heavier plate-at first this plate is squeezed into ground is pulled out then, thereby is produced a passage that enters ground for gripper shoe.
Therefore, as the 4th aspect of the present invention, provide a kind of cutting plate, this plate can be driven into ground and cut off tree root, the rock etc. of riving, and said this cutting plate is:
One is essentially tetragonal flap, at least around its longitudinal axis wrinkle, thereby produces at least one folding.
Here, said this cutting plate can by with go into ground, can cut off the tree root that may be present in the ground level place at least, the rock that may be present in the ground level place etc. of riving.
As the 5th aspect of the present invention, similar structure methods such as a kind of construction retaining wall are provided, said method is:
Select a kind of gripper shoe as the front defined;
If necessary, said gripper shoe is fixed on the joint as the front defined;
Said gripper shoe got at least near needed go into the ground degree of depth;
If of course, remove said joint, and/or if necessary, put annex previously described, that link together with the top of described gripper shoe, and continue said gripper shoe is navigated to needed length of embedment.
The inventor also has been found that and can build the needed any profile of various special bank protections with gripper shoe described above and their method for supporting.If necessary, this plate fixing after, the side that water arranged from needed bank protection is dug up soil etc., and a topping laying is had at this plate on the side surface of water, and this surface layer has been filled up so that the material of suitable hardness to be arranged.
As a sixth aspect of the present invention, provide a kind of method of building bank protection-on the water or under water face-said method is:
Select gripper shoe as preceding defined;
Said gripper shoe by desired tilt angle, is fixed to the needed degree of depth;
If suitable, soil of said gripper shoe one side etc. dug up and
One surface layer etc. is laid on the said surface, and said here surface layer can fill up so that the material of suitable hardness to be arranged.
Above an optional characteristic of said method be:
Before selecting gripper shoe for use, use the plate of band cutting as described, this cutting plate, squeeze into ground by desired tilt angle.Needed depth of drive can cut off being present in underground tree root, and the rock in it etc. is rived.Then this cutting plate is pulled out.In addition, when when squeezing into this gripper shoe, if tree root, rock or other rubble be in do not give expect local time, before the gripper shoe in replacing ground, this gripper shoe is pulled out, and by re-use this machinable plate by method described above.
Certainly, if necessary, can squeeze into ground to second such gripper shoe, it and adjacent first gripper shoe are partly overlapped.Equally, the degree of depth if desired be dark especially words-this degree of depth be to use the monolithic gripper shoe inaccessible-can squeeze into ground level to first gripper shoe, then the suitable uncinus of second gripper shoe-have-the be fixed to top of first gripper shoe squeezing into like this in its bottom, again second gripper shoe squeezed into ground, force first block of plate to enter below the ground level.Reuse this method of operating, till the retaining wall of the required length and/or the degree of depth is built up.We find that ground pressure enough makes the place, bottom of this plate be in contact with one another closely, also can use high-strength bolt that this lapping plate is fixed together tightly at the top of the plate that overlaps or near this tip position.
Concerning similar structure such as bank protection, in case reached the needed length and the degree of depth, just on whole length, lay surface layer, fill up harder material then.
Although the quantity of the folding on this plate and the joint and position can be according to using needs to change, but reasonable way is this cutting plate, gripper shoe and joint, form by more than one folding for every, thereby the whole width along corresponding this plate is formed uniformly a succession of two-fold (pleat), is arranged in symmetrically on the whole width of respective plate.The broken number of every block of plate and joint is preferably 5 to 7 foldings.
The device that makes joint be detachably connected to the gripper shoe top is preferably: (a) two fixing " L " shape brackets, this bracket can make said gripper shoe be fixed between dull and stereotyped and each said bracket of joint; (b) hole in said bracket and gripper shoe when using said joint, these hole alignment, allows bolt or similar item to pass, thereby said joint and gripper shoe is linked together.Joint and gripper shoe link together.
The cross section of the strip annex that uses with gripper shoe is preferably the groove of square " C ", and the width of this groove slightly than the degree of depth of the pleat of gripper shoe more greatly.This channel member also can be made of the outer prolongation limit that forms complementation of profile and this gripper shoe.
Concerning similar structure such as counter dam, surface layer is preferably double-deck nylon cushion, and this nylon cushion is to use the bag of being made up of the braiding of multiply nylon wire, is fixed on the treatment hole place at regular intervals.The hard inserts of shelving in this surface layer does not influence this filter bores, and it is designed to play the effect that reduces hydraulic pressure.
The stiff materials that is used as inserts is better with sand or concrete, preferably adds pressure injection with pea gravel concreten and waters this surface layer.
Also can brush various suitable rustproof paints, further reduce wear and the erosion of water, get rusty etc. to gripper shoe.
In some soil, maybe need to dig quite dark place, have necessary fixing gripper shoe described above and building unit, produce excessive moving to stop their.
Therefore, according to the 7th aspect of the present invention, provide one to make retaining wall, similar structure such as bank protection are fixed on the anchor support on the desired location, and said this anchor support is:
