CN104074527B - Face-upward slope combined supporting Tunnel Portal Structures - Google Patents
Face-upward slope combined supporting Tunnel Portal Structures Download PDFInfo
- Publication number
- CN104074527B CN104074527B CN201410340086.2A CN201410340086A CN104074527B CN 104074527 B CN104074527 B CN 104074527B CN 201410340086 A CN201410340086 A CN 201410340086A CN 104074527 B CN104074527 B CN 104074527B
- Authority
- CN
- China
- Prior art keywords
- portal
- headwall
- tunnel
- outside
- face
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
Face-upward slope combined supporting Tunnel Portal Structures, this structure stress is good, landform strong adaptability, to improve design efficiency, facilitates site operation, saves construction costs.Including portal headwall (10), tunnel-liner (30) be positioned at outside tunnel that outside the hole of both sides barricade (20).The front of described portal headwall (10) is integrated with tunnel-liner (30) end face consolidation;The segmental arc that the both lateral sides of described portal headwall (10) has outside side and extends forward, segmental arc is smoother with barricade outside hole (20) to be connected as one, and the shape of segmental arc is close to the optimal distance of Wall back pressure.
Description
Technical field
The present invention relates to railway tunnel work, face upward slope combined supporting tunnel portal knot particularly to one
Structure.
Background technology
All tunnel portals all should arrange portal structure, mainly includes retaining structure and discharge structure,
Gear structure is used for supporting the Portal Section soil body, and domatic for earth's surface water is collected by discharge structure, introduces perimeter trench.
The selection of portal pattern should be in conjunction with combined factors such as the landform at hole, geological conditions, neighboring buildings than choosing
Determine.The most conventional tunnel portal, by whether arranging portal headwall, can be divided into headwall class portal and nothing
The big class of headwall class portal two.Headwall class portal has headwall formula, step, pillar, aileron formula, ear wall
The dark hole such as formula portal, also includes the open cut tunnel portals such as single pressure type, voltage bias type, ears wall.The hole of class without headwall
Door mainly has vertical cut formula, inclined cutout, the portals such as inclined cutout that fall.
The headwall class portal of design and construction, generally arranges class in the front of tunnel portal and side at present
It is similar to the retaining structure of gravity retaining wall.Front portion is referred to as portal headwall, two collateral gear knot outside hole
Structure is referred to as barricade outside hole.Narrow upper width under portal headwall is general, middle part is connected with lining cutting, two side lower parts and
Outside hole, barricade is connected, and both sides are partially submerged into surrounding soil 0.5~1.5m higher than barricade, and from bottom to top
Widen in step-like.Portal headwall relies on liner structure and surrounding soil to provide constraint, and a gear faces upward slope soil
Body.Outside hole, barricade is generally parallel to line direction or is distributed in toed-out, orthogonal with portal headwall or oblique
Hand over, and set the breast slope that 1:0.1 to 1:0.25 does not waits, typically grow 5~10m, high 6~10m.Keep off outside hole
Wall is mainly used in a gear slope soil.The discharge structure of headwall class portal is usually, and sets behind at headwall
Put ditch, before flowing into wall through headwall after collecting domatic water, by the ditch being arranged at outside hole on barricade,
Flow into roadbed ditch.Headwall class portal structure support capacity is strong, and safety is high.Portal headwall is higher than lining
Build about 2m, can prevent facing upward slope soil stone and tumble, there is certain rockfall protective action.But it is main
There is some not enough: (1) headwall is planar structure, differs with the optimal distance of Wall back pressure
Relatively big, headwall bears bigger tension and shear stress, is unfavorable for structure stress;(2) headwall embeds
Periphery soil body certain depth, its size changes with topography variation, and structure is complicated, on-the-spot slotting excavation,
Constructional difficulties;(3) headwall and barricade junction structural mutation outside hole, connect the most smoother, and stress is concentrated,
Easily cracking.(4) headwall and barricade press the calculating of Gravity Retaining Wall independent design, independent rib respectively
Slope and face upward slope, does not considers both couplings, it is impossible to play entirety gear effect.(5) due to end
Wall both sides embed the soil body, and wall back of the body hydrops cannot be drained, it is necessary to through headwall, and arranges water on barricade
Ditch, complex process, and heavy rain a large amount of insulated stream in season enter roadbed ditch, may exceed roadbed ditch
Drainability, jeopardizes traffic safety.
The portal of class without headwall is not provided with traditional headwall and barrier wall structure, lining of tunnel portal section structure is poured
Become vertical cut, cut sth. askew and to shape of cutting sth. askew, for preventing surface water from flowing into tunnel, be provided with the brim of a hat, formed
Vertical cut formula, inclined cutout and the portal of falling cut, such has " simplicity generosity, both artistic and practical, protection ring
Border " advantage, for Railway Tunnel, also there is the effect of slow down air kinetic effect, but
Such portal landform adaptability is poor, is only applicable to the hole that landform is more mild, face-upward slope is relatively low,
Lining of tunnel portal section is exposed, without earthing, it is difficult to the impact of opposing rockfall, is not therefore suitable for crag
The hole that falling rocks is grown, it is difficult to large-scale application in mountain tunnel, and just cut and the portal of falling cut
Construction complexity, need to customize special template, relatively costly.
Summary of the invention
The technical problem to be solved is to provide a kind of face-upward slope combined supporting tunnel portal knot
Structure, this structure stress is good, landform strong adaptability, to improve design efficiency, facilitates site operation,
Save construction costs.
The technical solution adopted for the present invention to solve the technical problems is as follows:
The face-upward slope combined supporting Tunnel Portal Structures of the present invention, including portal headwall, tunnel-liner and
It is positioned at outside tunnel barricade outside the hole of both sides, it is characterized in that: the front of described portal headwall and tunnel-liner
End face consolidation is integrated;The arc that the both lateral sides of described portal headwall has outside side and extends forward
Section, segmental arc is smoother with barricade outside hole to be connected as one, and the shape of segmental arc is close to Wall back pressure
Optimal distance.
Described portal headwall arranges, with barricade outside hole, the gutter connected behind.
The invention has the beneficial effects as follows, portal headwall has its shape reasonable arch close to Wall back pressure
The segmental arc of axis, shear stress and the tension of headwall are less, compared with conventional planar headwall, knot
Structure stress performance is superior, can reduce headwall thickness, reduces construction costs;Barricade and portal headwall outside hole
The smoother connection of segmental arc, smoothly transits, and effectively eliminates stress and concentrates, improves structure stress condition,
Can effectively ensure that hole safety;Portal merges preferably with massif around on the whole, lines are smoother, beautiful
See generous;Headwall arranges, with barricade outside hole, the gutter connected behind, and surface water directly collects inflow certainly
So ditch, construction is simple;Be not only suitable for dark hole, be also applied for open cut tunnel, landform strong adaptability, design and
Construct simple and feasible;Portal headwall front exceeds tunnel-liner certain altitude, and portal headwall can return behind
Banket stone, can effectively protect rockfall impact, it is to avoid positive cut and the portal of falling cut liner structure
The shortcoming of rockfall impact capacity exposed, anti-difference, preferably combines tradition headwall class portal and cuts
The formula portal of cutting a little, overcomes both deficiencies.
Accompanying drawing explanation
This specification includes following two width accompanying drawings:
Fig. 1 is the front elevation of face-upward slope combined supporting Tunnel Portal Structures of the present invention;
Fig. 2 is the top view of face-upward slope combined supporting Tunnel Portal Structures of the present invention;
Fig. 3 is face-upward slope combined supporting Tunnel Portal Structures wall backwater ditch sectional drawing of the present invention.
Component shown in figure, toponym and corresponding labelling: barricade outside portal headwall 10, hole
20, tunnel-liner 30, gutter 40.
Detailed description of the invention
Below in conjunction with the accompanying drawings the present invention is further described.
Seeing figures.1.and.2, the face-upward slope combined supporting Tunnel Portal Structures of the present invention, including portal
Headwall 10, tunnel-liner 30 and be positioned at outside tunnel barricade 20 outside the hole of both sides.Described portal headwall
The front of 10 is integrated with tunnel-liner 30 end face consolidation.The both lateral sides of described portal headwall 10
The segmental arc having outside side and extend forward, segmental arc is smoother with barricade outside hole 20 to be connected as one,
The shape of segmental arc is close to the optimal distance of Wall back pressure.Outside portal headwall and hole, barricade sets behind
Put the gutter 40 of connection.Outside portal headwall and hole barricade can Combining with terrain geological conditions use about
Contour symmetrical structure, it is possible to unsymmetric structure the most contour about employing.
Compared with conventional planar headwall, structure tension performance is superior, can reduce headwall thickness, reduces
Construction costs.Portal headwall 10 segmental arc can realize the smoother of barricade 20 outside portal headwall 10 and hole
Connect, eliminate stress to greatest extent and concentrate, improve structure stress condition.Wall the back of the body side slope and face upward
The smoother transition of slope soil excavation, improves the self-stability of the soil body, reduces landslide risk.Portal headwall
10 are firmly connected with barricade 20 outside tunnel-liner 30 and hole, and three mutually retrains, and mutually supports,
Improve stability and the safety of portal retaining structure.The circle of barricade 20 outside portal headwall 10 and hole
Along connecting, change tradition portal side slope and independently prop up, with facing upward slope, the design concept kept off, form face-upward slope connection
Close supporting construction, give full play to the integer support effect of portal structure.Keep off outside portal headwall 10 and hole
Wall 20 arranges the gutter 40 of connection behind, and surface water directly collects inflow nature ditch, and draining is unobstructed,
Construction is simple.
With reference to Fig. 1, the height in described portal headwall 10 front is more than the height of tunnel-liner 30.Hole
Door headwall 10 can backfill soil stone behind, can effectively protect rockfall impact, it is to avoid positive cut with
The shortcoming of the portal of falling cut liner structure rockfall impact capacity exposed, anti-difference, preferably combines
Tradition headwall class portal and cutting face a little, overcome both deficiencies.
The above the one of face-upward slope combined supporting Tunnel Portal Structures of the present invention that simply explains through diagrams
A little principles, are not intended to the present invention is confined to shown and described concrete structure and usage range, neck
In territory, therefore every corresponding amendment being likely utilized and equivalent, belong to the present invention and applied for
The scope of the claims.
Claims (3)
1. face-upward slope combined supporting Tunnel Portal Structures, including portal headwall (10), tunnel-liner (30)
Outside the hole of both sides barricade (20) with being positioned at outside tunnel, it is characterized in that: described portal headwall (10)
Front is integrated with tunnel-liner (30) end face consolidation;The both lateral sides of described portal headwall (10)
Outside the segmental arc having outside side and extend forward, segmental arc and hole, barricade (20) is smoother is connected as one
Body, the shape of segmental arc is close to the optimal distance of Wall back pressure.
2. face-upward slope combined supporting Tunnel Portal Structures as claimed in claim 1, is characterized in that:
The height in described portal headwall (10) front is more than the height of tunnel-liner (30).
3. face-upward slope combined supporting Tunnel Portal Structures as claimed in claim 1, is characterized in that:
Described portal headwall (10) arranges the gutter (40) connected behind with barricade outside hole (20).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410340086.2A CN104074527B (en) | 2014-07-17 | 2014-07-17 | Face-upward slope combined supporting Tunnel Portal Structures |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410340086.2A CN104074527B (en) | 2014-07-17 | 2014-07-17 | Face-upward slope combined supporting Tunnel Portal Structures |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104074527A CN104074527A (en) | 2014-10-01 |
CN104074527B true CN104074527B (en) | 2016-08-24 |
Family
ID=51596093
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410340086.2A Active CN104074527B (en) | 2014-07-17 | 2014-07-17 | Face-upward slope combined supporting Tunnel Portal Structures |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104074527B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107218057B (en) * | 2017-06-15 | 2024-01-05 | 中铁二院工程集团有限责任公司 | Drainage portal structure suitable for water-rich stratum |
CN109973112B (en) * | 2019-04-26 | 2024-02-27 | 四川路桥华东建设有限责任公司 | Super-large-dip-angle narrow-space tunnel anchor cable saddle gantry system and installation method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08177387A (en) * | 1994-12-22 | 1996-07-09 | Fujita Corp | Tunnel entrance and construction method therefor |
JP2004124418A (en) * | 2002-09-30 | 2004-04-22 | Nishimatsu Constr Co Ltd | Lining wall for mine mouth part of tunnel |
CN101182773A (en) * | 2007-12-20 | 2008-05-21 | 中铁十二局集团有限公司 | Railway large-bore tunnel oval-shaped table-board cap brim bias-cutting type hole-door construction method |
CN103016023A (en) * | 2012-12-31 | 2013-04-03 | 中铁第四勘察设计院集团有限公司 | Bell mouth tunnel portal structure |
KR20130063692A (en) * | 2011-12-07 | 2013-06-17 | 한국과학기술원 | Tunnel structure for reducing micro pressure wave in tunnel |
CN204060708U (en) * | 2014-07-17 | 2014-12-31 | 中铁二院工程集团有限责任公司 | Face-upward slope combined supporting Tunnel Portal Structures |
-
2014
- 2014-07-17 CN CN201410340086.2A patent/CN104074527B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08177387A (en) * | 1994-12-22 | 1996-07-09 | Fujita Corp | Tunnel entrance and construction method therefor |
JP2004124418A (en) * | 2002-09-30 | 2004-04-22 | Nishimatsu Constr Co Ltd | Lining wall for mine mouth part of tunnel |
CN101182773A (en) * | 2007-12-20 | 2008-05-21 | 中铁十二局集团有限公司 | Railway large-bore tunnel oval-shaped table-board cap brim bias-cutting type hole-door construction method |
KR20130063692A (en) * | 2011-12-07 | 2013-06-17 | 한국과학기술원 | Tunnel structure for reducing micro pressure wave in tunnel |
CN103016023A (en) * | 2012-12-31 | 2013-04-03 | 中铁第四勘察设计院集团有限公司 | Bell mouth tunnel portal structure |
CN204060708U (en) * | 2014-07-17 | 2014-12-31 | 中铁二院工程集团有限责任公司 | Face-upward slope combined supporting Tunnel Portal Structures |
Non-Patent Citations (1)
Title |
---|
公路隧道洞门设计的探讨;翟可;《隧道建设》;20001231;第35-39页 * |
Also Published As
Publication number | Publication date |
---|---|
CN104074527A (en) | 2014-10-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203308470U (en) | Cover arch structure suitable for large-section unsymmetrical loading tunnel portal section | |
CN104480974B (en) | Reverse seepage drain system suitable for upstream type tailings pond and upstream type tailings pond | |
CN105986836B (en) | A kind of single-track railway tunnel substrate guarded drainage strengthen the system | |
CN105927272A (en) | Floor anchoring constraint tunnel lining structure | |
CN106087953B (en) | A kind of drainage and construction method for preventing and treating mountain area large size spoil ground mud-rock flow | |
CN204060708U (en) | Face-upward slope combined supporting Tunnel Portal Structures | |
CN105862665A (en) | Small watershed comprehensive management-fertile farmland reengineering novel technology | |
CN104074527B (en) | Face-upward slope combined supporting Tunnel Portal Structures | |
CN105649645A (en) | Railway bridge-tunnel connected integrated structure | |
CN102535491A (en) | Embedded water permeable plate water collection siphon drainage method for side slope ground water interception | |
CN102425175B (en) | Reinforcement protective structure of large spoil disposal area in mountainous area | |
CN104164878A (en) | Earth excavation technology for ultra-large type deep foundation pit | |
CN205444395U (en) | Be equipped with drain pipe in hole of permeating water on pipe wall | |
CN207211100U (en) | Vertical shaft type powerhouse of hydropower station structure | |
CN201183938Y (en) | Semi-arch oblique cylinder shed hole structure | |
CN207525758U (en) | A kind of reinforced Structure About Soldier Pile | |
CN205677668U (en) | A kind of single-track railway tunnel substrate guarded drainage strengthening system | |
CN209040840U (en) | A kind of evagination semi shield oil cylinder and mud water balance push bench | |
CN208220794U (en) | A kind of small serrated knife of shield machine | |
CN109869163A (en) | A kind of construction method and structure of tunnel | |
CN204370328U (en) | A kind of water-permeable pipe connector | |
CN107386222A (en) | Vertical shaft type powerhouse of hydropower station structure | |
CN204781274U (en) | Tunnel portal faces upward on limit sloping catch water drain structure | |
CN210164024U (en) | Fill husky cable pit drainage system | |
CN206800423U (en) | Subsiding land counterfort virescence brick |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |