CN104085559B - A kind of raising steel-tube finishing line speed of production and steel pipe information tracking method - Google Patents
A kind of raising steel-tube finishing line speed of production and steel pipe information tracking method Download PDFInfo
- Publication number
- CN104085559B CN104085559B CN201210021179.XA CN201210021179A CN104085559B CN 104085559 B CN104085559 B CN 104085559B CN 201210021179 A CN201210021179 A CN 201210021179A CN 104085559 B CN104085559 B CN 104085559B
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- steel
- bundle
- wire sling
- production
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Basic Packing Technique (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
The present invention relates to a kind of raising steel-tube finishing line speed of production and steel pipe information tracking method, belong to steel pipe's production field. Method step is as follows: ties steel pipe by first and puts into material frame; Tie first and steel pipe is laid first wire sling; Tie steel pipe by second and be placed on first wire sling; Tie steel pipe with first wire sling by second to bundle; Hung away material frame is often tied steel pipe by wire sling with crane, by bundle packing. The present invention lays the method for steel wire rope and reaches not mix the purpose of bundle, is effectively increased steel-tube finishing line speed of production, it is achieved that the retrospective of every steel pipe, reasonably carries out information trace. Decreasing simultaneously in steel-tube finishing production process, owing to steel pipe kind is many, have finished product, waste product, return and cut, return spy strong, anti-, reconditioning etc., every kind is required for charging frame respectively, saves the expense making material frame, and can save floor space.
Description
Technical field
The present invention relates to a kind of raising steel-tube finishing line speed of production and steel pipe information tracking method, belong to steel pipe's production field.
Background technology
User requires that dispatch from the factory 10 steel pipes of steel pipe are the packing of a bundle steel band. API standard requirement, often every steel pipe in bundle pipe will have retrospective. After 10 steel pipe charging frames, this bundle must be hung away packing by crane, it may appear that crane hangs to come over, and affects so very much the speed of production line. If after placing 20 or 30 steel pipes in material frame, the steel pipe in material frame arises that mixed bundle phenomenon, easily causes accident, poor stability.
Summary of the invention
It is an object of the invention to provide a kind of it can be avoided that the one of mixed bundle improves steel-tube finishing line speed of production and steel pipe information tracking method.
Technical solution:
The inventive method is as follows:
1) tie steel pipe by first and put into material frame;
2) laying first wire sling on steel pipe is tied first;
3) tie steel pipe by second and be placed on first wire sling;
4) tie steel pipe with first wire sling by second to bundle;
5) hung away steel pipe often tied by material frame by the suspension ring on wire sling with crane, by bundle packing.
Described second bundle steel pipe re-lays second wire sling, ties steel pipe by the 3rd and be placed on second wire sling, bundle the 3rd bundle steel pipe with second wire sling, repeat said process, determine placing steel tubes bale according to material frame. Then hung away steel pipe often tied by material frame by the suspension ring on wire sling with crane, by bundle packing.
Advantages of the present invention:
A, the speed of production of steel-tube finishing line can be effectively improved, reach not mix the purpose of bundle by the method laying steel wire rope, it is achieved the retrospective of every steel pipe, reasonably carry out information trace.
B, can saving the expense making material frame, in steel-tube finishing production process, the kind of steel pipe is relatively more, has finished product, waste product, returns and cut, return spy strong, anti-, reconditioning etc., and every kind is required for charging frame respectively, and thus needing to make a lot of material frame increases expense. Just can solve this problem by the method laying wire sling and floor space can be saved.
Detailed description of the invention
10 steel pipes of the present invention are a bundle, first tie steel pipe by first and put into material frame, tie first and steel pipe is laid first wire sling, tie steel pipe by second again and be placed on first wire sling, at this moment the first bundle steel pipe and the second bundle steel pipe are separated by first wire sling, then tie steel pipe with first wire sling by second and bundle; The second wire sling laid on steel pipe is tied again second, tie steel pipe by the 3rd and be positioned on second wire sling, at this moment the second bundle steel pipe and the 3rd bundle steel pipe are separated by second wire sling, after tying steel pipe binding with second wire sling by the 3rd, with crane, three bundle steel pipes in material frame are hung away by wire sling, by bundle packing, thus will not mix bundle and improve finishing line speed of production. Per pass wire sling is two.
Claims (2)
1. one kind is improved steel-tube finishing line speed of production and steel pipe information tracking method, it is characterised in that method step is as follows:
1) tie steel pipe by first and put into material frame;
2) laying first wire sling on steel pipe is tied first;
3) tie steel pipe by second and be placed on first wire sling;
4) tie steel pipe with first wire sling by second to bundle;
5) hung away steel pipe often tied by material frame by the suspension ring on wire sling with crane, by bundle packing.