The bar that has a foliated soil colligator of a strip, this colligator are rotatably connected to an end of this bar, and it can turn to second opening with initial closed state;
The other end of said bar is fixed on said retaining wall, the bank protection.
As the 8th aspect of the present invention, a kind of retaining wall that is anchored in soil, the sand etc. is provided, the method for bank protection or other similar structure, said this method is:
1). at least one is in said first closed condition, and said retaining wall, bank protection etc. are passed in the sort of anchor support that has stipulated the front, and on demand the angle and the necessary degree of depth inject in the similar items such as soil, sand again;
2). make said foliaceous colligator take said second opening;
3). when taking said second opening or thereafter, use a kind ofly can stop the influence owing to ground or other pressure etc. to make this retaining wall, bank protection etc. produce any mobile method effectively, the other end of said bar is fixed on this retaining wall, the bank protection etc.
The whole length direction of this bar preferably all has external screw thread, and adopts the mode of plain nut that it is fixed on said retaining wall, the bank protection etc.
The shape of anchor support, the mode that injects soil and its whole operation are all because the difference of the soil types of the retaining wall of building in this cob wall, bank protection and different.
Such as, in weak soil or wet soil, sand etc., just need a quite wide foliaceous soil colligator.An outer tube is enclosed within on the said bar, again an end of said outer tube is detachably connected on first joint.Said first joint and said foliaceous colligator bridle joint make this colligator remain on first closed condition together.The other end of outer tube is fixed on second joint, and this joint itself is connected on the repeated impact forces source.
The support of the anchor of the closed condition that is placed in it, angle on demand and necessary length of embedment are squeezed into ground, lay down outer tube and two joints again, and the other end of barre is connected on retaining wall, the bank protection etc., and makes this bar reach required pulling force then.
On the other hand, in super compacted soil or rocky soil, just only need a foliaceous soil colligator that is rather narrow.The angle at first on demand and the necessary degree of depth are done the duct an of necessity in this soil, with artificial way this screwed anchor pole is injected in this duct again; Then this threaded rod termination is fixed on retaining wall, the bank protection etc.
The inventor also further finds, above said gripper shoe, also can carry when level is arranged being essentially, so can be used for building suspended span flooring, road, bridge etc.
Said every has at least the plate of wrinkle to become lateral arrangement with the traffic flow direction of this road surface bridge when this gripper shoe being used for road construction, bridge etc.In this embodiment, every gripper shoe is preferably on its whole length on two vertical limits also has a narrow edge of a wing, and every gripper shoe makes the adjacent edge of a wing overlap in order, again the common metal net, such as being used for strengthening concrete road, be fixed on the end face of this gripper shoe; The both sides that are fixed to this gripper shoe are covered on one continous way limit, to help maintaining packing material; Any suitable packing material, be layered on the end face of this gripper shoe by the needed degree of depth and between the lid of both sides.
Referring now to accompanying drawing several illustrated embodiments of the present invention is described, wherein:
Fig. 1 is the sketch of cutting plate constructed in accordance;
Fig. 2 is the perspective sketch of gripper shoe constructed in accordance;
Fig. 3 a, 3b and Fig. 3 c, 3d are respectively the sketch of two joints that use with the described gripper shoe of Fig. 2;
Fig. 4 a, 4b and Fig. 4 c, 4d are respectively as Fig. 3 a, 3b and the described joint of Fig. 3 c, 3d, are connected respectively to the sketch on the gripper shoe as described in Figure 2;
Fig. 5 a, 5b and Fig. 5 c, 5d are respectively the sketch of two kinds of annexes constructed in accordance;
Figure 6 shows that the retaining wall of building according to the present invention;
Fig. 7 is building unit sketch made in accordance with the present invention;
Fig. 8 is the mole sketch of building according to the present invention;
Fig. 9 a and Fig. 9 b are the sketch of first kind of anchor support made in accordance with the present invention;
Figure 10 is the first joint sketch made in accordance with the present invention;
Figure 11 is as Fig. 9 a and the described outer tube that has of 9b, and is connected with the anchor support sketch of first and second joints;
Figure 12 a is as Fig. 9 and the support of the 11 described anchors a series of schematic diagrames when the installation site to 12c;
Figure 13 a is the sketch of second kind of anchor support made in accordance with the present invention to 13c;
Figure 14 (ab) is two embodiment sketches, and these two kinds of embodiment are that needed pulling force is gone up in the anchor support that is used for being adjusted in described in the prior figures;
Figure 15 a is the bridge sketch of building according to the present invention across a river;
Figure 15 b is the part profile of the described bridge of Figure 15 a;
Figure 16 is the sketch of the described bridge of Figure 15 limit lid.
Cutting plate as shown in Figure 1 is made up of a flap (1) that is roughly rectangle, and this flap (1) is along some equally spaced longitudinal axis (2) wrinkle, thereby produces described a series of pleat.Two outside 3(a, short section 12(a b) b) tilts inwardly with an angle.
In the said gripper shoe of Fig. 2, rectangular slab (1), a pleat and a short section 12(a, b) the same with in the machinable plate among Fig. 1 basically, still the thickness of this gripper shoe is thinner than the thickness of the sort of machinable plate.And, be provided with hole 4(a in place, b) near limit, upper end (5).
