CN104100006B - 一种大梁与柱的连接结构 - Google Patents

一种大梁与柱的连接结构 Download PDF

Info

Publication number
CN104100006B
CN104100006B CN201410317010.8A CN201410317010A CN104100006B CN 104100006 B CN104100006 B CN 104100006B CN 201410317010 A CN201410317010 A CN 201410317010A CN 104100006 B CN104100006 B CN 104100006B
Authority
CN
China
Prior art keywords
post
crossbeam
concrete
bar
beard muscle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410317010.8A
Other languages
English (en)
Other versions
CN104100006A (zh
Inventor
张跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Broad Sustainable Building Co
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410317010.8A priority Critical patent/CN104100006B/zh
Publication of CN104100006A publication Critical patent/CN104100006A/zh
Application granted granted Critical
Publication of CN104100006B publication Critical patent/CN104100006B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

本发明涉及一种大梁与柱的连接结构,包括大梁、柱,所述大梁由钢结构梁和带钢筋网的砼地构成,是将钢结构梁与钢筋网焊接成一体并用砼浇筑而成,所述大梁与柱采用螺栓连接在一起的,所述大梁与柱上均设有胡子筋,所述大梁上的胡子筋与柱上的胡子筋相互连接,在现场采用砼后浇的方式连接。本发明结构新颖、施工方便、强度高、成本低,适合规模化工厂标准化生产,可实现高速度模块化建筑施工。

