CN104101126A - Continuous heat-supplying phase change energy storage overlapped type air source heat pump system and operation method thereof - Google Patents

Continuous heat-supplying phase change energy storage overlapped type air source heat pump system and operation method thereof Download PDF

Info

Publication number
CN104101126A
CN104101126A CN201410358222.0A CN201410358222A CN104101126A CN 104101126 A CN104101126 A CN 104101126A CN 201410358222 A CN201410358222 A CN 201410358222A CN 104101126 A CN104101126 A CN 104101126A
Authority
CN
China
Prior art keywords
magnetic valve
valve
stage compressor
phase change
temperature stage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410358222.0A
Other languages
Chinese (zh)
Other versions
CN104101126B (en
Inventor
曲明璐
王坛
王瑾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Shanghai for Science and Technology
Original Assignee
University of Shanghai for Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Shanghai for Science and Technology filed Critical University of Shanghai for Science and Technology
Priority to CN201410358222.0A priority Critical patent/CN104101126B/en
Publication of CN104101126A publication Critical patent/CN104101126A/en
Application granted granted Critical
Publication of CN104101126B publication Critical patent/CN104101126B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a continuous heat-supplying phase change energy storage overlapped type air source heat pump system and an operation method thereof; the overlapped air source heat pump technology is combined with the phase change energy storage technology, a phase change heat accumulator is used as a low-grade heat source for defrosting and supplying heat to a room, so that stability and reliability of defrosting operation of the overlapped type air source heat pump are ensured, meanwhile heat can be continuously supplied to the room, and thereby stable temperature of the room is ensured, and indoor thermal comfort during a defrosting period is improved; according to the continuous heat-supplying phase change energy storage overlapped type air source heat pump system, since the phase change heat accumulator provides enough heat in the defrosting process, defrosting speed can be improved; the heat pump accumulates heat when in efficient operation, so that accumulated heat can be used for defrosting and heating when needing to defrost, and thereby space-time transfer of energy is achieved, and overall operation efficiency of the unit is improved.