Fig. 3 a, 3b and 3c, 3d have described two joints that use with gripper shoe respectively.Each joint is made up of a flap (6) that is roughly rectangle, and this flap is according to the same quadrat method of gripper shoe wrinkle among Fig. 2, along its short axis wrinkle.At Fig. 3 a and 3b) in the said joint, on the folding ditch in the middle of a flat board (14) is fixed to.(dull and stereotyped (14) except rigidity is delivered to the joint, can also as the tie point that this joint is connected on the corresponding impact force source).Bracket in each joint (7) is connected on end limit (8), and hole 9 and 10 lays respectively on bracket (7) and the plate (6), they can with the hole 4(a of gripper shoe (3), b) alignment, shown in Fig. 4 a to 4d, permission bolt (11) passes through.
Fig. 5 a, 5b and 5c, said two annexes of 5d (17), each is respectively groove (15) formation of a strip of rectangle " c " by section.The width of this groove (15) a little than the degree of depth of the pleat of the said gripper shoe of Fig. 2 more greatly.The member (16) of one " H " shape section is connected to roughly in the center of this groove (15), and extends a segment length towards the opening rightabout of this strip groove (15).
In use, if necessary, can use various suitable device, pile driver clamps this cutting plate as everyone knows, and it is vertically squeezed into ground, cuts off tree root etc.With various habitual equipment this plate is pulled out then.Words if necessary, before this plate is squeezed into ground, press the said method of Fig. 4 a to 4d, joint is connected on this gripper shoe, after laying down joint, if necessary, also can be fixed to the parts of annex (17) (16) such as on the pile driver, channel member (15) is installed in the end of this gripper shoe, and this end is fit to insert this notch.Then this gripper shoe is squeezed into ground level.After this gripper shoe reaches the desired degree of depth, if desired, can overlap by shown in Figure 6 second gripper shoe (any later plate is the same) with first gripper shoe, squeeze into ground then.
In building unit shown in Figure 7, rectangular slab (1), pleat, a short section 15(a, b) and hole 4(a, b) (set up, do not draw among this figure) basically the same with gripper shoe described in Fig. 2.With various suitable methods one surface layer (18) is fixed on the plate (1), this surface layer is made of pair of lamina nylon cushion (20), and this nylon cushion is that the certain intervals by treatment hole is fixed on the plate.Annotate the way of watering with pressurization, make and fill out in this surface layer, until this nylon cushion being expand into the essentially identical state of obtaining with this rectangular slab (1) of shape as pea gravel concreten (21).But reserve a gap g simultaneously between the end of this nylon cushion wall and each folding b, treatment hole (19) does not have concrete.When wave attempted to oppress this nylon cushion near this plate, gap g can help further to consume wave energy.
In use, according to step described above,, the plate that needs quantity (1) is squeezed into ground by the required angle and the degree of depth that should reach.If necessary, bank protection there is the soil etc. of a side of water dig up, then surface layer shown in Figure 7 (18) is installed in the one side of these plates, in this surface layer, fill with pea gravel concreten more thereafter.
It should be noted,, also can be installed in this shell on the appropriate location, then fill up concrete even this plate may be positioned under water.
These characteristics are to building advantageous particularlies such as groynes, mole, because can't draining under the sort of situation or change the flow direction of water.As shown in Figure 8, the sidewall 22(a that keeps at a certain distance away b) can extend desired length to the bank from shoreline (24).Arrange an end wall (23) then there.The sidewall 22(a that each keeps at a certain distance away is b) described the same with top Fig. 7 with end wall (23).Rock (25), other appropriate filler such as pumping sand are filled between these walls, thereby build up this mole then.Although (say that surface layer (18) has only covered the one side of every block of plate, but in fact surface layer will cover the end edge of every block of plate, and recross end face and down extend, then each edge of this surface layer all is embedded in ground/below the sea bed face height) along the another side of this plate.
The anchor support is made of a soil colligator (26) in Fig. 9 a and 9b, and this colligator is made up of one flat plate (27).These dull and stereotyped both sides are at one end close gradually, and form a tip (28).The other end bifurcated is formed two parts of cutting apart (80), then, each part of cutting apart is become an angle of inclination bending by the plane with plate (27).Cut again to form the straight flange (44) of broad.Have two to be fixed to wing plate 30(a moulding on plate (27) two edges, crooked in addition, b), it is positioned at the sweep of this plate (27) and in its bifurcate end.One key-way shape hole (29) is positioned at the place of the close tip (28) of plate (27).One turning arm (31) crosses hole (29) and almost becomes a right angle with the longitudinal axis of plate (27) and be fixed on this plate.The open tubes that has internal thread (32) of a weak point rotatably couples together through plate (33) and arm (31).Hole (29), the position of turning arm (31) and open tubes (32) is to cooperate like this: initial pipe (32) is arranged essentially parallel to said longitudinal axis, but when plate (27) by revolving shown in Fig. 9 b when turning 90 degrees, the outward flange (81) of pipe (32) should be near the inward flange (34) of hole (29).
Figure 10 represents the joint (42) that is made of parts (36) that are roughly bullet shaped.One male-pipe (37) is connected to the afterbody of these parts (36).On these parts (36), remove one section, form a plane (38).Gore (39) is fixed to (38) top formation one notch (40) on the plane that stretches forward on these parts (36).One hole (41) connects the whole length of this joint.