Description

一种大梁与柱的连接结构
技术领域
本发明涉及建筑技术领域,具体涉及一种大梁与柱的连接结构。
背景技术
在钢结构高层建筑中,钢结构大梁与钢结构柱一般采用连接座连接。为了降低全钢结构的成本,我们研究开发了一种新型大梁,这种大梁由钢结构梁和带钢筋网的砼地构成,将钢结构梁与钢筋网焊接成一体并用砼浇筑而成。这种大梁不同于全钢结构大梁和钢筋混凝土大梁,这种新型的由钢结构梁和带钢筋网的砼地构成的大梁,既具备传统混凝土大梁成本低的优点,又具备钢结构大梁连接组装迅速、易于工厂化大规模生产、强度高、建筑速度快的优点,避免了混凝土大梁的笨重、强度低、生产周期长的缺点,同时避免了钢结构大梁成本较高、钢材消耗量大的缺点。另外,我们同时研究开发了一种与上述大梁相对应的带胡子筋的柱,这种柱与大梁的连接结构不同于传统的连接结构。对于这种新型大梁与新型柱的建筑结构,如何连接才能有效保证安装方便、连接可靠、强度更高、且能实现工厂标准化生产,是当前建筑领域的一个重要技术课题。
发明内容
本发明的目的是提供一种可工厂标准化生产、现场模块化组装、省工省时、无建筑垃圾、施工速度快、连接方便的一种大梁与柱的连接结构。
本发明是通过以下技术方案予以实现的:
一种大梁与柱的连接结构,包括大梁、柱,所述大梁由钢结构梁和带钢筋网的砼地构成,是将钢结构梁与钢筋网焊接成一体并用砼浇筑而成,所述大梁与柱采用螺栓连接在一起的,所述大梁与柱上均设有胡子筋,所述大梁上的胡子筋与柱上的胡子筋相互连接,在现场采用砼后浇的方式连接。
进一步的,所述大梁的钢结构梁上设有通用化模数的螺栓孔,所述大梁的砼地设有用砼浇筑的楞,所述楞中镶嵌有钢筋桁架,所述钢筋桁架、砼地中的钢筋网、钢结构梁三者焊接为一体,所述砼地的侧边设有胡子筋,所述柱上设有对应的螺栓孔和胡子筋,所述大梁与柱上的螺栓孔对齐,再用螺栓连接在一起,所述砼地的胡子筋与柱上的胡子筋通过焊接、钢丝捆绑、螺接、扣接等多种方式中的任一种连接在一起,连接后采用后浇的砼填满。
本发明的技术效果如下:
本发明同时采用高强度螺栓连接、胡子筋连接、后浇砼连接的多重连接新颖结构,很好地解决了带有砼地的新型大梁与带胡子筋的新型柱的连接技术难题,突破了传统大梁与柱的连接方式,结构新颖、施工方便、连接牢固可靠、强度高、成本低,适合规模化工厂标准化生产,可实现高速度模块化建筑施工。
附图说明
图1为本发明的结构示意图。
附图中:1—大梁,2—柱,3—螺栓孔,4—螺栓,5—胡子筋,6—砼,11—钢筋网,12—钢筋桁架,13—楞,14—砼地,15—钢结构梁。
具体实施方式
如图1所示,一种大梁1与柱2的连接结构,包括大梁1、柱2。所述大梁1由钢结构梁15和带钢筋网11的砼地14构成,是将钢结构梁15与钢筋网11焊接成一体并用砼6浇筑而成。钢结构梁15由桁架、槽钢或其它型钢焊接而成,呈矩形,其上下两面同时浇筑有带钢筋网11的砼地14,所述砼地14中的钢筋网11采用钢丝编织成具有一定厚度的立体网状结构,所述钢筋网11牢固焊接在钢结构梁15的上方、下方,再用砼6浇筑钢筋网11,在钢结构梁15上方和下方形成紧密连接为一体的砼地14。
大梁1的砼地14设有用砼6浇筑的楞13,所述楞13中镶嵌有钢筋桁架12,所述钢筋桁架12与砼地14中的钢筋网11、钢结构梁15三者焊接为一体。所述带钢筋桁架12的楞13主要用来进一步加强大梁1的强度和刚度。
如图1所示,本发明的柱2采用带胡子筋5的柱2,可以为钢结构柱2,在柱体上焊接有用来连接大梁1或楼板的胡子筋5,也可以为混凝土柱2,在柱体上预埋有胡子筋5,这两种柱体上均设有标准模数的螺栓孔3。
这种新型大梁1与新型柱2采用螺栓4连接、胡子筋5连接、后浇砼6连接多重连接的新颖结构,先用高强度螺栓4将大梁1上的钢结构梁15与柱体上的螺栓孔3紧固在一起,同时将大梁1与柱2上对应位置的胡子筋5通过焊接、钢丝捆绑、螺接、扣接等多种方式中的任一种连接在一起,连接后采用后浇的砼6填满。
本发明很好地解决了带有砼地14的新型大梁1与带胡子筋5的新型柱2的连接技术难题,突破了传统大梁1与柱2的连接方式,结构新颖、施工方便、连接牢固可靠、强度高、成本低,适合规模化工厂标准化生产,可实现高速度模块化建筑施工。
需要指出的是,以上实施例是对本发明的解释,并非限定,以上只是部分举例。对本行业的技术人员来说,根据本发明的基本原理和结构进行的简单变换和改进,均包括在本发明的保护范围之内,例如大梁1与柱2还增加连接座进行连接,形成螺栓4、连接座和胡子筋5三都同时连接的受力结构,或者大梁1只采用上层砼地14与钢结构梁15组成,或只采用下层砼地14与钢结构梁15组成,或砼地14中的钢筋网11与钢结构梁15采用钢丝捆绑、螺接、扣接等方式连接在一起。

Claims (1)

1.一种大梁与柱的连接结构,包括大梁、柱,所述大梁由钢结构梁和带钢筋网的砼地构成,将钢结构梁与钢筋网焊接成一体并用砼浇筑而成,所述大梁与柱上均设有胡子筋,所述大梁与柱采用螺栓连接,所述大梁上的胡子筋与柱上的胡子筋相互连接,再现场采用砼后浇的方式连接,其特征在于:
所述大梁的钢结构梁上设有通用化模数的螺栓孔,所述大梁的砼地设有用砼浇筑的楞,所述楞中镶嵌有钢筋桁架,所述钢筋桁架、砼地中的钢筋网、钢结构梁三者焊接为一体,所述砼地的侧边设有胡子筋,所述柱上设有对应的螺栓孔和胡子筋,所述大梁与柱上的螺栓孔对齐,再用螺栓连接在一起,所述砼地的胡子筋与柱上的胡子筋通过焊接、钢丝捆绑、螺接、扣接中的任一种方式连接在一起,连接后采用后浇的砼填满。
CN201410317010.8A 2014-07-07 2014-07-07 一种大梁与柱的连接结构 Active CN104100006B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410317010.8A CN104100006B (zh) 2014-07-07 2014-07-07 一种大梁与柱的连接结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410317010.8A CN104100006B (zh) 2014-07-07 2014-07-07 一种大梁与柱的连接结构