Description

Continuous heat supply phase-changing energy-storing overlapping air source heat pump system and operation method
Technical field
The present invention relates to a kind of heating system, particularly a kind of continuous heat supply phase-changing energy-storing overlapping air source heat pump system and operation method.
Background technology
Net for air-source heat pump units is applied and will be occurred that heating capacity sharply declines under northern area winter low temperature environment, there will be delivery temperature to transfinite, the problems such as compressor protection shutdown.Adopt overlapping air source heat pump to reach to improve air source heat pump low temperature adaptability, improve the object of its low-temperature heating performance.The same with conventional air source heat pump, overlapping air source heat pump when off-premises station surface temperature is lower than air dew point and while being below the freezing point, there will be frost in heat supply running.Northern China has a lot of cities to have winter below air themperature-10 DEG C, the more than 75% low temperature and high relative humidity weather of relative humidity, the such as city such as Harbin, Changchun.Off-premises station frost can cause air source heat pump heating capacity and systematic energy efficiency ratio to reduce, and affects heat supply continuity and the reliability of air source heat pump system.In order to ensure the good running status continuously of unit, need to periodically defrost to off-premises station.The feature of general overlapping air source heat pump utilization system self adopts the method for low temperature level bypass defrost, but in defrost process, without heat supply, indoor air temperature is reduced due to indoor, affects indoor thermal comfort.In addition, experimental studies have found that, when outdoor temperature is lower than-10 DEG C of left and right, hot gas bypass defrosting method defrosting time is very long, its reason is that the suction and discharge temperature of single-stage operation is all very low, and outdoor temperature is low, the heat that compressor is produced cannot meet cold and the required heat of heat exchanger frost layer defrost that heat exchanger absorbs from environment, has more extended the indoor time without heat supply.
Summary of the invention
The present invention be directed in existing overlapping air source heat pump system defrost process indoor without heat supply, defrosting time is long, indoor comfort is poor problem, propose a kind of continuous heat supply phase-changing energy-storing overlapping air source heat pump system and operation method, can realize the overlapping air source heat pump system of normal defrosting and continuous heat supply.
Technical scheme of the present invention is: a kind of continuous heat supply phase-changing energy-storing overlapping air source heat pump system, system comprises low temperature stage compressor, high temperature stage compressor, four-way change-over valve, indoor set, off-premises station, the second electric expansion valve, the first electric expansion valve, the second gas-liquid separator, the first gas-liquid separator, evaporative condenser, phase change heat accumulator, several magnetic valve, and system comprises the circulation of low temperature level and high temperature level circulation two parts;
Low temperature level circulation: the output of low temperature stage compressor is connected with the first interface of four-way change-over valve, the second interface of four-way change-over valve divides two-way, the first via is entered phase change heat accumulator by the first magnetic valve, and another road connects the other end of phase change heat accumulator successively by the 5th magnetic valve, the 3rd magnetic valve; Between the 5th magnetic valve and the 3rd magnetic valve, connecting line divides two-way to connect evaporative condenser, and the 7th magnetic valve of leading up to enters evaporative condenser, and another road enters evaporative condenser by the 11 magnetic valve, the 9th magnetic valve successively; Between the 11 magnetic valve and the 9th magnetic valve, connecting line connects off-premises station one end by the first electric expansion valve, the other end of off-premises station is connected with the 3rd interface of four-way change-over valve, the 4th interface of four-way change-over valve is connected with the input of the first gas-liquid separator, and the output of the first gas-liquid separator is connected with the input of low temperature stage compressor;