In use, as shown in figure 11, a threaded rod (35) is screwed on this open tubes (32).A slender casing (43)-its each termination all there is a bit of internal thread-be connected on the screwed pipe (37) of joint (42), combine with the limit (44) of plate (27) up to notch (40) and threaded rod (35) passes slender casing (43), thereby this blade (26) is fixed in its position tightly.Threaded rod (35) stretches out a short distance from the other end of sleeve pipe (43).Second every limit by hexagon nut (46)-this nut (46) had a short male-pipe 47(a, b)-joint (45) that constitutes is installed on the external part of threaded rod (35), and tighten the termination of sleeve pipe (43), until the end of nut (46) near this sleeve pipe (43).
Shown in Figure 12 a-12c, a hole is arranged on retaining wall (47), the size in this hole is enough to make the anchor support that blade (26) is installed to pass that (Figure 12 is a).The end of second joint (45) applies power, can squeeze into ground to this anchor support by the desired tilt angle and the degree of depth.Although use various suitable device to squeeze into ground to this anchor support, had better use pneumatic motor to finish this work.This is that another benefit of sleeve pipe (43) and first joint (42) is because air-flow down passes through second joint (45): can keep the screw thread of screw rod (35) not have soil and sand etc. when ground is passed in this anchor support.Shown in Figure 12 b, lay down second joint (45), sleeve pipe (43) slave plate (27) is located to unclamp unload (such as, screw rod (35) is applied a power, make this anchor support continue to enter ground forward, or adopt partially or completely this sleeve pipe (43) is taken out from ground).Above have the shape of shape and the single folding of plate (1) of plate (50)-this plate in a hole identical-outside that is configured in wall (47) on one side, and thereon fastening the nut (51) on the screw rod (35).Because nut has been fixed, then screw rod (35) moves forward and can cause that blade (26) presents opening (Figure 12 c), moves thereby stop it to produce in soil.Tightening nuts (51) again is till screw rod reaches needed pulling force.
The blade (52) that the support of anchor shown in Figure 13 a and the 13b is made of a narrow boards (53) is formed, the both sides of this narrow boards (53) at one end gradually near and form a tip (54).The other end of this plate (53) becomes an angle of slope bending with the plane of plate (53), forms an empennage (55), and the limit (56) of this empennage (55) is a coarse wave, and a key-way shape hole (57) is positioned at the place that plate (53) is gone up close most advanced and sophisticated (54).One turning arm (58) crosses hole (57), and almost becomes a right angle with the longitudinal axis of plate (53) and be fixed on this plate (53).One open tubes (60) that has internal thread rotatably links together through plate (59) and turning arm (58).Hole (57), the position of turning arm (58) and open tubes (60) is to cooperate like this: initial pipe (60) is arranged essentially parallel to said longitudinal axis, but when plate (53) by revolving shown in Figure 13 a and the 13b when turning 90 degrees, the outside (61) of pipe (60) is connected to an external thread rod (35) on the pipe (60) near the inner edge (62) in hole (57) again.
In use, at first use any general equipment to bore a hole, for the support of the anchor shown in Figure 13 a-c provides a passage.A hole is arranged in retaining wall, and there is sufficient size in this hole, and the anchor support that allows to be connected on the bar (35) is passed.This anchor support continues down by the said pre-drilled passage in front (when the anchor support was inserted in the passage, empennage (55) was towards tilting, so plate (53) rests on the threaded rod (35)) again.When this anchor support reached the needed degree of depth, under action of gravity, this bar (35) made blade (52) present the part opening conversely; The elongation end of barre (35) is fixed on the retaining wall with quadrat method with reference to Figure 12 a-c is described by top again.This initial tension can make this anchor support insert in the ground.Then, lay down this pulling force, fill up passage with cement paste; Again this anchor support retighten.In case this cement paste has solidified, further this anchor support of retighten again.But, if necessary, both made cementation also not solidify this retaining wall and still can use at any time at once.
Can use many devices to control each anchor and support needed pulling force.Such as (Figure 14 a) before without any tension, is installed in a variable nut (64) on the bar (35), and near plate (50).Then a bridging plate (65) is assemblied on the bar (35); Subsequently, compression spring (a 66) fit on that gives first scale.If necessary, refill a packing ring (67).Compress this spring (66) with tightening second nut (68) that is contained on the screw rod (35), reach needed pulling force, and regularly screw this variable nut (64) and make it near wall (1) until this bar (35).
In addition, also can be at the local working pressure meter (not expression on the figure) of spring (66).
Another kind of way, the strut rail (69) that also can adopt the hollow section of a square-section to constitute.Test this strut rail in advance, so that know its distortion under certain pressure.Therefore, this strut rail is installed shown in Figure 14 b, screwed nut (70) till surface (71) deforms.Using strut rail is a kind of good especially embodiment, because also the same with shown in Figure 14 b used a strut rail can strain several anchors and supportted.
Figure 15 a(strides across a water channel) and 15b shown in road constitute by some rectangular slabs (7(72), every such rectangular slab (72) all around its longitudinal axis wrinkle, forms a series of pleat.Thereby vertically a narrower edge of a wing (73) is extended on the limit, the more corresponding edge of a wing (73) of adjacent panels (72) overlap joint is got up, and with general nut and bolt they is linked together.The bottom surface of every block of plate also can brush various suitable antirusting paints.Go up to arrange the common wire lath (90) of one deck at plate (72), this wire lath (90) such as get up with spot-welded on.The limit of profile as shown in figure 16 lid is fixed along the opening of this pleat.The lower flange (76) of limit lid (75) is positioned under the plate (72), and with the bolt that passes the lower flange (76) and the wing (73) lower flange (76) is connected on the plate (72).Limit (77) is near this plate end, the width of flange (78) no better than the top of pleat to the height of this flange (78).The height of upper flange (79) and the deep equality of needed packing material.The upper surface of this flange (79) provides an easy leveling layer for this packing material.