2. a kind of raising steel-tube finishing line speed of production according to claim 1 and steel pipe information tracking method, it is characterized in that, described second bundle steel pipe re-lays second wire sling, tie steel pipe by the 3rd and be placed on second wire sling, the 3rd bundle steel pipe is bundled with second wire sling, repeat said process, determine placing steel tubes bale according to material frame.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210021179.XA CN104085559B (en) | 2011-12-04 | 2012-01-08 | A kind of raising steel-tube finishing line speed of production and steel pipe information tracking method |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011104262550 | 2011-12-04 | ||
CN201110426255.0 | 2011-12-04 | ||
CN201110426255 | 2011-12-04 | ||
CN201210021179.XA CN104085559B (en) | 2011-12-04 | 2012-01-08 | A kind of raising steel-tube finishing line speed of production and steel pipe information tracking method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104085559A CN104085559A (en) | 2014-10-08 |
CN104085559B true CN104085559B (en) | 2016-06-08 |
Family
ID=51633360
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210021179.XA Withdrawn - After Issue CN104085559B (en) | 2011-12-04 | 2012-01-08 | A kind of raising steel-tube finishing line speed of production and steel pipe information tracking method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104085559B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113815947B (en) * | 2021-09-26 | 2024-04-30 | 包头钢铁(集团)有限责任公司 | Device capable of avoiding mixing and improving production speed of finishing line of steel pipe |
CN113998192B (en) * | 2021-10-12 | 2024-01-30 | 包头钢铁(集团)有限责任公司 | Method for molding and packing steel pipes |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0735972A1 (en) * | 1994-11-03 | 1996-10-09 | John Marshall Engineers Limited | Tube bundling machines |
EP1577231A1 (en) * | 2004-03-16 | 2005-09-21 | Industrie Settala S.p.A. | Method for the production of a pallet having a high stability and resistance for tube bundles |
CN102259973A (en) * | 2011-05-20 | 2011-11-30 | 北京市环境保护科学研究院 | Modularized flexible connection packing container for wastewater treatment and manufacturing method thereof |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7381020B1 (en) * | 2005-09-20 | 2008-06-03 | Western Tube & Conduit Corporation | Method for loading tube bundles on railcars and tube packs for railcars |
JP2011195186A (en) * | 2010-03-23 | 2011-10-06 | Stanley Electric Co Ltd | Method for packing discharging lamp |
-
2012
- 2012-01-08 CN CN201210021179.XA patent/CN104085559B/en not_active Withdrawn - After Issue
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0735972A1 (en) * | 1994-11-03 | 1996-10-09 | John Marshall Engineers Limited | Tube bundling machines |
EP1577231A1 (en) * | 2004-03-16 | 2005-09-21 | Industrie Settala S.p.A. | Method for the production of a pallet having a high stability and resistance for tube bundles |
CN102259973A (en) * | 2011-05-20 | 2011-11-30 | 北京市环境保护科学研究院 | Modularized flexible connection packing container for wastewater treatment and manufacturing method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN104085559A (en) | 2014-10-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104085559B (en) | A kind of raising steel-tube finishing line speed of production and steel pipe information tracking method | |
CN201813110U (en) | Special clamp for drawing cable machine | |
CN103738524A (en) | Packaging structure of screw-thread steel and semi-automatic packaging method | |
CN203921268U (en) | Full automaticity lopping binding all-in-one | |
CN204508421U (en) | A kind of manual tube coiling appts | |
CN103010506B (en) | Two-pass bundling method for wire bundling machine | |
ATE442988T1 (en) | METHOD FOR WINDING CABLES | |
CN205724669U (en) | Frock is laid in cable layering beam splitting | |
CN204094789U (en) | A kind of automatic binding machinery hand system produced for hairbrush | |
CN202687755U (en) | Press blank material hanging tool | |
CN202642408U (en) | High-wire coil rod packaging gasket | |
CN203921592U (en) | A kind of pot galvanize strap | |
CN206465069U (en) | A kind of wire spool storing unit | |
CN205906929U (en) | Suspender separation structure for building | |
CN204705504U (en) | Steel coil sampling device | |
CN204642899U (en) | A kind of lace-tied type active joint of belt of belt conveyor | |
CN201075612Y (en) | Cable laying equipment | |
CN203581614U (en) | Bag tie wire for bundling | |
CN202244177U (en) | Double-station automatic wire tying machine | |
CN205347318U (en) | High -efficient partial shipment device in succession of organic silicon | |
CN202915031U (en) | Winding plate strip with steel strip | |
CN102424188A (en) | Convenient object fixer | |
CN203975268U (en) | A kind of Combined omnidirectional steel coil bundling device | |
CN203904626U (en) | Knot tying jig for cotton threads | |
CN207160711U (en) | A kind of construction Portable hanging rack |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20160608 Effective date of abandoning: 20220322 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20160608 Effective date of abandoning: 20220322 |
|
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |