CN104097961B - Between a kind of slot type coal hopper accessible maintenance of train car unloader - Google Patents

Between a kind of slot type coal hopper accessible maintenance of train car unloader Download PDF

Info

Publication number
CN104097961B
CN104097961B CN201410341819.4A CN201410341819A CN104097961B CN 104097961 B CN104097961 B CN 104097961B CN 201410341819 A CN201410341819 A CN 201410341819A CN 104097961 B CN104097961 B CN 104097961B
Authority
CN
China
Prior art keywords
maintenance
car
car unloader
unloader
train
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410341819.4A
Other languages
Chinese (zh)
Other versions
CN104097961A (en
Inventor
班国荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Energy source in China construction group Guangxi Co., Ltd of Electric Design academy
Original Assignee
GUANGXI ELECTRIC POWER INDUSTRY INVESTIGATION DESIGN AND RESEARCH INSTITUTE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGXI ELECTRIC POWER INDUSTRY INVESTIGATION DESIGN AND RESEARCH INSTITUTE filed Critical GUANGXI ELECTRIC POWER INDUSTRY INVESTIGATION DESIGN AND RESEARCH INSTITUTE
Priority to CN201410341819.4A priority Critical patent/CN104097961B/en
Publication of CN104097961A publication Critical patent/CN104097961A/en
Application granted granted Critical
Publication of CN104097961B publication Critical patent/CN104097961B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ship Loading And Unloading (AREA)

Abstract

Between the open a kind of slot type coal hopper accessible maintenance of train car unloader of the present invention, mainly by maintenance across, lifting across forming with bridge crane.Overhaul and have a maintenance layer, lifting can overhaul across carrying out lifting operation with lifting across interior without floor, bridge crane across interior across interior.The train car unloader of Awaiting Overhaul rests in and lifts across interior, bridge crane it is vertically hung car unloading operation line, then winches to overhaul across interior, overhauls in train car unloader rests in maintenance layer.Overhaul complete train car unloader by bridge crane from maintenance across winch to lift across, lifting across interior installation to car unloading operation line.Advantages of the present invention: between present invention maintenance during maintenance train car unloader, do not hinder other train car unloader at the normal car unloading operation of car unloading operation line, economize the land resource, save and unload the time, reducing operating cost, its off-line maintenance mode ensures that car unloading operation is carried out safely.