Publications (2)

Publication Number Publication Date
CN104100006A CN104100006A (zh) 2014-10-15
CN104100006B true CN104100006B (zh) 2016-05-04

Family

ID=51668519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410317010.8A Active CN104100006B (zh) 2014-07-07 2014-07-07 一种大梁与柱的连接结构

Country Status (1)

Country Link
CN (1) CN104100006B (zh)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1644827A (zh) * 2005-01-04 2005-07-27 华南理工大学 一种组合梁与混凝土柱的节点结构及其施工方法
CN201296977Y (zh) * 2008-07-30 2009-08-26 姜维山 一种混凝土和型钢混合结构构件
KR101186062B1 (ko) * 2011-02-25 2012-09-25 서울시립대학교 산학협력단 콘크리트 충전 강관 기둥과 에이치형 단면 강재 보의 접합부 구조 및 이의 시공방법
CN103556780B (zh) * 2013-10-29 2016-05-18 华侨大学 一种翼缘防屈曲型钢-混凝土组合梁
CN103741877B (zh) * 2013-12-30 2016-07-06 北京工业大学 梯格抗剪装置-钢-压型钢板-再生混凝土组合梁及作法
CN203961026U (zh) * 2014-07-07 2014-11-26 张跃 一种大梁与柱的连接结构

Also Published As

Publication number Publication date
CN104100006A (zh) 2014-10-15

Similar Documents

Publication Publication Date Title
CN204876092U (zh) 一种榫卯式模块建筑角部连接节点
CN105133731B (zh) 一种装配式钢与混凝土组合结构
CN201722776U (zh) 适用于方钢管柱的梁柱节点
CN206467788U (zh) 一种混凝土楼板磁性栓接连接结构
CN103696607B (zh) 一种带钢支撑的预应力装配式板柱结构及其施工方法
CN203961026U (zh) 一种大梁与柱的连接结构
CN204385883U (zh) 一种装配式阳台
CN207048076U (zh) 一种钢筋桁架楼承板与双钢板组合剪力墙的连接构造
CN201722702U (zh) 工厂化预制构件的拼装基础
CN202745208U (zh) 重组竹框架结构节点连接
CN204266378U (zh) 一种能承受较大拉力的钢结构预埋件
CN104100002A (zh) 一种楼板与柱的连接结构
CN104100006B (zh) 一种大梁与柱的连接结构
CN203701386U (zh) 一种钢结构楼板组
CN203007838U (zh) 一种索塔塔架
CN206143950U (zh) 竖向桁架及建筑钢结构总成
CN202249004U (zh) 改进型钢结构厂房结构
CN205348214U (zh) 一种柱状式钢筋混凝土与型钢混合式龙门吊基础
CN205276698U (zh) 一种混凝土中制孔的角钢
CN204001330U (zh) 一种钢结构楼板
CN204163280U (zh) 一种大梁
CN204040058U (zh) 组合式塔吊基础结构
CN203878864U (zh) 一种钢结构柱
CN204059692U (zh) 一种楼板
CN207436260U (zh) 节点刚接的装配式钢结构咬合拼接体系

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 410013 Changsha province through the opening of the city of Yuanda Road, big city, the three

Applicant after: Zhang Yue

Address before: 410013 South Shaoshan Road, Yuhua District, Hunan, 1, Changsha

Applicant before: Zhang Yue

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180607

Address after: 410500 Port Road, Lingxing industrial area, Wenxing Town, Xiangyin, Yueyang, Hunan

Patentee after: Broad Sustainable Building Co., Ltd.

Address before: 410013 Yuanda three road great city, Changsha City, Hunan

Patentee before: Zhang Yue

TR01 Transfer of patent right