High temperature level circulation: the output of high temperature stage compressor is connected with one end of indoor set, the other end of indoor set divides two-way to connect evaporative condenser by the second electric expansion valve, the tenth magnetic valve of leading up to connects evaporative condenser, and another road connects evaporative condenser by the 12 magnetic valve, the 8th magnetic valve successively; Between the 12 magnetic valve and the 8th magnetic valve, connecting line divides two-way to connect phase change heat accumulator, and the 4th magnetic valve of leading up to connects phase change heat accumulator, and another road connects phase change heat accumulator by the 6th magnetic valve, the second magnetic valve successively; Between the 6th magnetic valve and the second magnetic valve, connecting line connects the input of the second gas-liquid separator, and the output of the second gas-liquid separator is connected with the input of high temperature stage compressor.
An operation method for continuous heat supply phase-changing energy-storing overlapping air source heat pump system, described system is divided into normal heating mode, accumulation of heat pattern and defrosting mode,
Normal heating mode: by the first magnetic valve, the second magnetic valve, the 3rd magnetic valve, the 4th magnetic valve, the 11 magnetic valve, the 12 closed electromagnetic valve, the 5th magnetic valve, the 6th magnetic valve, the 7th magnetic valve, the 8th magnetic valve, the 9th magnetic valve, the tenth magnetic valve are opened to low temperature level circulation: be followed successively by low temperature stage compressor, four-way change-over valve, the 5th magnetic valve, the 7th magnetic valve, evaporative condenser, the 9th magnetic valve, the first electric expansion valve, off-premises station, four-way change-over valve, the first gas-liquid separator and get back to low temperature stage compressor; High temperature level circulation: be followed successively by high temperature stage compressor, indoor set, the second electric expansion valve, the tenth magnetic valve, evaporative condenser, the 8th magnetic valve, the 6th magnetic valve, the second gas-liquid separator and get back to high temperature stage compressor;
Accumulation of heat pattern: by the second magnetic valve, the 4th magnetic valve, the 5th magnetic valve, the 11 magnetic valve, the 12 closed electromagnetic valve, by the first magnetic valve, the 3rd magnetic valve, the 6th magnetic valve, the 7th magnetic valve, the 8th magnetic valve, the 9th magnetic valve, the tenth magnetic valve is opened, low temperature level circulation: be followed successively by low temperature stage compressor, four-way change-over valve, the first magnetic valve, phase change heat accumulator, the 3rd magnetic valve, the 7th magnetic valve, evaporative condenser, the 9th magnetic valve, the first electric expansion valve, off-premises station, four-way change-over valve, the first gas-liquid separator is got back to low temperature stage compressor, high temperature level circulation: be followed successively by high temperature stage compressor, indoor set, the second electric expansion valve, the tenth magnetic valve, evaporative condenser, the 8th magnetic valve, the 6th magnetic valve, the second gas-liquid separator and get back to high temperature stage compressor,
Defrosting mode: by the 5th magnetic valve, the 6th magnetic valve, the 7th magnetic valve, the 8th magnetic valve, the 9th magnetic valve, the tenth closed electromagnetic valve, the first magnetic valve, the second magnetic valve, the 3rd magnetic valve, the 4th magnetic valve, the 11 magnetic valve, the 12 magnetic valve are opened to low temperature level circulation: be followed successively by low temperature stage compressor, four-way change-over valve, off-premises station, the first electric expansion valve, the 11 magnetic valve, the 3rd magnetic valve, phase change heat accumulator, the first magnetic valve, four-way change-over valve, the first gas-liquid separator and get back to low temperature stage compressor; High temperature level circulation: high temperature stage compressor, indoor set, the second electric expansion valve, the 12 magnetic valve, the 4th magnetic valve, phase change heat accumulator, the second magnetic valve, the second gas-liquid separator are got back to high temperature stage compressor.
Beneficial effect of the present invention is: continuous heat supply phase-changing energy-storing overlapping air source heat pump system of the present invention and operation method, overlapping air source heat pump technology is combined with phase-changing energy-storing technology, utilize phase change heat accumulator as defrosting with to the low level heat energy of indoor heating, ensure stability and the reliability of the operation of overlapping air source heat pump defrosting, indoor uninterrupted heat supply simultaneously, thereby ensure that room temperature is stable, indoor thermal comfort degree during raising defrosting; The present invention, because phase change heat accumulator provides enough heats in defrost process, can improve defrosting speed; Due to heat pump accumulation of heat when the efficient operation, in the time need to defrosting by the heat storing for defrosting, heat supply, realized the Time-spatial diversion of energy, improved the overall operation efficiency of unit.
Brief description of the drawings
Fig. 1 is continuous heat supply phase-changing energy-storing overlapping air source heat pump system structural representation of the present invention.
Detailed description of the invention
Continuous heat supply phase-changing energy-storing overlapping air source heat pump system structural representation as shown in Figure 1, system comprises low temperature stage compressor 1, high temperature stage compressor 2, four-way change-over valve 3, indoor set 4, off-premises station 5, the second electric expansion valve 6, the first electric expansion valve 7, the second gas-liquid separator 8, the first gas-liquid separator 9, evaporative condenser 10, phase change heat accumulator 11, magnetic valve F1, magnetic valve F2, magnetic valve F3, magnetic valve F4, magnetic valve F5, magnetic valve F6, magnetic valve F7, magnetic valve F8, magnetic valve F9, magnetic valve F10, magnetic valve F11, magnetic valve F12.Described system comprises the circulation of low temperature level and high temperature level circulation two parts.
For low temperature level: the output of low temperature stage compressor 1 is connected with the first interface of four-way change-over valve 3, the second interface of four-way change-over valve 3 divides two-way, the first via is entered phase change heat accumulator 11 by magnetic valve F1, and another road connects the other end of phase change heat accumulator 11 successively by magnetic valve F5, magnetic valve F3.Between magnetic valve F5 and magnetic valve F3, connecting line divides two-way to connect evaporative condenser 10, and the magnetic valve F7 of leading up to enters evaporative condenser 10, and another road enters evaporative condenser 10 by magnetic valve F11, magnetic valve F9 successively.Between magnetic valve F11 and magnetic valve F9, connecting line connects off-premises station 5 one end by the first electric expansion valve 7, the other end of off-premises station 5 is connected with the 3rd interface of four-way change-over valve 3, the 4th interface of four-way change-over valve 3 is connected with the input of the first gas-liquid separator 9, and the output of the first gas-liquid separator 9 is connected with the input of low temperature stage compressor 1.
For high temperature level: the output of high temperature stage compressor 2 is connected with one end of indoor set 4, the other end of indoor set 4 connects evaporative condenser 10 by 6 points of two-way of the second electric expansion valve, the magnetic valve F10 of leading up to connects evaporative condenser 10, and another road connects evaporative condenser 10 by magnetic valve F12, magnetic valve F8 successively.Between magnetic valve F12 and magnetic valve F8, connecting line divides two-way to connect phase change heat accumulator 11, and the magnetic valve F4 of leading up to connects phase change heat accumulator 11, and another road connects phase change heat accumulator 11 by magnetic valve F6, magnetic valve F2 successively.Between magnetic valve F6 and magnetic valve F2, connecting line connects the input of the second gas-liquid separator 8, and the output of the second gas-liquid separator 8 is connected with the input of high temperature stage compressor 2.
Operation principle:
When accumulation of heat duty, between low temperature stage compressor 1, four-way change-over valve 3, phase change heat accumulator 11, evaporative condenser 10, the first electric expansion valve 7, off-premises station 5, four-way change-over valve 3, the first gas-liquid separator 9, low temperature stage compressor 1, series connection forms closed circuit, low temperature stage compressor 1 is delivered to the heat on off-premises station respectively in phase change heat accumulator 11 and evaporative condenser 10, makes the phase-change material accumulation of heat in phase change heat accumulator 11.High temperature stage compressor 2, indoor set 4, connect with the second electric expansion valve 6, evaporative condenser 10, the second gas-liquid separator 8, high temperature stage compressor 2, high temperature stage compressor 2 is delivered to the heat of evaporative condenser 10 in indoor set 4.
When defrosting duty, low temperature stage compressor 1, four-way change-over valve 3, off-premises station 5, the first electric expansion valve 7, phase change heat accumulator 11, between four-way change-over valve 3, the first gas-liquid separator 9, low temperature stage compressor 1, series connection forms closed circuit, low temperature stage compressor 1 is delivered on off-premises station 5 phase change heat accumulator 11 heats for defrosting, makes the phase-change material heat release in phase change heat accumulator 11.High temperature stage compressor 2, indoor set 4, connect with the second electric expansion valve 6, phase change heat accumulator 11, the second gas-liquid separator 8, high temperature stage compressor 2, high temperature stage compressor 2 is delivered to the heat of phase change heat accumulator 11 in indoor set 4.
The present invention's new system of one that to be thought based on energy Time-spatial diversion organically combine overlapping air source heat pump technology and phase-changing energy-storing technology.This system is utilized air source heat pump from air, to extract heat and heat is stored in phase-changing energy-storing device, in the time that needs defrost, the heat of storage is taken out to defrosting and hold concurrently to room heat supply winter.System running pattern can be divided into normal heating mode, accumulation of heat pattern and defrosting mode.
One, normal heating mode
Magnetic valve F1, magnetic valve F2, magnetic valve F3, magnetic valve F4, magnetic valve F11, magnetic valve F12 are closed, magnetic valve F5, magnetic valve F6, magnetic valve F7, magnetic valve F8, magnetic valve F9, magnetic valve F10 are opened.The flow process of whole system is to circulate for low temperature level: low temperature stage compressor 1 → four-way change-over valve 3 → magnetic valve F5 → magnetic valve F7 → evaporative condenser 10 → magnetic valve F9 → the first electric expansion valve 7 → off-premises station 5 → four-way change-over valve 3 → the first gas-liquid separator 9 → low temperature stage compressors 1; Circulate for high temperature level: high temperature stage compressor 2 → indoor set 4 → the second electric expansion valve 6 → magnetic valve F10 → evaporative condenser 10 → magnetic valve F8 → magnetic valve F6 → the second gas-liquid separator 8 → high temperature stage compressors 2.
Two, accumulation of heat pattern
Magnetic valve F2, magnetic valve F4, magnetic valve F5, magnetic valve F11, magnetic valve F12 are closed, magnetic valve F1, magnetic valve F3, magnetic valve F6, magnetic valve F7, magnetic valve F8, magnetic valve F9, magnetic valve F10 are opened.The flow process of whole system is to circulate for low temperature level: low temperature stage compressor 1 → four-way change-over valve 3 → magnetic valve F1 → phase change heat accumulator 11 → magnetic valve F3 → magnetic valve F7 → evaporative condenser 10 → magnetic valve F9 → the first electric expansion valve 7 → off-premises station 5 → four-way change-over valve 3 → the first gas-liquid separator 9 → low temperature stage compressors 1; Circulate for high temperature level: high temperature stage compressor 2 → indoor set 4 → the second electric expansion valve 6 → magnetic valve F10 → evaporative condenser 10 → magnetic valve F8 → magnetic valve F6 → the second gas-liquid separator 8 → high temperature stage compressors 2.
Three, defrosting mode
Magnetic valve F5, magnetic valve F6, magnetic valve F7, magnetic valve F8, magnetic valve F9, magnetic valve F10 are closed, magnetic valve F1, magnetic valve F2, magnetic valve F3, magnetic valve F4, magnetic valve F11, magnetic valve F12 are opened.The flow process of whole system is to circulate for low temperature level: low temperature stage compressor 1 → four-way change-over valve 3 → off-premises station 5 → the first electric expansion valve 7 → magnetic valve F11 → magnetic valve F3 → phase change heat accumulator 11 → magnetic valve F1 → four-way change-over valve 3 → the first gas-liquid separator 9 → low temperature stage compressors 1; Circulate for high temperature level: high temperature stage compressor 2 → indoor set 4 → the second electric expansion valve 6 → magnetic valve F12 → magnetic valve F4 → phase change heat accumulator 11 → magnetic valve F2 → the second gas-liquid separator 8 → high temperature stage compressors 2.

Claims (2)

1. a continuous heat supply phase-changing energy-storing overlapping air source heat pump system, it is characterized in that, system comprises low temperature stage compressor (1), high temperature stage compressor (2), four-way change-over valve (3), indoor set (4), off-premises station (5), the second electric expansion valve (6), the first electric expansion valve (7), the second gas-liquid separator (8), the first gas-liquid separator (9), evaporative condenser (10), phase change heat accumulator (11), the second pipeline (12), several magnetic valve, and system comprises the circulation of low temperature level and high temperature level circulation two parts;
Low temperature level circulation: the output of low temperature stage compressor (1) is connected with the first interface of four-way change-over valve (3), the second interface of four-way change-over valve (3) divides two-way, the first via is entered phase change heat accumulator (11) by the first magnetic valve (F1), and another road connects the other end of phase change heat accumulator (11) successively by the 5th magnetic valve (F5), the 3rd magnetic valve (F3); Between the 5th magnetic valve (F5) and the 3rd magnetic valve (F3), connecting line divides two-way to connect evaporative condenser (10), the 7th magnetic valve (F7) of leading up to enters evaporative condenser (10), and another road enters evaporative condenser (10) by the 11 magnetic valve (F11), the 9th magnetic valve (F9) successively; Between the 11 magnetic valve (F11) and the 9th magnetic valve (F9), connecting line connects off-premises station (5) one end by the first electric expansion valve (7), the other end of off-premises station (5) is connected with the 3rd interface of four-way change-over valve (3), the 4th interface of four-way change-over valve (3) is connected with the input of the first gas-liquid separator (9), and the output of the first gas-liquid separator (9) is connected with the input of low temperature stage compressor (1);
High temperature level circulation: the output of high temperature stage compressor (2) is connected with one end of indoor set (4), the other end of indoor set (4) connects evaporative condenser (10) by the second electric expansion valve (6) point two-way, the tenth magnetic valve (F10) of leading up to connects evaporative condenser (10), and another road connects evaporative condenser (10) by the 12 magnetic valve (F12), the 8th magnetic valve (F8) successively; Between the 12 magnetic valve (F12) and the 8th magnetic valve (F8), connecting line divides two-way to connect phase change heat accumulator (11), the 4th magnetic valve (F4) of leading up to connects phase change heat accumulator (11), and another road connects phase change heat accumulator (11) by the 6th magnetic valve (F6), the second magnetic valve (F2) successively; Between the 6th magnetic valve (F6) and the second magnetic valve (F2), connecting line connects the input of the second gas-liquid separator (8), and the output of the second gas-liquid separator (8) is connected with the input of high temperature stage compressor (2).
2. the operation method of system according to claim 1, is characterized in that, described system is divided into normal heating mode, accumulation of heat pattern and defrosting mode,
Normal heating mode: by the first magnetic valve, the second magnetic valve, the 3rd magnetic valve, the 4th magnetic valve, the 11 magnetic valve, the 12 closed electromagnetic valve, by the 5th magnetic valve, the 6th magnetic valve, the 7th magnetic valve, the 8th magnetic valve, the 9th magnetic valve, the tenth magnetic valve is opened, low temperature level circulation: be followed successively by low temperature stage compressor (1), four-way change-over valve (3), the 5th magnetic valve (F5), the 7th magnetic valve (F7), evaporative condenser (10), the 9th magnetic valve (F9), the first electric expansion valve (7), off-premises station (5), four-way change-over valve (3), the first gas-liquid separator (9) is got back to low temperature stage compressor (1), high temperature level circulation: be followed successively by high temperature stage compressor (2), indoor set (4), the second electric expansion valve (6), the tenth magnetic valve (F10), evaporative condenser (10), the 8th magnetic valve (F8), the 6th magnetic valve (F6), the second gas-liquid separator (8) and get back to high temperature stage compressor (2),
Accumulation of heat pattern: by the second magnetic valve, the 4th magnetic valve, the 5th magnetic valve, the 11 magnetic valve, the 12 closed electromagnetic valve, by the first magnetic valve, the 3rd magnetic valve, the 6th magnetic valve, the 7th magnetic valve, the 8th magnetic valve, the 9th magnetic valve, the tenth magnetic valve is opened, low temperature level circulation: be followed successively by low temperature stage compressor (1), four-way change-over valve (3), the first magnetic valve (F1), phase change heat accumulator (11), the 3rd magnetic valve (F3), the 7th magnetic valve (F7), evaporative condenser (10), the 9th magnetic valve (F9), the first electric expansion valve (7), off-premises station (5), four-way change-over valve (3), the first gas-liquid separator (9) is got back to low temperature stage compressor (1), high temperature level circulation: be followed successively by high temperature stage compressor (2), indoor set (4), the second electric expansion valve (6), the tenth magnetic valve (F10), evaporative condenser (10), the 8th magnetic valve (F8), the 6th magnetic valve (F6), the second gas-liquid separator (8) and get back to high temperature stage compressor (2),
Defrosting mode: by the 5th magnetic valve, the 6th magnetic valve, the 7th magnetic valve, the 8th magnetic valve, the 9th magnetic valve, the tenth closed electromagnetic valve, by the first magnetic valve, the second magnetic valve, the 3rd magnetic valve, the 4th magnetic valve, the 11 magnetic valve, the 12 magnetic valve is opened, low temperature level circulation: be followed successively by low temperature stage compressor (1), four-way change-over valve (3), off-premises station (5), the first electric expansion valve (7), the 11 magnetic valve, the 3rd magnetic valve, phase change heat accumulator (11), the first magnetic valve, four-way change-over valve (3), the first gas-liquid separator (9) is got back to low temperature stage compressor (1), high temperature level circulation: high temperature stage compressor (2), indoor set (4), the second electric expansion valve (6), the 12 magnetic valve (F12), the 4th magnetic valve (F4), phase change heat accumulator (11), the second magnetic valve (F2), the second gas-liquid separator (8) are got back to high temperature stage compressor (2).
CN201410358222.0A 2014-07-25 2014-07-25 Continuous heat-supplying phase change energy storage overlapped type air source heat pump system and operation method thereof Expired - Fee Related CN104101126B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410358222.0A CN104101126B (en) 2014-07-25 2014-07-25 Continuous heat-supplying phase change energy storage overlapped type air source heat pump system and operation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410358222.0A CN104101126B (en) 2014-07-25 2014-07-25 Continuous heat-supplying phase change energy storage overlapped type air source heat pump system and operation method thereof

Publications (2)

Publication Number Publication Date
CN104101126A true CN104101126A (en) 2014-10-15
CN104101126B CN104101126B (en) 2017-01-25

Family

ID=51669499

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410358222.0A Expired - Fee Related CN104101126B (en) 2014-07-25 2014-07-25 Continuous heat-supplying phase change energy storage overlapped type air source heat pump system and operation method thereof

Country Status (1)

Country Link
CN (1) CN104101126B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105783317A (en) * 2016-04-19 2016-07-20 上海理工大学 Continuous heating phase change energy storage cascade air source heat pump experiment system
CN105890211A (en) * 2016-04-08 2016-08-24 陈建平 Energy-storage interconnected heat pump system suitable for heat supply of cold regions
CN109357438A (en) * 2018-11-30 2019-02-19 山东陆海新能源技术有限公司 The low-temperature air source heat pump of afterheat recovery type removes defrosting system
CN110779241A (en) * 2019-11-25 2020-02-11 开平市高美空调设备有限公司 Overlapping type energy storage defrosting device of air source heat pump
CN115013889A (en) * 2022-06-21 2022-09-06 同济大学 Environment-independent type runner dehumidification regeneration system
CN116182432B (en) * 2023-02-22 2024-04-19 大连理工大学 Overlapping type compressed PVT-air source heat pump system for supplying heat without intermittent defrosting alternately

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101338960A (en) * 2008-08-13 2009-01-07 哈尔滨工业大学 Continuous heat supply phase-change energy storage defrosting system
CN101566410A (en) * 2009-05-27 2009-10-28 湖南工程学院 Method and system for reducing frosting degree of air-source heat pump hot water unit in winter
WO2010070828A1 (en) * 2008-12-16 2010-06-24 三菱電機株式会社 Heat pump hot-water supply device and operation method therefor
CN201903165U (en) * 2010-12-17 2011-07-20 宁波天海制冷设备有限公司 Household ultralow-temperature heat pump hot water unit
CN102506502A (en) * 2011-10-19 2012-06-20 广东美的暖通设备限公司 Heat-accumulation-type cascade-cycle water heating machine and control method thereof
GB2488331A (en) * 2011-02-23 2012-08-29 Star Refrigeration Heat pump system with a thermal store comprising a phase change material
CN203336870U (en) * 2013-05-17 2013-12-11 上海理工大学 Overlapped type heat pump system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101338960A (en) * 2008-08-13 2009-01-07 哈尔滨工业大学 Continuous heat supply phase-change energy storage defrosting system
WO2010070828A1 (en) * 2008-12-16 2010-06-24 三菱電機株式会社 Heat pump hot-water supply device and operation method therefor
CN101566410A (en) * 2009-05-27 2009-10-28 湖南工程学院 Method and system for reducing frosting degree of air-source heat pump hot water unit in winter
CN201903165U (en) * 2010-12-17 2011-07-20 宁波天海制冷设备有限公司 Household ultralow-temperature heat pump hot water unit
GB2488331A (en) * 2011-02-23 2012-08-29 Star Refrigeration Heat pump system with a thermal store comprising a phase change material
CN102506502A (en) * 2011-10-19 2012-06-20 广东美的暖通设备限公司 Heat-accumulation-type cascade-cycle water heating machine and control method thereof
CN203336870U (en) * 2013-05-17 2013-12-11 上海理工大学 Overlapped type heat pump system

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105890211A (en) * 2016-04-08 2016-08-24 陈建平 Energy-storage interconnected heat pump system suitable for heat supply of cold regions
CN105890211B (en) * 2016-04-08 2018-05-08 陈建平 A kind of accumulation of energy interconnection heat pump system of suitable cold district heat supply
CN105783317A (en) * 2016-04-19 2016-07-20 上海理工大学 Continuous heating phase change energy storage cascade air source heat pump experiment system
CN105783317B (en) * 2016-04-19 2018-08-28 上海理工大学 Continuous heat supply phase-changing energy-storing overlapping air source heat pump experimental system
CN109357438A (en) * 2018-11-30 2019-02-19 山东陆海新能源技术有限公司 The low-temperature air source heat pump of afterheat recovery type removes defrosting system
CN110779241A (en) * 2019-11-25 2020-02-11 开平市高美空调设备有限公司 Overlapping type energy storage defrosting device of air source heat pump
CN115013889A (en) * 2022-06-21 2022-09-06 同济大学 Environment-independent type runner dehumidification regeneration system
CN115013889B (en) * 2022-06-21 2024-01-26 同济大学 Environment-independent rotating wheel dehumidification regeneration system
CN116182432B (en) * 2023-02-22 2024-04-19 大连理工大学 Overlapping type compressed PVT-air source heat pump system for supplying heat without intermittent defrosting alternately

Also Published As

Publication number Publication date
CN104101126B (en) 2017-01-25

Similar Documents

Publication Publication Date Title
CN101338960B (en) Continuous heat supply phase-change energy storage defrosting system
CN202709311U (en) Air conditioner system
CN103673438B (en) A kind of sustainable multi-connected air conditioner of heating and Defrost method thereof
CN104101126A (en) Continuous heat-supplying phase change energy storage overlapped type air source heat pump system and operation method thereof
CN103363710B (en) A kind of heat pump of air source hot pump water heater
CN105783317A (en) Continuous heating phase change energy storage cascade air source heat pump experiment system
CN106016539A (en) Multi-branch heat pipe and heat pump compounding system
CN101893299A (en) Solar adsorption type air-conditioning system based on phase change cold accumulation
CN106288562A (en) The defrosting of a kind of air source heat pump system controls devices and methods therefor
CN203518373U (en) Air conditioning system
CN103363717A (en) Refrigerating system and operation method thereof
CN202973692U (en) Air-conditioning system with defrosting device and central air-conditioning hot water system
CN102635972B (en) Cold-storing type solar-energy spraying and compression coupling refrigerating device
CN103528267B (en) With the low ambient temperature air source heat pump refrigeration system of heat pipe circuit
CN106196779A (en) A kind of solution defrosting freezing regeneration air source source pump
CN105240919A (en) Energy storage type air source heat pump heating system and operation method thereof
CN103307804B (en) Defrosting system for heat pump
CN203432134U (en) Heat pump system of air source heat pump water heater
CN109269140B (en) Air source heat pump unit capable of continuously supplying heat and defrosting
CN203478687U (en) Refrigeration system
CN205119211U (en) Energy storage type air source heat pump heating system
CN102538272B (en) Air-conditioning system and defrosting method thereof
CN203550269U (en) Air conditioning system
CN219141147U (en) Air source heat pump unit capable of defrosting alternately
CN211575592U (en) Air source heat pump system based on soil seasonal heat storage defrosting and solar intermittent utilization

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170125

Termination date: 20190725