Description

Between a kind of slot type coal hopper accessible maintenance of train car unloader
Invention field
The invention belongs to technical field between train unloading system overhaul of the equipments, specifically a kind of slot type coal hopper train Between the accessible maintenance of car unloader.
Background technology
Slot type coal hopper train unloading system is widely used in electric power, metallurgy and chemical industry.Train car unloader Work under hard conditions, operation intensity big, fault rate is high, and maintenance workload is big, therefore slot type coal hopper train is unloaded and is System is both provided with between the maintenance of train car unloader.Between the slot type coal hopper train car unloader maintenance put into operation typically by Form with single hook bridge crane between single span maintenance.Without floor in single span maintenance, it is not intended for fault and unloads The dedicated track that machine is parked, is also configured without overhauling power supply and maintenance socket.Bridge crane uses single hook, Lifting capacity only meets the maximum separation part of lifting car unloader, it is impossible to car unloader complete machine is hung car unloading operation line.
When utilizing existing car unloader to carry out upkeep operation between overhauling, Awaiting Overhaul car unloader need to rest in maintenance On the track of car unloading operation line, with the car unloader of normal operation on the same track.When train car unloader quantity When being not more than 2, the two ends at slot type coal hopper arranges that between car unloader maintenance, fault car unloader can move nearby To tip placement car unloader overhaul between overhaul, do not interfere with the car unloader of other normal operation during maintenance Car unloading operation.When train car unloader quantity is more than 2, the car unloader being positioned at centre will be unable to move to end Overhaul between the car unloader maintenance that head is arranged, need to set up between car unloader maintenance at the middle part of slot type coal hopper.? When being positioned at maintenance car unloader between the maintenance that middle part is arranged, other car unloader can be limited and unload at the row of production line Walk distance, the car unloader of normal operation is formed obstacle, causes efficiency degradation of unloading.When car unloader Unload car body and break down when can not pack up, between overhauling due to existing car unloader (no matter tip placement or in the middle part of Arrange) do not possess and car unloader entirety is hung the ability unloading fare, it is impossible to that packs up unloads car body by barrier train Fare is unloaded in compartment turnover, thus causes whole piece to unload fare and cannot be carried out unloading.
The industry size productivity effects such as electric power, metallurgy and chemical industry are obvious, and enterprise keeps the large-scale development can not Avoid.The unloading capacity of slot type coal hopper train unloading system improves constantly therewith, promotes slot type coal hopper to length Longer, car unloader arranges that more direction is developed.After increasing due to car unloader quantity, maintenance Have a strong impact on car unloading operation during car unloader, have design to arrange in the middle part of slot type coal hopper between multiple maintenance.But due to Not possessing between these maintenance and car unloader entirety hangs car unloading operation line, fault car unloader unloads with normal operation Car machine is the most on the same track, it is difficult to get a desired effect.
The content of invention
It is an object of the invention to provide between a kind of slot type coal hopper accessible maintenance of train car unloader, to meet event Barrier car unloader entirety hang the requirement that car unloading operation line carries out overhauling, it is achieved car unloader maintenance time accessible other The normal car unloading operation of car unloader.
The technical scheme that the present invention solves above-mentioned technical problem is as follows.
1, between a kind of slot type coal hopper accessible maintenance of train car unloader, mainly by maintenance across, lifting across He Qiao Formula crane three parts form.
