CN104074530A CN201410269820.0A CN201410269820A CN104074530A CN 104074530 A CN104074530 A CN 104074530A CN 201410269820 A CN201410269820 A CN 201410269820A CN 104074530 A CN104074530 A CN 104074530A
Authority
CN
China
Prior art keywords
liquid
shield
slip casting
construction method
grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410269820.0A
Other languages
Chinese (zh)
Other versions
CN104074530B (en
Inventor
郑勇
乔水旺
赵林
郭志峰
李辉
郭县华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 15th Bureau Group Co Ltd
Original Assignee
China Railway 15th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 15th Bureau Group Co Ltd filed Critical China Railway 15th Bureau Group Co Ltd
Priority to CN201410269820.0A priority Critical patent/CN104074530B/en
Priority claimed from CN201410269820.0A external-priority patent/CN104074530B/en
Publication of CN104074530A publication Critical patent/CN104074530A/en
Application granted granted Critical
Publication of CN104074530B publication Critical patent/CN104074530B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a shield synchronous grouting construction method and a construction material. The construction material comprises liquid A and liquid B, wherein the liquid A comprises 25.5 weight percent of cement, 2.6 weight percent of bentonite, 0.4 weight percent of stabilizing agents and 71.5 weight percent of water; the liquid B is water glass; and the volume ratio of the liquid A to the liquid B is 8:1-15:1. During synchronous grouting construction, the liquid A is prepared in a mixing station, and the liquid A and the liquid B are respectively conveyed into a liquid A slurry storage tank and a liquid B slurry storage tank which are arranged on a shield machine; the liquid A and the liquid B are respectively conveyed into a mixer positioned at the shield tail part of the shield machine through a liquid A slurry injection pipe and a liquid B slurry injection pipe; and the liquid A and/or the liquid B in the mixer are/is synchronously injected into a shield tail building gap through a shield tail slurry injection pipe. The shield synchronous grouting construction method solves various problems in subsequent grouting, synchronous single slurry injection, in-time grouting and secondary grouting in the prior art through utilizing good performance of the liquid A and the liquid B before and after the mixing of the liquid A and the liquid B and combining a primary synchronous grouting process.

Description

A kind of shield synchronization slip casting construction method and construction material
Technical field
The present invention, for constructing tunnel field, particularly relates to a kind of shield synchronization slip casting construction method and construction material.
Background technology
In shield tunnel construction process, when shield tail is deviate from assembled shield duct piece, must cause the structure void between pipe-plate lining and the soil body, now need to carry out timely grouting at the tail of the shield machine, to prevent the loosening of shield duct piece surrounding soil, strengthen the package action of the soil body to shield duct piece liner structure simultaneously, avoid tunnel segment structure to occur stress raisers phenomenon because lacking necessary effect of elastic resistance.Grouting at the tail of the shield machine refers in the process of shield driving construction, after tunnel lining segment is assembled, when shield tail is deviate from tunnel, under certain grouting pressure, the appropriate injecting paste material that has certain early strength and final strength is inserted in the space after shield tail, after its consolidation and sclerosis, play structure void after filling wall, certain supporting capacity is provided, stablize the grouting method of pipe-plate lining.
The type of grouting at the tail of the shield machine is divided into slip casting afterwards, synchronous grouting, slip casting in time and secondary grouting, wherein the control of surface settlement and tunnel upward floating is required to the general synchronous grouting that adopts in stricter situation, and secondary grouting is measure as a supplement.In China's shield tunnel construction, maximum synchronous grouting of use is the single liquid slurry of synchronous note at present, synchronously notes single liquid slurry and in construction, has many defects:
1) synchronously note single liquid slurry early strength low, the later stage lacks chemical stability, is easy to segregation, can not effectively control tunnel and departs from the floating after shield tail and keep the longitudinal stability in tunnel later stage.2) slip casting number of dropouts is large, and slip casting total amount is not easy to control, and when especially shield structure is through Fu Shui stratum, because the factors such as the number of dropouts of single liquid slurry is large cause being difficult to fill completely section of jurisdiction and the gap of excavating between wall, easily causes the sedimentation on ground excessive.3) it is long that single liquid is starched the initial setting time, and early strength cannot be provided fast.4) single liquid slurry is easily emanated, and gives transportation, stores and cause difficulty.
