CN104100295A - Mobile buffering and transferring belt conveyor for rock roadway - Google Patents
Mobile buffering and transferring belt conveyor for rock roadway Download PDFInfo
- Publication number
- CN104100295A CN104100295A CN201410352563.7A CN201410352563A CN104100295A CN 104100295 A CN104100295 A CN 104100295A CN 201410352563 A CN201410352563 A CN 201410352563A CN 104100295 A CN104100295 A CN 104100295A
- Authority
- CN
- China
- Prior art keywords
- middle frame
- belt conveyor
- conveyor
- frame
- standard middle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The invention discloses a mobile buffering and transferring belt conveyor for a rock roadway. The belt conveyor comprises a tail drum, a belt conveyor tailstock, a receiving device with buffer effect, a climbing section middle frame, a standard middle frame, a transition section connecting the climbing section middle frame and the standard middle frame, surface carrier rollers, bottom carrier rollers, a belt conveyor headstock, a turnabout drum, adhesive tape, support foot stands functioning in supporting and stabilizing, a tail cart with four fixing rail clamps, and a limiting rail clamp preventing bottom-dump type mine carts from impacting on the bottom of a frame. Two-inch steel pipes are welded at two ends of the bottom of each of the belt conveyor headstock and the standard middle frame and at the positions 500mm from the end portions, mounting and supporting of the belt conveyor are realized, the standard middle frame is totally of a trussed structure, the adjacent frames are connected by the aid of vertical bolts at two ends, and a clearance between the frame bottom surface of the standard middle frame and the top surface of each bottom-dump type mine cart in the height direction is kept more than 100mm. The belt conveyor has the advantages that mounting, dismounting and movement are simple and rapid, gangue transfer quantity in a single cycle is increased obviously, absolute gangue discharge time is reduced, shunting turnover times are decreased obviously, labor intensity of staff is reduced greatly, and working efficiency and labor-hour utilization rate are increased.
Description
Technical field
The present invention relates to a kind of conveyer, particularly a kind of rock gangway is reprinted belt conveyor by portable buffering.
Background technology
Along with rock gangway fast digging technique and technological improvement, the transhipment of work plane moraine head spoil becomes the important factor in order of restriction driving.The spoil transhipment technique that rock gangway adopts mainly contains following several: the one, and adopt (P-30 type) scraper mucking to turn cash dress cash, manually push 1T fixed mine wagon fortune cash; The 2nd, adopt (P-60 type) scraper mucking to turn cash dress cash, manually push or adopt car hauler to use 3T drop-bottom car fortune cash; The 3rd, adopt side dump dirt loader or scraper mucking to turn cash dress cash, following adopted belt conveyor is transported cash continuously, is directly transported to lower cash eye or buffering waste bin.Part tunnel, because not possessing the belt conveyor of installation fortune cash condition, adopts scraper mucking to join 3T drop-bottom car shipment cash, utilizes car hauler or manually pushes mode, operational densities is more frequent, labour intensity is large, and efficiency is not high, and the raising of driving work efficiency is had to a certain degree impact.Research and improvement for the follow-up rapid transport equipment of this type of tunnel spoil become urgent problem.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, provide the portable buffering of a kind of rock gangway to reprint belt conveyor, to increase single cycle spoil transhipment amount, reduce definitely to go out the cash time, reduce labor intensity, improve operating efficiency and the rate of utilization of work hour.A kind of rock gangway of the present invention is reprinted belt conveyor by portable buffering and is mainly made up of aircraft tail cylinder 1, conveyor tailstock 2, material-receiving device 3, climbing section middle frame 4, transition segment 5, face carrying roller 6, collet roller 7, standard middle frame 8, the conveyor headstock 9, bend pulley 10, adhesive tape 11, support foot rest 12, tail actuated small roadster 13, fixing rail meter 14, spacing rail meter 15, and the movable type buffering that is configured for stone drifting work plane is reprinted belt conveyor.