Use the present invention, have significantly a large amount of advantages, these advantages are:
Because the cost of thinner gripper shoe is reduced significantly, so after these gripper shoes use up, also be both economical even forever be embedded in underground. This is in that narrow and small place, if namely do not damage the basis newly built up and wall etc., does not also damage contiguous existing structure, when constructing with regard to the place that may take out hardly this gripper shoe, seems particularly useful.
Another characteristics of this randomness of this gripper shoe are these gripper shoes when staying the job site, and they also can be used as the template on the basis etc. of new structures. After building retaining wall, can there is no need with other resource and manpower needed template to be installed, as being subsequently the used template of basic cast concrete. In this respect, gripper shoe is stayed the job site superiority economically is provided.
Ground has been produced the gripper shoe needed littler impulsive force of being driven underground quite low Shock wave, this shock wave have reduced the probability to the damage of contiguous existing structure.
Compare with using other known method, whole the present invention has used less utensil, these utensils and make the plate needed equipment of being driven underground the structures such as retaining wall can more close existing structure.
In this respect, opposite with stake of the prior art, this plate can be with reverse angle setting, and the eaves of the existing structure of namely not dismantling etc. just can be arranged plate near existing structure.
To a certain extent, retaining wall needed " intensity " is along with the change of " overlap joint " degree of adjacent panels and change. When for example two flangings overlapped, even per two, three meters arrange a bracing piece, in fact, such layout was enough fastening and stable. The intensity of this strength ratio interlocking piles of the prior art is taller, and if necessary, can also pull out this plate and reuse.
Be deposited in owing to get rusty, dirt etc. in the groove of stake of the prior art, in fact they be consolidated, and needs very big power so extract this stake. When using gripper shoe of the present invention, if when need to be from ground this plate being extracted, then without a doubt.
The retaining wall of constructing in reservoir is for example in dam or lake. The water-resisting property of this retaining wall is fine, can partly discharge from a side of this retaining wall the interior water such as dam. After the required work of doing of a side of discharge water is finished, can slowly move this gripper shoe, the current that allow one control flow through under it.
Concerning bank protection, before any excavation, just can build a supporting wall, select the angle of this supporting wall, can reduce wave when making wave from the bank protection upper deflecting and go up a slope; Because supporting wall is fluid-tight basically, if need to excavate in the side that water is arranged, this work then can be carried out from a side that does not have water of this wall.
Use thinner flap and covering surface layer thereon, can greatly reduce the cost of building breakwater, and can improve total intensity.
The present invention be particularly suitable for bank protection-on the water or under water-with for the protection of the coastline, abutment, highway and railway embankment, dam, river course, spillway, filling is general and stormwater channel. Sliding navigation channel, retaining wall, breakwater etc.
If need reinforcement the structures such as various retaining walls, the anchor support is installed quite rapidly and can uses immediately. When the position is leaned on very closely, can only use away from the equipment of blade end anchor support is installed, then with comparalive ease the anchor support is being arranged in such as is nestling up the basis of various existing adjacent buildings, the compact nature of anchor support provides a main advantage. Another advantage is that its cost is more much lower than the cost of existing equipment, and some parts of this anchor support can also be reused. Important advantage is after the anchor support is mounted and works by original requirement, does not need to loosen the stress of this anchor support. Another advantage is that the support of this anchor is different with anchor support of the prior art, in its total useful life whenever, can both be its retighten. In addition, if no longer include constant pulling force on the necessary maintenance retaining wall, when then designing this anchor support and its inserted mode, all other parts that the anchor except blade is supportted can both easily take out from underground.
This basic gripper shoe can be used as highway pavement, even before spreading last surfacing, and it also can bear the load of truck etc. Therefore this plate can be placed directly in such as on the existing ground, basically can at any time prepare to use immediately.
Another major advantage is that various plates of the present invention and anchor support be processing and fabricating on-site. If the building site can provide steel, because the machine of backfin and cutting steel is lightweights, the quantity of so needed parts and shape can both be made in the building site. This shows the expense that can greatly reduce in transportation and making. Estimate that the present invention is much firmer than known existing method. And, just can reach same effect as long as have about 25% of the used cost of method now.
Can think that embodiment described above is several examples, for described the present invention here various variations can also be arranged and do not deviate from inventive concept defined in the following claim.

Claims (33)

1, a kind ofly be used to build that bearing surface such as retaining wall, flooring are striden, the gripper shoe of path etc., it is characterized in that:
A flap that is roughly rectangle at least around its longitudinal axis wrinkle, thereby produces a folding at least in described flap.
2, a kind of joint that is used for the described gripper shoe of claim 1 is characterized in that:
(a) flap that is roughly rectangle at least around its longitudinal axis wrinkle, thereby produces a folding at least in described flap;
(b) this joint is removably mounted on device on the gripper shoe;
Said here broken number and broken number and the position on position and the said gripper shoe that is at least a folding is basic identical.
3, a kind of ground of squeezing into, in order to cut off tree root, cutting such as the rock of riving plate is characterized in that:
A flap that is essentially rectangle at least around its longitudinal axis wrinkle, thereby produces a folding at least in described flap.
Cutting plate described here can be squeezed into ground or arrive ground level less, in order to cut off the tree root that exists in it and the rock that exists in it of riving etc.
4, gripper shoe as claimed in claim 1, or joint as claimed in claim 2, or cutting plate as claimed in claim 3 is characterized in that the said rectangular slab of wrinkle, thereby form a succession of two-fold.
5, flap as claimed in claim 4, joint or cutting plate, the quantity that it is characterized in that said a succession of folding is between 5 and 7.
6,, it is characterized in that on the length on two vertical limits of whole gripper shoe, a narrow edge of a wing being arranged respectively also as claim 1, the 4 or 5 described gripper shoe of any one claim wherein.
7, be used for the annex of gripper shoe as claimed in claim 1, it is characterized in that:
1) one is suitable for and the top of said gripper shoe parts that be connected, that be roughly strip;
2) can removably be connected to the former device of vibration force to said elongated member.
8, annex as claimed in claim 7 is characterized in that said elongated member is a channel member, and the width of this groove is less times greater than the degree of depth of the pleat of the flap of said at least one folding formation.
9, annex as claimed in claim 8 is characterized in that the both sides of said channel member become complementary shape for the shape as each said gripper shoe in the claim 1,4,5 or 6.
10, a kind of method of building structure such as retaining wall, the step of said method is:
Select at least one as each said gripper shoe in the claim 1,4 or 5;
If necessary, said gripper shoe is assembled to as on the said joint of each claim in the claim 2,4 or 5;
Said gripper shoe is driven at least near needed length of embedment;
If suitable, lay down said joint; And/or if necessary, install one as the said annex of each claim in the claim 7 to 9, and continue said plate is driven into the required underground degree of depth at the top of gripper shoe.
11, method as claimed in claim 10, it is characterized in that before selecting said gripper shoe, by needed angle and length of embedment, being driven underground as the said cutting plate of each claim in the claim 3 to 5, in order to cut off the tree root and the rock etc. of riving, then said cutting plate is pulled out.
12, a kind ofly be built in method waterborne or bank protection under water, the step of said method is:
Select at least one as the said gripper shoe of each claim in the claim 1,4 or 5;
Said gripper shoe by desired tilt angle, is fixed to the needed degree of depth;
If suitable, soil of said gripper shoe one side etc. is dug up; With
One surface layer etc. is laid on the surface of said gripper shoe one side, and said here surface layer can fill up to have the material of suitable hardness.
13, one is used for making similar structure such as retaining wall, bank protection to be fixed on required locational anchor support, said this anchor support is: the bar that has a foliaceous soil colligator of a strip, this colligator is rotatably connected to an end of this bar, it can turn to second opening from initial closed state, and the other end of said bar is suitable for being fixed on the similar structure such as retaining wall, bank protection.
14,, it is characterized by said soil colligator and be as the support of the said anchor of claim 13:
A) one flat plate, its both sides are at one end close gradually, and extremely some other end of said flat board becomes an angle of slope with this plate level, and upwards bending;
B) be fixed to crooked wing plate on the said dull and stereotyped both sides respectively, every block of this wing plate is connected sweep and its bifurcate end of said flat board;
C) hole is arranged in said flat board;
D) cross said hole, and allow the rotation of said plate to be no more than the device that is rotatably connected about 90 degree.
15, anchor support as claimed in claim 13 is characterized in that wherein said soil colligator is:
A) at one end gradually near arriving a bit, the other end of said flat board becomes an angle of slope and upwards bending with this plate level for one flat plate, its both sides;
