CN104082466B - A kind of chrysanthemum be exclusively used in fixation machine for chrysanthemum completes mechanism - Google Patents

A kind of chrysanthemum be exclusively used in fixation machine for chrysanthemum completes mechanism Download PDF

Info

Publication number
CN104082466B
CN104082466B CN201410263289.6A CN201410263289A CN104082466B CN 104082466 B CN104082466 B CN 104082466B CN 201410263289 A CN201410263289 A CN 201410263289A CN 104082466 B CN104082466 B CN 104082466B
Authority
CN
China
Prior art keywords
chrysanthemum
blanking
steam pipe
steam
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410263289.6A
Other languages
Chinese (zh)
Other versions
CN104082466A (en
Inventor
陈玲芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongxiang Lvkang Chrysanthemum Industry Co Ltd
Original Assignee
Tongxiang Lvkang Chrysanthemum Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongxiang Lvkang Chrysanthemum Industry Co Ltd filed Critical Tongxiang Lvkang Chrysanthemum Industry Co Ltd
Priority to CN201410263289.6A priority Critical patent/CN104082466B/en
Publication of CN104082466A publication Critical patent/CN104082466A/en
Application granted granted Critical
Publication of CN104082466B publication Critical patent/CN104082466B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Fiber Materials (AREA)

Abstract

The present invention relates to a kind of chrysanthemum be exclusively used in fixation machine for chrysanthemum to complete mechanism.Feature of the present invention is: comprise vapour hood, top left side steam pipe, top right side steam pipe, several bottom steam pipe, piece chrysanthemum completes conveyer belt, drive roll, driven voller, drive roll installing rack, driven voller installing rack and uniform discharge device, the top of steam chest is provided with multiple passage, the top of bottom steam pipe is provided with multiple top nozzle, piece chrysanthemum conveyer belt that completes comprises a gauze, several support bar and two chains, complete the first half of conveyer belt of piece chrysanthemum is arranged in steam chest, uniform discharge device comprises blanking rotating shaft, eccentric wheel, even blanking net, upper alignment pin and lower alignment pin, lower alignment pin and bottom connecting ring matched in clearance, the complete discharging end of conveyer belt of piece chrysanthemum is positioned at directly over even blanking net.Reasonable in design of the present invention, steam utilization is high, and fixation effect is good, can directly will the chrysanthemum carrying out completing be needed to carry out steam beating.