Technical scheme of the present invention is achieved in that as shown in Figure 1, 2, and a kind of rock gangway is reprinted belt conveyor by portable buffering and is mainly made up of aircraft tail cylinder 1, conveyor tailstock 2, material-receiving device 3, a climbing section middle frame 4, transition segment 5, face carrying roller 6, collet roller 7, standard middle frame 8, the conveyor headstock 9, bend pulley 10, adhesive tape 11, support foot rest 12, tail actuated small roadster 13, fixing rail meter 14, spacing rail meter 15.Stone drifting work plane spoil is transported to portable buffering by scraper mucking 17 and reprints belt conveyor, is then transported to continuously drop-bottom car 16, realizes buffering transport function.Conveyor tailstock 2 is installed by connecting bolt on tail actuated small roadster 13 soles that are fastened on four fixing rail meters 14, and climbing section middle frame 4 is connected with standard middle frame 8 by transition segment 5.
It is characterized in that: the conveyor headstock 9, standard middle frame 8 every bottoms are connected with support foot rest 12 far from two ends, 500mm place, end two cun of steel pipes of welding, realize installation and the support of belt conveyor, play firm effect.
It is characterized in that: standard middle frame 8 all adopts truss structure, adjacent dependence two ends vertical setting of types bolt couples together, standard middle frame 8 frame bottom surface height and drop-bottom car 16 apical side heights remain on gap more than 100mm, prevent from wiping on-hook frame bottom, single can hold five drop-bottom cars 16, greatly increases circulation transhipment amount.
It is characterized in that: below transition segment 5 appropriate location track both sides each install a pair of spacing rail meter 15 drop-bottom car 16 is carried out spacing, climbing section middle frame 4 and the transition segment 5 of the too fast shock belt conveyor of vehicle while preventing winch scheduling traction bunching.
The present invention's beneficial effect is compared with prior art that installation, dismounting, mobile quick and easy, increase single cycle spoil transhipment amount successful, reduce definitely to go out the cash time, the number of turnover of shunting obviously reduces, and greatly alleviates worker's labour intensity, improves operating efficiency and the rate of utilization of work hour.
Brief description of the drawings
Fig. 1 is structural representation of the present invention.
Fig. 2 is A-A sectional drawing of the present invention.
Number in the figure: 1 aircraft tail cylinder; 2 conveyor tailstocks; 3 material-receiving devices; 4 climbing section middle frames; 5 transition segments; 6 carrying rollers; 7 collets; 8 standard middle frames; The 9 conveyor headstocks; 10 bend pulleys; 11 adhesive tapes; 12 support foot rests; 13 tail actuated small roadsters; 14 fixing rail meters; 15 spacing rail meters; 16 drop-bottom cars; 17 scraper muckings.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is further illustrated, but therefore do not limit the present invention among described scope of embodiments.
Referring to Fig. 1, Fig. 2, a kind of rock gangway is reprinted belt conveyor by portable buffering, comprise aircraft tail cylinder 1, conveyor tailstock 2, there is the material-receiving device 3 of cushioning effect, climbing section middle frame 4, standard middle frame 8, the transition segment 5 of connection climbing section middle frame 4 and standard middle frame 8, face carrying roller 6, collet roller 7, the conveyor headstock 9, bend pulley 10, adhesive tape 11, work the support foot rest 12 that supports firm effect, with the tail actuated small roadster 13 of four fixing rail meters 14, anti-drop-bottom car 16 clashes into the spacing rail meter 15 of frame bottom.
Stone drifting work plane spoil adopts scraper mucking 17 to be transported to and unloads cash groove, transfers to portable buffering reprint on belt conveyor by material-receiving device 3, is then transported to continuously drop-bottom car 16 and realizes transhipment.Material-receiving device 3 has cushioning effect, select impact idler support belt, the length that connects material from the front 500mm of aircraft tail cylinder 1 to scraper mucking 17 about discharge port far-end 1200mm, concave arc-shaped section uses nature radian, prevent that the starting the arc adhesive tape from departing from carrying roller, utilize convex arc to transfer horizontal segment to, extend to head unloading place.Aircraft tail cylinder 1 place conveyor tailstock 2 forms an entirety with the section of connecting material, and conveyor tailstock 2 constituent components require to move in orbit and convenient fixing, arrange take turns to and fixing rail meter 4, it is fixed and is moved.For prevent drop-bottom car 16 walked position, railway limit rail meter 15 is set at the place of approaching, and requires standard middle frame 8 frame bottom surface height and drop-bottom car 16 apical side heights to remain on gap more than 100mm, prevent from colliding conveyor frame.Belt frame is fixed, and meeting fuselage width and drop-bottom car 16 by under the condition at two ends, makes the supported on both sides foot rest 12 of suitable distance, and Belt Conveying fuselage is fixed; When mobile, mainly by car hauler traction belts aircraft tail shelf 2, frame follows up thereupon below, be that standard middle frame 8, the conveyor headstock 9 are padded on drop-bottom car 16 than the way that is easier to realize, the linkage of drop-bottom car 16 is connected with the tail actuated small roadster of conveyor tailstock 2, keep belt conveyor entirety steadily mobile, move on to after correct position, open again support foot rest 12, take off connector, complete the movement of belt conveyor and fix.
Though combine above accompanying drawing, embodiments of the present invention are described, but those of ordinary skill in the art also can recognize making various variations or amendment in the scope of claims, these modifications and variations are interpreted as within scope of the present invention and intention.
Claims (4)
1. a rock gangway is reprinted belt conveyor by portable buffering, by aircraft tail cylinder (1), conveyor tailstock (2), material-receiving device (3), climbing section middle frame (4), transition segment (5), face carrying roller (6), collet roller (7), standard middle frame (8), the conveyor headstock (9), bend pulley (10), adhesive tape (11), support foot rest (12), tail actuated small roadster (13), fixing rail meter (14), spacing rail meter (15) composition, conveyor tailstock (2) is installed by connecting bolt on tail actuated small roadster (13) sole being fastened on four fixing rail meters (14), climbing section middle frame (4) is connected with standard middle frame (8) by transition segment (5).
2. a kind of rock gangway is reprinted belt conveyor by portable buffering according to claim 1, it is characterized in that the conveyor headstock (9), every bottom of standard middle frame (8) are connected with support foot rest (12) far from two ends, 500mm place, end two cun of steel pipes of welding, realize installation and the support of belt conveyor.
3. a kind of rock gangway according to claim 1 is reprinted belt conveyor by portable buffering, it is characterized in that standard middle frame (8) all adopts truss structure, adjacent dependence two ends vertical setting of types bolt couples together, standard middle frame (8) frame bottom surface height and drop-bottom car (16) apical side height remain on gap more than 100mm, prevent from wiping on-hook frame bottom, single can hold five drop-bottom cars (16), greatly increases circulation transhipment amount.