1) described maintenance is across about 1 point two-layer.Lower floor is normal working lining, and normal working lining is from top to bottom It is provided with on production line the car unloader track 12 of normal work, railroad car 13 and slot type coal hopper 14, operation On line, the car unloader 11 of normal work is placed on production line on the car unloader track 12 of normal work, fire Car railway carriage 13 is on track for a train, and track for a train is presented herein below slot type coal hopper 14.Upper strata is maintenance layer, maintenance Layer is provided with bridge crane track 6 from top to bottom, dedicated track 5 parked by fault car unloader, maintenance power supply With maintenance socket 4, bridge crane 3 is placed on bridge crane track 6, and the fault in maintenance is unloaded Car machine 9 is placed in fault car unloader and parks in dedicated track 5.Bridge crane track 6 and fault are unloaded The model of dedicated track 5 parked by machine and gauge is consistent with the track on train car unloader car unloading operation line, fault Car unloader is parked the height in dedicated track 5 to floor face and should be met after car unloader spirillum puts down, and spirillum is Low spot distance floor face is not less than 300mm.The maintenance power supply of maintenance power supply and maintenance socket 4 is three-phase alternating current Electricity, its power supply is 380V/220V, frequency is 50Hz, and maintenance battery main switch sets earth leakage protective and fault Display device.The voltage of maintenance socket is respectively three-phase 380V, single-phase 220V and single-phase 24V, Qi Zhongdan The capacity of phase 24V transformator is not less than 500VA, and maintenance socket is arranged on position easy to use.Train is unloaded All service works of machine complete at maintenance layer.
2) lifting is without floor in 2, and the train car unloader of Awaiting Overhaul hangs car unloading operation line at this across interior, Overhaul complete train car unloader and put into car unloading operation line at this across infantile tic.
3) bridge crane 3 carries out lifting operation in lifting across 2 and maintenance in 1, uses double-hung, The lifting capacity of main suspension hook 7 meets train car unloader integral lifting, for Awaiting Overhaul car unloader entirety being hung Car unloading operation line and will maintenance after car unloader integral hoisting to car unloading operation line.Secondary suspension hook 8 meets lifting fire Car car unloader maximum separation part, the parts of lifting car unloader during for overhauling car unloader.
Above-mentioned maintenance can place train car unloader complete machine in 1, and train car unloader overhauls in maintenance layer, with Car unloading operation line is isolated, and does not hinder the car unloading operation of other car unloader on car unloading operation line in maintenance process.
Beneficial effects of the present invention
1. the present invention utilizes and quickly fault train car unloader can be hung car unloading operation line between accessible maintenance, Guarantee that slot type coal hopper car unloading operation efficiency because overhauling individual failure car unloader and degradation, thus will not be avoided Because unloading capacity is not enough, causes time delay to take train and pay time delay expense, save operating cost.
Space for maintenance between the most accessible maintenance is completely isolated with car unloading operation line, upkeep operation and car unloading operation It does not interfere with each other.Therefore, can avoid causing car unloading operation that security incident occurs because of maintenance car unloader.
Being arranged in the middle part of slot type coal hopper between the most accessible maintenance, its space for maintenance is located at just going up of slot type coal hopper Side, it is not necessary to take extra land use area, economize the land resource.
4. arrange between single accessible maintenance directly over slot type coal hopper, multiple stage car unloader can be carried out one by one from Line maintenance and maintenance, can greatly reduce the quantity between car unloader maintenance, investment reduction cost.
Accompanying drawing explanation
Fig. 1 is structural representation between the slot type coal hopper accessible maintenance of train car unloader of the present invention.
Fig. 2 is that the maintenance between the slot type coal hopper accessible maintenance of train car unloader of the present invention is across structural representation.