B) hole is arranged in said flat board; With
C) cross said hole, and allow the said dull and stereotyped rotary connecting device that is no more than about 90 degree that rotates.
16, a kind of method that is fixed on structure such as interior retaining wall such as soil, sand, bank protection, the step of said method is:
1) said at least one as each claim in the claim 13 to 15, and be in the said first anchor support of closing closed condition and pass said wall, bank protection etc., angle on demand and necessary length of embedment are inserted it in said soil, the sand etc.;
2) make said foliaceous device present said second opening; With
3) when being transformed into said second opening or thereafter, use a kind ofly can stop influence to produce any mobile method effectively, the other end of said bar is secured on retaining wall, the bank protection etc. owing to ground pressure or other pressure etc.
17, method as claimed in claim 16, its step are before said wall is passed in said anchor support or simultaneously, elder generation is connected to said anchor support on the bar; Then an outer tube is set on the said bar; An end of said sleeve pipe is detachably connected on first joint, first joint makes said anchor support remain on said closed condition again; , the other end of this outer tube be connected to second joint on, and second joint is detachably connected on the repeated impact forces source thereafter.
18, method as claimed in claim 16 is characterized in that at first boring a duct in said soil before said wall is passed in said anchor support, is connected in the said duct of anchor support insertion on the bar said with artificial way then.
19,, it is characterized in that said retaining wall, bank protection etc. are to use as method as described in each claim in the claim 10 to 12 to build as the described method of each claim in the claim 16 to 18.
20, as employed first joint in claim 17 or the 19 described methods, it is characterized in that:
A) parts that are roughly bullet shaped cut one section on these parts, thereby have produced a plane on the surface near the tip of said parts;
B) one with the y direction equidirectional of said parts and be connected the externally threaded pipe that has on this parts afterbody;
C) fit on one gore on the upper surface of said parts is in order to form a notch between its bottom surface and said plane;
D) hole of running through the entire longitudinal length of said joint.
21, the method for a kind of road construction etc., the step of said method is:
Select at least one gripper shoe as claimed in claim 6, the adjacent narrow edge of a wing with said gripper shoe overlaps mutually successively;
Have at least the gripper shoe of a folding to become lateral arrangement said with said terrain vehicle flow path direction;
A device that blocks inserts is provided; With
Suitable inserts is layered on the upper surface of said gripper shoe.
22,, it is characterized in that the wherein said device that blocks inserts is one and is parallel to the continuous type limit lid that said wagon flow direction is extended, and be connected with the said narrow edge of a wing as the said method of claim 21.
23, a gripper shoe is characterized in that this gripper shoe is with basic identical with reference to the described gripper shoe of accompanying drawing here.
24, a joint is characterized in that this joint is with basic identical with reference to the described joint of accompanying drawing here.
25, a cutting plate is characterized in that this plate is with basic identical with reference to the described cutting plate of accompanying drawing here.
26, an annex is characterized in that this annex is with basic identical with reference to the described annex of accompanying drawing here.
27, one first joint, this first joint of its feature is with basic identical with reference to described first joint of accompanying drawing here.
28, a kind of method of building retaining wall etc. is characterized in that this method is with basic identical with reference to the described method of accompanying drawing here.
29, a kind of method of building bank protection etc. is characterized in that this method is with basic identical with reference to the described method of accompanying drawing here.
30, a kind of anchor support is characterized in that this anchor support is with basic identical with reference to the described anchor support of accompanying drawing here.
31, the method for a kind of fixed retaining wall, bank protection etc. is characterized in that this method is with basic identical with reference to the described method of accompanying drawing here.
32, cover on one side, it is characterized in that this limit lid is with basic identical with reference to the described limit of accompanying drawing lid here.
33, a kind of method of road construction is characterized in that this method is with basic identical with reference to the described method of accompanying drawing here.
CN 89106406 1988-05-25 1989-05-25 Construction method and enforcement thereof Pending CN1041022A (en)