4. a kind of rock gangway according to claim 1 is reprinted belt conveyor by portable buffering, it is characterized in that in track both sides, appropriate location, transition segment (5) below each install a pair of spacing rail meters (15) drop-bottom car (16) is carried out spacing, climbing section middle frame (4) and the transition segment (5) of the too fast shock belt of vehicle while preventing winch scheduling traction bunching.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410352563.7A CN104100295A (en) | 2014-07-24 | 2014-07-24 | Mobile buffering and transferring belt conveyor for rock roadway |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410352563.7A CN104100295A (en) | 2014-07-24 | 2014-07-24 | Mobile buffering and transferring belt conveyor for rock roadway |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104100295A true CN104100295A (en) | 2014-10-15 |
Family
ID=51668799
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410352563.7A Pending CN104100295A (en) | 2014-07-24 | 2014-07-24 | Mobile buffering and transferring belt conveyor for rock roadway |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104100295A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110002183A (en) * | 2019-04-28 | 2019-07-12 | 淮北矿业股份有限公司 | Comprehensive pick belt feeder mobile tail |
CN113895899A (en) * | 2021-10-26 | 2022-01-07 | 中国煤炭科工集团太原研究院有限公司 | Underground movable material storage system and method for coal mine |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201534696U (en) * | 2009-04-11 | 2010-07-28 | 闫振东 | Self-propelling portable belt conveyor |
CN102454417A (en) * | 2010-10-27 | 2012-05-16 | 刘素华 | Storage and transportation system of box type material storehouse |
CN203441528U (en) * | 2013-06-24 | 2014-02-19 | 辽宁工程技术大学 | Coal and gangue bidirectional transportation belt conveyor |
CN203962034U (en) * | 2014-07-24 | 2014-11-26 | 四川省华蓥山煤业股份有限公司绿水洞煤矿 | A kind of rock gangway is reprinted belt conveyor by portable buffering |
-
2014
- 2014-07-24 CN CN201410352563.7A patent/CN104100295A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201534696U (en) * | 2009-04-11 | 2010-07-28 | 闫振东 | Self-propelling portable belt conveyor |
CN102454417A (en) * | 2010-10-27 | 2012-05-16 | 刘素华 | Storage and transportation system of box type material storehouse |
CN203441528U (en) * | 2013-06-24 | 2014-02-19 | 辽宁工程技术大学 | Coal and gangue bidirectional transportation belt conveyor |
CN203962034U (en) * | 2014-07-24 | 2014-11-26 | 四川省华蓥山煤业股份有限公司绿水洞煤矿 | A kind of rock gangway is reprinted belt conveyor by portable buffering |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110002183A (en) * | 2019-04-28 | 2019-07-12 | 淮北矿业股份有限公司 | Comprehensive pick belt feeder mobile tail |
CN113895899A (en) * | 2021-10-26 | 2022-01-07 | 中国煤炭科工集团太原研究院有限公司 | Underground movable material storage system and method for coal mine |
CN113895899B (en) * | 2021-10-26 | 2023-03-14 | 中国煤炭科工集团太原研究院有限公司 | Underground movable material storage system and method for coal mine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105083867B (en) | Free-discharging rotary displacement conveyor for tailing discharge and use method thereof | |
US4046077A (en) | Track renewal method and apparatus | |
US6729464B2 (en) | Mine conveying system | |
CN201496069U (en) | Bridge type transfer machine with large span | |
CN205221931U (en) | Band conveyer is from telephone -moving tail | |
CN203962034U (en) | A kind of rock gangway is reprinted belt conveyor by portable buffering | |
CN202063155U (en) | Transitional rail changing device for mine empty wagons | |
CN115402730B (en) | Intelligent rapid-digging follow-up continuous transportation system for coal mine | |
CN104100295A (en) | Mobile buffering and transferring belt conveyor for rock roadway | |
CN202743922U (en) | Self-moving device of loader | |
US2696791A (en) | Equipment for the laying ahead of railroad tracks by means of completely assembled sections | |
CN102602398A (en) | Quick-transporting method and quick-transport device for foldable temporary cableways | |
CN204436459U (en) | A kind of warehouse style leather belt reshipment machine | |
CN102649511B (en) | Railway gondola car loading system | |
CN205150967U (en) | A rotatory conveyer that displaces of freely unloading for tailing discharges | |
CN201902210U (en) | Lapping device of road header and belt conveyor | |
CN109928187A (en) | A kind of device that frame head of reloading machine elapses automatically | |
CN101289941A (en) | Multi-pit car type second conveyor | |
CN211768162U (en) | Overlength overlap joint bridge type reprint belt feeder | |
CN111133172A (en) | Transport and transport system for tunnel buildings | |
CN105217267B (en) | Mining mobile flexible tape transporter | |
CN204822987U (en) | Rotation of freely unloading displaces conveyer | |
CN218144035U (en) | Discharging device for bidirectional feeding belt conveyor | |
CN105712036A (en) | Arrangement method for mine open pit mining belt conveyor | |
CN205602600U (en) | Side wall delivery wagon pneumatic motor running gear |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20141015 |