Description

A kind of chrysanthemum be exclusively used in fixation machine for chrysanthemum completes mechanism
Technical field
The present invention relates to an a kind of chrysanthemum to complete mechanism, especially relating to a kind of chrysanthemum be exclusively used in fixation machine for chrysanthemum and to complete mechanism, belonging to parts in fixation machine for chrysanthemum, for completing to the chrysanthemum be positioned on conveyer belt.
Background technology
Fixation machine for chrysanthemum is for the operation that completes to a chrysanthemum, fixation machine for chrysanthemum conventional is at present when completing to a chrysanthemum, usual needs by a chrysanthemum splendid attire to be completed to completing in frame, a chrysanthemum to be completed enters in the lump in the steam chest of fixation machine for chrysanthemum with the frame that completes and completes, the operation that completes of a chrysanthemum is carried out in the lump with a chrysanthemum frame, fixation effect is poor, and steam utilization is not high; In addition, because the chrysanthemum frame that completes also will enter steam chest, expand the volume of steam chest, be unfavorable for the Optimal Structure Designing of steam chest, in addition, when carrying out completing operation, because steam chest volume is larger, there is the frame that completes in piece chrysanthemum and steaming time, greatly have impact on fixation effect, reduce the utilization rate of steam.
The structural design of the steam chest that completes in fixation machine for chrysanthemum conventional is at present reasonable not, and the high-temperature steam completed in steam chest is difficult to form effective convection current, and steam utilization is low, poor to the fixation effect of a chrysanthemum; In addition, have some vapor and be liquefied as water in steam discharge process, the shipwreck of these post liquefaction, effectively to discharge, affects the temperature completed in steam chest, thus affects the fixation effect to a chrysanthemum further.
In current fixation machine for chrysanthemum, also do not have a kind of structure simple, reasonable in design, be convenient to installation and removal, good to the fixation effect of a chrysanthemum, can directly complete the chrysanthemum be exclusively used in fixation machine for chrysanthemum needing the chrysanthemum carrying out completing to carry out steam beating mechanism.
Summary of the invention
The object of the invention is to overcome above shortcomings in prior art, and a kind of reasonable in design is provided, steam utilization is high, fixation effect is good, water after steam liquefied can be discharged in time, can the chrysanthemum that carries out completing directly will be needed to carry out steam beating, can effectively the chrysanthemum after the end that completes to be completed mechanism from the chrysanthemum conveyer belt chrysanthemum be exclusively used in fixation machine for chrysanthemum be distributed to uniformly a chrysanthemum frame that completes.
The present invention's adopted technical scheme that solves the problem is: this chrysanthemum be exclusively used in fixation machine for chrysanthemum completes mechanism, comprise blower fan, temperature sensor and steam chest, described temperature sensor is arranged in steam chest, it is characterized in that: also comprise vapour hood, upper main steam pipe, top left side steam pipe, top right side steam pipe, lower main steam pipe, several bottom steam pipe, some support horizontal stripe, left bank water pipe, right drainpipe, piece chrysanthemum completes conveyer belt, drive roll, driven voller, drive roll installing rack, driven voller installing rack and uniform discharge device, described steam chest is rectangular structure, the top of this steam chest is provided with multiple passage, described top left side steam pipe and top right side steam pipe are all fixed on the top of steam chest, this top left side steam pipe and top right side steam pipe are close to inner left wall and the right side inwall of steam chest respectively, the bottom of described top left side steam pipe and the bottom of top right side steam pipe are provided with several lower nozzles, this top left side steam pipe is all connected with upper main steam pipe with top right side steam pipe, described several bottom steam Guan Jun is fixed on the bottom of steam chest, there is the spacing of 5-15cm in the left side wall of the root bottom part steam pipe and steam chest that are positioned at the leftmost side, there is the spacing of 5-15cm in the right side wall of the root bottom part steam pipe and steam chest that are positioned at the rightmost side, bottom steam Guan Jun is connected with lower main steam pipe, the top of described bottom steam pipe is provided with multiple top nozzle, have in each top nozzle and only have three jet holes, these three jet holes are respectively left nozzle mouth, middle jet hole and right nozzle mouth, the axis of described middle jet hole is vertical shape structure, angle between the axis of described left nozzle mouth and the axis of middle jet hole is 30 degree of angles, angle between the axis of described middle jet hole and the axis of right nozzle mouth is 30 degree of angles, the axis of described left nozzle mouth, the axis of middle jet hole and the axes intersect of right nozzle mouth are in same point, this point is positioned at the inwall of bottom steam pipe, described some support horizontal stripes are all fixed on bottom steam pipe, support the height of height higher than top nozzle of horizontal stripe, described vapour hood is fixed on steam chest, the passage at steam chest top is all positioned at vapour hood, the inwall both sides of described vapour hood are respectively arranged with left bank tank and right rhone, described left bank water pipe and right drainpipe are connected on left bank tank and right rhone, and described assembling is on vapour hood, described chrysanthemum conveyer belt that completes comprises a gauze, several support bar and two chains, a movable chain pin is provided with in every root chain, some connect chain pin and a buckle, described movable chain pin is provided with the movable cotter way of a circle, one adjacent with movable chain pin is connected and chain pin is provided with a circle connects cotter way, described buckle is pitched by clamping, dop and bayonet lock composition, described clamping fork is provided with two card bases, the end of a card base is provided with a pin-and-hole, one end of described dop is hinged on the end of another card base, described bayonet lock is connected to the other end of dop, this bayonet lock and pin-and-hole coordinate, the two ends of every root chain form circulus each via a movable chain pin connects, described buckle be connected to the movable cotter way of movable chain pin and adjacent with movable chain pin one be connected on the connection cotter way of chain pin, the two ends of support bar are fixed on two chains respectively, and be parallel to each other between described two chains, described gauze is fixed on support bar and forms circulus, described drive roll is arranged on the rear end of steam chest by drive roll installing rack, described driven voller is arranged on the front end of steam chest by driven voller installing rack, the two ends of described drive roll and the two ends of driven voller are all fixed with gear, a chain is engaged on the gear of drive roll one end and driven voller one end, another root chain is engaged on the gear of the drive roll other end and the driven voller other end, complete the first half of conveyer belt of described chrysanthemum is arranged in steam chest, and be positioned at and support on horizontal stripe, complete the latter half of conveyer belt of this chrysanthemum is positioned at immediately below steam chest, described uniform discharge device comprises bearing block mounting rail, a bearing block, No. two bearing blocks, blanking rotating shaft, belt pulley, eccentric wheel, back-moving spring, even blanking net, transmission arm, upper alignment pin, lower alignment pin, spacer, blanking support bar off the net, the online positive stop strip of blanking, top connecting ring, bottom connecting ring, left Antileaking plate and right Antileaking plate, described bearing