Summary of the invention
For addressing the above problem, the invention provides a kind of initial setting time short, early stage, later strength is high, is difficult for segregation, can effectively fill structure void, prevents tunnel duct piece floating and distortion; Agglutination after mixing, good fluidity, anti-dispersiveness is strong, easily guarantees grouting amount, the easily construction material of transportation and long period storage, and the shield synchronization slip casting construction method that relies on this construction material to complete.
The technical solution adopted for the present invention to solve the technical problems is: a kind of shield synchronization slip casting construction method, comprises the following steps:
1) in agitator, configure A liquid, respectively A liquid and B liquid are delivered in the A liquid slurry can and B liquid slurry can on shield machine; Described A liquid comprises the cement of 25.5wt%, the stabilizing agent of the swell soil of 2.6wt%, 0.4wt% and the water of 71.5wt%; Described B liquid is water glass;
2) described A liquid and B liquid are delivered to by A liquid grout pipe and B liquid grout pipe the blender that is arranged in shield machine shield tail place respectively;
3) in blender A liquid and/or B liquid by grouting at the tail of the shield machine pipe simultaneous implantation in shield tail structure void.
Be further used as the improvement of technical solution of the present invention, described stabilizing agent is one or more in naphthalene series high-efficiency water-reducing agent, polycarboxylic acid series high efficiency water reducing agent, melamine superplasticizer or amido sulfoacid series high-efficiency water reducer.
Be further used as the improvement of technical solution of the present invention, described step 2) in, the volume ratio of described A liquid and B liquid is 8 ︰ 1~15 ︰ 1.
Be further used as the improvement of technical solution of the present invention, step 2) in, when starting, slip casting first injects A liquid 1-2 minute, inject afterwards B liquid, and when slip casting finishes, first stop injecting B liquid and after ten minutes, stop again the injection of A liquid.
Be further used as the improvement of technical solution of the present invention, grouting at the tail of the shield machine pipe carries out multiple spot slip casting to the shield tail structure void in shield duct piece outside simultaneously.
Be further used as the improvement of technical solution of the present invention, in described step 1), load weighted swell soil is added to the water, and with mixer, stirs, and makes that swell soil is dispersed to be opened; In solution, add load weighted stabilizing agent, stir, then add load weighted cement in solution, after stirring, A liquid prepared complete.
Be further used as the improvement of technical solution of the present invention, described A liquid grout pipe, B liquid grout pipe and grouting at the tail of the shield machine Guan Jun are usingd frequency conversion type extrusion pump as slip casting power.
Be further used as the improvement of technical solution of the present invention, setting pressure sensor on A liquid grout pipe and B liquid grout pipe, in slip casting process, the moment is noted the injection pressure of A liquid and B liquid.
A shield synchronization slip casting construction material, comprises A liquid and B liquid, and wherein, described A liquid comprises the cement of 25.5wt%, the stabilizing agent of the swell soil of 2.6wt%, 0.4wt% and the water of 71.5wt%; Described B liquid is water glass, and the volume ratio of described A liquid and B liquid is 8 ︰ 1~15 ︰ 1.Described stabilizing agent is one or more in naphthalene series high-efficiency water-reducing agent, polycarboxylic acid series high efficiency water reducing agent, melamine superplasticizer or amido sulfoacid series high-efficiency water reducer.
Beneficial effect of the present invention: shield synchronization slip casting construction material provided by the invention comprises A liquid, B liquid.By composition and the content of each component in reasonable adjustment A liquid, and the mixed proportion of A liquid and B liquid, compressive strength, bleeding rate, time of setting and the mobility of control construction material, before mixing A liquid, B liquid, A liquid good stability, the easily storage of transportation and long period.Agglutination after the mixed liquor slurry that A liquid, B liquid are mixed to form mixes, good fluidity, anti-dispersiveness is strong, easily guarantees grouting amount; Simultaneously to enter the initial setting time short, early stage, later strength is high, is difficult for segregation, can effectively fill shield tail structure void, prevents tunnel duct piece floating and distortion, can effectively guarantee quality, safety and the progress of shield-tunneling construction for mixed liquor.The present invention is based on above-mentioned construction material, a kind of shield synchronization slip casting construction method be provided, after according to specific ratio, A liquid, B liquid being mixed, in shield machine construction, at shield tail simultaneous implantation in shield tail structure void.This shield synchronization slip casting construction method relies on A liquid, B liquid good performance before and after mixing, and in conjunction with a synchronous grouting technique, has solved slip casting afterwards in prior art, has synchronously noted the many difficult problems that exist in single liquid slurry, slip casting in time and secondary grouting.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the invention will be further described:
Fig. 1 is shield synchronization slip casting construction method schematic diagram of the present invention.