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
AUPI842688 1988-05-25
AUPI8426 1988-05-25
AUPI8597 1988-06-03
AUPI987388 1988-08-16
AUPI9873 1988-08-16

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN 94108655 Division CN1111702A (en) 1988-05-25 1994-08-30 Methods of construction and implements therefor

Publications (1)

Publication Number Publication Date
CN1041022A true CN1041022A (en) 1990-04-04

Family

ID=25643483

Family Applications (2)

Application Number Title Priority Date Filing Date
CN 89106406 Pending CN1041022A (en) 1988-05-25 1989-05-25 Construction method and enforcement thereof
CN 94108655 Pending CN1111702A (en) 1988-05-25 1994-08-30 Methods of construction and implements therefor

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN 94108655 Pending CN1111702A (en) 1988-05-25 1994-08-30 Methods of construction and implements therefor

Country Status (1)

Country Link
CN (2) CN1041022A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101806048A (en) * 2009-02-16 2010-08-18 环境工学株式会社 Civil structure and construction method thereof
CN109689989A (en) * 2016-09-01 2019-04-26 莱斯建筑型材私人有限公司 The improvement of template

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643201B (en) * 2018-05-11 2019-10-15 广东中绿园林集团有限公司 A kind of steady type slope ecological prosthetic device and restorative procedure
CN112854790A (en) * 2021-01-13 2021-05-28 林慧 Shoveling device for lime brushing surface in building wall

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101806048A (en) * 2009-02-16 2010-08-18 环境工学株式会社 Civil structure and construction method thereof
CN109689989A (en) * 2016-09-01 2019-04-26 莱斯建筑型材私人有限公司 The improvement of template
US11466452B2 (en) 2016-09-01 2022-10-11 Rise Form Pty Ltd. Collapsible formwork for concrete walls
US11920345B2 (en) 2016-09-01 2024-03-05 Rise Form Pty Ltd. Collapsible formwork for concrete walls

Also Published As

Publication number Publication date
CN1111702A (en) 1995-11-15

Similar Documents

Publication Publication Date Title
CN102444142A (en) Pile group column replacement expanded basement and construction method of same
CN202298648U (en) Soil-retaining anti-scouring system for self-embedded type flower drop wall
CN105002916B (en) A kind of construction method of immerseable embankment high slope interlocking ecological brick flexible protective structure
CN1067453C (en) Supporting and protecting method for base pit, side slope, flat anchor and spray net
CN109537604A (en) A method of utilizing screw pile bolt anchorage Cut Slopes of Expansive Soil
CN1208102A (en) Deposited pile and its construction
CN108589747A (en) EPS light road banks are widened in conjunction with plant biological bag protective slope structure and construction method
CN1041022A (en) Construction method and enforcement thereof
CN112176954A (en) Construction method for newly excavated channel
KR20200001850U (en) Improved pile, pier, footing, caisson, foundation
US10648146B1 (en) Precast concrete screw cylinder system and method for soil stabilization and erosion control
CN114059566B (en) Soft rock slope semi-rigid supporting and retaining structure and construction method thereof
JPH03504402A (en) Construction methods and construction materials
CN112359850B (en) Masonry protection structure of road engineering and construction method thereof
CN108547306A (en) A kind of building waste block stone does the construction method of bank protection
CN211285635U (en) Loess slope's reinforced structure
CN112176953A (en) Construction method for newly-built channel
CN208293589U (en) A kind of EPS light road bank is widened in conjunction with plant biological bag protective slope structure
KR20200001851U (en) Improved, reinforced pile, pier, footing, caisson, foundation
CN205999947U (en) Thin stake reinforcement soil digging rectification composite foundation
CN205387721U (en) Highway retaining wall reinforced structure
CN104153359B (en) Construction method of prestressed concrete sparse-rebar pile
CN113430989B (en) Lifting construction method for sea pond
CN214573980U (en) Cement mixing stock soil nail wall
CN210066644U (en) Hydraulic engineering prevents bank protection

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C01 Deemed withdrawal of patent application (patent law 1993)
WD01 Invention patent application deemed withdrawn after publication