block mounting rail is fixed in frame, a described bearing block and No. two bearing blocks are all fixed on bearing block mounting rail, described blanking rotating shaft is arranged on a bearing block and No. two bearing blocks by bearing, described belt pulley is fixed on one end of blanking rotating shaft, described eccentric side is fixed on the other end of blanking rotating shaft, one end of described upper alignment pin is fixed on eccentric opposite side, described top connecting ring and bottom connecting ring are separately fixed at the top and bottom of transmission arm, described upper set pin sleeve is contained in the connecting ring of top, alignment pin and top connecting ring matched in clearance on this, mesh in described even blanking net is the square structure of length of side 3-5cm, it is online that the bottom of described spacer is fixed on even blanking, one end of described lower alignment pin is fixed on spacer, and this lower set pin sleeve is contained in the connecting ring of bottom, this lower alignment pin and bottom connecting ring matched in clearance, the upper end of described back-moving spring is fixed on the bottom of bearing block mounting rail, it is online that the lower end of this back-moving spring is fixed on even blanking, described blanking support bar off the net and the online positive stop strip of blanking are all fixed in frame, spacing is there is between this blanking support bar off the net and the online positive stop strip of blanking, described even blanking rack is on blanking support bar off the net, and this even blanking net is between blanking support bar off the net and the online positive stop strip of blanking, described left Antileaking plate and right Antileaking plate are all fixed in frame, this left Antileaking plate and right Antileaking plate are all positioned at the below of even blanking net, and left Antileaking plate and right Antileaking plate lay respectively at left side and the right side of even blanking net, the number of degrees of the angle between described left Antileaking plate and vertical plane are 50 degree, the number of degrees of the angle between described right Antileaking plate and vertical plane are 50 degree, the described projection of even blanking net in the vertical direction and the equitant width of projection of left Antileaking plate in the vertical direction are 4cm, the described projection of even blanking net in the vertical direction and the equitant width of projection of right Antileaking plate in the vertical direction are 4cm, the complete discharging end of conveyer belt of described chrysanthemum is positioned at directly over even blanking net.The bottom of top left side steam pipe and the bottom of top right side steam pipe are provided with several lower nozzles, top left side steam pipe and top right side steam pipe are close to inner left wall and the right side inwall of steam chest respectively, effectively can guarantee with right side, to there is enough vapor (steam) temperatures on the left of steam chest, guarantee the overall fixation effect of steam chest, there is the spacing of 5-15cm in the left side wall of the root bottom part steam pipe and steam chest that are positioned at the leftmost side, there is the spacing of 5-15cm in the right side wall of the root bottom part steam pipe and steam chest that are positioned at the rightmost side, under top left side steam pipe and top right side steam pipe are close to the inner left wall of steam chest and the prerequisite of right side inwall respectively, make the steam in steam chest can be formed with the convection current of effect, the steam sprayed in top left side steam pipe and top right side steam pipe flows from top to bottom along the inner left wall of steam chest and right side inwall respectively, the steam sprayed in bottom steam pipe flows from the bottom up, greatly improve the fixation effect to chrysanthemum.The top of bottom steam pipe is provided with multiple top nozzle, have in each top nozzle and only have three jet holes, these three jet holes are respectively left nozzle mouth, middle jet hole and right nozzle mouth, the axis of middle jet hole is vertical shape structure, angle between the axis of left nozzle mouth and the axis of middle jet hole is 30 degree of angles, angle between the axis of middle jet hole and the axis of right nozzle mouth is 30 degree of angles, the axis of left nozzle mouth, the axis of middle jet hole and the axes intersect of right nozzle mouth are in same point, this point is positioned at the inwall of bottom steam pipe, the scientific structure design of top nozzle, rationally, steam jeting effect is good, the steam be conducive in steam chest is uniformly distributed, and steam is even, effectively penetrate chrysanthemum layer to be completed, improve fixation effect.
As preferably, vapour hood of the present invention is by left plate, right plate, left frid, right frid, front end-plate and end plate composition, the top of described left plate and the top of right plate are fixed, the bottom of this left plate and the bottom of right plate are all fixed on steam chest, the passage at steam chest top is between left plate and right plate, the bottom of described left frid is fixed on the inside bottom of left plate, left bank tank is formed between this left frid and left plate, the bottom of described right frid is fixed on the inside bottom of right plate, right rhone is formed between this right frid and right plate, angle between the inner side of described left plate and horizontal plane is 35 degree, angle between the inner side of described right plate and horizontal plane is 35 degree, angle between described left frid and horizontal plane is 20 degree, angle between described right frid and horizontal plane is 20 degree, described front end-plate is fixed on the front end of left plate, right plate, left frid and right frid, and described end plate is fixed on the rear end of left plate, right plate, left frid and right frid.Make the reasonable in design of vapour hood thus, steam after completing rises along vapour hood, export finally by blower fan, water after steam liquefied is along the inwall of left plate and the inwall of right plate toward dirty, flow in left bank tank and right rhone respectively, these water can be discharged from left bank water pipe and right drainpipe timely, guarantee that the vapor (steam) temperature in steam chest is unaffected.
As preferably, top left side steam pipe of the present invention and top right side steam pipe all arrange along the length direction of steam chest, one that is positioned at steam chest end in described top left side steam pipe is connected with upper main steam pipe, and one that is positioned at steam chest end in described top right side steam pipe is connected with upper main steam pipe; Every root bottom part steam pipe all arranges along the length direction of steam chest, and one that is positioned at steam chest end in every root bottom part steam pipe is all connected with lower main steam pipe.Make the scientific arrangement of top left side steam pipe, top right side steam pipe and bottom steam pipe, rationally thus, vapor (steam) temperature in steam chest can be formed stepped, the temperature of steam chest entrance is relatively lower, raise gradually along chrysanthemum throughput direction temperature, not only increase the utilization rate of steam, and improve fixation effect.
As preferably, the height of steam chest of the present invention is 20-40cm, and described bottom steam pipe is parallel to each other, and the spacing between adjacent two root bottom part steam pipes is 10-30cm.
As preferably, the distance between the top of top nozzle of the present invention and the bottom supporting horizontal stripe is 2-8cm.
As preferably, the lower nozzle on top left side steam pipe of the present invention and top right side steam pipe all vertically down.
As preferably, several support bars that of the present invention chrysanthemum completes in conveyer belt are parallel to each other, and the spacing between adjacent two support bars is 25-45cm, and stating the support bar that a chrysanthemum completes in conveyer belt is stainless steel.
As preferably, even blanking net of the present invention is made up of blanking support bar, several blanking cross bar and some blanking montants, one end of described several blanking cross bar is all fixed on blanking support bar, described some blanking montants are fixed on several blanking cross bar, and blanking cross bar and blanking montant are woven into a mesh structure.
As preferably, blanking rotating shaft of the present invention is horizontal structure, described transmission arm is vertical shape structure, described upper alignment pin and lower alignment pin are horizontal structure, parallel between described blanking support bar off the net and the online positive stop strip of blanking, this blanking support bar off the net is positioned at immediately below the online positive stop strip of blanking.
As preferably, back-moving spring of the present invention is near one end of blanking support bar.
Compared with prior art, have the following advantages and effect: reasonable in design, steam utilization is high in the present invention, and fixation effect is good, and the water after steam liquefied can be discharged in time, is conducive to the whole structure promoting fixation machine for chrysanthemum.Complete steam chest operationally, chrysanthemum exports conveying from steam chest entrance to steam chest, the steam sprayed in top left side steam pipe and top right side steam pipe flows from top to bottom along the inner left wall of steam chest and right side inwall respectively, the steam sprayed in bottom steam pipe flows from the bottom up, make the steam in steam chest can be formed with the convection current of effect, effectively can guarantee that whole steam chest has enough vapor (steam) temperatures, guarantee the overall fixation effect of steam chest.The inwall both sides of vapour hood are respectively arranged with left bank tank and right rhone, are conducive to the water after steam liquefied and discharge in time, guarantee the vapor (steam) temperature in steam chest.
Piece chrysanthemum completes the sound construction of conveyer belt, reasonable in design, the two ends of every root chain form circulus each via a movable chain pin connects, and are convenient to installation and removal, after the two ends of chain disassemble, the chrysanthemum of the ring-type conveyer belt that completes just becomes banded structure.The present invention directly can carry out steam beating by needing the chrysanthemum carrying out completing to be transported in the steam chest of fixation machine for chrysanthemum, without the need to using the frame splendid attire chrysanthemum that completes, be conducive to reducing steam chest volume, during use, the conveyer belt that completed by a chrysanthemum is arranged in the steam chest of fixation machine for chrysanthemum and forms circulus, a chrysanthemum to be completed is evenly distributed in a chrysanthemum and completes on the conveyor surface of conveyer belt, and complete in the steam chest of conveyer belt feeding fixation machine for chrysanthemum with a chrysanthemum, steam in fixation machine for chrysanthemum steam chest directly to complete operation to a chrysanthemum, fixation effect is good, and steam utilization is high.The present invention is fixed by the two ends of buckle by chain, sound construction, easy accessibility.
The structure of uniform discharge device of the present invention is simple, reasonable in design, scientific arrangement, easy to use, can effectively the chrysanthemum after terminating that completes be distributed to a chrysanthemum frame from the chrysanthemum conveyer belt that completes uniformly, be conducive to increasing work efficiency, during use, rotated by external force drive pulley, blanking axis of rotation is driven by belt pulley, rotated by blanking rotating shaft band movable eccentric wheel, drive upper alignment pin along eccentric deflection orbiting motion by eccentric wheel again, upper alignment pin drives top connecting ring successively, transmission arm, bottom connecting ring, lower alignment pin and spacer motion, finally drive even blanking net up-down vibration by spacer, the chrysanthemum completed on conveyer belt when a chrysanthemum drop to even blanking online after, under the effect of vibration of even blanking net, leak down from even blanking net uniformly, finally drop in the chrysanthemum frame be fed forward.
Upper alignment pin in the present invention and top connecting ring matched in clearance, lower alignment pin and bottom connecting ring matched in clearance, make transmission more flexible, transmission better effects if.The online positive stop strip of blanking can play effective position-limiting action to even blanking net, guarantees that even blanking net can more effectively vibrate between blanking support bar off the net and the online positive stop strip of blanking.Under the effect of back-moving spring, make the up-down vibration of even blanking net more even, be conducive to a chrysanthemum and drop into more uniformly in a chrysanthemum frame.Left Antileaking plate and right Antileaking plate are all in ramp-like configuration, the chrysanthemum dropped on the left of even blanking net can be caught by left Antileaking plate, be directed in a chrysanthemum frame by left Antileaking plate, the chrysanthemum dropped on the right side of even blanking net can be caught by right Antileaking plate, be directed in a chrysanthemum frame by right Antileaking plate, overall construction design is more reasonable.
Accompanying drawing explanation
Fig. 1 is that the embodiment of the present invention chrysanthemum be exclusively used in fixation machine for chrysanthemum completes the structural representation of mechanism.
Fig. 2 is that the embodiment of the present invention chrysanthemum be exclusively used in the fixation machine for chrysanthemum mechanism that completes removes the structural representation after uniform discharge device.
Fig. 3 is that in the embodiment of the present invention, a chrysanthemum completes the main TV structure schematic diagram of conveyer belt.
Fig. 4 is the structural representation in Fig. 2 after the amplification of A place.
Fig. 5 is movable chain pin in Fig. 4, the structure for amplifying schematic diagram connecting chain pin and buckle.
Fig. 6 is the structural representation after removing buckle in Fig. 5.
Fig. 7 be Fig. 3 look up structural representation.
Fig. 8 is the structural representation in Fig. 7 after the amplification of B place.
Fig. 9 is movable chain pin in Fig. 8, the structure for amplifying schematic diagram connecting chain pin and buckle.
Figure 10 is the structural representation of buckle in Fig. 9.
Figure 11 is the structural representation after clamping fork on the buckle in Figure 10 and dop are opened.
Figure 12 is the structural representation after removing gauze in Fig. 3.
Figure 13 removes a chrysanthemum to complete the main TV structure schematic diagram after conveyer belt in Fig. 2.
Figure 14 is that structure for amplifying schematic diagram is looked on a left side of Figure 13.
Figure 15 removes upper main steam pipe, lower main steam pipe and the structural representation after supporting horizontal stripe in Figure 14.
Figure 16 is the plan structure schematic diagram of Figure 13.
Figure 17 is the structure for amplifying schematic diagram after vapour hood in the embodiment of the present invention removes front end-plate and end plate.
Figure 18 is the structure for amplifying schematic diagram of top left side steam pipe in the embodiment of the present invention.
Figure 19 is the left TV structure schematic diagram of Figure 18.
Figure 20 is the structure for amplifying schematic diagram of bottom steam pipe in the embodiment of the present invention.
Figure 21 is the left TV structure schematic diagram of Figure 20.
Figure 22 is the structural representation in Figure 21 after the amplification of D place.
Figure 23 is the main TV structure schematic diagram of embodiment of the present invention uniform discharge device.
Figure 24 is the backsight structural representation of Figure 23.
Figure 25 is the structural representation of even blanking net in the embodiment of the present invention.
Figure 26 is the structural representation in Figure 23 after the amplification of E place.
Figure 27 is the structural representation in Figure 23 after the amplification of F place.
Detailed description of the invention
Embodiment.
See Fig. 1 to Figure 27, the chrysanthemum be exclusively used in the present embodiment in fixation machine for chrysanthemum completes, and mechanism comprises frame, blower fan 1, temperature sensor 2, steam chest 3, vapour hood 4, upper main steam pipe 5, top left side steam pipe 6, top right side steam pipe 7, lower main steam pipe 8, several bottom steam pipe 9, some support horizontal stripe 10, left bank water pipe 11, right drainpipe 12, a chrysanthemum complete conveyer belt 13, drive roll 14, driven voller 15, drive roll installing rack 16, driven voller installing rack 17 and uniform discharge device I, wherein, temperature sensor 2 is arranged in steam chest 3.
Steam chest 3 in the present embodiment is rectangular structure, the top of this steam chest 3 is provided with multiple passage, top left side steam pipe 6 and top right side steam pipe 7 are all fixed on the top of steam chest 3, this top left side steam pipe 6 and top right side steam pipe 7 are close to inner left wall and the right side inwall of steam chest 3 respectively, the bottom of top left side steam pipe 6 and the bottom of top right side steam pipe 7 are provided with several lower nozzles 61, this top left side steam pipe 6 and top right side steam pipe 7 are all connected with upper main steam pipe 5, several bottom steam pipes 9 are all fixed on the bottom of steam chest 3, there is the spacing of 5-15cm in the left side wall of the root bottom part steam pipe 9 and steam chest 3 that are positioned at the leftmost side, there is the spacing of 5-15cm in the right side wall of the root bottom part steam pipe 9 and steam chest 3 that are positioned at the rightmost side, bottom steam pipe 9 is all connected with lower main steam pipe 8.
The top of the present embodiment bottom steam pipe 9 is provided with multiple top nozzle 91, have in each top nozzle and only have three jet holes, these three jet holes are respectively left nozzle mouth 92, middle jet hole 93 and right nozzle mouth 94, the axis k of middle jet hole 93 is vertical shape structure, angle α 1 between the axis m of left nozzle the mouth 92 and axis k of middle jet hole 93 is 30 degree of angles, angle α 2 between the axis k of middle the jet hole 93 and axis n of right nozzle mouth 94 is 30 degree of angles, the axis m of left nozzle mouth 92, the axis k of middle the jet hole 93 and axis n of right nozzle mouth 94 intersects at same point O, this O is positioned at the inwall of bottom steam pipe 9, make the reasonable in design of top nozzle 91, uperize effective.Some support horizontal stripe 10 and are all fixed on bottom steam pipe 9, support the height of height higher than top nozzle 91 of horizontal stripe 10.
Vapour hood 4 in the present embodiment is fixed on steam chest 3, the passage at steam chest 3 top is all positioned at vapour hood 4, the inwall both sides of vapour hood 4 are respectively arranged with left bank tank 45 and right rhone 46, left bank water pipe 11 and right drainpipe 12 are connected on left bank tank 45 and right rhone 46, and blower fan 1 is arranged on vapour hood 4.
Vapour hood 4 in the present embodiment is by left plate 41, right plate 42, left frid 43, right frid 44, front end-plate and end plate composition, the top of left plate 41 and the top of right plate 42 are fixed, the bottom of this left plate 41 and the bottom of right plate 42 are all fixed on steam chest 3, the passage at steam chest 3 top is between left plate 41 and right plate 42, the bottom of left frid 43 is fixed on the inside bottom of left plate 41, left bank tank 45 is formed between this left frid 43 and left plate 41, the bottom of right frid 44 is fixed on the inside bottom of right plate 42, right rhone 46 is formed between this right frid 44 and right plate 42.Angle β 1 between the inner side of the present embodiment left plate 41 and horizontal plane is 35 degree, angle β 2 between the inner side of right plate 42 and horizontal plane is 35 degree, angle γ 1 between left frid 43 and horizontal plane is 20 degree, and the angle γ 2 between right frid 44 and horizontal plane is 20 degree.The present embodiment front end-plate is fixed on the front end of left plate 41, right plate 42, left frid 43 and right frid 44, end plate is fixed on the rear end of left plate 41, right plate 42, left frid 43 and right frid 44, certainly, the bottom of front end-plate and the bottom of end plate are all fixed on steam chest 3.
In the present embodiment, top left side steam pipe 6 and top right side steam pipe 7 all arrange along the length direction of steam chest 3, one that is positioned at steam chest 3 end in top left side steam pipe 6 is connected with upper main steam pipe 5, and one that is positioned at steam chest 3 end in top right side steam pipe 7 is connected with upper main steam pipe 5.In the present embodiment, every root bottom part steam pipe 9 all arranges along the length direction of steam chest 3, and one that is positioned at steam chest 3 end in every root bottom part steam pipe 9 is all connected with lower main steam pipe 8.
Bottom steam pipe 9 in the present embodiment is parallel to each other, and the spacing between adjacent two root bottom part steam pipes 9 is 10-30cm.Under normal circumstances, the height of the steam chest 3 in the present embodiment is 20-40cm, and the distance between the top of top nozzle 91 and the bottom supporting horizontal stripe 10 is 2-8cm, and the lower nozzle 61 on top left side steam pipe 6 and top right side steam pipe 7 all vertically down.
A chrysanthemum in the present embodiment conveyer belt 13 that completes comprises a gauze 131, several support bar 132 and two chains 133, wherein, a movable chain pin 31, some connection chain pins 32 and a buckle 33 is provided with in every root chain 133, movable chain pin 31 is provided with the movable cotter way 34 of a circle, one adjacent with movable chain pin 31 is connected and chain pin 32 is provided with a circle connects cotter way 35.Connection chain pin 32 in the present invention belongs to prior art, connects chain pin 32 for connecting the carrier bar on chain 133.
Buckle 33 in the present embodiment pitches 36 by clamping, dop 37 and bayonet lock 38 form, clamping fork 36 is provided with two card bases 39, wherein, the end of a card base 39 is provided with a pin-and-hole 310, this pin-and-hole 310 is circular hole, one end of dop 37 is hinged on the end of another card base 39, dop 37 can rotate on another card base 39, bayonet lock 38 is connected to the other end of dop 37, this bayonet lock 38 and pin-and-hole 310 coordinate, when dop 37 turns to certain position on another card base 39, bayonet lock 38 and pin-and-hole 310 are aimed at, now, as long as bayonet lock 38 is inserted in pin-and-hole 310, the location to dop 37 can be realized.
In the present embodiment, the two ends of every root chain 133 form circulus each via a movable chain pin 31 connects, buckle 33 be connected to the movable cotter way 34 of movable chain pin 31 and one adjacent with movable chain pin 31 be connected on the connection cotter way 35 of chain pin 32, realize the location to movable chain pin 31 by buckle 33, prevent movable chain pin 31 from coming off.
Support bar 132 in the present embodiment is generally stainless steel, and the two ends of support bar 132 are fixed on two chains 133 respectively, and several support bar 132 is parallel to each other, and the spacing between adjacent two support bars 132 is 25-45cm.Be parallel to each other between two chains 133 in the present embodiment, gauze 131 is fixed on support bar 132 and forms circulus, and gauze 131 surrounds outside chain.
When need a chrysanthemum of dismantling in the present embodiment complete conveyer belt 13 time, first gauze 131 is disassembled from support bar 132, then bayonet lock 38 is extracted from pin-and-hole 310, rotate dop 37, by buckle 33 from movable chain pin 31 be connected chain pin 32 and extract, more movable chain pin 31 to be extracted from chain 133, the two ends of chain 133 is separated, thus change annular link chain 133 into strip chain 133, be convenient to installation and removal.In the present embodiment, the two ends of chain 133 link together by buckle 33, and sound construction is convenient to dismounting.
Drive roll 14 in the present embodiment is arranged on the rear end of steam chest 3 by drive roll installing rack 16, drive roll 14 can rotate on drive roll installing rack 16, driven voller 15 is arranged on the front end of steam chest 3 by driven voller installing rack 17, and driven voller 15 can rotate on driven voller installing rack 17.The two ends of the present embodiment drive roll 14 and the two ends of driven voller 15 are all fixed with gear, a chain 133 is engaged on the gear of drive roll 14 one end and the gear of driven voller 15 one end, another root chain 133 is engaged on the gear of drive roll 14 other end and the gear of driven voller 15 other end, namely the chrysanthemum conveyer belt 13 that completes is connected on drive roll 14 and driven voller 15, two chains 133 can be driven to rotate by drive roll 14, the function that conveyer belt 13 rotates thus a realization chrysanthemum completes.In the present embodiment, complete the first half of conveyer belt 13 of a chrysanthemum is arranged in steam chest 3, and be positioned on support horizontal stripe 10, complete the latter half of conveyer belt 13 of this chrysanthemum is positioned at immediately below steam chest 3, namely a chrysanthemum completes the bottom of conveyer belt 13 around steam chest 3, and bottom steam pipe 9 and support horizontal stripe 10 and be positioned at a chrysanthemum and complete the region that conveyer belt 13 holds, make bottom steam pipe 9 can carry out Steam Heating to the chrysanthemum conveyer belt 13 that completes from the bottom up, needing the chrysanthemum completed directly to be placed in a chrysanthemum completes on the gauze 131 of conveyer belt 13, be transported in steam chest 3 with gauze 131, by steam, the steam be positioned on gauze 131 is completed, and export from steam chest 3 with gauze 131, thus the process that completes completed a chrysanthemum.
In the present embodiment, uniform discharge device I comprises bearing block mounting rail I 1, bearing block I 2, No. two bearing blocks I 3, blanking rotating shaft I 4, belt pulley I 5, eccentric wheel I 6, back-moving spring I 7, evenly blanking net I 8, transmission arm I 9, upper alignment pin I 10, lower alignment pin I 11, spacer I 12, blanking support bar off the net I 13, the online positive stop strip of blanking I 14, top connecting ring I 15, bottom connecting ring I 16, left Antileaking plate I 17 and right Antileaking plate I 18.
Bearing block mounting rail I 1 in the present embodiment is fixed in frame, a bearing block I 2 and No. two bearing blocks I 3 are all fixed on bearing block mounting rail I 1, blanking rotating shaft I 4 is arranged on a bearing block I 2 and No. two bearing blocks I 3 by bearing, namely blanking rotating shaft I 4 is arranged on a bearing block I 2 by a bearing, and is arranged on No. two bearing blocks I 3 by another bearing.Blanking rotating shaft I 4 in the present embodiment is horizontal structure, and the two ends of this blanking rotating shaft I 4 are all outside exposed.
Belt pulley I 5 in the present embodiment is fixed on one end of blanking rotating shaft I 4, the side of eccentric wheel I 6 is fixed on the other end of blanking rotating shaft I 4, one end of upper alignment pin I 10 is fixed on the opposite side of eccentric wheel I 6, top connecting ring I 15 and bottom connecting ring I 16 are separately fixed at the top and bottom of transmission arm I 9, upper alignment pin I 10 is sleeved in top connecting ring I 15, alignment pin I 10 and top connecting ring I 15 matched in clearance on this, the rotation between upper alignment pin I 10 and top connecting ring I 15 is more flexible.
Even blanking net I 8 in the present embodiment is made up of blanking support bar I 81, several blanking cross bar I 82 and some blanking montants I 83, one end of several blanking cross bar I 82 is all fixed on blanking support bar I 81, some blanking montants I 83 are fixed on several blanking cross bar I 82, and blanking cross bar 82 and blanking montant 83 are woven into a mesh structure.
Mesh I 84 in even blanking net I 8 in the present embodiment is the square structure of length of side 3-5cm, the bottom of spacer I 12 is fixed on blanking support bar I 81, namely the bottom of spacer I 12 is fixed on even blanking net I 8, one end of lower alignment pin I 11 is fixed on spacer I 12, this lower alignment pin I 11 is sleeved in the connecting ring I 16 of bottom, this lower alignment pin I 11 and bottom connecting ring I 16 matched in clearance, make the rotation between lower alignment pin I 11 and bottom connecting ring I 16 more flexible.
The upper end of the present embodiment back-moving spring I 7 is fixed on the bottom of bearing block mounting rail I 1, and the lower end of this back-moving spring I 7 is fixed on blanking support bar I 81, and namely the lower end of back-moving spring I 7 is fixed on even blanking net I 8.Blanking support bar off the net I 13 and the online positive stop strip I 14 of blanking are all fixed in frame, spacing is there is between this blanking support bar off the net I 13 and the online positive stop strip I 14 of blanking, even blanking net I 8 frame is on blanking support bar I 13 off the net, and this even blanking net I 8 is between blanking support bar off the net I 13 and the online positive stop strip I 14 of blanking.The online positive stop strip of blanking I 14 can play effective position-limiting action to even blanking net I 8, guarantees that even blanking net I 8 can more effectively vibrate between blanking support bar off the net I 13 and the online positive stop strip I 14 of blanking.
Under normal circumstances, the blanking rotating shaft I 4 in the present invention is horizontal structure, and back-moving spring I 7 is near one end of blanking support bar I 81, and transmission arm I 9 is vertical shape structure, and upper alignment pin I 10 and lower alignment pin I 11 are horizontal structure.Parallel between blanking support bar off the net I 13 and the online positive stop strip of blanking I 14, this blanking support bar off the net I 13 is positioned at immediately below the online positive stop strip I 14 of blanking.
The left Antileaking plate of the present embodiment I 17 and right Antileaking plate I 18 are all fixed in frame, this left Antileaking plate I 17 and right Antileaking plate I 18 are all positioned at the below of even blanking net I 8, and left Antileaking plate I 17 and right Antileaking plate I 18 lay respectively at left side and the right side of even blanking net I 8.Left Antileaking plate I 17 in the present embodiment and right Antileaking plate I 18 are all in ramp-like configuration, and the number of degrees of the included angle X 1 between left Antileaking plate I 17 and vertical plane are 50 degree, and the number of degrees of the included angle X 2 between right Antileaking plate I 18 and vertical plane are 50 degree.In the present embodiment, the projection of even blanking net I 8 in the vertical direction and the equitant width L1 of projection of left Antileaking plate I 17 in the vertical direction are 4cm, the chrysanthemum dropped on the left of even blanking net I 8 can be caught by left Antileaking plate I 17, be directed in a chrysanthemum frame by left Antileaking plate I 17; The projection of even blanking net I 8 in the vertical direction and the equitant width L2 of projection of right Antileaking plate I 18 in the vertical direction are 4cm, the chrysanthemum dropped on the right side of even blanking net I 8 can be caught by right Antileaking plate I 18, be directed in a chrysanthemum frame by right Antileaking plate I 18.
The complete discharging end of conveyer belt 13 of piece chrysanthemum is positioned at directly over even blanking net I 8, complete conveyer belt 13 the completes chrysanthemum after having operated falls down from the complete discharging end of conveyer belt 13 of a chrysanthemum for piece chrysanthemum, just in time can drop in even blanking net I 8, under the state that even blanking net I 8 vibrates, uniformly by the mesh I 84 of even blanking net I 8, finally can drop in the chrysanthemum frame at the uniform velocity advanced.In the present invention, the complete discharging end of conveyer belt 13 of said chrysanthemum refers to that the chrysanthemum after terminating that completes leaves a chrysanthemum and to complete one end of conveyer belt 13, piece chrysanthemum leaves a chrysanthemum and completes after conveyer belt 13 and drop in even blanking net I 8, and the complete particular location of discharging end of conveyer belt 13 of a chrysanthemum is common practise to those skilled in the art.

Claims (8)

1. the chrysanthemum be exclusively used in fixation machine for chrysanthemum completes mechanism, comprise blower fan, temperature sensor and steam chest, described temperature sensor is arranged in steam chest, it is characterized in that: also comprise vapour hood, upper main steam pipe, top left side steam pipe, top right side steam pipe, lower main steam pipe, several bottom steam pipe, some support horizontal stripe, left bank water pipe, right drainpipe, piece chrysanthemum completes conveyer belt, drive roll, driven voller, drive roll installing rack, driven voller installing rack and uniform discharge device, described steam chest is rectangular structure, the top of this steam chest is provided with multiple passage, described top left side steam pipe and top right side steam pipe are all fixed on the top of steam chest, this top left side steam pipe and top right side steam pipe are close to inner left wall and the right side inwall of steam chest respectively, the bottom of described top left side steam pipe and the bottom of top right side steam pipe are provided with several lower nozzles, this top left side steam pipe is all connected with upper main steam pipe with top right side steam pipe, described several bottom steam Guan Jun is fixed on the bottom of steam chest, there is the spacing of 5-15cm in the left side wall of the root bottom part steam pipe and steam chest that are positioned at the leftmost side, there is the spacing of 5-15cm in the right side wall of the root bottom part steam pipe and steam chest that are positioned at the rightmost side, bottom steam Guan Jun is connected with lower main steam pipe, the top of described bottom steam pipe is provided with multiple top nozzle, have in each top nozzle and only have three jet holes, these three jet holes are respectively left nozzle mouth, middle jet hole and right nozzle mouth, the axis of described middle jet hole is vertical shape structure, angle between the axis of described left nozzle mouth and the axis of middle jet hole is 30 degree of angles, angle between the axis of described middle jet hole and the axis of right nozzle mouth is 30 degree of angles, the axis of described left nozzle mouth, the axis of middle jet hole and the axes intersect of right nozzle mouth are in same point, this point is positioned at the inwall of bottom steam pipe, described some support horizontal stripes are all fixed on bottom steam pipe, support the height of height higher than top nozzle of horizontal stripe, described vapour hood is fixed on steam chest, the passage at steam chest top is all positioned at vapour hood, the inwall both sides of described vapour hood are respectively arranged with left bank tank and right rhone, described left bank water pipe and right drainpipe are connected on left bank tank and right rhone, and described assembling is on vapour hood, described chrysanthemum conveyer belt that completes comprises a gauze, several support bar and two chains, a movable chain pin is provided with in every root chain, some connect chain pin and a buckle, described movable chain pin is provided with the movable cotter way of a circle, one adjacent with movable chain pin is connected and chain pin is provided with a circle connects cotter way, described buckle is pitched by clamping, dop and bayonet lock composition, described clamping fork is provided with two card bases, the end of a card base is provided with a pin-and-hole, one end of described dop is hinged on the end of another card base, described bayonet lock is connected to the other end of dop, this bayonet lock and pin-and-hole coordinate, the two ends of every root chain form circulus each via a movable chain pin connects, described buckle be connected to the movable cotter way of movable chain pin and adjacent with movable chain pin one be connected on the connection cotter way of chain pin, the two ends of support bar are fixed on two chains respectively, and be parallel to each other between described two chains, described gauze is fixed on support bar and forms circulus, described drive roll is arranged on the rear end of steam chest by drive roll installing rack, described driven voller is arranged on the front end of steam chest by driven voller installing rack, the two ends of described drive roll and the two ends of driven voller are all fixed with gear, a chain is engaged on the gear of drive roll one end and driven voller one end, another root chain is engaged on the gear of the drive roll other end and the driven voller other end, complete the first half of conveyer belt of described chrysanthemum is arranged in steam chest, and be positioned at and support on horizontal stripe, complete the latter half of conveyer belt of this chrysanthemum is positioned at immediately below steam chest, described uniform discharge device comprises bearing block mounting rail, a bearing block, No. two bearing blocks, blanking rotating shaft, belt pulley, eccentric wheel, back-moving spring, even blanking net, transmission arm, upper alignment pin, lower alignment pin, spacer, blanking support bar off the net, the online positive stop strip of blanking, top connecting ring, bottom connecting ring, left Antileaking plate and right Antileaking plate, described bearing block mounting rail is fixed in frame, a described bearing block and No. two bearing blocks are all fixed on bearing block mounting rail, described blanking rotating shaft is arranged on a bearing block and No. two bearing blocks by bearing, described belt pulley is fixed on one end of blanking rotating shaft, described eccentric side is fixed on the other end of blanking rotating shaft, one end of described upper alignment pin is fixed on eccentric opposite side, described top connecting ring and bottom connecting ring are separately fixed at the top and bottom of transmission arm, described upper set pin sleeve is contained in the connecting ring of top, alignment pin and top connecting ring matched in clearance on this, mesh in described even blanking net is the square structure of length of side 3-5cm, it is online that the bottom of described spacer is fixed on even blanking, one end of described lower alignment pin is fixed on spacer, and this lower set pin sleeve is contained in the connecting ring of bottom, this lower alignment pin and bottom connecting ring matched in clearance, the upper end of described back-moving spring is fixed on the bottom of bearing block mounting rail, it is online that the lower end of this back-moving spring is fixed on even blanking, described blanking support bar off the net and the online positive stop strip of blanking are all fixed in frame, spacing is there is between this blanking support bar off the net and the online positive stop strip of blanking, described even blanking rack is on blanking support bar off the net, and this even blanking net is between blanking support bar off the net and the online positive stop strip of blanking, described left Antileaking plate and right Antileaking plate are all fixed in frame, this left Antileaking plate and right Antileaking plate are all positioned at the below of even blanking net, and left Antileaking plate and right Antileaking plate lay respectively at left side and the right side of even blanking net, the number of degrees of the angle between described left Antileaking plate and vertical plane are 50 degree, the number of degrees of the angle between described right Antileaking plate and vertical plane are 50 degree, the described projection of even blanking net in the vertical direction and the equitant width of projection of left Antileaking plate in the vertical direction are 4cm, the described projection of even blanking net in the vertical direction and the equitant width of projection of right Antileaking plate in the vertical direction are 4cm, the complete discharging end of conveyer belt of described chrysanthemum is positioned at directly over even blanking net, the height of described steam chest is 20-40cm, and described bottom steam pipe is parallel to each other, and the spacing between adjacent two root bottom part steam pipes is 10-30cm, and the lower nozzle on described top left side steam pipe and top right side steam pipe all vertically down.
2. the chrysanthemum be exclusively used in fixation machine for chrysanthemum according to claim 1 completes mechanism, it is characterized in that: described vapour hood is by left plate, right plate, left frid, right frid, front end-plate and end plate composition, the top of described left plate and the top of right plate are fixed, the bottom of this left plate and the bottom of right plate are all fixed on steam chest, the passage at steam chest top is between left plate and right plate, the bottom of described left frid is fixed on the inside bottom of left plate, left bank tank is formed between this left frid and left plate, the bottom of described right frid is fixed on the inside bottom of right plate, right rhone is formed between this right frid and right plate, angle between the inner side of described left plate and horizontal plane is 35 degree, angle between the inner side of described right plate and horizontal plane is 35 degree, angle between described left frid and horizontal plane is 20 degree, angle between described right frid and horizontal plane is 20 degree, described front end-plate is fixed on the front end of left plate, right plate, left frid and right frid, and described end plate is fixed on the rear end of left plate, right plate, left frid and right frid.
3. the chrysanthemum be exclusively used in fixation machine for chrysanthemum according to claim 1 completes mechanism, it is characterized in that: described top left side steam pipe and top right side steam pipe all arrange along the length direction of steam chest, one that is positioned at steam chest end in described top left side steam pipe is connected with upper main steam pipe, and one that is positioned at steam chest end in described top right side steam pipe is connected with upper main steam pipe; Every root bottom part steam pipe all arranges along the length direction of steam chest, and one that is positioned at steam chest end in every root bottom part steam pipe is all connected with lower main steam pipe.
4. the chrysanthemum be exclusively used in fixation machine for chrysanthemum according to claim 1 completes mechanism, it is characterized in that: the distance between the top of described top nozzle and the bottom supporting horizontal stripe is 2-8cm.
5. the chrysanthemum be exclusively used in fixation machine for chrysanthemum according to claim 1 completes mechanism, it is characterized in that: several support bars that described chrysanthemum completes in conveyer belt are parallel to each other, spacing between adjacent two support bars is 25-45cm, and the support bar that described chrysanthemum completes in conveyer belt is stainless steel.
6. the chrysanthemum be exclusively used in fixation machine for chrysanthemum according to claim 1 completes mechanism, it is characterized in that: described even blanking net is made up of blanking support bar, several blanking cross bar and some blanking montants, one end of described several blanking cross bar is all fixed on blanking support bar, described some blanking montants are fixed on several blanking cross bar, and blanking cross bar and blanking montant are woven into a mesh structure.
7. the chrysanthemum be exclusively used in fixation machine for chrysanthemum according to claim 1 completes mechanism, it is characterized in that: described blanking rotating shaft is horizontal structure, described transmission arm is vertical shape structure, described upper alignment pin and lower alignment pin are horizontal structure, parallel between described blanking support bar off the net and the online positive stop strip of blanking, this blanking support bar off the net is positioned at immediately below the online positive stop strip of blanking.
8. the chrysanthemum be exclusively used in fixation machine for chrysanthemum according to claim 6 completes mechanism, it is characterized in that: described back-moving spring is near one end of blanking support bar.
CN201410263289.6A 2014-06-15 2014-06-15 A kind of chrysanthemum be exclusively used in fixation machine for chrysanthemum completes mechanism Expired - Fee Related CN104082466B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410263289.6A CN104082466B (en) 2014-06-15 2014-06-15 A kind of chrysanthemum be exclusively used in fixation machine for chrysanthemum completes mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410263289.6A CN104082466B (en) 2014-06-15 2014-06-15 A kind of chrysanthemum be exclusively used in fixation machine for chrysanthemum completes mechanism

Publications (2)

Publication Number Publication Date
CN104082466A CN104082466A (en) 2014-10-08
CN104082466B true CN104082466B (en) 2016-03-02

Family

ID=51630315

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410263289.6A Expired - Fee Related CN104082466B (en) 2014-06-15 2014-06-15 A kind of chrysanthemum be exclusively used in fixation machine for chrysanthemum completes mechanism

Country Status (1)

Country Link
CN (1) CN104082466B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105851288B (en) * 2016-06-01 2023-08-18 邯郸学院 Steam fixation device for processing tea

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201175462Y (en) * 2008-03-18 2009-01-07 重庆市农业科学院 Honeysuckle continuous steaming and cooling device
CN202276818U (en) * 2011-10-28 2012-06-20 桐乡市绿康菊业有限公司 Fixation machine for chrysanthemum
CN202635503U (en) * 2012-06-01 2013-01-02 盐城东茗菊花制品有限公司 Steam enzyme-deactivating machine for chrysanthemum
CN203590906U (en) * 2013-12-17 2014-05-14 淳安县枫树岭中药材专业合作社 Chrysanthemum processing machine
CN203884594U (en) * 2014-06-15 2014-10-22 桐乡市绿康菊业有限公司 Special chrysanthemum flower fixation mechanism for chrysanthemum fixation machine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201175462Y (en) * 2008-03-18 2009-01-07 重庆市农业科学院 Honeysuckle continuous steaming and cooling device
CN202276818U (en) * 2011-10-28 2012-06-20 桐乡市绿康菊业有限公司 Fixation machine for chrysanthemum
CN202635503U (en) * 2012-06-01 2013-01-02 盐城东茗菊花制品有限公司 Steam enzyme-deactivating machine for chrysanthemum
CN203590906U (en) * 2013-12-17 2014-05-14 淳安县枫树岭中药材专业合作社 Chrysanthemum processing machine
CN203884594U (en) * 2014-06-15 2014-10-22 桐乡市绿康菊业有限公司 Special chrysanthemum flower fixation mechanism for chrysanthemum fixation machine

Also Published As

Publication number Publication date
CN104082466A (en) 2014-10-08

Similar Documents

Publication Publication Date Title
CN101733631B (en) Waste circuit board hook pulling and dismounting device
CN104082466B (en) A kind of chrysanthemum be exclusively used in fixation machine for chrysanthemum completes mechanism
CN203884594U (en) Special chrysanthemum flower fixation mechanism for chrysanthemum fixation machine
CN203952298U (en) A kind of chrysanthemum steaming apparatus being exclusively used in fixation machine for chrysanthemum
CN104095132B (en) To complete steam chest for the chrysanthemum in fixation machine for chrysanthemum
CN104095127B (en) Be exclusively used in the chrysanthemum steaming apparatus in fixation machine for chrysanthemum
CN204047880U (en) A kind ofly to complete steam chest for the chrysanthemum in fixation machine for chrysanthemum
CN104082458B (en) The chrysanthemum be exclusively used in fixation machine for chrysanthemum completes steam chest
CN203884595U (en) Special chrysanthemum bud fixation mechanism for chrysanthemum fixation machine
CN203952300U (en) A kind of for a steaming apparatus for chrysanthemum green-keeping machine
CN203943026U (en) A kind of tire chrysanthemum steaming apparatus being exclusively used in fixation machine for chrysanthemum
CN104082467B (en) A kind of tire chrysanthemum be exclusively used in fixation machine for chrysanthemum completes mechanism
CN104146119B (en) Be exclusively used in the tire chrysanthemum steaming apparatus in fixation machine for chrysanthemum
CN104082485B (en) For the steaming apparatus in tire chrysanthemum green-keeping machine
CN104095128B (en) To complete steam chest for the tire chrysanthemum in fixation machine for chrysanthemum
CN203884597U (en) Fixation mechanism for chrysanthemum flower fixation machine
CN104082468B (en) A kind of for the mechanism that completes in a chrysanthemum green-keeping machine
CN203884596U (en) Fixation mechanism for chrysanthemum buds fixation machine
CN203952302U (en) A kind of steaming apparatus for tire chrysanthemum green-keeping machine
CN203884592U (en) Chrysanthemum flower fixation steam chamber special for chrysanthemum fixation machine
CN104082469B (en) A kind of for the mechanism that completes in tire chrysanthemum green-keeping machine
CN103736682B (en) Through type high-pressure water jet cleaner
CN104095130B (en) For the steaming apparatus in a chrysanthemum green-keeping machine
CN203884591U (en) Special chrysanthemum buds fixation steam chamber for chrysanthemum fixation machine
CN104082459B (en) The tire chrysanthemum be exclusively used in fixation machine for chrysanthemum completes steam chest

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160302

Termination date: 20160615