In figure: overhaul across 1, lifting is across 2, bridge crane 3, maintenance power supply and maintenance socket 4, fault Car unloader is parked in dedicated track 5, bridge crane track 6, main suspension hook 7, secondary suspension hook 8, maintenance The car unloader 11 of normal work, fire on fault car unloader 9, the fault car unloader 10 of Awaiting Overhaul, production line The track 12 of car car unloading operation line, the railway carriage 13 of normal work, slot type coal hopper 14.Wherein, 1 to 8 is ingredient between the slot type coal hopper accessible maintenance of train car unloader of the present invention, 9 to 14 non-invention compositions Part.
Detailed description of the invention
The present invention is further illustrated with embodiment below in conjunction with the accompanying drawings.
Between the one slot type coal hopper accessible maintenance of train car unloader of the present invention, structure is as shown in Figure 1 and Figure 2, main Will by maintenance across 1, lifting across 2, bridge crane 3 three parts form.
1) described maintenance is across about 1 point two-layer.Lower floor is normal working lining, and normal working lining is from top to bottom It is provided with on production line the car unloader track 12 of normal work, railroad car 13 and slot type coal hopper 14, operation On line, the car unloader 11 of normal work is placed on production line on the car unloader track 12 of normal work, fire Car railway carriage 13 is on track for a train, and track for a train is presented herein below slot type coal hopper 14.Upper strata is maintenance layer, maintenance Layer is provided with bridge crane track 6 from top to bottom, dedicated track 5 parked by fault car unloader, maintenance power supply With maintenance socket 4, bridge crane 3 is placed on bridge crane track 6, and the fault in maintenance is unloaded Car machine 9 is placed in fault car unloader and parks in dedicated track 5.Bridge crane track 6 and fault are unloaded The model of dedicated track 5 parked by machine and gauge is consistent with the track on train car unloader car unloading operation line, fault Car unloader is parked the height in dedicated track 5 to floor face and should be met after car unloader spirillum puts down, and spirillum is Low spot distance floor face is not less than 300mm.The maintenance power supply of maintenance power supply and maintenance socket 4 is three-phase alternating current Electricity, its power supply is 380V/220V, frequency is 50Hz, and maintenance battery main switch sets earth leakage protective and fault Display device.The voltage of maintenance socket is respectively three-phase 380V, single-phase 220V and single-phase 24V, Qi Zhongdan The capacity of phase 24V transformator is not less than 500VA, and maintenance socket is arranged on position easy to use.Train is unloaded All service works of machine complete at maintenance layer.
2) lifting is without floor in 2, and the train car unloader of Awaiting Overhaul hangs car unloading operation line at this across interior, Overhaul complete train car unloader and put into car unloading operation line at this across infantile tic.
3) bridge crane 3 carries out lifting operation in lifting across 2 and maintenance in 1, uses double-hung, The lifting capacity of main suspension hook 7 meets train car unloader integral lifting, for Awaiting Overhaul car unloader entirety being hung Car unloading operation line and will maintenance after car unloader integral hoisting to car unloading operation line.Secondary suspension hook 8 meets lifting fire Car car unloader maximum separation part, the parts of lifting car unloader during for overhauling car unloader.
Above-mentioned maintenance can place train car unloader complete machine in 1, and train car unloader overhauls in maintenance layer, with Car unloading operation line is isolated, and does not hinder the car unloading operation of other car unloader on car unloading operation line in maintenance process.
Embodiment 1
Arrange between accessible maintenance by maintenance two-wire slot type coal hopper train car unloader.
1. determine the span between accessible maintenance.Span between accessible maintenance can not be less than slot type coal hopper top The span of structure, the span of two-wire slot type coal hopper is 15m, for investment reduction, take between accessible maintenance across Degree is 15m.
2. calculate span L k of bridge crane, Lk=15-(2 × 0.75)=13.5m.(note: 15m is nothing Span value between obstacle maintenance, 0.75m is the distance at column center between bridge crane track and maintenance).
3. determining bridging crane main suspension hook lifting capacity, this lifting capacity should be greater than two-wire slot type coal hopper train and unloads The gross weight (about 32 tons) of machine, choosing main suspension hook lifting capacity is 35 tons.
4. determining bridge crane pair suspension hook lifting capacity, this lifting capacity should be greater than two-wire slot type coal hopper train and unloads The weight (about 3 tons) of machine maximum separation part, choosing secondary suspension hook lifting capacity is 5 tons.
5. determine overhaul across height H.Overhaul across height mainly unloaded by height, the train of slot type coal hopper The impacts such as the height of machine, the height of bridge crane and suspension hook lifting extreme position.Calculation procedure is as follows:
(1) first calculate maintenance across maintenance floor plate height H1, this height H1 should be on slot type coal hopper The height of portion's structure is plus maintenance layer deck-molding, and the height of two-wire slot type coal hopper superstructure is 9.55m, maintenance Layer deck-molding about 1.5m, can calculate overhaul across maintenance floor plate height H1=11.05m.
(2) in the case of determining that train car unloader spirillum puts down, its minimum point and the distance overhauling floor plate H2, for ease of maintenance, H2 should be not less than 0.3m, take H2=0.3m.
(3) determining train car unloader maximum height value H3, H3 is train car unloader spirillum train when putting down The total height of car unloader, can discover and seize H3=7.5m from the equipment data of train car unloader factory.
(4) determine bridging crane main suspension hook to distance H4 of train car unloader peak, this distance is Bundling the distance needed for the suspenders such as steel wire rope when hanging, H4 takes 2.7m.
(5) bridging crane main suspension hook distance H5 in limit lifting position to crane peak is determined, H5=3.0m can be discovered and seized from the equipment data of crane factory.
(6) determine that bridge crane peak is no less than to maintenance across top layer clearance H6, this distance 0.3m, takes H6=0.3m.
(7) maintenance across the summation that height H is values above, it may be assumed that
H=H1+H2+H3+H4+H5+H6=11.05+0.3+7.5+2.7+3.0+0.3=24.85 (m).
6, determine the height between accessible maintenance, the height between accessible maintenance mainly by maintenance across height Determine, say, that overhaul across height H=24.85m be the height between accessible maintenance.
7, determining bridge crane sling height h, this height is that bridging crane main suspension hook lifts by crane in the limit The height value of position, it may be assumed that
H=H1+H2+H3+H4=11.05+0.3+7.5+2.7=21.55 (m).
8, determine the width L between accessible maintenance, this width L be overhaul across with lifting across the summation of width. Overhaul across with lifting across the desirable identical value of width L1, L1 should be not less than train car unloader Breadth Maximum value, And should have enough lifting safe distances.Train car unloader maximum width can be discovered and seized from equipment factory equipment data Angle value is about 7.0m, takes L1=8.0m.Width L=2 × L1=2 × 0.8m=between accessible maintenance 16.0m。
The concrete operation of the present invention: when the car unloader 11 of work normal on production line breaks down and need to carry out During maintenance, this car unloader is i.e. considered the fault car unloader 10 of Awaiting Overhaul, moves it between accessible maintenance Lifting in 2, the position of " the fault car unloader 10 of Awaiting Overhaul " as shown in Figure 1;Bridge-type is utilized to rise Fault car unloader 10 entirety of Awaiting Overhaul is hung the track of train car unloading operation line by the main suspension hook 7 of heavy-duty machine 3 12, and lift to maintenance park in dedicated track 5 across 1 internal fault car unloader, as shown in structural representation " inspection Fault car unloader 9 in repairing " position, car unloader in this position i.e. be considered maintenance in fault unload Car machine 9;Now, fault car unloader is completely isolated with car unloading operation line, and maintainer unloads not affecting other In the case of car machine normal operation, fault car unloader is overhauled, when needs dismounting car unloader parts, The secondary suspension hook 8 of available bridge crane 3 lifts by crane, and power supply used by service kit is by overhauling power supply and inspection Repair socket 4 to provide;The complete car unloader of maintenance is hung fault and unloads by the main suspension hook 7 utilizing bridge crane 3 Dedicated track 5 parked by car machine, and lifts to the track 12 of train car unloading operation line, the most whole maintenance Process terminates, and the car unloader after maintenance normally can work on production line.

Claims (3)

1. between the slot type coal hopper accessible maintenance of train car unloader, it is characterised in that between maintenance mainly by Overhaul and form across (2) and bridge crane (3) three parts across (1), lifting;
1) described maintenance is across (1) point upper and lower two-layer: lower floor is normal working lining, is provided with from top to bottom in layer Car unloader track (12), railroad car (13) and the slot type coal hopper (14) of normal work on production line, On production line, the car unloader (11) of normal work is placed on production line the car unloader track of normal work (12), on, railroad car (13) is on track for a train, and track for a train is presented herein below slot type coal hopper (14); Upper strata is maintenance layer, and layer is provided with bridge crane track (6) from top to bottom, fault car unloader is parked in maintenance Dedicated track (5), maintenance power supply and maintenance socket (4), bridge crane (3) is placed in overhead traveling crane Machine is with on track (6), and the fault car unloader (9) in maintenance is placed in fault car unloader and parks dedicated track (5) on, bridge crane track (6) and fault car unloader park dedicated track (5) model and Gauge is consistent with the track on train car unloader car unloading operation line, and dedicated track (5) parked by fault car unloader Should meet after car unloader spirillum puts down to the height in floor face, spirillum perigee distance floor face is not less than 300mm;The maintenance power supply of maintenance power supply and maintenance socket (4) is three-phase alternating current, and its power supply is 380V/220V, frequency are 50Hz, and maintenance battery main switch sets earth leakage protective and fault display device;Inspection The voltage repairing socket is respectively three-phase 380V, single-phase 220V and single-phase 24V, the most single-phase 24V transformator Capacity be not less than 500VA, maintenance socket is arranged on position easy to use;All maintenance of train car unloader It is operated in maintenance layer to complete;
2) lifting is without floor in (2), and the train car unloader of Awaiting Overhaul hangs car unloading operation line at this across interior, Overhaul complete train car unloader and put into car unloading operation line at this across infantile tic;
3) bridge crane (3) carries out lifting operation in lifting across (2) and maintenance in (1), uses Double-hung: the lifting capacity of main suspension hook (7) meets train car unloader integral lifting, for unloading Awaiting Overhaul Car machine entirety hangs car unloading operation line and by the car unloader integral hoisting after maintenance to car unloading operation line;Secondary suspension hook (8) lifting train car unloader maximum separation part is met, lift by crane car unloader during for overhauling car unloader zero Part;The lifting capacity of main suspension hook (7) should be greater than the gross weight 32 tons of two-wire slot type coal hopper train car unloader.
2. between the slot type coal hopper accessible maintenance of train car unloader described in claim 1, it is characterised in that Described maintenance can place train car unloader complete machine in (1), and train car unloader overhauls in maintenance layer, with Car unloading operation line is isolated, and does not hinder the car unloading operation of other car unloader on car unloading operation line in maintenance process.
3. between the slot type coal hopper accessible maintenance of train car unloader as claimed in claim 1, it is characterised in that Concrete operation: when the car unloader (11) of work normal on production line breaks down and need to overhaul, This car unloader is i.e. considered the fault car unloader (10) of Awaiting Overhaul, moves it to the lifting between accessible maintenance The position of the fault car unloader (10) of the Awaiting Overhaul in (2);The master utilizing bridge crane (3) hangs Fault car unloader (10) entirety of Awaiting Overhaul is hung the track (12) of train car unloading operation line by hook (7), And lift to maintenance fault in the maintenance that (1) internal fault car unloader is parked in dedicated track (5) and unload The position of machine (9), car unloader in this position is i.e. considered the fault car unloader (9) in maintenance;This Time, fault car unloader is completely isolated with car unloading operation line, and maintainer normally makees not affecting other car unloader In the case of industry, fault car unloader is overhauled, when needs dismounting car unloader parts, available bridge The secondary suspension hook (8) of formula crane (3) lifts by crane, and power supply used by service kit is by overhauling power supply and maintenance Socket (4) provides;The main suspension hook (7) utilizing bridge crane (3) hangs overhauling complete car unloader Park in dedicated track (5), and the track (12) lifted to train car unloading operation line from fault car unloader, The most whole maintenance process terminates, and the car unloader after maintenance normally can work on production line.
CN201410341819.4A 2014-07-17 2014-07-17 Between a kind of slot type coal hopper accessible maintenance of train car unloader Active CN104097961B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410341819.4A CN104097961B (en) 2014-07-17 2014-07-17 Between a kind of slot type coal hopper accessible maintenance of train car unloader

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410341819.4A CN104097961B (en) 2014-07-17 2014-07-17 Between a kind of slot type coal hopper accessible maintenance of train car unloader

Publications (2)

Publication Number Publication Date
CN104097961A CN104097961A (en) 2014-10-15
CN104097961B true CN104097961B (en) 2016-08-24

Family

ID=51666571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410341819.4A Active CN104097961B (en) 2014-07-17 2014-07-17 Between a kind of slot type coal hopper accessible maintenance of train car unloader

Country Status (1)

Country Link
CN (1) CN104097961B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107842862B (en) * 2016-09-20 2020-11-03 皮猛 Maintenance method for garbage crane
CN106494903A (en) * 2016-12-09 2017-03-15 大连华锐重工集团股份有限公司 A kind of platform tilt container dumper

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202429735U (en) * 2011-12-27 2012-09-12 中国中材国际工程股份有限公司 Discharging device
CN202809486U (en) * 2012-09-11 2013-03-20 成都市新筑路桥机械股份有限公司 Tower passing overhaul system of suspension type bridge detection vehicle
CN202864715U (en) * 2012-09-04 2013-04-10 天津起重设备有限公司 Electric hoist type crane overhauling device
CN203007831U (en) * 2012-12-25 2013-06-19 上海普英特高层设备有限公司 Bridge maintenance vehicle
CN203998199U (en) * 2014-07-17 2014-12-10 广西电力工业勘察设计研究院 Between the accessible maintenance of a kind of slot type coal hopper train car unloader

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080219804A1 (en) * 2000-11-14 2008-09-11 Nigel Chattey Container crane apparatus and method for container security screening during direct transshipment between transportation modes
CN101229883A (en) * 2008-01-24 2008-07-30 上海振华港口机械(集团)股份有限公司 Container terminal loading and unloading system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202429735U (en) * 2011-12-27 2012-09-12 中国中材国际工程股份有限公司 Discharging device
CN202864715U (en) * 2012-09-04 2013-04-10 天津起重设备有限公司 Electric hoist type crane overhauling device
CN202809486U (en) * 2012-09-11 2013-03-20 成都市新筑路桥机械股份有限公司 Tower passing overhaul system of suspension type bridge detection vehicle
CN203007831U (en) * 2012-12-25 2013-06-19 上海普英特高层设备有限公司 Bridge maintenance vehicle
CN203998199U (en) * 2014-07-17 2014-12-10 广西电力工业勘察设计研究院 Between the accessible maintenance of a kind of slot type coal hopper train car unloader

Also Published As

Publication number Publication date
CN104097961A (en) 2014-10-15

Similar Documents

Publication Publication Date Title
CN102139832B (en) Gantry crane device with lengthways and transverse traveling functions and hoisting method
CN201882763U (en) Special carrying pole type beam of double-machine lifting crane
CN104097961B (en) Between a kind of slot type coal hopper accessible maintenance of train car unloader
CN105460759B (en) A kind of method that main shaft winch tail rope is changed
CN107226419A (en) A kind of synchronisation control means of the special double-hung driving of H profile steel reconditioning
CN104818858B (en) Indoor heavy electrical cabinet hanging method
CN202690063U (en) Derrick-free shaft-sinking construction device for mine shaft
CN204689430U (en) To Construction of Silo movable hoisting device
CN108486309A (en) A kind of pneumatic steelmaking system and the method for adding steel scrap and molten iron
CN204847752U (en) Be used for hanging small -size sectionalised gallows of hook type crane handling
CN204778459U (en) Double small car container bank bridge
CN102030270A (en) Auxiliary tool and method for replacing wire rope of bridge crane
CN106276602B (en) A kind of across high ferro Business Line beam body hangs method
CN105416098A (en) Subway overhead line system overhaul barrow
CN105329818A (en) Maintenance platform for electric grab bucket for ship unloader
CN203998199U (en) Between the accessible maintenance of a kind of slot type coal hopper train car unloader
CN202755300U (en) Hanging basket of main cable working vehicle
CN208532847U (en) A kind of pneumatic steelmaking system
CN203334180U (en) High-speed railway overhead bridge detection and rescue working truck
CN107337004A (en) A kind of tippler end ring track changes reforming technology
CN202744961U (en) Lifting mechanism for anti-falling beam check block
CN203976242U (en) A kind of generator unit stator associating hanging apparatus
CN109052150A (en) Suspender and its application method for Fast Installation mill housing
CN204530513U (en) The manned maintenance Hanging Basket of suspension cable
CN204728225U (en) A kind of rail rail traffic bridge of embracing evacuates inspection platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 530023 10 Jian Zheng Road, Qingxiu District, Nanning, the Guangxi Zhuang Autonomous Region

Patentee after: Energy source in China construction group Guangxi Co., Ltd of Electric Design academy

Address before: 530023 10 Jian Zheng Road, Qingxiu District, Nanning, the Guangxi Zhuang Autonomous Region

Patentee before: Guangxi Electric Power Industry Investigation Design and Research Institute