The specific embodiment
The invention provides a kind of shield synchronization slip casting construction material, comprise A liquid and B liquid, wherein, described A liquid comprises the cement of 25.5wt%, the stabilizing agent of the swell soil of 2.6wt%, 0.4wt% and the water of 71.5wt%; Described B liquid is water glass, and the volume ratio of described A liquid and B liquid is 8 ︰ 1~15 ︰ 1.Described stabilizing agent is one or more in naphthalene series high-efficiency water-reducing agent, polycarboxylic acid series high efficiency water reducing agent, melamine superplasticizer or amido sulfoacid series high-efficiency water reducer.
The biliquid slurry initial setting time that described A liquid and B liquid form is 10s~14s; 28d uniaxial compressive strength is not less than 2.5Mpa; There is good water resistant dispersiveness and the property noted, gelling time is generally 4~10h, within one day, be not less than 0.2MPa(and be equivalent to soft rock stratum unconfined compression strength), within 28 days, be not less than 2.5MPa(and be slightly larger than the natural compressive strength of strong-weathered rock), slurries calculus rate >95%, be fixed shrinkage factor <5%, liquid denseness 8~12cm, pulp stability (staticly settling the ratio of rear floating water volume and cumulative volume) is less than 5%.
In order to determine above-mentioned A fluid component proportioning, and the volume ratio of A liquid and B liquid to compare respectively test as follows:
Selecting the volume ratio of A liquid and B liquid is 8 ︰ 1, adjusts each constituent mass mark in A liquid, makes proportioning 1-5, as table 1.
Each component proportion in A liquid when the volume ratio of table 1 A liquid and B liquid is 8 ︰ 1
Press A fluid component proportioning in table 1, and the volume ratio of A liquid and B liquid, the key property of A liquid and B liquid mixed construction material is as table 2.
Table 2 is pressed the key property of 1-5 proportioning A liquid and B liquid mixed construction material in table 1
From table 1 and table 2,1., along with the reducing of A liquid water/binder ratio, the degree of mobilization of A liquid increases gradually, and after degree of mobilization is too large, A liquid is easily in slip casting tube wall deposition, and the of a specified duration grouting pipeline channel narrows that easily causes is from affecting mixing of A liquid and B liquid; After degree of mobilization is too little, in A liquid, easily occur the laminated segregation phenomenon of cement and water, so the degree of mobilization of A liquid must be in a suitable interval.2. along with the reducing of A liquid water/binder ratio, reduce the time of setting of the biliquid slurry that A liquid and B liquid form gradually.3. reducing along with A liquid water/binder ratio, biliquid slurry 1h, 1d, 7d, 28d compressive strength that A liquid and B liquid form all show the rule increasing gradually, wherein 1h compressive strength with A liquid water/binder ratio to reduce amplitude of variation less, measured proportioning 1 to the 28d compressive strength of proportioning 5 has all reached 2.5MPa, reduces as can be seen here water/binder ratio very obvious to the compressive strength of raising biliquid slurry.But water/binder ratio is not the smaller the better, because water/binder ratio is reduced to a certain degree and can impacts the property noted of slurries afterwards, thereby likely cause and biliquid slurry time of setting too fastly cause plugging, after water/binder ratio reduces in addition, cement consumption increases, thereby slip casting cost also increases economy variation, so choosing of biliquid pulp-water gray scale need to consider these factors.4. bleeding rate is the important indicator of reflection A liquid water retention, if bleeding rate is too high, to the intensity of test block, can have a significant impact, and is guaranteeing that under the condition that mobility is certain, bleeding rate is more low better.Consider technology and economic factor, A liquid optimum ratio 2.
Select the A liquid of proportioning 2, adjust the volume ratio of A liquid and B liquid, make proportioning 6-14, as table 3.
Table 3 selects the A liquid of proportioning 2 to adjust the volume ratio of A liquid and B liquid
Select the A liquid of proportioning 2, adjust the volume ratio of A liquid and B liquid, the key property of A liquid and B liquid mixed construction material is as table 4.
Table 4 is pressed the key property of 6-14 proportioning A liquid and B liquid mixed construction material in table 3
Experimental data result in his-and-hers watches 4 is analyzed and can be drawn the following conclusions:
1) along with the increasing of B liquid consumption in A liquid and B liquid biliquid slurry, show the rule increasing gradually the time of setting of biliquid slurry.When the volume ratio of A liquid and B liquid is greater than 8 ︰ 1, change little the time of setting of biliquid slurry, and basic expressions goes out the linear rule increasing; And when the consumption of B liquid is increased to certain value, there will be a flex point suddenly increasing the time of setting of biliquid slurry.
2) along with the increase of water glass consumption in A liquid and B liquid biliquid slurry, biliquid slurry 1h, the 1d of test specimen are, the compressive strength of 7d, 28d all shows the rule of first increases and then decreases, and wherein the compressive strength amplitude of variation of 1h changes comparatively obvious compared with compressive strength little and 1d, 7d and 28d.The data of surveying from test can find, in biliquid slurry, the consumption of water glass is not The more the better, when water glass consumption is within the specific limits time, can improve the early strength of biliquid slurry test specimen and along with the increase of consumption, intensity also increases; But after water glass consumption surpasses certain limit, run counter to desire, the intensity of biliquid slurry test specimen does not increase on the contrary and can sharply reduce.
In sum, take technology and economic factor into consideration, the volume ratio of A liquid and B liquid is preferably 8 ︰ 1~15 ︰ 1.
With reference to Fig. 1, the invention provides a kind of shield synchronization slip casting construction method, comprise the following steps:
1) in agitator, configure A liquid, respectively described A liquid and B liquid are delivered in the A liquid slurry can and B liquid slurry can on shield machine, described A liquid comprises the cement of 25.5wt%, the stabilizing agent of the swell soil of 2.6wt%, 0.4wt% and the water of 71.5wt%, described stabilizing agent is one or more in naphthalene series high-efficiency water-reducing agent, polycarboxylic acid series high efficiency water reducing agent, melamine superplasticizer or amido sulfoacid series high-efficiency water reducer, and described B liquid is water glass;
2) described A liquid and B liquid are delivered to by A liquid grout pipe and B liquid grout pipe the blender that is arranged in shield machine shield tail place respectively; When slip casting starts, first inject A liquid 1-2 minute, inject afterwards B liquid, and to make the volume ratio of described A liquid and B liquid be 8 ︰ 1~15 ︰ 1; When slip casting finishes, first stop injecting B liquid and after ten minutes, stop again the injection of A liquid.
3) in blender, A liquid and/or B liquid are by grouting at the tail of the shield machine pipe simultaneous implantation in shield tail structure void, and grouting at the tail of the shield machine pipe adopts the slip casting simultaneously of four some positions, is respectively 1 position, 5 positions, 7 positions and 11 positions; .
In described step 1), load weighted swell soil is added to the water, and with mixer, stirs, and makes that swell soil is dispersed to be opened; In solution, add load weighted stabilizing agent, stir, then add load weighted cement in solution, after stirring, A liquid prepared complete.
Described A liquid grout pipe, B liquid grout pipe and grouting at the tail of the shield machine Guan Jun are usingd frequency conversion type extrusion pump as slip casting power.
Setting pressure sensor on A liquid grout pipe and B liquid grout pipe, constantly notes the injection pressure of A liquid and B liquid in slip casting process, avoid because of injection pressure excessive, and the destruction that may cause part, section of jurisdiction or whole floating, faulting of slab ends, cracking, crushing or other form.
Certainly, the invention is not limited to above-mentioned embodiment, those of ordinary skill in the art also can make equivalent variations or replacement under the prerequisite without prejudice to spirit of the present invention, and the modification that these are equal to or replacement are all included in the application's claim limited range.

Claims (10)

1. a shield synchronization slip casting construction method, is characterized in that, comprises the following steps:
1) in agitator, configure A liquid, respectively A liquid and B liquid are delivered in the A liquid slurry can and B liquid slurry can on shield machine; Described A liquid comprises the cement of 25.5wt%, the stabilizing agent of the swell soil of 2.6wt%, 0.4wt% and the water of 71.5wt%; Described B liquid is water glass;
2) described A liquid and B liquid are delivered to by A liquid grout pipe and B liquid grout pipe the blender that is arranged in shield machine shield tail place respectively;
3) in blender A liquid and/or B liquid by grouting at the tail of the shield machine pipe simultaneous implantation in shield tail structure void.
2. shield synchronization slip casting construction method according to claim 1, is characterized in that: described stabilizing agent is one or more in naphthalene series high-efficiency water-reducing agent, polycarboxylic acid series high efficiency water reducing agent, melamine superplasticizer or amido sulfoacid series high-efficiency water reducer.
3. shield synchronization slip casting construction method according to claim 1, is characterized in that: described step 2), the volume ratio of described A liquid and B liquid is 8 ︰ 1~15 ︰ 1.
4. shield synchronization slip casting construction method according to claim 1, is characterized in that: described step 2), first inject A liquid 1-2 minute when slip casting starts, inject afterwards B liquid, first stop injecting B liquid and after ten minutes, stop the injection of A liquid again when slip casting finishes.
5. shield synchronization slip casting construction method according to claim 1, is characterized in that: grouting at the tail of the shield machine pipe carries out multiple spot slip casting to the shield tail structure void in shield duct piece outside simultaneously.
6. shield synchronization slip casting construction method according to claim 1, is characterized in that: in described step 1), load weighted swell soil is added to the water, and with mixer, stirs, and makes that swell soil is dispersed to be opened; In solution, add load weighted stabilizing agent, stir, then add load weighted cement in solution, after stirring, A liquid prepared complete.
7. shield synchronization slip casting construction method according to claim 1, is characterized in that: described A liquid grout pipe, B liquid grout pipe and grouting at the tail of the shield machine Guan Jun are usingd frequency conversion type extrusion pump as slip casting power.
8. shield synchronization slip casting construction method according to claim 1, is characterized in that: setting pressure sensor on A liquid grout pipe and B liquid grout pipe, in slip casting process, the moment is noted the injection pressure of A liquid and B liquid.
9. a shield synchronization slip casting construction material, is characterized in that: comprise A liquid and B liquid, wherein, described A liquid comprises the cement of 25.5wt%, the stabilizing agent of the swell soil of 2.6wt%, 0.4wt% and the water of 71.5wt%; Described B liquid is water glass, and the volume ratio of described A liquid and B liquid is 8 ︰ 1~15 ︰ 1.
10. shield synchronization slip casting construction material according to claim 9, is characterized in that: described stabilizing agent is one or more in naphthalene series high-efficiency water-reducing agent, polycarboxylic acid series high efficiency water reducing agent, melamine superplasticizer or amido sulfoacid series high-efficiency water reducer.
CN201410269820.0A 2014-06-17 A kind of shield synchronization slip casting construction method and construction material Active CN104074530B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410269820.0A CN104074530B (en) 2014-06-17 A kind of shield synchronization slip casting construction method and construction material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410269820.0A CN104074530B (en) 2014-06-17 A kind of shield synchronization slip casting construction method and construction material

Publications (2)

Publication Number Publication Date
CN104074530A true CN104074530A (en) 2014-10-01
CN104074530B CN104074530B (en) 2016-11-30

Family

ID=

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104481548A (en) * 2014-11-01 2015-04-01 中铁一局集团有限公司 Tunnel face cavity processing method for shield tunnel construction
CN105257303A (en) * 2015-10-28 2016-01-20 广州广隧机电设备有限公司 Construction method capable of achieving synchronous double-grout grouting during shield tunneling
CN106007639A (en) * 2016-05-19 2016-10-12 佛山市泰迪斯材料有限公司 Preparation method of high-viscosity thixotropic slurry
CN106948828A (en) * 2017-05-07 2017-07-14 中铁十八局集团有限公司 A kind of device that secondary grouting is carried out using shield synchronization slip casting equipment
CN107120121A (en) * 2017-05-31 2017-09-01 中建三局基础设施工程有限公司 A kind of shield-tunneling construction supplements slip casting anti-settling control method in real time
CN107165655A (en) * 2017-06-29 2017-09-15 山东科技大学 A kind of backfilling grouting method in the driving for complete-section tunnel boring machine
CN107235688A (en) * 2017-06-26 2017-10-10 浙江德清天和新型建材有限公司 A kind of GIL pipe galleries behind waterproof grout material and its grouting method
CN107387121A (en) * 2017-08-15 2017-11-24 中铁工程装备集团有限公司 The all-hydraulic coupling control system of novel double liquid grout injecting
CN107459324A (en) * 2017-08-11 2017-12-12 山东大学 A kind of shield anti-stratum settlement housing packing material and preparation method thereof
CN107698226A (en) * 2017-09-06 2018-02-16 合诚工程咨询集团股份有限公司 A kind of cement-silicate injecting paste material
CN108166983A (en) * 2018-01-11 2018-06-15 河海大学 With the novel shield shield tail grouting behind shaft or drift lining liquid for preventing from being lost in
CN108298912A (en) * 2018-03-16 2018-07-20 中铁十二局集团有限公司 The preparation method of synchronous grouting concrete and synchronous grouting concrete
CN108412517A (en) * 2018-02-24 2018-08-17 北京交通大学 Synchronous grouting device and method for water rich strata shield lower slope section driving
CN108442932A (en) * 2018-02-27 2018-08-24 北京交通大学 One kind being suitable for large diameter shield tunnel simultaneous grouting slurry
CN108585648A (en) * 2018-05-31 2018-09-28 成都金玉雄辉建筑工程有限公司 Grouting serous fluid formula and preparation method thereof
CN108751873A (en) * 2018-08-13 2018-11-06 河南省建筑科学研究院有限公司 The shield machine synchronous grouting material and preparation method thereof of fine powder is recycled containing building waste
CN109534769A (en) * 2018-12-14 2019-03-29 沈阳建筑大学 A kind of application method of magnetorheological intelligent shield grouting material
CN109595031A (en) * 2018-11-02 2019-04-09 山东大学 Three liquid support with backfilling construction methods and system in shield tunnel
CN110255988A (en) * 2019-06-10 2019-09-20 山东宏禹工程科技有限公司 A kind of synchronous grouting material of foam improvement
CN110552721A (en) * 2019-10-23 2019-12-10 阳铁机械(杭州)有限公司 double-liquid wall post-grouting equipment
CN110630293A (en) * 2019-10-30 2019-12-31 阳铁机械(杭州)有限公司 Double-liquid and method for grouting wall
CN110790561A (en) * 2019-05-29 2020-02-14 南京城市地下空间工程研究院有限公司 Vibration damping material based on subway rail transit shield construction and preparation method thereof
CN111170711A (en) * 2020-01-07 2020-05-19 河海大学 Set-time-controllable grouting slurry for wall back grouting, grouting process and grouting device
CN112723836A (en) * 2021-02-03 2021-04-30 中国矿业大学(北京) Shield excavation gap synchronous grouting slurry for water-rich silty soil stratum
CN113074000A (en) * 2021-04-16 2021-07-06 吉林大学 Y-shaped tunnel grouting structure and matched grouting method
CN114180930A (en) * 2021-12-31 2022-03-15 中国海洋大学 High-water-pressure ultra-large-diameter underwater shield tunnel double-liquid grouting slurry, process and application
CN114352316A (en) * 2021-11-30 2022-04-15 中交隧道工程局有限公司 Slurry mixing system for synchronous double-liquid grouting of shield tunnel
CN115012994A (en) * 2022-06-10 2022-09-06 福建中天交通工程技术服务有限公司 Shield synchronous double-liquid grouting process

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101654356A (en) * 2009-09-02 2010-02-24 中铁二局股份有限公司 Shield method tunnel synchronous grouting slurry applied to compound stratum with upper soft part and lower hard part
CN102733821A (en) * 2012-06-19 2012-10-17 浙江大学 Secondary double-liquid slurry re-grouting method capable of effectively controlling surface deformation
CN202832567U (en) * 2012-09-14 2013-03-27 广东华隧建设股份有限公司 Single or double grout injection system of shield tunneling machine
CN103396065A (en) * 2013-08-23 2013-11-20 中铁十四局集团有限公司 Synchronous grouting grout for shield construction control and grouting method thereof
CN103821539A (en) * 2013-10-15 2014-05-28 中铁工程装备集团有限公司 Shield tunneling machine shield tail synchronous embedded-type double-liquid grouting device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101654356A (en) * 2009-09-02 2010-02-24 中铁二局股份有限公司 Shield method tunnel synchronous grouting slurry applied to compound stratum with upper soft part and lower hard part
CN102733821A (en) * 2012-06-19 2012-10-17 浙江大学 Secondary double-liquid slurry re-grouting method capable of effectively controlling surface deformation
CN202832567U (en) * 2012-09-14 2013-03-27 广东华隧建设股份有限公司 Single or double grout injection system of shield tunneling machine
CN103396065A (en) * 2013-08-23 2013-11-20 中铁十四局集团有限公司 Synchronous grouting grout for shield construction control and grouting method thereof
CN103821539A (en) * 2013-10-15 2014-05-28 中铁工程装备集团有限公司 Shield tunneling machine shield tail synchronous embedded-type double-liquid grouting device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
夏诗梁: "双液注浆在大型泥水平衡盾构施工中的应用", 《世界隧道》 *

Cited By (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104481548A (en) * 2014-11-01 2015-04-01 中铁一局集团有限公司 Tunnel face cavity processing method for shield tunnel construction
CN104481548B (en) * 2014-11-01 2016-05-11 中铁一局集团有限公司 A kind of shield tunnel construction face void handling method
CN105257303A (en) * 2015-10-28 2016-01-20 广州广隧机电设备有限公司 Construction method capable of achieving synchronous double-grout grouting during shield tunneling
CN106007639A (en) * 2016-05-19 2016-10-12 佛山市泰迪斯材料有限公司 Preparation method of high-viscosity thixotropic slurry
CN106948828A (en) * 2017-05-07 2017-07-14 中铁十八局集团有限公司 A kind of device that secondary grouting is carried out using shield synchronization slip casting equipment
CN107120121A (en) * 2017-05-31 2017-09-01 中建三局基础设施工程有限公司 A kind of shield-tunneling construction supplements slip casting anti-settling control method in real time
CN107120121B (en) * 2017-05-31 2019-10-25 中建三局基础设施工程有限公司 A kind of shield-tunneling construction supplements slip casting anti-settling control method in real time
CN107235688A (en) * 2017-06-26 2017-10-10 浙江德清天和新型建材有限公司 A kind of GIL pipe galleries behind waterproof grout material and its grouting method
CN107165655A (en) * 2017-06-29 2017-09-15 山东科技大学 A kind of backfilling grouting method in the driving for complete-section tunnel boring machine
CN107459324A (en) * 2017-08-11 2017-12-12 山东大学 A kind of shield anti-stratum settlement housing packing material and preparation method thereof
CN107459324B (en) * 2017-08-11 2019-09-24 山东大学 A kind of shield anti-stratum settlement shell packing material and preparation method thereof
CN107387121A (en) * 2017-08-15 2017-11-24 中铁工程装备集团有限公司 The all-hydraulic coupling control system of novel double liquid grout injecting
CN107698226A (en) * 2017-09-06 2018-02-16 合诚工程咨询集团股份有限公司 A kind of cement-silicate injecting paste material
CN108166983B (en) * 2018-01-11 2020-01-17 河海大学 Novel shield tail wall back grouting liquid capable of preventing loss
CN108166983A (en) * 2018-01-11 2018-06-15 河海大学 With the novel shield shield tail grouting behind shaft or drift lining liquid for preventing from being lost in
CN108412517A (en) * 2018-02-24 2018-08-17 北京交通大学 Synchronous grouting device and method for water rich strata shield lower slope section driving
CN108442932A (en) * 2018-02-27 2018-08-24 北京交通大学 One kind being suitable for large diameter shield tunnel simultaneous grouting slurry
CN108298912A (en) * 2018-03-16 2018-07-20 中铁十二局集团有限公司 The preparation method of synchronous grouting concrete and synchronous grouting concrete
CN108585648A (en) * 2018-05-31 2018-09-28 成都金玉雄辉建筑工程有限公司 Grouting serous fluid formula and preparation method thereof
CN108751873A (en) * 2018-08-13 2018-11-06 河南省建筑科学研究院有限公司 The shield machine synchronous grouting material and preparation method thereof of fine powder is recycled containing building waste
CN109595031A (en) * 2018-11-02 2019-04-09 山东大学 Three liquid support with backfilling construction methods and system in shield tunnel
CN109534769A (en) * 2018-12-14 2019-03-29 沈阳建筑大学 A kind of application method of magnetorheological intelligent shield grouting material
CN110790561A (en) * 2019-05-29 2020-02-14 南京城市地下空间工程研究院有限公司 Vibration damping material based on subway rail transit shield construction and preparation method thereof
CN110255988A (en) * 2019-06-10 2019-09-20 山东宏禹工程科技有限公司 A kind of synchronous grouting material of foam improvement
CN110552721A (en) * 2019-10-23 2019-12-10 阳铁机械(杭州)有限公司 double-liquid wall post-grouting equipment
CN110630293A (en) * 2019-10-30 2019-12-31 阳铁机械(杭州)有限公司 Double-liquid and method for grouting wall
CN111170711A (en) * 2020-01-07 2020-05-19 河海大学 Set-time-controllable grouting slurry for wall back grouting, grouting process and grouting device
CN112723836A (en) * 2021-02-03 2021-04-30 中国矿业大学(北京) Shield excavation gap synchronous grouting slurry for water-rich silty soil stratum
CN113074000A (en) * 2021-04-16 2021-07-06 吉林大学 Y-shaped tunnel grouting structure and matched grouting method
CN114352316A (en) * 2021-11-30 2022-04-15 中交隧道工程局有限公司 Slurry mixing system for synchronous double-liquid grouting of shield tunnel
CN114352316B (en) * 2021-11-30 2024-03-19 中交隧道工程局有限公司 Slurry stirring system for synchronous double-liquid grouting of shield tunnel
CN114180930A (en) * 2021-12-31 2022-03-15 中国海洋大学 High-water-pressure ultra-large-diameter underwater shield tunnel double-liquid grouting slurry, process and application
CN115012994A (en) * 2022-06-10 2022-09-06 福建中天交通工程技术服务有限公司 Shield synchronous double-liquid grouting process
WO2023236250A1 (en) * 2022-06-10 2023-12-14 福建中天交通工程技术服务有限公司 Shield synchronous double-liquid grouting process

Similar Documents

Publication Publication Date Title
CN102241495B (en) Ultrafine mixed sand concrete by using additive
CN106946522A (en) A kind of shield synchronization slip casting construction material
CN101328052B (en) Hill sand inorganic grouting material, preparation and construction method thereof
Liu et al. Effects of cementitious grout components on rheological properties
CN102267809B (en) High strength cement mortar for connecting steel bars, and preparation method thereof
CN103951353B (en) For grouting material that road is reinforced and preparation method thereof
CN101603427A (en) Shield synchronization slip casting construction technology
CN107698226A (en) A kind of cement-silicate injecting paste material
CN101935198B (en) Environment-friendly shield construction single-liquid synchronous grouting slurry
CN110105031A (en) A kind of selfreparing grouting material and preparation method thereof
CN107902998A (en) A kind of lightweight foam soil prepared using alum clay tailing and preparation method thereof
CN104844121A (en) Non-shrinkage sleeve grouting material and preparation method thereof
CN108129110B (en) A kind of high-speed railway large cross-section tunnel prestressed cable anchorage paste materials
CN108609972A (en) A kind of high-strength fast hard bolt grouting material
CN108569877A (en) A kind of early-strength tunnel grouting material
CN103539416A (en) Special novel shear-resistant mortar for synchronous grouting and preparation method thereof
CN105271888B (en) It is a kind of suitable for modified additive of low quality aggregate concrete and preparation method thereof
CN104074530A (en) Shield synchronous grouting construction method and construction material
CN103922658A (en) Underwater anti-dispersion cement paste and preparation method thereof
CN108218359B (en) A kind of cement base high-performance microdilatancy filling and injecting slurry material
CN114315243B (en) Environment-friendly self-compacting premixed concrete and production process thereof
CN110282899A (en) A kind of shield mortar coagulation time regulator and its preparation method and application
CN108585713A (en) A kind of injecting paste material of cement mortar
CN104074530B (en) A kind of shield synchronization slip casting construction method and construction material
CN103924579A (en) Construction method of vacuum pre-pressing foundation processing low-mixing-amount cement-soil mixed sealing wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant